About this file
This is a General Contracting Pricing Sheet (Attachment A) for RFP 20-0147, which appears to be issued by a school district or educational institution managing multiple facilities including White Academy, Ludington Magnet Middle School, and Adult Education East. The pricing sheet establishes unit pricing structures for both facility-specific lump sum costs and itemized work categories across the three named locations. The document outlines pricing requirements for materials and services including painting, flooring, doors, hardware, lighting fixtures, lockers, and toilet fixtures, along with various demolition and refinishing work measured in square feet or by individual unit counts.
The pricing sheet also establishes hourly labor rates for multiple trade classifications including carpenters, masons, painters, demolition laborers, general laborers, cleaning labor, plumbers, pipe fitters, and electricians. Bidders are required to submit unit prices for both material items and labor rates per hour, which will serve as the basis for contract pricing across the three facility locations. The document does not specify contract duration, renewal options, funding sources, or set-aside categories, as it functions solely as a pricing template for bid submission rather than containing those contractual terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 General Contracting RFP 20-0147 Attachment A Pricing Sheet
| Facility | Lump Sum Cost |
| White Academy | $ |
| Ludington Magnet Middle School | $ |
| Adult Education East | $ |
| Unit Items | Unit Prices | Per measure |
| Painting | /sq. ft. | |
| Electrostatic painting | /sq. ft. | |
| ACT and grid | /sq. ft. | |
| VCT (R&R) | /sq. ft. | |
| 3070 Door & Hardware w/ lite | each | |
| 6' VDB (white) | each | |
| 8' VDB (white) | each | |
| LED light fixture (2x4) | each | |
| Electric Water Cooler | each | |
| Wood flooring refinish/patching | /sq. ft. | |
| Caulking (latex) | /lft. | |
| Locker (12" x 69" x 15") | each | |
| Toilet w/ flush valve (R&R) | each | |
| 4' VDB (white) | each | |
| Exit light | each | |
| Fire Extinguisher cabinet | each | |
| LED light fixture (1x4) | each |
| Labor Items | Labor Rates | Per measure |
| Carpenter | /per hour | |
| Mason (brick, block) | /per hour | |
| Painter | /per hour | |
| Demolition (laborer) | /per hour | |
| General laborer | /per hour | |
| Labor (final cleaning) | /per hour | |
| Plumber | /per hour | |
| Pipe Fitter | /per hour | |
| Electrician | /per hour |