2-Utility Plan.PDF
PDF 282 KB Posted
- Solicitation number
- Not on record
- Issued by
- Somerset County, South Pottstown CDP, Pennsylvania
About this file
The file is a Utility Plan document for the Schuylkill County Bridge No. 80 Superstructure Replacement Project, involving Julia Street (T-652) in Girardville Borough and Butler Township, Schuylkill County, Pennsylvania. The utility plan specifically details electric utility coordination with PPL Electric Utilities for temporary de-energization of overhead electric lines during bridge reconstruction. The project involves replacing the existing bridge superstructure with a new single-span precast adjacent box beam superstructure, with specific notes for coordinating with PPL Electric Utilities' primary contact, John Valentine, to schedule de-energization of electric lines prior to crane operations and beam placement.
The project will be bid through the PennBid Program, with sealed bids due on December 10, 2025, at 9:00 AM, and a tentative award date of December 17, 2025. Bidders are required to submit a bid bond of 10 percent of the total bid amount, payable to Schuylkill County. The successful contractor will need to provide performance and payment bonds for 100% of the contract price. The procurement includes provisions for roadway approach work, paving, guide rail, and signing improvements, with the entire project to be awarded to a single contractor. Bidding documents are available at no cost through the PennBid platform, with contractor support available via email at info@pennbid.net or by phone at 610-693-4769.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTILITY PLAN
KMM KMM JCK 1
LEGEND
EA
OVERHEAD ELECTRIC
- TEMPORARY DE-ENERGIZED
- EDGE OF STREAM
- UTILITY POLE
- PROPERTY LINE
AERIAL UTILITY NOTES
PPL ELECTRIC UTILITIES TO RE-ENERGIZE THE OVERHEAD ELECTRIC LINES.
UPON COMPLETION OF ALL CRANE OPERATIONS AND BEAM PLACEMENT, COORDINATE WITH 2.
570-573-0472 ajvalentine@pplweb.com
JOHN VALENTINE - OPS DISTRIBUTION SCHEDULER
PRIMARY CONTACT AT PPL FOR THIS WORK ORDER IS:
DE-ENERGIZATIONS AND TO ALLOW FOR PPL ELECTRIC UTILITIES MOBILIZATION. THE
ENSURE ADEQUATE LEAD TIMES CAN BE PROVIDED FOR NOTIFICATIONS OF
DE-ENERGIZATION OF THE OVERHEAD ELECTRIC LINES PRIOR TO ANY CRANE ACTIVITY.
COORDINATE WITH PPL ELECTRIC UTILITIES TO SCHEDULE THE TEMPORARY 1.
NOTES:
1. REFER TO CONTRACT PLANS FOR BEAM PLACEMENT DETAILS.
Rev Date By Chk'd Description
Copyright 2025, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 10/29/25 32020.00Drawn: Designed: Checked: OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Girardville Borough & Butler Township, Schuylkill County, Pennsylvania
OVER MAHANOY CREEK
SUPERSTRUCTURE REPLACEMENT
JULIA STREET (T-652)
U
S E
R C
F G
U
S E
R
D
A T
E
T
IM
E
F
IL
E
N08°23'08"E
10 11 1210
EXISTING WINGWALL
(TO REMAIN) (TYP)
UTILITY PLAN
0 FEET10 10 20
PPL 40329-S53457
PPL 40329-S53463
PPL 40331-S53473
PPL 40332-S53485
PPL 40333-S53491
Utility Plan
File details come from the government source that posted it. Updated .