This is Amendment #1 to Request for Bid (RFB) 20-0056 issued by the University of Wisconsin-Madison Purchasing Services for the procurement of a nonhuman primate rack and cage washer. The amendment adds Attachment H, which includes CAD drawings of existing facility plans, room drawings, and photographs of an existing rail system from another building to assist vendors with understanding the installation environment. The amendment also expands Attachment C to include a dedicated section for optional additional items. Bidders must acknowledge receipt and compliance with this amendment; failure to return the amendment documentation will result in the assumption that the original bid meets all amendment conditions. Bid prices and terms are firm for sixty (60) days from the date of bid opening. The primary deliverable consists of one nonhuman primate rack and cage washer meeting specifications outlined in Attachment B, with optional line items for training, shipping, and installation if not included in equipment pricing.
Pricing for the primary equipment item, training, and shipping/installation must be itemized on the revised Attachment C. Optional pricing items include first-, second-, and third-year service contracts covering software updates and upgrades following warranty expiration, quoted as firm annual costs. Vendors may also propose optional accessories, upgrades, and consumables necessary for equipment operation. Consumable pricing should be held firm for one year from the delivery date, with annual increases limited to a maximum specified percentage over a five-year period. All bids must include utility requirements specifications for installation and operation. Attachment H provides detailed technical information regarding existing infrastructure, including notes that all effluent is tempered before entering the city sewer and that alkaline and acid cycle temperatures are not guaranteed but could be configured as needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20-0056 RFB.docx | DOCX document | |
| 20-0056 RFB AMD 2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT #1
Bid No: 20-0056
UNIVERSITY OF WISCONSIN
MADISON, WISCONSIN 53715-1218
Bid prices and terms shall be firm for sixty (60) days from the date of bid opening, unless otherwise specified in this Request for Bid by the UW-Madison Purchasing Services.
Unless otherwise noted, public openings will be on the date and time specified. Award(s), if any, will be made as soon thereafter as possible.
The bid abstract will be on file and is open to public inspection only after award determination has been made.
If NO BID (check here) ☐ and return.
20-0056 / AMENDMENT #1 / NONHUMAN PRIMATE RACK AND CAGE WASHER Amendment #1 is issued to add Attachment H which provides vendors with a cad file, room drawings, and pictures of existing rail system in a different building; and amend Attachment C to provide a space for optional additional items. If this amendment is not returned, it shall be assumed your original bid meets all conditions of the amendment. All other terms and conditions remain the same. Please revise and submit your bid accordingly. Please replace pages 24 & 25 of 37 noting the addition to Attachment C and add Attachment H - pages 38 - 41.
In signing this bid, we have read and fully understand and agree to all terms, conditions and specifications and acknowledge that the UW-Madison Purchasing Services bid document on file shall be the controlling document for any resulting contract. We certify that we have not, either directly or indirectly, entered into any contract or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a bid; that this bid has been independently arrived at without collusion with any other bidder, competitor or potential competitor; that this bid has not been knowingly disclosed prior to the opening of bids to any other bidder or competitor; that the stated statement is accurate under penalty of perjury. I certify that the information I have provided in this bid is true and I understand that any false, misleading or missing information may disqualify the bid.
By submitting a bid, the bidder certifies that no relationship exists between the bidder and the University that interferes with fair competition or is a Conflict of Interest, and no relationship exists between such bidder and another person or firm that constitutes a Conflict of Interest. Further, bidder certifies that no employee of the University whose duties relate to this request for bid assisted the bidder in preparing the bid in any way other than in his or her official capacity and scope of employment.
The Bidder certifies by submission of the bid that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency.
Company Name:
Company Street Address:
Company City, State & Zip: Date:
Signature:
Type or Print Name:
Title:
Telephone Number: ( ) Fax Number: ( ) Email address:
Fein Number : DUNS #:
Attachment C: Itemized Bid List Costs which are not specifically identified below will not be compensated under any Contract awarded pursuant to this RFB.
| Item |
| QTY. |
| Description |
| List Price Each |
| Net Price Each |
| Extended Net Price |
| 1. |
| 1 |
| Nonhuman Primate Rack and Cage Washer meeting specifications in Attachment B |
Manufacturer
Model No.:
| 2. |
| 1 |
| Training (if not included in price of equipment) |
| 3. |
| 1 |
| Shipping and Installation (if not included in price of equipment) |
| Extended Net Total |
| $_________ |
Specify all utility requirements for installation and operation of system, e.g. electrical, physical, etc. (include attachments if necessary).
OPTIONAL (not included in award determination)
| ITEM |
| QTY |
| DESCRIPTION |
| LIST PRICE |
| TOTAL NET PRICE |
4.
| 1 Year |
| Service Contract including software updates and upgrades- First year after expiration of the warranty. |
| $________ |
| $_________ |
| 5. |
| 1 year |
| Service Contract including software updates and upgrades- Second year after expiration of the warranty. |
| $________ |
| $_________ |
| 6. |
| 1 Year |
| Service Contract including software updates and upgrades – Third year after expiration of the warranty. |
| $________ |
| $_________ |
Pricing for items service should be quoted as firm annual costs to be purchased at the beginning of each annual term. Unless otherwise referenced it is assumes maintenance for the first year is covered under the equipment warranty. Page 24 of 37
OPTIONAL (not included in award determination) Provide a list of optional accessories/upgrades that can be provided that may be of value to WNPRC.
| Manufacturer Item Number |
| Description |
| List Price |
| % Discount |
| Net Price |
OPTIONAL (not included in award determination) Provide a list and pricing of consumables (i.e. reagents) necessary to run the instrument as outlined in the Scope in Attachment B. Please add additional items as applicable.
| Manufacturer Item Number |
| Description |
| List Price |
| % Discount |
| Net Price |
Prices should be held firm for one (1) year from date of delivery. Annual increases beyond the first year are limited to a maximum of ____% for five (5) years.
Attachment H: Drawings and Pictures Double-click on the picture below to access the PDF of the existing plans.
CAD Drawing of Existing Plan:
* All effluent is tempered before entering the city sewer.
* Alkaline and acid cycle temperatures are not set for guarantee but could be.
* The cage washer pictured is slightly elevated from the floor. The guide tracks measure .5” thick.
Pictures of an existing rail system from a different building:
image2.emf image3.emf
0782CADExistingPlan.dwg image4.jpg image5.jpg image6.jpg image1.png