20-002770 Mott CC_HJ_Shoring_DWGS_10.13.2025.pdf
PDF 3 MB Posted
- Attached to
- Ramps H & J Shoring
- Solicitation number
- ITB-KD-1025-RampsH&J-Shoring
- Issued by
- Genesee County, Michigan
About this file
These construction documents detail a temporary shoring and barricades project for Deck H and Deck J at Mott Community College in Flint, Michigan, prepared by Walker Consultants in October 2025. The project involves installing temporary structural support and safety barriers across six parking deck levels, with specific focus on addressing structurally deficient post-tensioned concrete beams and floor slabs. The work is limited to temporary shoring installation and does not involve changes to occupancy, use, or egress. The project will be completed in accordance with the 2021 International Building Code and NFPA 241 fire safety standards, with work limited to 7 am - 7 pm, Monday through Friday.
The project includes critical structural safety considerations, notably that the roof level (Levels 5 & 6) has reduced live load capacity of 30 psf, with strict barricading requirements to prevent overloading. The temporary shoring is based on engineering surveys conducted in October 2025, with an allowable soil bearing capacity of 1,500 psf. The documentation emphasizes that this is a temporary solution, with permanent repairs recommended and regular monitoring required. The contractor will be responsible for carefully installing steel post shores, maintaining precise spacing and load distribution, and exercising extreme caution to avoid damaging post-tensioned tendons during the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB-KD-1025-RampsH_J-Shoring..pdf | ||
| MCC Shoring and Barricades SPECS 10.13.25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING INDEX
NO: SHEET NAME
GENERAL
G-000 COVER SHEET AND SITE LOCATION MAP
G-001 GENERAL NOTES, LEGENDS, & WORK ITEM SCHEDULE
RESTORATION
R-101 1ST & 2ND LEVEL PLAN
R-102 3RD & 4TH LEVEL PLAN
R-103 5TH & 6TH LEVEL PLAN
R-501 REPAIR DETAILS
COPYRIGHT © 2025. ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM OR BY ANY MEANS WITHOUT PERMISSION FROM WALKER CONSULTANTS.
ENGINEER
525 Avis Dr, Suite 1 Ann Arbor, MI 48108
734.663.1070 Ph
www.walkerconsultants.com
FLINT, MI
MOTT COMMUNITY COLLEGE
RAMPS H&J SHORING & BARRICADES
OCTOBER, 13, 2025
BIDDING & CONSTRUCTION
WALKER PROJECT NO: 20-002770.00
PROJECT SITE
OWNER
DECK J
DECK H
GENERAL NOTES
A. CONSTRUCTION
1. This set of Construction Documents is for temporary shoring and barricades installation only. There are no changes to use, egress, occupancy, or area.
2. The Contractor shall obtain all necessary permits to complete the work outlined in these documents.
3. The Contractor shall perform Work in accordance with all applicable Federal, State, and Local Codes, Laws and Ordinances, The Contractor shall promptly notify the Engineer of any known nonconformity with the intent of the Construction Documents and as-built conditions to the applicable Codes, Laws or Ordinances and request clarification from the Engineer prior to proceeding with Work which is deemed in conflict with the applicable Codes, Laws or Ordinances.
4. The project shall be completed in accordance with the 2021 International Building Code.
5. Fire Safety during construction, alteration or demolition shall comply with the latest edition of NFPA 241.
6. Prior to preparing the bid and fabrication of any material or placement of concrete, field verify all existing dimensions and conditions shown on Drawings. Report all discrepancies to the Engineer immediately.
7. Do Not Scale Drawings.
8. Walker will not have control over or charge of and will not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and safety programs in connection with the project. Since these are the responsibility of others, Walker will not be responsible for the contractor's schedules or failure to carry out the project in accordance with Contract Documents. Walker will not have control over or charge of acts or omissions of the contractor, sub-contractors, or their agents or employees, or of other non-Walker persons performing portions of the project.
9. The presence of Walker or testing agency at the jobsite does not relieve contractor of the obligation to perform the work in accordance with the contract documents.
10. Shoring shall be installed snug tight and attached/anchored to prevent movement or loosening.
B. CONSTRUCTION DOCUMENTS
1. Construction Documents entitled “Mott Community College — Ramps H&J Shoring and Barricades” includes these Drawings and separately bound Specifications. For purposes of performing the work, Drawings and Specifications shall be a single unit.
2. The extent of repair areas shown on the drawings indicates Engineer’s estimates only. The estimated unit quantities included in the bid documents are based on Engineer’s estimated units for bid purposes only. The Contractor is responsible for determining the actual extent and locations of repair areas. The actual repair quantities shall be verified and agreed upon by the Engineer prior to commencing the repair Work.
3. Work shall be performed in coordination with construction observations by the Engineer to determine if the exposed existing construction is as assumed in the design.
4. Dimensions shown on plans are based on original construction documents.
5. Refer to Specifications for scope, description and requirements of Work.
C. DESIGN ASSUMPTIONS
1. The roof level (Levels 5 & 6) beams are assumed to be structurally deficient based on results of representative test openings. No live load allowed on roof level (Levels 5 & 6) until shoring installation is complete.
2. The allowable live load capacity of the roof level (Levels 5 & 6) is 30 psf based on results of test openings performed in September 2025. Staggered space closures are necessary to maintain this reduced live load. The barricading layout shown on R-103 accomplishes this. Roof level barricades shall be maintained at all times, either by Owner or Contractor, to prevent parking and overloading of slabs.
3. Allowable soil bearing capacity is 1,500 psf. Shoring loads at grade shall be adequately distributed so as not to exceed this limit.
4. Shoring design is based on conditions in the structure as of October, 2025 during the engineer's survey. If new deterioration conditions develop or existing deterioration becomes more severe, additional shoring shall be added.
5. This shoring is considered temporary. Permanent repairs are required and recommended. Regular monitoring and adjusting/repairing of the temporary shoring is recommended until permanent repairs are completed.
6. During construction of permanent repairs, it is the responsibility of the repair/construction contractor and the repair/construction designer to verify the suitability of and supplement any existing temporary shoring/bracing that will be delegated to and utilized during construction activities. Shoring/bracing during construction needs to consider changes to the shoring/bracing conditions throughout construction and the application of construction loads. Shoring/bracing during construction also needs to consider differing deterioration conditions from that present during installation of the temporary shoring contained in these construction documents, among other things.
D. EXISTING SERVICES AND UTILITIES
1. Contractor shall review all existing conditions to determine all Electrical and Mechanical services and Utilities affected by the repair work. Make necessary temporary connections to maintain existing services to all areas of the parking garage or other areas (Not in Contract) affected by the work. The contractor shall submit the methods and schedule of connections for the owner’s approval prior to commencement.
E. DETAILS AND SYMBOLS
1. Repair details are shown on drawing series R-501 and are generally identified as two-digit (X.X) details.
2. Where the Work Item bubble is noted “TYP,” it means the Work Item occurs at all locations where the applicable deterioration or designation symbol occurs on that plan.
3. Where two or more Work Item Bubbles are grouped together, it means any or all of the referenced work items may be applicable. Coordination of Work Items is Contractor’s responsibility.
4. See Work Item specification (020010) for additional information regarding details.
F. CONSTRUCTION PHASING, SEQUENCING AND TRAFFIC MAINTENANCE
1. Work sequence shall be coordinated with the Owner’s representative and all identified project representatives.
2. Work hours are 7 am - 7 pm, Monday - Friday. The Contractor shall verify work hours with the Owner. Contractor shall coordinate off-hours, weekend, and holiday Work with Owner at least 72 hours in advance.
3. Contractor shall be responsible to lockout access to the structure after all entries or exits by contractor's laborers or material deliveries so that structure is maintained continuously locked to unauthorized public access.
4. Owner will continue to use structure during shoring/barricading installation.
Contractor shall phase/perform work so that no more than 50 spaces are closed beyond those scheduled to be barricaded as shown on the Drawings.
G. WORKSITE REQUIREMENTS
1. Trash and debris shall be removed from the site on a daily basis, including all loose concrete removals required for shoring installation.
2. The Contractor is responsible for protecting all adjacent structures, landscaping, and other surfaces and items which could be affected by the Work.
3. All lights, signs, and other features and property damaged during construction shall be replaced / repaired at no cost to Owner.
4. Do not place loads on the structure or store demolished materials on the structure in a manner that will exceed shoring design loads.
H. UNIT PRICE WORK QUANTITY ADMINISTRATION
1. Contractor is responsible for maintaining accurate documentation and submission in a timely fashion of measured repair quantities for all Unit Price Work. These quantities shall be reconciled with the owner or their representative weekly.
2. Contractor shall maintain a Record Drawing showing the general location, size, and associated Work Item of each repair. Record Drawing shall include repair quantity for each repair location or be keyed to a spreadsheet/quantity documentation sheet with the quantities.
3. See section 020010 “Work Items” for additional administration requirements for each specific Work Item.
I. MISCELLANEOUS CONCRETE SITE REQUIREMENTS
1. The following requirements apply to concrete and asphalt sawcutting and other similar work (cutting, grinding, drilling, etc):
a. Discharge of water, dust, or debris from concrete work to storm or sanitary is prohibited.
b. Storm drains must be protected from dust and debris. Provide sedimentation and surface deposition mitigation plan.
c. Any water used during concrete work (including sweeping and sawcutting) must be contained and collected for proper disposal. Suggested controls include wet vacuum, absorbants.
d. Good housekeeping practices must be employed at the jobsite. Minimize dust.
J. ABBREVIATIONS
1. APPROX = Approximately
2. AGG = Aggregate
3. BM = Beam
4. BOT = Bottom
5. CIP = Cast in Place
6. CFV = Contractor Field Verify
7. CJ = Construction Joint/Control Joint
8. CLR = Clearance
9. COL = Column
10. CONC = Concrete
11. CY = Cubic Yard
12. DET = Detail
13. EA = Each
14. E.E. = Each End
15. E.S. = Each Side
16. EMBED = Embedment length
17. EJ = Expansion Joint
18. EXIST = Existing
19. FIN = Finished
20. FL = Floor
21. IN = Inches
22. INC = Incidental
23. LF = Linear Foot
24. LS = Lump Sum
25. MAX = Maximum
26. MIN = Minimum
27. N/A = Not Applicable
28. OC = On Center
29. OH = Opposite Hand
30. P/C = Precast
31. PSF = Pounds Per Square Foot
32. PSI = Pounds Per Square Inch
33. P-T = Post-Tensioned
34. REINF = Reinforcement
35. REQ’D = Required
36. SF = Square Foot
37. SIM = Similar
38. SOG = Slab on Ground
39. SPEC = Specification
40. SUPT = Supported
41. T = Top
42. TAR = Typical as Required
43. TYP = Typical
44. UN or UNO = Unless Noted Otherwise
45. VIF = Verify in Field
46. WI = Work Item
47. WWR = Welded Wire Reinforcement
CHECKED BY:
SHEET TITLE:
DRAWN BY:
PROJECT NO:
COPYRIGHT © 2025. ALL RIGHTS
RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED IN
ANY FORM OR BY ANY MEANS
WITHOUT PERMISSION FROM
WALKER CONSULTANTS, INC.
G re e n s p o in t P a rk w a y S u it e
H o ff m a n E s ta te s
IL
.6
.2
P h w w w
.w a lk e rc o n s u lt a n ts
.c o m
ISSUE:
/1 /2
:2
:1
P M
J M ic h ig a n \2
-0
-0 -M o tt
C C
H
J S h o ri n g \D ra w in g s \2
-0
M o tt C
C H
J
S h o ri n g .r v t
F L
IN
T
M
I
M O
T T
C O
M M
U N
IT
Y
C O
L L
E G
E
R A
M P
S H
J
S H
O R
IN
G
B
A R
R
IC
A D
E S
JAD
MRL
20-002770.00
GENERAL NOTES,
LEGENDS, & WORK
ITEM SCHEDULE
G-001
IS
S
U E
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N
/1
/2
B
ID
D
IN
G
A N
D C
O N
S T
R U
C T
IO
N
O
R A
M P
1615141312111098
NO
RAMP
17 18 19 20 21 22 23 24 272625
A
B
D
C
11'-11" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0"
909090 90 90 90
909090909090
909090 90 90 90
909090909090 90
1ST LEVEL
2ND LEVEL
R-501
U P
-T
O -2
D O
W
3-
TO
-2
D O
W N
2-TO
-1
U P
2-TO
-390
NOTE 3
SLAB ON GRADE CONCRETE
SLAB ON GRADE CONCRETE
TYP
PT BEAMS ABOVE
SHOWN DASHED
1R -5
NOTE 3NOTE 3
T Y
P
PT BEAMS ABOVE
SHOWN DASHED
90 90 9090 90 9090 90
90 90 9090 90 9090
90 90 90
9090909090909090
9090909090909090 90
LEVEL 1
LEVEL 2
D O
W N
2-TO
-1
U P
2-TO
-3
U P
1-
TO
-2
NOTE 3 NOTE 3 NOTE 3 NOTE 3
PT BEAM ABOVE
SHOWN DASHED
PT BEAM ABOVE
SHOWN DASHED
SLAB ON GRADE
SLAB ON GRADE
TRUE NORTH
N
SHEET NOTES
CHECKED BY:
SHEET TITLE:
DRAWN BY:
PROJECT NO:
COPYRIGHT © 2025. ALL RIGHTS
RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED IN
ANY FORM OR BY ANY MEANS
WITHOUT PERMISSION FROM
WALKER CONSULTANTS, INC.
G re e n s p o in t P a rk w a y S u it e
H o ff m a n E s ta te s
IL
.6
.2
P h w w w
.w a lk e rc o n s u lt a n ts
.c o m
ISSUE:
/1 /2
:2
:1
P M
J M ic h ig a n \2
-0
-0 -M o tt
C C
H
J S h o ri n g \D ra w in g s \2
-0
M o tt C
C H
J
S h o ri n g .r v t
F L
IN
T
M
I
M O
T T
C O
M M
U N
IT
Y
C O
L L
E G
E
R A
M P
S H
J
S H
O R
IN
G
B
A R
R
IC
A D
E S
Checker
Author
20-002770.00
1ST & 2ND LEVEL
PLAN
R-101
3/64" = 1'-0"2
DECK H - 1ST & 2ND LEVEL PLAN
REFERENCES:
1. GENERAL NOTES AND WI R-001
SCHEDULE
2. FLOOR PLANS R-100 SERIES
3. REPAIR DETAILS R-500 SERIES
LEGEND:
= END BEARING SHORING, SEE NOTE 1
= SPACE CLOSED
= EXISTING EXPANSION JOINT
GENERAL NOTES:
1. # LISTED IS THE REQUIRED CAPACITY OF THE SHORE
GROUP (KIPS).
2. SHORING SHALL BE INSTALLED ON THE LEVEL
SHOWN TO SUPPORT THE BEAM ABOVE.
3. INCREASED OR DECREASED SHORE CAPACITY MAY
BE NEEDED DEPENDING ON RESULTS OF TEST
OPENING PERFORMED BY OTHERS. UNKNOWN AT
TIME OF BID. CONFIRM FINAL SHORE CAPACITY
BASE UPON RESULTS OF TEST OPENINGS, IN FIELD
WITH ENGINEER DURING CONSTRUCTION.
4. RELOCATE CLOSED ADA SPACE. COORDINATE WITH
OWNER.
5. LEVEL 5 & 6: INSTALL STEEL CATTLEGATE
BARRICADE AND "NO PARKING" SIGNAGE AT FRONT
OF PARKING STALLS WHERE SPACES ARE SHOWN
TO BE CLOSED. SPACE CLOSURES AT ROOF ARE
NECESSARY TO MAINTAIN ROOF SLAB AT 30 PSF
ALLOWABLE SLAB CAPACITY.
3/64" = 1'-0"1
DECK J - 1ST & 2ND LEVEL PLAN
IS
S
U E
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N
/1
/2
B
ID
D
IN
G
A N
D C
O N
S T
R U
C T
IO
N
CAUTION NOTE:
THE FLOOR SLAB HAS POST-TENSIONING TENDONS. THESE TENDONS ARE
NEAR THE FLOOR SURFACE AT SPALLS AND DELAMINATIONS. THE
CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN DRILLING OR
CHIPPING SO AS NOT TO DAMAGE EXISTING TENDONS OR TENDON SHEATHS.
TENDONS MAY BREAK WITH EXPLOSIVE FORCE WHEN CUT.
1615141312111098
CONT. A
IR W
ELL
CONT. AIR WELL
17 18 19 20 21 22 23 24 272625
A
B
D
C
11'-11" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0" 33'-0"
3RD LEVEL
4TH LEVEL
909090 90 90 90 90
90 90 90 90 90 90
9090 90 90 90
90 90 90 90 90 90
D O
-T
O -2
U P
-T
O -4
UP
2-TO-3
D O
W N
4-TO
-3
U P
4-TO
-5
LIGHT
WELL
LIGHT
WELL
ENTRY
EXIT
EXISTING
PT DECK
EXISTING
PT DECK
NOTE 3
1R -5
NOTE 3
PT BEAMS ABOVE
SHOWN DASHED
R-501
TYP
T Y
PPT BEAMS ABOVE
SHOWN DASHED
PT BEAMS ABOVE
SHOWN DASHED
9090909090909090
9090909090909090 90
LEVEL 3
LEVEL 4
SAFETY
BOOTH
ENTRY EXIT
D O
W N
4-TO
-3
U P
4-TO
-5
U P
3-
TO
-4
DO
W
N
3-T O
-2
CONTINUOUS AIR/LIGHT WELL
LIGHT
WELL
90 90 90 90 90 90 90
90 90 90 90 90 90 90 9090
UP
2-TO-3
90 90
NOTE 3 NOTE 3
NOTE 3 NOTE 3
PT BEAM ABOVE
SHOWN DASHED
PT BEAM ABOVE
SHOWN DASHEDPT CONC. DECK
PT CONC. DECK
3/64" = 1'-0"2
DECK H - 3RD & 4TH LEVEL PLAN
TRUE NORTH
N
SHEET NOTES
CHECKED BY:
SHEET TITLE:
DRAWN BY:
PROJECT NO:
COPYRIGHT © 2025. ALL RIGHTS
RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED IN
ANY FORM OR BY ANY MEANS
WITHOUT PERMISSION FROM
WALKER CONSULTANTS, INC.
G re e n s p o in t P a rk w a y S u it e
H o ff m a n E s ta te s
IL
.6
.2
P h w w w
.w a lk e rc o n s u lt a n ts
.c o m
ISSUE:
/1 /2
:2
:1
P M
J M ic h ig a n \2
-0
-0 -M o tt
C C
H
J S h o ri n g \D ra w in g s \2
-0
M o tt C
C H
J
S h o ri n g .r v t
F L
IN
T
M
I
M O
T T
C O
M M
U N
IT
Y
C O
L L
E G
E
R A
M P
S H
J
S H
O R
IN
G
B
A R
R
IC
A D
E S
Checker
Author
20-002770.00
3RD & 4TH LEVEL
PLAN
R-102
REFERENCES:
1. GENERAL NOTES AND WI R-001
SCHEDULE
2. FLOOR PLANS R-100 SERIES
3. REPAIR DETAILS R-500 SERIES
LEGEND:
= END BEARING SHORING, SEE NOTE 1
= SPACE CLOSED
= EXISTING EXPANSION JOINT
GENERAL NOTES:
1. # LISTED IS THE REQUIRED CAPACITY OF THE SHORE
GROUP (KIPS).
2. SHORING SHALL BE INSTALLED ON THE LEVEL
SHOWN TO SUPPORT THE BEAM ABOVE.
3. INCREASED OR DECREASED SHORE CAPACITY MAY
BE NEEDED DEPENDING ON RESULTS OF TEST
OPENING PERFORMED BY OTHERS. UNKNOWN AT
TIME OF BID. CONFIRM FINAL SHORE CAPACITY
BASE UPON RESULTS OF TEST OPENINGS, IN FIELD
WITH ENGINEER DURING CONSTRUCTION.
4. RELOCATE CLOSED ADA SPACE. COORDINATE WITH
OWNER.
5. LEVEL 5 & 6: INSTALL STEEL CATTLEGATE
BARRICADE AND "NO PARKING" SIGNAGE AT FRONT
OF PARKING STALLS WHERE SPACES ARE SHOWN
TO BE CLOSED. SPACE CLOSURES AT ROOF ARE
NECESSARY TO MAINTAIN ROOF SLAB AT 30 PSF
ALLOWABLE SLAB CAPACITY.
3/64" = 1'-0"1
DECK J - 3RD & 4TH LEVEL PLAN
IS
S
U E
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N
/1
/2
B
ID
D
IN
G
A N
D C
O N
S T
R U
C T
IO
N
CAUTION NOTE:
THE FLOOR SLAB HAS POST-TENSIONING TENDONS. THESE TENDONS ARE
NEAR THE FLOOR SURFACE AT SPALLS AND DELAMINATIONS. THE
CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN DRILLING OR
CHIPPING SO AS NOT TO DAMAGE EXISTING TENDONS OR TENDON SHEATHS.
17 18 19 20 21 22 23 24 272625
A
B
D
C
1615141312111098
CONT. A
IR W
ELL
CONT. AIR WELL
UP
4-TO-5
D O
W N
6-TO
-5
U P
5-
TO
-6
DO
W
N
5-T O
-4
LIGHT
WELL
5TH LEVEL
6TH LEVEL
NOTE 4 NOTE 4NOTE 4
PT BEAM ABOVE
SHOWN DASHED
PT BEAM BELOW
SHOWN DASHED
PT CONC. DECK
PT CONC. DECK
5TH LEVEL
6TH LEVEL
D O
-T
O -4
U P
-T
O -6
UP
4-TO-5
D O
W N
6-TO
-5
PT CONCRETE DECK
PT CONCRETE DECK
LIGHT
WELL
LIGHT
WELL
BEAMS BELOW
(SHOWN DASHED)
NOTE 4
NOTE 4
1R -5
T Y
P
BEAMS BELOW
(SHOWN DASHED)
TRUE NORTH
N
SHEET NOTES
CHECKED BY:
SHEET TITLE:
DRAWN BY:
PROJECT NO:
COPYRIGHT © 2025. ALL RIGHTS
RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED IN
ANY FORM OR BY ANY MEANS
WITHOUT PERMISSION FROM
WALKER CONSULTANTS, INC.
G re e n s p o in t P a rk w a y S u it e
H o ff m a n E s ta te s
IL
.6
.2
P h w w w
.w a lk e rc o n s u lt a n ts
.c o m
ISSUE:
/1 /2
:2
:1
P M
J M ic h ig a n \2
-0
-0 -M o tt
C C
H
J S h o ri n g \D ra w in g s \2
-0
M o tt C
C H
J
S h o ri n g .r v t
F L
IN
T
M
I
M O
T T
C O
M M
U N
IT
Y
C O
L L
E G
E
R A
M P
S H
J
S H
O R
IN
G
B
A R
R
IC
A D
E S
Checker
Author
20-002770.00
5TH & 6TH LEVEL
PLAN
R-103
REFERENCES:
1. GENERAL NOTES AND WI R-001
SCHEDULE
2. FLOOR PLANS R-100 SERIES
3. REPAIR DETAILS R-500 SERIES
LEGEND:
= END BEARING SHORING, SEE NOTE 1
= SPACE CLOSED
= EXISTING EXPANSION JOINT
GENERAL NOTES:
1. # LISTED IS THE REQUIRED CAPACITY OF THE SHORE
GROUP (KIPS).
2. SHORING SHALL BE INSTALLED ON THE LEVEL
SHOWN TO SUPPORT THE BEAM ABOVE.
3. INCREASED OR DECREASED SHORE CAPACITY MAY
BE NEEDED DEPENDING ON RESULTS OF TEST
OPENING PERFORMED BY OTHERS. UNKNOWN AT
TIME OF BID. CONFIRM FINAL SHORE CAPACITY
BASE UPON RESULTS OF TEST OPENINGS, IN FIELD
WITH ENGINEER DURING CONSTRUCTION.
4. RELOCATE CLOSED ADA SPACE. COORDINATE WITH
OWNER.
5. LEVEL 5 & 6: INSTALL STEEL CATTLEGATE
BARRICADE AND "NO PARKING" SIGNAGE AT FRONT
OF PARKING STALLS WHERE SPACES ARE SHOWN
TO BE CLOSED. SPACE CLOSURES AT ROOF ARE
NECESSARY TO MAINTAIN ROOF SLAB AT 30 PSF
ALLOWABLE SLAB CAPACITY.
3/64" = 1'-0"1
DECK J - 5TH & 6TH LEVEL PLAN
3/64" = 1'-0"2
DECK H - 5TH & 6TH LEVEL PLAN
IS
S
U E
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N
/1
/2
B
ID
D
IN
G
A N
D C
O N
S T
R U
C T
IO
N
CAUTION NOTE:
THE FLOOR SLAB HAS POST-TENSIONING TENDONS. THESE TENDONS ARE
NEAR THE FLOOR SURFACE AT SPALLS AND DELAMINATIONS. THE
CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN DRILLING OR
CHIPPING SO AS NOT TO DAMAGE EXISTING TENDONS OR TENDON SHEATHS.
BELOW
8'-0" 8'-0"
R-501
R-501
(V
IF
TWO ROWS OF (5) STEEL POST SHORE,
RATED FOR 9-KIP CAPACITY AT
REQUIRED EXTENSION HEIGHT,
TYPICAL. SEE PLAN SHEETS FOR
REQUIRED CAPACITY OF GROUP.
PT BEAM
EMBEDDED BEAM POST-TENSIONING TENDONS
UNDERSIDE OF
CONCRETE FLOOR
SLAB BEYOND
T Y
P
IC
A L
CLOSE OFF SPACE W/ STEEL "CATTLE-GATE"
BARRICADES. PROVIDE "NO PARKING" SIGN
ON CATTLEGATE. CATTLEGATE DOES NOT
NEED TO BE ANCHORED TO FLOOR.
5 - SHORE POSTS @ 6" O.C. EACH
SIDE OF BEAM CTR LINE. 10 TOTAL
SHORES W/ 90-KIP TOTAL CAPACITY
CENTER GROUP 8'-0" FROM COL LINE
EXISTING CONCRETE COLUMN
EXISTING STRIPING
COLUMN LINES (SEE PLAN)
FACE OF PT BEAM ABOVE
9" 4'-6" 9"
C L
TYP
4'-6"
C L
C L
9" +/- 9" +/-
EXIST. PT CONCRETE BEAM
TWO ROWS OF (5) STEEL POST SHORES,
RATED FOR 9-KIP CAPACITY AT
REQUIRED EXTENSION HEIGHT, TYPICAL.
SEE PLAN SHEETS FOR REQUIRED
CAPACITY OF GROUP.
EXIST. CONCRETE COLUMN BEYOND
EXIST. PT CONCRETE DECK
(TYPICAL PT BEAM)
6'-0"
EXIST. PT BEAM TENDONS.
LOCATE TENDONS PRIOR
TO ANCHORING
TWO ROWS OF (5) STEEL
POST SHORES, RATED FOR
9-KIP CAPACITY AT
REQUIRED EXTENSION
HEIGHT, TYPICAL. SEE PLAN
SHEETS FOR REQUIRED
CAPACITY OF GROUP.
NOTE:
1. ANY LOOSE, DELAMINATED, OR HANGING CONCRETE TO BE REMOVED PRIOR TO INSTALLING SHORING. DO NOT
REMOVE SOUND CONCRETE. DO NOT CUT OR DAMAGE EXISTING POST-TENSIONED TENDONS. INSTALL POST
SHORES ON SOLID CONCRETE AFTER ALL LOOSE MATERIAL IS REMOVED
2. PACK GROUT TO PROVIDE EVEN BEARING SURFACE AT CONCRETE REMOVAL AREAS.
TO COL CTR LINE
8'-0" CTR OF SHORE GROUP
NOTE 1
NOTE 2
TYP
6"
C L
C L
EXIST. CONC. COLUMN
EXIST. CONC. BEAM
UNDERSIDE OF CONC.
FLOOR SLAB BEYOND
CONC. FLOOR SLAB
C L
NOTE:
1. CONSTRUCT CRIBBAGE OF SUFFICIENT AREA TO DISTRIBUTE ALL IMPOSED SHORING LOADS
EVENLY TO SLAB-ON-GRADE BELOW SO THAT DISPERSED LOAD DOES NOT EXCEED 1,500 PSF.
SOIL
POST SHORE, TYP
CROSS-STACKED 2X4
WOOD SPREADER BEAMS
EXISTING SLAB ON
GRADE
SECURELY ANCHOR
POST SHORE TO WOOD
SPREADER BEAMS
1. THE SHORING LAYOUT SHOWN ON THIS DETAIL SHEET IS FOR THE TYPICAL 90-KIP CAPACITY SHORE GROUP. WHERE INCREASED OR DECREASED SHORE CAPACITY IS REQUIRED, CONTRACTOR SHALL MODIFY THE NUMBER OF SHORE POSTS ACCORDINGLY, FOLLOWING THE SAME GENERAL SPACING/PLACEMENT REQUIREMENTS AS FOR THE TYPICAL
SHORE GROUP.
2. INSTALL SHORES TIGHT TO FLOOR SLAB AND BOTTOM OF CONCRETE BEAM. WHERE SPALLING PRODUCES AN UNEVEN BEARING SURFACE (WHETHER FROM CONTRACTOR’S REMOVAL OF LOOSE/DELAMINATED CONCRETE OR FROM EXISTING CONCRETE SPALLS), PACK GROUT AT SHORE POST BEARING AREA TO PROVIDE UNIFORM BEARING SURFACE. FOR BIDDING PURPOSES, CONTRACTOR MAY ASSUME THIS WILL BE REQUIRED AT APPROXIMATELY 2-5%
OF SHORE LOCATIONS (VIF).
3. SHORING WILL BE REQUIRED ON MULTIPLE LEVELS. INSTALL SHORING CONCENTRIC FROM LEVEL TO LEVEL.
4. SHORING SHALL BE INSTALLED SNUG TIGHT AND ATTACHED/ANCHORED TO PREVENT MOVEMENT OR LOOSENING.
5. BEAMS AND FLOOR SLABS CONTAIN LIVE POST-TENSIONED TENDONS. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN DRILLING OR REMOVING LOOSE CONCRETE SO AS NOT TO DAMAGE TENDONS. TENDONS MAY
BREAK WITH EXPLOSIVE FORCE WHEN DAMAGED.
CHECKED BY:
SHEET TITLE:
DRAWN BY:
PROJECT NO:
COPYRIGHT © 2025. ALL RIGHTS
RESERVED. NO PART OF THIS
DOCUMENT MAY BE REPRODUCED IN
ANY FORM OR BY ANY MEANS
WITHOUT PERMISSION FROM
WALKER CONSULTANTS, INC.
G re e n s p o in t P a rk w a y S u it e
H o ff m a n E s ta te s
IL
.6
.2
P h w w w
.w a lk e rc o n s u lt a n ts
.c o m
ISSUE:
/1 /2
:2
:1
P M
J M ic h ig a n \2
-0
-0 -M o tt
C C
H
J S h o ri n g \D ra w in g s \2
-0
M o tt C
C H
J
S h o ri n g .r v t
F L
IN
T
M
I
M O
T T
C O
M M
U N
IT
Y
C O
L L
E G
E
R A
M P
S H
J
S H
O R
IN
G
B
A R
R
IC
A D
E S
Checker
Author
20-002770.00
REPAIR DETAILS
R-501
3/8" = 1'-0"1
TYPICAL BEAM SHORING SECTION
1/2" = 1'-0"2
ENLARGED PLAN DETAIL
1" = 1'-0"3
TYPICAL BEAM SHORING - SECTION
1" = 1'-0"4
TYPICAL BEAM SHORING
6. PROVIDE WORKING LOAD CAPACITY SHOWN ON PLAN SHEETS AT EACH LOCATION
7. DISTRIBUTE LOAD TO GRADE SO THAT THE BEARING PRESSURE IS LIMITED TO 1,500 PSF. SEE DETAIL 5/R-501 FOR
TYPICAL CRIBBAGE REQUIREMENTS.
8. TYPICAL SHORING EXTENSION HEIGHT (ASSUMED FROM TOP OF SLAB TO BOTTOM OF BEAM) IS APPROXIMATELY 8'-8", AS SHOWN ON DETAL 2 / R-501. CONTRACTOR SHALL VERIFY ON A CASE-BY-CASE BASIS.
9. THE ROOF LEVEL (LEVELS 5 & 6) BEAMS ARE ASSUMED TO BE STRUCTURALLY DEFICIENT BASED ON RESULTS OF REPRESENTATIVE TEST OPENINGS. NO LIVE LOAD ALLOWED ON ROOF LEVEL (LEVELS 5 & 6) UNTIL SHORING
INSTALLATION IS COMPLETE.
10. SHORING DESIGN IS BASED ON CONDITIONS IN THE STRUCTURE AS OF OCTOBER, 2025 DURING THE ENGINEER'S SURVEY. IF NEW DETERIORATION CONDITIONS DEVELOP OR EXISTING DETERIORATION BECOMES MORE SEVERE, ADDITIONAL SHORING SHALL BE ADDED.
GENERAL SHORING NOTES
IS
S
U E
M A
R K
D A
T E
D E
S C
R
IP
T
IO
N
/1
/2
B
ID
D
IN
G
A N
D C
O N
S T
R U
C T
IO
N
1" = 1'-0"5
TYPICAL CRIBBAGE AT SLAB-ON-GRADE
| Sheets |
| G-000 - COVER SHEET AND SITE LOCATION MAP |
| G-001 - GENERAL NOTES, LEGENDS, & WORK ITEM SCHEDULE |
| R-101 - 1ST & 2ND LEVEL PLAN |
| R-102 - 3RD & 4TH LEVEL PLAN |
| R-103 - 5TH & 6TH LEVEL PLAN |
| R-501 - REPAIR DETAILS |