2-Tijeras Pedestrian Bridge - 100% Drawings Signed and Sealed.pdf
PDF 12 MB Posted
- Solicitation number
- RFB 44-26-DC
- Issued by
- Bernalillo County, New Mexico
About this file
This file consists of 100% design drawings and specifications for the Tijeras Pedestrian Bridge Replacement project prepared by BHI (Bernalillo Habich Inc.) for Bernalillo County Public Works Division Technical Services Department in New Mexico. The project involves construction of a new single-span pedestrian bridge over Tijeras Creek in the Los Vecinos community area near Interstate 40 and NM 333. The bridge will be a prefabricated steel truss structure measuring 124 feet center-to-center between bearings with an 8-foot clear width between railings, designed for a pedestrian live load of 90 psf and an H-5 vehicular live load. Construction work includes two 24-inch diameter drilled shaft foundations (46 feet each), reinforced concrete abutments with wingwalls, soil-filled riprap bank protection, concrete approach pads, removal and replacement of existing asphalt trail surfaces, bridge lighting with recessed fixtures, removable bollard installation, and revegetation of disturbed areas. The estimated project quantities include 1 prefabricated pedestrian bridge, 18 cubic yards of reinforced concrete, 81 linear feet of railing, 184 linear feet of drilled shaft foundation, 1,196 cubic yards of structural excavation, 985 cubic yards of structural backfill, 170 cubic yards of soil-filled riprap, and various other site improvements totaling approximately 1 acre of seeding work.
The design specifications reference the New Mexico Department of Transportation 2019 Standard Specifications for Highway and Bridge Construction, AASHTO LRFD Bridge Design Specifications (2024), and AASHTO Guide Specifications for the Design of Pedestrian Bridges (2009 with 2015 interim revisions). Concrete design specifications call for NMDOT Structural Concrete Class A air-entrained with 3,000 psi compressive strength at 28 days, with ASTM A615 Grade 60 reinforcing steel. The design establishes a maximum allowable soil bearing pressure of 2,500 psf and includes provisions for the 100-year flood event with a design discharge of 9,117 cubic feet per second and an expected maximum scour depth of 16.1 feet. The project includes coordination requirements with multiple utility companies including AT&T, Bernalillo County utilities, cable providers, Century Link, Comcast, New Mexico Gas Company, and PNM Electric. Contractor responsibilities encompass construction staking, traffic control, NPDES storm water permitting, erosion control, special notices to affected properties, coordination with Albuquerque Public Schools and ABQ Ride transit, protection of survey monuments, and as-built documentation. The drawings were signed and sealed as of January 22, 2026, and marked as 100% plans for review only.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
INTERSTATE 40
NM 333
PUBLIC SCHOOL RD
LOS VECINOS
COMMUNITY
CENTER
TCWRP PROJECT
AREA
A. MONTOYA ELEMENTARY
SCHOOL
ROOSEVELT MIDDLE
SCHOOL
(F) LOS VECINOS
PARK (UNDER
CONSTRUCTION)
EAST MOUNTAIN
PUBLIC LIBRARY
LVCC MULTI-PURPOSE
CENTER BUILDING
VICINITY
MAP
SILVER
CITY
EL PASO
SOCORRO
SANTA ROSA
TUCUMCARI
SANTA FE
ALAMOS
ROSWELL
CARLSBAD
LAS VEGAS
LORDSBURG
JAL
LOS
MOSQUERO
TIERRA
AMARILLA
AZTEC
A R
I Z
O N
A
T E X A S
M E X I C O
O K .
LOVINGTON
TRES
CROWNPOINT
AMBROSIA
LAKE
MATEO
MORIARTY
CORNERS
ESTANCIAFENCE LAKE
CUBA ESPANOLA
ABBOT
BUEYEROS
ENCINO
BERNARDO
BELEN
MOUNTAINAIR
ANTONIO
RODEO
ANTHONY
MELROSE
TATUM
HOBBS
209 469
SAN JUAN
McKINLEY
CIBOLA
MORA
COLFAX
HARDING
SAN MIGUEL
SANTA
FE
GUADALUPE QUAY
ROOSEVELT
OTERO
SIERRA
ANA
CATRON
LUNA
SANDOVAL
CONSEQUENCES
TRUTH OR
ALAMOGORDO
CLOVIS
CARRIZOZO
LOS
CLAYTON
TAOS
ALBUQUERQUE
LAS
CRUCES
RATON
EUNICE
PORTALES
FORT SUMNER
60 42
LUNAS
10276
T E X A S
C O L O R A D O
RESERVE
GALLUP
SHIPROCK
FARMINGTON BLOOMFIELD
DULCE
CHAMA
PIEDRAS
PUEBLO BONITO
SAN
GRANTS CLINES
EAGLE
NEST
SPRINGER
MORA
CONCHAS DAM
LOGAN
VAUGHN
RAGLAND
QUEMADO
SAN
CAPITAN
HONDO
RUIDOSO
TULAROSA
CABALLO
BAYARD
ROAD
FORKS
COLUMBUS
DEMING
DORA
ARTESIA
RIO ARRIBA
TAOS
UNION
CURRY
DeBACA
CHAVES
LEA
EDDY
LINCOLN
DONA
SOCORRO
GRANT
HIDALGO
TORRANCE
BERNALILLO
VALENCIA
10 10
PROJECT LOCATION
23556
NEW MEX ICO
03/24/2026
20260174 G-02 2 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
BERNALILLO COUNTY
GENERAL NOTES
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:13:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_02_G-02_GENERAL NOTES.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
PROJECT GENERAL NOTES
1. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, REGULATIONS, AND RULES WHICH
APPLY TO THIS PLAN SET.
2. UNLESS OTHERWISE STATED STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION (NEW
MEXICO DEPARTMENT OF TRANSPORTATION, 2019 EDITION) SHALL APPLY.
SURVEYING:
3. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND MAINTAINING ALL EXISTING SURVEY MONUMENTATION CONTROLS. SURVEY MONUMENTS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED AT THE CONTRACTOR'S EXPENSE. NOTIFY MONUMENT OWNER 48 HOURS PRIOR TO ANY WORK AROUND EXISTING
MONUMENTS.
4. CONSTRUCTION STAKING SHALL INCLUDE ALL SURVEYING AND CONTROL STAKING NECESSARY TO ESTABLISH THE PROJECT CONSTRUCTION BASELINE, TOE OF SLOPE CATCH POINTS, AND ALL OTHER INFRASTRUCTURE DESIGNATED IN THE CONSTRUCTION PLANS SET AS REQUIRED FOR CONSTRUCTION OF THE PROJECT. SUCH INFRASTRUCTURE SHALL INCLUDE BUT NOT BE LIMITED TO ALL SURFACING, STORM DRAIN LINES, SEWER LINES, WATER LINES AND SERVICE LINES. (ONLY IF CONSTRUCTION STAKING IS INCLUDED IN THE BID)
5. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO REESTABLISH ANY MISSING REFERENCE POINTS REQUIRED FOR CONSTRUCTION OF THE PROJECT INFRASTRUCTURE. ALL COSTS INCURRED IN PROVIDING SUCH CONSTRUCTION STAKING AND SURVEYING WORK SHALL BE PAID AS SHOWN IN THE BID PROPOSAL.
6. PROVIDE A WEEKLY CONSTRUCTION ACTIVITY SCHEDULE TO BERNALILLO COUNTY PUBLIC WORKS DIVISION, ATTN: COUNTY PROJECT MANAGER.
7. THE CONTRACTOR SHALL NOTIFY THE AND THE IN WRITING A MINIMUM OF FIVE (5) WORKING DAYS PRIOR TO ANY
WORK WITH ANY COUNTY OR CITY RIGHT-OF-WAY.
8. THE CONTRACTOR SHALL COORDINATE WITH ALBUQUERQUE PUBLIC SCHOOLS AND WITH ABQ RIDE TO
ACCOMMODATE THE SCHEDULE FOR ALL DESIGNATED BUS ROUTES.
SPECIAL NOTICES:
9. HAND DELIVER SPECIAL NOTICES TO EACH RESIDENCE OR BUSINESS ADJACENT TO THE CONSTRUCTION AREA AND TO OTHERS WHICH MAY BE AFFECTED BY CONSTRUCTION ACTIVITIES. SPECIAL NOTICES ARE TO INFORM RESIDENTS AND BUSINESSES IN WRITING WHENEVER ACCESS, UTILITY SERVICES, OR OTHER SERVICES TO THEIR
PROPERTIES MAY BE IMPAIRED.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR:
- DELIVERY OF SPECIAL NOTICES NOT MORE THAN SEVEN (7) DAYS PRIOR TO PHYSICAL CONSTRUCTION
THAT WILL AFFECT THE PROPERTY.
- CORRECTED NOTICES ARE TO BE DELIVERED IF CONSTRUCTION DOES NOT START WITHIN 48 HOURS OF
DATE GIVEN IN NOTICE.
- THE WRITTEN NOTICE IS TO STATE:
- CONTRACTOR'S NAME, ADDRESS, AND LOCAL TELEPHONE NUMBER.
- NATURE OF WORK TO BE DONE AND TIMING OF WORK.
- TIME AND LENGTH OF DISRUPTION TO EXPECT.
- EXPECTED DURATION OF CONSTRUCTION.
- CONTRACTOR'S LOCAL PHONE NUMBER TO WHICH EMERGENCY CONDITIONS CAN BE REPORTED DURING
NORMAL WORK HOURS.
- CONTRACTOR'S LOCAL PHONE NUMBER TO WHICH EMERGENCY CONDITIONS CAN BE REPORTED DURING
NON-WORKING PERIODS.
11. CONTRACTOR SHALL COORDINATE MAIL DELIVERY DURING CONSTRUCTION OF THE PROJECT WITH THE U.S.
POSTAL SERVICE SO THAT THERE IS NO INTERRUPTION OF MAIL SERVICE. THIS WORK SHALL BE CONSIDERED
INCIDENTAL TO THE CONTRACT AND NO SEPARATE PAYMENT SHALL BE MADE THEREFORE.
12. DURING CONSTRUCTION, CONTRACTOR SHALL COORDINATE WITH SOLID WASTE FOR TRASH COLLECTION IN FRONT OF PROPERTIES AND MOVE TRASH BINS AS NECESSARY. THE COST FOR PERFORMING THIS WORK IS
INCIDENTAL TO THE CONTRACT AND NO SEPARATE PAYMENT SHALL BE MADE THEREFORE.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MISCELLANEOUS SITE PREPARATION AND CLEANUP WORK
REQUIRED TO COMPLETE THE PROJECT.
DURING CONSTRUCTION:
14. AT LEAST SEVEN (7) CALENDAR DAYS PRIOR TO THE INSTALLATION OF EACH SERVICE LINE, THE CONTRACTOR SHALL DISTRIBUTE A WRITTEN NOTICE TO EACH EXISTING RESIDENCE OF BUSINESS TO BE SERVICED BY THE LINE, ADVISING THEM OF THE PLANNED SERVICE LINE LOCATION AND PROVIDING A CONTACT NAME, ADDRESS AND PHONE NUMBER FOR ANY COMMENTS REGARDING THE PLAN. THE NOTICE WILL STATE IN BOTH ENGLISH AND
SPANISH:
- THE ADDRESS TO BE SERVED.
- SKETCH WITH VALVE PIT AND SERVICE LATERAL LOCATION.
- CONTRACTOR CONTACT INFORMATION
- ALL MARK-UP/RETURNED VALVE PIT SKETCHES SHALL BE FORWARDED TO ENGINEER/INSPECTOR FOR
REVIEW PRIOR TO FINAL PLACEMENT OF VALVE PIT.
- IF RESIDENT DOES NOT RESPOND TO SKETCH, IT SHALL BE ASSUMED THAT THE VALVE PIT LOCATION
AND/OR SERVICE LINE LATERAL LOCATION IS ACCEPTABLE AS SHOWN ON PLAN.
DAMAGE/DISTURBANCE:
15. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED BY IT TO EXISTING WALLS, FENCES, SIDEWALKS, TRAIL SURFACES, IRRIGATION LINES, LANDSCAPING, VALVE BOXES, MANHOLES, ETC. DURING CONSTRUCTION AND
SHALL REPAIR OR REPLACE SAME AT ITS OWN EXPENSE.
16. EXISTING CURB AND GUTTER NOT CALLED OUT TO BE REMOVED UNDER THE CONTRACT WHICH IS DAMAGED OR DISPLACED BY THE CONTRACTOR SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT THE
CONTRACTOR'S OWN EXPENSE.
17. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ANY DAMAGE TO EXISTING PAVEMENT AND CURB AND GUTTER DURING CONSTRUCTION, APART FROM THOSE SECTIONS INDICATED FOR REMOVAL ON THE PLANS AND SHALL REPAIR OR REPLACE THE PAVEMENT OR CURB AND GUTTER USING BERNALILLO COUNTY STANDARD DRAWINGS 2415 AND 2465, AT HIS OWN EXPENSE. CONTRACTOR SHALL SUITABLY PROTECT THE CURB AND GUTTER FROM INCIDENTAL SPLASHING DURING THE TACK COAT APPLICATION AND CLEANING SHALL BE AT THE
CONTRACTOR'S EXPENSE SHOULD SPLASHING OCCUR.
18. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING ANY TRAFFIC SIGNS AND PAVEMENT MARKINGS THAT ARE
DAMAGED OR REMOVED.
19. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING ANY SPEED HUMPS THAT MAY BE DAMAGED DURING CONSTRUCTION, TO THEIR ORIGINAL CONDITION. ANY PAVEMENT MARKINGS ON SPEED HUMPS SHALL BE
REPLACED. ALL OF THIS WORK SHALL BE DONE AT THE CONTRACTOR'S OWN EXPENSE.
20. UPON COMPLETION OF CONSTRUCTION, ALL AREAS WITHIN PROJECT LIMITS WHICH ARE DISTURBED OR ARE TO BE RE-VEGETATED SHALL BE SEEDED IN ACCORDANCE WITH SECTION 1012 "NATIVE PLANT SEEDING" OF THE COA
STANDARD SPECIFICATIONS, EXCEPT AS MODIFIED HEREIN.
21. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A VIDEO TAPE OF THE EXISTING CONSTRUCTION PROJECT SITE PRIOR TO CONSTRUCTION AS OUTLINED IN THE CONTRACT PROJECT SPECIFICATIONS. CONTRACTOR WILL NOT BE
PAID FOR MOBILIZATION UNTIL THE VIDEO TAPE IS PROVIDED.
EARTHWORK:
22. ALL EXCAVATION WILL BE GOVERNED BY FEDERAL, STATE AND LOCAL LAWS, RULES, AND REGULATIONS
CONCERNING CONSTRUCTION SAFETY AND HEALTH.
23. ALL WORK ON THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, RULES AND REGULATIONS CONCERNING SAFETY AND HEALTH. ALL EXCAVATION, TRENCHING AND SHORING ACTIVITIES SHALL BE CARRIED OUT IN ACCORDANCE WITH OSHA 29, CFR 1926.650, SUBPART P.
24. DESIGN AND CONSTRUCTION OF ALL FORMS, SHORING, AND TEMPORARY BRACING SHALL COMPLY WITH 29 CFR 1926 AND THESE COSTS SHALL BE CONSIDERED INCIDENTAL TO THE TRENCHING AND BACK FILL COSTS.
25. ANY DAMAGE TO EXISTING FACILITIES (PAVEMENT, CONDUITS, LANDSCAPING, UTILITY LINES, ETC.) DURING
CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
UTILITY CONTACTS:
COMPANY NAME PHONE #
BERNALILLO COUNTY DAMIAN LUNA OFFICE: (505) 640-6375
AT&T SEAN KELLY OFFICE: (505) 842-2990
BERNALILLO COUNTY TRAFFIC DAVID HALL OFFICE: (505) 848-1542
BERNALILLO COUNTY UTILITIES PATRIC CHAVEZ OFFICE: (505) 848-1505
CABLE COM TIMOTHY STROMM OFFICE: (505) 273-7833
CENTURY LINK DON DAVALOS OFFICE: (505) 710-0753
COMCAST MIKE MORTUS OFFICE: (505) 271-3644
NEW MEXICO GAS RYAN COSTANZA OFFICE: (505) 798-3346
PNM ELECTRIC CHRIS BUDD OFFICE: (505) 848-1505
PAUL DUNAGAN
26. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING INFRASTRUCTURE (C&G, PAVING MARKINGS, PAVING, SIDEWALKS, WHEELCHAIR RAMPS, DRIVEPADS, ETC.) DURING CONSTRUCTION, APART FROM THOSE SECTIONS INDICATED FOR REMOVAL ON THE PLANS. REPAIR OR REPLACEMENT OF THE SAME SHALL BE AT THE CONTRACTOR'S OWN EXPENSE. CONTRACTOR SHALL SUITABLY PROTECT THE CURB AND GUTTER FROM INCIDENTAL SPLASHING DURING THE TACK COAT APPLICATION AND CLEANING SHALL BE AT THE CONTRACTOR'S
EXPENSE SHOULD SPLASHING OCCUR.
27. INCIDENTALS: INCIDENTALS THAT ARE APPLICABLE TO EACH SPECIFIC PROJECT ARE ITEMIZED IN THE
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS.
AS-BUILTS:
28. THE CONTRACTOR SHALL MAINTAIN AN UP-TO-DATE SET OF AS-BUILT PLANS FOR THE PROJECT, PROMPTLY RECORDING DATA, INCLUDING HORIZONTAL AND VERTICAL LOCATIONS FOR ALL UTILITY LINES AND ACCESSORIES, EXISTING OR NEW, REQUIRED BY THE COUNTY FOR THE PREPARATION OF RECORD DRAWINGS BY THE ENGINEER.
CONTRACTOR SHALL NOT COVER UTILITY LINES AND ACCESSORIES UNTIL ALL DATA HAS BEEN RECORDED. THESE PLANS SHALL BE KEPT CURRENT AND AT THE PROJECT SITE AT ALL TIMES AND SHALL BE AVAILABLE TO THE PROJECT MANAGER AND PROJECT ENGINEER AT ANYTIME DURING CONSTRUCTION AND WILL BE CHECKED BY THE ENGINEER FOR ACCURACY AND COMPLETENESS ONCE EVERY TWO WEEKS. THE FINAL AS-BUILT PLANS SHALL BE
SUBMITTED TO THE PROJECT MANAGER PRIOR TO FINAL PAYMENT.
RELEVANT NEW MEXICO REGULATIONS AND OFFICE:
NEW MEXICO SOLID WASTE MANAGEMENT REGULATIONS
TITLE 20-CHAPTER 9-PART 1
WEB SITE ADDRESS- www.nmenv.state.nm.us
29. DISPOSAL OF UNSUITABLE MATERIALS & DEBRIS: THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER IN WRITING OF THE DETAILS OF THE DISPOSAL OPERATIONS. BORROW, MATERIALS, ROCK WASTE, VEGETATION DEBRIS, ETC., SHALL NOT BE PLACED IN WETLAND AREAS OR AREAS WHICH MAY IMPACT ENDANGERED SPECIES OR ARCHAEOLOGICAL RESOURCES. AN ARCHAEOLOGICAL SURVEY AND ENVIRONMENTAL CLEARANCE SHALL BE OBTAINED BY THE CONTRACTOR BEFORE DISPOSAL SITES ARE ACCEPTED IN ACCORDANCE WITH SECTION 107.14 OF THE NEW MEXICO STATE HIGHWAY AND TRANSPORTATION DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION.
30. DISPOSAL SITE FOR ALL EXCESS EXCAVATION MATERIAL, ASPHALT PAVING, CONCRETE PAVING, CURB & GUTTER, SIDEWALKS, DRIVEWAYS AND OTHER REMOVAL ITEMS SHALL BE LOCATED BY THE CONTRACTOR. ALL COSTS INCURRED IN OBTAINING A DISPOSAL SITE AND HAUL THERETO SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION AND NO DIRECT PAYMENT WILL BE THEREFORE. THE DISPOSAL SITE SHALL BE ENVIRONMENTALLY ACCEPTABLE AND APPROVED BY THE PROJECT MANAGER. ALSO, A PERMITTED FACILITY FOR DISPOSABLE HAZARDOUS WASTE SHALL BE LOCATED
AND APPROVED BY PROJECT MANAGER.
31. CONTRACTOR ACTIVITIES IN THE VICINITY OF WATERWAYS: ALL WORK IN THE VICINITY OF LIVE STREAMS, WATER IMPROVEMENTS, WETLANDS, OR IRRIGATION SUPPLIES SHALL BE AFFECTED IN SUCH A MANNER AS TO MINIMIZE VEGETATION REMOVAL, SOILS DISTURBANCES AND EROSION. EROSION, AND CROSSINGS OF LIVE STREAMS WITH HEAVY EQUIPMENT SHALL BE MINIMIZED. AS DETERMINED BY THE PROJECT MANAGER, EQUIPMENT REFUELING, MAINTENANCE, AND CEMENT DUMPING IN THE VICINITY OF WATER CROSSINGS IS STRICTLY PROHIBITED AND SHALL BE PERFORMED IN
PROPER CONTAINMENT AREAS.
ADDITIONAL ENVIRONMENTAL NOTES:
32. THE CONTRACTOR SHALL ENSURE THAT DAMAGE TO OR REMOVAL OF VEGETATION WILL BE KEPT TO A MINIMUM AND THAT NO EXTRANEOUS CLEARING, GRUBBING, LAND DISTURBANCE OR EXCAVATION WILL TAKE PLACE. CONSISTENT WITH THE REQUIREMENTS OF THE DEPARTMENT'S STANDARD SPECIFICATIONS SECTION 107.28 PROTECTION & RESTORATION OF PROPERTY & LANDSCAPING, SECTION 201, CLEARING & GRUBBING, AND SUBSECTION 603.32, CONTRACTOR'S OPERATIONS. THE CONTRACTOR SHALL SEE TO IT THAT TREES AND SHRUBS WITHIN THE RIGHT-OF-WAY AND ALONG THE
FENCE LINES ARE NOT OVERRUN OR DAMAGED BY CONSTRUCTION EQUIPMENT UNNECESSARILY.
33. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL HAVE TEMPORARY AND PERMANENT EROSION CONTROL.
MEASURES IMPLEMENTED BY THE CONTRACTOR SHALL BE IN ACCORDANCE WITH THE NEW MEXICO WATER UTILITY ACT AND APPLIANCE CLEAN WATER ACT PERMITS AND REGULATIONS. THE CONTRACTOR SHALL BEAR THE FULL COST OF IMPLEMENTATION OF EROSION CONTROL. MEASURES AND VEGETATION RE-MEDIATION NECESSARY DUE TO THE CONTRACTOR'S NEGLIGENCE SHALL BE DETERMINED BY THE PROJECT MANAGER AND THE ENVIRONMENTAL PROGRAM MANAGER'S REPRESENTATIVE. THIS WORK WILL BE CONSIDERED INCIDENTAL TO CONSTRUCTION AND NO MEASUREMENT
OR PAYMENT WILL BE MADE.
34. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY NPDES PERMIT DURING CONSTRUCTING, FILLING OUT THE NOTICE OF INTENT (NOI) APPLICATION, NOTICE OF TERMINATION APPLICATION, AND FULFILLING ALL OTHER NECESSARY NPDES REQUIREMENTS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE SUBMITTAL OF A POLLUTION PREVENTION PLAN AND INSPECTION REPORTS. THESE ITEMS SHALL BE PAID FOR UNDER THE BID ITEM FOR
"NPDES STORM WATER PERMITTING AND SWPPP".
35. THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL CLEAN ASPHALT PAVEMENT AND CONCRETE MATERIAL TO BE REMOVED ACCORDING TO THE PLANS. CLEAN ASPHALT IS CLASSIFIED AS FILL MATERIAL AND IS NOT SUBJECT TO THE SOLID WASTE MANAGEMENT REGULATIONS OF THE NEW MEXICO ENVIRONMENTAL DEPARTMENT.
CLEAN IS DEFINED AS "BEING FREE OF SOLID WASTE OR CONTAMINANTS WHICH HAVE THE POTENTIAL OF MIGRATING INTO SURFACE OR GROUND WATER". THE MATERIAL SHALL BE COVERED WITH TWO FEET OF CLEAN EARTH IMMEDIATELY AFTER DISPOSAL. THE MATERIAL CANNOT BE PLACED IN A WATERCOURSE, ARROYO, OR WITHIN 10 FEET OF GROUNDWATER. IF THE ASPHALT AND CONCRETE MATERIAL IS NOT CLEAN, IT IS SUBJECT TO THE SOLID WASTE ACT AND MUST BE PLACED IN AN APPROVED LANDFILL. ALL DISPOSAL SITES ARE SUBJECT TO THE APPROVAL OF THE RESPECTIVE
LANDOWNER AND THE PROJECT MANAGER.
36. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING AND CLEANUP OF SPILLS ASSOCIATED WITH PROJECT CONSTRUCTION AND SHALL REPORT AND RESPOND TO SPILLS OF HAZARDOUS MATERIALS SUCH AS GASOLINE, DIESEL, MOTOR OILS, SOLVENTS, CHEMICALS, TOXIC AND CORROSIVE SUBSTANCES, ETC., WHICH MAY BE A THREAT TO PUBLIC HEALTH OR THE ENVIRONMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING DISCOVERIES OF PAST SPILLS AND OF CURRENT SPILLS NOT ASSOCIATED WITH CONSTRUCTION. REPORTS SHALL BE MADE IMMEDIATELY TO THE NM ENVIRONMENT DEPARTMENT EMERGENCY RESPONSE AT 827-9329. NON-EMERGENCIES MAY BE REPORTED TO 428-2500.
37. CONTRACTOR SHALL CONFORM TO ALL LOCAL AND FEDERAL DUST AND EROSION CONTROL REGULATIONS. THE CONTRACTOR SHALL PREPARE AND OBTAIN ANY DUST CONTROL OR EROSION CONTROL PERMITS FROM THE APPROPRIATE REGULATORY AGENCIES.WATERING, AS REQUIRED FOR CONSTRUCTION DUST CONTROL, SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION AND NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE.
38. CONSTRUCTION AREAS SHALL BE WATERED FOR DUST CONTROL IN COMPLIANCE WITH GOVERNMENT ORDINANCES.
THE CONTRACTOR SHALL COORDINATE WITH ABCWUA FOR WATER AVAILABILITY AND USE. THE CONTRACTOR SHALL SUPPLY ALL EQUIPMENT AND MATERIALS NECESSARY FOR PROVIDING WATER. THE CONTRACTOR WILL CONFINE HIS WORK WITHIN THE CONSTRUCTION EASEMENT LIMITS AND/OR RIGHT-OF-WAY OR PROVIDE COPIES OF AGREEMENTS WITH
ADJACENT LANDOWNERS TO THE COUNTY.
39. TWO (2) WORKING DAYS PRIOR TO ANY EXCAVATION, CONTRACTOR MUST CONTACT NEW MEXICO ONE CALL SYSTEM, 260-1990(ALBUQUERQUE AREA), 1-800-321-ALERT (2537) (STATEWIDE) FOR LOCATION OF EXISTING UTILITIES.
40. THE CONTRACTOR SHALL NOTIFY THE COUNTY SURVEYOR NOT LESS THAN SEVEN (7) DAYS PRIOR TO STARTING WORK IN ORDER THAT THE COUNTY SURVEYOR MAKE TAKE NECESSARY MEASURES TO INSURE THE PRESERVATION OF SURVEY MONUMENTS. CONTRACTOR SHALL NOT DISTURB PERMANENT SURVEY MONUMENTS WITHOUT THE CONSENT OF THE COUNTY SURVEYOR AND SHALL NOTIFY THE COUNTY SURVEYOR AND BEAR THE EXPENSE OF REPLACING ANY THAT MAY BE DISTURBED WITHOUT PERMISSION. REPLACEMENT SHALL BE DONE ONLY BY THE COUNTY SURVEYOR. WHEN A CHANGE IS MADE IN THE FINISHED ELEVATION OF THE PAVEMENT OF ANY ROADWAY IN WHICH A PERMANENT SURVEY MONUMENT IS LOCATED, CONTRACTOR SHALL, AT HIS OWN EXPENSE, ADJUST THE MONUMENT COVER TO THE NEW GRADE UNLESS OTHERWISE SPECIFIED. REFER TO SECTION 4.4 OF THE CITY OF ALBUQUERQUE STANDARD SPECIFICATIONS-PUBLIC WORKS CONSTRUCTION- 1986- UPDATE NO. 8, INCLUDING AMENDMENT 1 TO UPDATE 8.
41. IF ANY UTILITY LINES, PIPELINES, OR UNDERGROUND UTILITY LINES ARE SHOWN ON THESE
DRAWINGS, THEY ARE SHOWN IN AN APPROXIMATE MANNER ONLY, AND SUCH LINES MAY EXIST
WHERE NONE ARE SHOWN. IF ANY SUCH EXISTING LINES ARE SHOWN, THE LOCATION IS BASED UPON INFORMATION PROVIDED BY THE OWNER OF SAID UTILITY, AND THE INFORMATION MAY BE
INCOMPLETE, OR MAY BE OBSOLETE BY THE TIME CONSTRUCTION COMMENCES. THE ENGINEER
HAS CONDUCTED ONLY PRELIMINARY INVESTIGATION OF THE LOCATION, DEPTH, SIZE, OR TYPE OF THE EXISTING UTILITY LINES, PIPELINES, OR UNDERGROUND UTILITY LINES. THIS INVESTIGATION IS
NOT CONCLUSIVE, AND MAY NOT BE COMPLETE, THEREFORE, MAKES NO REPRESENTATION
PERTAINING THERETO, AND ASSUMES NO RESPONSIBILITY OR LIABILITY THEREFORE. THE
CONTRACTOR SHALL INFORM ITSELF OF THE LOCATION OF ANY UTILITY LINE, PIPELINE, OR
UNDERGROUND UTILITY LINE IN OR NEAR THE AREA OF WORK IN ADVANCE OF AND DURING
EXCAVATION WORK. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE
CAUSED BY ITS FAILURE TO LOCATE, IDENTIFY AND PRESERVE ANY AND ALL EXISTING UTILITIES, PIPELINES, AND UNDERGROUND UTILITY LINES. IN PLANNING AND CONDUCTING EXCAVATION, THE CONTRACTOR SHALL COMPLY WITH STATE STATUTES, MUNICIPAL AND LOCAL ORDINANCES, RULES AND REGULATIONS, IF ANY, PERTAINING TO THE LOCATION OF THESE LINES AND FACILITIES.
42. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL EXCAVATE AND VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL OBSTRUCTIONS. SHOULD A CONFLICT EXIST BETWEEN THESE
PLANS AND ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL PROMPTLY NOTIFY THE
ENGINEER IN WRITING SO THAT THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF
DELAY FOR ALL PARTIES.
43. CAUTION: THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION
SAFETY WHICH SHALL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR. ALL WORK ON THIS
PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATED AND LOCAL LAWS, RULES AND REGULATIONS CONCERNING SAFETY AND HEATH. ALL EXCAVATION, TRENCHING
AND SHORING ACTIVITIES MUST BE CARRIED-OUT IN ACCORDANCE WITH OSHA 29 CFR 1926,
SUBPART P-EXCAVATIONS.
44. WHEN APPLICABLE, CONTRACTOR SHALL SECURE "TOPSOIL DISTURBANCE PERMIT" FROM THE
CITY AND AN EXCAVATION/CONSTRUCTION PERMIT FROM THE COUNTY/CITY. AN
EXCAVATION/CONSTRUCTION PERMIT WILL BE REQUIRED BEFORE BEGINNING ANY WORK WITHIN
THE COUNTY RIGHT OF WAY.
45. THE CONTRACTOR SHALL CONTACT BERNALILLO COUNTY TRAFFIC ENGINEER (848-1575)
BEFORE REMOVING AND/OR INSTALLING ANY TRAFFIC SIGNS OR PERMANENT STRIPING AND
MARKINGS. ALL STRIPING, PAVEMENT MARKINGS INCLUDING CROSSWALKS, LEGENDS AND
SYMBOLS ARE TO BE CONSTRUCTED OF INTERSECTION GRADE COLD PLASTIC AND LINE MARKINGS
ARE TO BE CONSTRUCTED OF DURABLE PAINT IN ACCORDANCE WITH THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES(MUTCD) LATEST EDITION. ANY PAVEMENT MARKINGS AND SIGNS
REMOVED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED AT EXISTING LOCATIONS.
SUCH WORK SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION OF THE PROJECT.
46. BARRICADING AND CONSTRUCTION PERMITS MUST BE OBTAINED FROM BCPWD (848-1500)
PRIOR TO BEGINNING OF ANY CONSTRUCTION EFFORTS.
47. THE ACRONYM ABCWUA STANDS FOR THE ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY
AUTHORITY (THE AUTHORITY).
48. THE CONTRACTOR SHALL MAINTAIN A MINIMUM COVER OF 3' OVER ALL CULVERT CROSSING
USED FOR ACCESS TO THE PROJECT SITE.
EPA GENERAL NOTES:
49. IF ANY THREATENED OR ENDANGERED SPECIES OR THEIR HABITATS ARE DISCOVERED DURING CONSTRUCTION, WORK WILL CEASE IMMEDIATELY AND THE EPA WILL BE NOTIFIED IN ORDER THAT
APPROPRIATE MEASURES CAN BE TAKEN IN ACCORDANCE WITH THE ENDANGERED SPECIES ACT.
50. CONSTRUCTION MATERIAL AND WASTE PRODUCTS, INCLUDING MACHINERY LEAKAGE,
MAINTENANCE MATERIAL AND SPILLS, WILL BE CONTAINED AND PROPERLY DISPOSED PRIOR TO
PROJECT COMPLETION.
51. IF HUMAN REMAINS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE LAW
ENFORCEMENT AUTHORITIES AND THE OFFICE OF THE MEDICAL EXAMINER WILL BE CONTACTED.
52. IF CULTURAL MATERIALS ARE DISCOVERED DURING CONSTRUCTION, WORK WILL CEASE
IMMEDIATELY, AND EPA AND THE NEW MEXICO STATE HISTORIC PRESERVATION OFFICER AT (505) 827-4044, WILL BE NOTIFIED OF THE DISCOVERY. EPA WILL PROCEED IN ACCORDANCE WITH THE
REGULATIONS OF THE ADVISORY COUNCIL ON HISTORIC PRESERVATION PRIOR TO TAKING ANY
ACTION WHICH WOULD AFFECT THE CULTURAL RESOURCES.
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
23556
NEW MEX I CO
W
CPED
W
W
AS
PH
AL
T S
PE
ED
BU
MP
W
CPED
W
SET 2" DIA. ALUMINUM CAP
STAMPED "2617402"
MODIFIED GROUND
COORDINATE (USFT)
N: 1,484,648.333 E: 1,598,444.683
ELEV: 6,266.192
SET 2" DIA. ALUMINUM CAP
STAMPED "2617403"
MODIFIED GROUND
COORDINATE (USFT)
N: 1,483,983.613 E: 1,599,526.048
ELEV: 6,275.346
SET 2" DIA. ALUMINUM CAP
STAMPED "2617401"
MODIFIED GROUND
COORDINATE (USFT)
N: 1,484,264.320 E: 1,597,354.139
ELEV: 6,254.590
PROJECT LOCATION
20260174 G-03 3 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
BERNALILLO COUNTY
SURVEY CONTROL
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:13:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_03_G-03_SURVEY CONTROL.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
1"=80'
80 40 0 80
NOTES:
1. THE TOPOGRAPHIC SURVEY MAP IS BASED ON GROUND MODIFIED NEW MEXICO STATE PLANE COORDINATE
SYSTEM, CENTRAL ZONE.
2. THE HORIZONTAL DATUM IS BASED ON NAD83 AND THE VERTICAL DATUM IS BASED ON NAVD88 (GEOID18).
3. PROJECT COMBINED FACTOR = 0.99960603500 FOR GROUND TO GRID TRANSFORMATION OF THE
HORIZONTAL COORDINATES, SCALE ABOUT N = 0, E = 0.
4. THE COORDINATES AND ELEVATIONS SHOWN ARE IN U.S. SURVEY FEET
5. FOR DETAIL ON HOW CONTROL WAS ESTABLISHED, SEE CONTROL REPORT FOR THIS PROJECT DATED
SEPTEMBER 16, 2025.
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
W
50 62
51 62 52 62
0+
1+
1+
BP
0+
.00
EP
1+
.00
4 5
181920
7.5'
LEGEND
EXISTING SURFACE
CONTOUR MAJOR
PROPOSED SURFACE
CONTOUR MAJOR
EXISTING SURFACE
CONTOUR MINOR
PROPOSED SURFACE
CONTOUR MINOR
PROPOSED GRADING
LIMITS
X SECTION CUT
SOIL-FILLED RIPRAP PER
SPECIAL PROVISION 602-D
4" CONCRETE PAD WITH 6"
THICK BASECOURSE
GRADING & RIPRAP POINT TABLE
POINT#
NORTHING
1484349.98
1484363.76
1484374.38
1484382.45
1484384.70
1484388.52
1484387.03
1484385.61
1484383.03
1484368.11
1484355.58
1484341.84
EASTING
1598294.07
1598297.70
1598304.51
1598306.64
1598308.62
1598312.50
1598317.74
1598322.78
1598331.95
1598328.03
1598328.63
1598325.02
ELEVATION
6252.2 +/-
6253.2 +/-
6254.3 +/-
6254.5 +/-
6254.5 +/-
6254.6 +/-
6255.8 +/-
6255.7 +/-
6255.6 +/-
6254.8
6253.4
6252.5 +/-
DESCRIPTION
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
MATCH EDGE OF CONCRETE
MATCH EDGE OF CONCRETE
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
FINISHED GRADE AT EDGE OF RIPRAP
FINISHED GRADE AT EDGE OF RIPRAP
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
GRADING & RIPRAP POINT TABLE
POINT#
NORTHING
1484368.97
1484367.63
1484246.56
1484248.54
1484242.04
1484238.58
1484232.09
1484223.82
1484217.68
1484209.46
1484240.53
EASTING
1598312.93
1598318.04
1598268.86
1598272.03
1598287.96
1598295.82
1598294.11
1598289.56
1598285.29
1598279.59
1598267.27
ELEVATION
6252.24
6252.24
6253.0
6253.0
6253.0
6253.0
6255.9
6256.81
6256.81
6256.0 +/-
6254.0 +/-
DESCRIPTION
EDGE OF CONCRETE
EDGE OF CONCRETE
FINISHED GRADE AT EDGE OF RIPRAP
FINISHED GRADE AT EDGE OF RIPRAP
FINISHED GRADE AT EDGE OF RIPRAP
FINISHED GRADE AT EDGE OF RIPRAP
FINISHED GRADE AT EDGE OF RIPRAP
EDGE OF CONCRETE
EDGE OF CONCRETE
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
FINISHED GRADE AT EDGE OF RIPRAP, MATCH EX.
20260174 C-01 4 13
VC
S
NSKL
G
B
EN
C H
M A
R K
S
BERNALILLO COUNTY
GRADING PLAN
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
GRADING PLAN
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 12:29:pm, Plotted by: KGILBERT P:\20260174\SW\Design\Plans\20260174PLN01.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
1"=10'
10 5 0 10
REMOVE EXISTING ASPHALT TRAIL
TO EXTENTS SHOWN AND
REPLACE WITH CONCRETE
(RADIUS = 20')
INSTALL SOIL-FILLED RIPRAP PER
SPECIAL PROVISION 602-D FROM
WINGWALLS TO ELEV. 6253
SEE DWG. S-05 FOR
WINGWALL DETAILS
SEE NOTE ON S-02
FOR CONCRETE RAMP
INSTALL CONCRETE PAD CONNECTING
EXISTING RAMP TO BRIDGE.
SEE DWG. S-06 FOR
WINGWALL DETAILS
APPROXIMATE LOCATION OF EX. 6"
WATER LINE. EXTENTS UNKNOWN.
PROTECT TREE
IN PLACE
EX. OVERHEAD UTILITY LINE
ASPHALT TRAIL
TO REMAIN
EARTHEN PATHS
TO REMAIN
NEW PEDESTRIAN BRIDGE SEE
STRUCTURE LOCATION PLAN
INSTALL SOIL-FILLED RIPRAP PER
SPECIAL PROVISION 602-D TO
EXTENTS SHOWN
SE
E
SU
RV
EY
C
ON
TR
OL
S
HE
ET
B C-02
A C-02
January 22, 2026
100% FOR
REVIEW
ONLY
FULL DEPTH SAWCUT
EXISTING ASPHALT
TCWRP ADDITIONAL MITIGATION
MEASURES SHOWN IN GRAY SCALE
FOR REFERENCE ONLY
PREVIOUS BRIDGE,
REMOVED SUMMER 2025
SEE DWG. S-08 FOR
REMOVABLE BOLLARD
DETAIL
4'
4'
10'
10' TYP.
CONSTRUCTION NOTES
1. ALL AREAS DISTURBED BY THIS PROJECT SHALL BE
REVEGETATED PER GENERAL NOTE 20.
NOTE:
IT IS ASSUMED THAT TCWRP
ADDITIONAL MITIGATION MEASURES
WILL BE CONSTRUCTED IN THE FIRST
QUARTER OF 2026 IN ADVANCE OF THIS
PEDESTRIAN BRIDGE PROJECT.
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
INSTALL NEW SOIL-FILLED RIPRAP TO ABUT EXISTING
RIPRAP. PROTECT IN PLACE EXISTING RIPRAP OR IF
REMOVAL IS REQUIRED TO FACILITATE CONSTRUCTION,
REINSTALL TO ORIGINAL THICKNESS, SPECIFICATION,
AND ELEVATION. COORDINATE WITH ENGINEER AS
NEEDED.
STA. 1+42.75
0 200-20
.0
.97
1'
BRIDGE DECK
TOP OF SEAT
EXISTING GROUND
FINISHED GROUND
3:1 MAX.3:1 MAX.
SOIL-FILLED RIPRAP
3' THICKNESS
6" TOPSOIL
STA. 0+21.25
0 200-20
.0
.98
SOIL-FILLED RIPRAP
3' THICKNESS
4' 4'
SEE DETAIL 3
ON SHEET S-07
FOR WINGWALL
DETAILS
BRIDGE DECK
TOP OF SEAT
FINISHED GROUND
TCWRP FINISHED
GROUND AND
SOIL-FILLED RIPRAP
6" TOPSOIL
1'
BRIDGE DECK
TOP OF SEAT
3:1 MAX SLOPE
EXISTING GROUND
FINISHED GROUND
SOIL-FILLED RIPRAP
3' THICKNESS
1+20 1+60
6" TOPSOIL
BRIDGE DECK
TOP OF SEAT
0+10 0+50
CONCRETE PATH
TIJERAS CREEK CHANNEL BOTTOM
SOIL-FILLED RIPRAP
3' THICKNESS
6" TOPSOIL
TCWRP FINISHED
GROUND AND
SOIL-FILLED RIPRAP
20260174 C-02 5 13
VC
S
NSKL
G
B
EN
C H
M A
R K
S
BERNALILLO COUNTY
GRADING DETAILS
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
GRADING DETAILS
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 12:29:pm, Plotted by: KGILBERT P:\20260174\SW\Design\Plans\20260174PLN01.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
NORTH ABUTMENT SECTION VIEW
SCALE: 1" = 10'A NORTH ABUTMENT PROFILE VIEW
SCALE: 1" = 10'C
SOUTH ABUTMENT SECTION VIEW
SCALE: 1" = 10'B SOUTH ABUTMENT PROFILE VIEW
SCALE: 1" = 10'D
SE
E
SU
RV
EY
C
ON
TR
OL
S
HE
ET
January 22, 2026
100% FOR
REVIEW
ONLY
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
NOTE:
IT IS ASSUMED THAT TCWRP
ADDITIONAL MITIGATION MEASURES
WILL BE CONSTRUCTED IN THE FIRST
QUARTER OF 2026 IN ADVANCE OF THIS
PEDESTRIAN BRIDGE PROJECT.
SOIL-FILLED RIPRAP DETAIL
SCALE: 1" = 2'E
MIXED AND PLACED CLASS D
SOIL RIPRAP
(SPECIAL PROVISION 602-D)
GEOTEXTILE (CLASS 1)
TOP SOIL LAYER 6" THICK WITH
NATIVE SEED MIX
12" SUBGRADE COMPACTED TO
95% MIN. PER ASTM D-1557
(SPECIAL PROVISION 602-D)
TCWRP SOIL RIPRAP, TOPSOIL,
AND COIR MAT WHERE EXISTS
BRIDGE SEAT
FINISHED GRADE ELEVATIONS PER
GRADING PLAN PROVIDED AT TOP OF TOP
SOIL LAYER1'
20260174 6 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
GENERAL STRUCTURAL NOTES
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:14:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_06_S-01_GENERAL NOTES.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
INDEX OF STRUCTURAL SHEETS
S-01 GENERAL STRUCTURAL NOTES
S-02 STRUCTURE PLAN AND PROFILE
S-03 TRUSS ELEVATION
S-04 TRANSVERSE SECTIONS AND BEARINGS
S-05 ABUTMENT No. 1 DETAILS S-06 ABUTMENT No. 2 DETAILS
S-07 DRILLED SHAFTS DETAILS
S-08 MISCELLANEOUS DETAILS
DESIGN DATA
GENERAL NOTES
DESIGN FOR PEDESTRIAN BRIDGE OVER TIJERAS CREEK AND FOUNDATIONS IS PER LRFD
AASHTO GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES 2009 WITH 2015
INTERIM REVISIONS AND 10TH EDITION OF AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS,
2024. DESIGN METHOD: LOAD AND RESISTANCE FACTOR DESIGN
GRAVITY LOADS:
PEDESTRIAN LIVE LOAD = 90 PSF
VEHICULAR LIVE LOAD = H - 5
WIND LOADS:
HORIZONTAL WIND LOADS
STRENGTH III = 0.068 KSF
SERVICE I = 0.026 KSF
VERTICAL WIND LOADS
STRENGTH III = 0.020 KSF
THERMAL LOADS
COEFFICIENTS OF THERMAL EXPANSION:
CONCRETE THERMAL EXPANSION COEFFICIENT = 0.000072 IN/°F-FT
STEEL THERMAL EXPANSION COEFFICIENT = 0.000078 IN/°F-FT
DESIGN TEMPERATURE RANGES:
CONCRETE DESIGN TEMPERATURE RANGE = 80°F (0° TO 80°F)
STEEL DESIGN TEMPERATURE RANGE = 130°F (-10° TO 120°F)
DESIGN SOIL PARAMETERS
MAXIMUM ALLOWABLE SOIL BEARING PRESSURE = 2500 PSF
EQUIVALENT FLUID PRESSURE - ACTIVE = 35 PSF/FT
EQUIVALENT FLUID PRESSURE - AT REST = 60 PSF/FT
EQUIVALENT FLUID PRESSURE - PASSIVE = 250 PSF/FT
CONCRETE: NMDOT STRUCTURAL CONCRETE
CLASS A
AIR ENTRAINED
(f'c = 3000 psi @ 28 DAYS
STEEL REINFORCEMENT: ASTM A 615 fy = 60 KSI
1. THESE NOTES APPLY TO THE CONSTRUCTION OF THE PEDESTRIAN BRIDGE ONLY. THIS
INCLUDES BOTH ABUTMENTS AND WINGWALLS IN THEIR ENTIRETY. IT ALSO INCLUDES THE
STEEL TRUSS SUPERSTRUCTURE, AND COMPOSITE IN THEIR ENTIRETY.
2. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE DESIGN AND FABRICATION OF
THE PEDESTRIAN BRIDGE SUPERSTRUCTURE. THE PEDESTRIAN BRIDGE
SUPERSTRUCTURE DESIGN SHALL BE IN ACCORDANCE WITH SECTION 541-A OF THE
SUPPLEMENTAL TECHNICAL SPECIFICATIONS. THE DESIGN SHALL BE STAMPED BY A
STATE OF NEW MEXICO REGISTERED PROFESSIONAL ENGINEER.
3. THE CONTRACTOR SHALL PROVIDE AND SUBMIT A 3-D MEMBER IDENTIFICATION MODEL OF
THE STEEL TRUSS BRIDGE ALONG WITH A STAMPED DESIGNED LETTER DOCUMENTATION
OF A THIRD-PARTY INDEPENDENT STATE OF NEW MEXICO REGISTERED PROFESSIONAL
ENGINEERS REVIEW OF THE TRUSS DESIGN AND FABRICATION SHOP DRAWINGS.
4. IN THE EVENT OF A CONFLICT BETWEEN NMDOT SPECIFICATIONS AND SUPPLEMENTARY
TECHNICAL SPECS, THE SUPPLEMENTARY SPECIFICATIONS SHALL TAKE PRECEDENCE.
5. WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE NEW MEXICO STATE
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY & BRIDGE
CONSTRUCTION 2019 AND APPLICABLE SUPPLEMENTAL SPECIFICATIONS AND SPECIAL
PROVISIONS.
6. CONCRETE MIX DESIGN SHALL BE BASED ON MEDIUM- FREEZE THAW RISK ZONE.
7. DRILLED SHAFTS SHALL BE CLASS G CONCRETE.
8. CHAMFER ALL EXPOSED EDGES OF STRUCTURES 3/4" UNLESS OTHERWISE NOTED.
9. REINFORCE BARS SHALL BE GRADE 60. DIMENSIONS SHOWN REFER TO THE CENTERLINE
OF THE BARS UNLESS NOTES OTHERWISE.
10. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION.
THE ENGINEER OF RECORD SHALL BE NOTIFIED BY ANY DISCREPANCIES OR
INCONSISTENCIES.
11. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE SHOWN ON DRAWINGS.
12. NOTES ON DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND
TYPICAL DETAILS.
GENERAL NOTES, CONT.
11. THE CONTRACTOR STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR
SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING
CONSTRUCTION, AS WELL AS WORKER SAFETY AND COMPLIANCE WITH OSHA OR OTHER
AGENCY SAFETY GUIDELINES, SUCH MEASURES SHALL INCLUDE BUT NOT BE LIMITED TO,
BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC..
12. NOTCHING OR CUTTING IN ANY STRUCTURAL MEMBER IN THE FIELD IS PROHIBITED, UNLESS
APPROVED BY THE STRUCTURAL ENGINEER.
13. A REGISTERED, GEOTECHNICAL ENGINEER SHALL OBSERVE ALL CONTROLLED EARTHWORK.
THE GEOTECHNICAL ENGINEER SHALL PROVIDE PERIODIC ON-SITE OBSERVATION BY
EXPERIENCED PERSONNEL DURING CONSTRUCTION OF CONTROLLED EARTHWORK.
14. THE GEOTECHNICAL ENGINEER SHALL SUBMIT THE RESULTS OF ALL REQUIRED TESTS TO THE
OWNER OR OWNER'S REPRESENTATIVE.
15. FABRICATOR SHALL PROVIDE EXPANSION AND FIXED BEARINGS WHERE INDICATED IN PLAN.
EXPANSION BEARINGS SHALL UTILIZE ELASTOMERIC BEARING PADS OR *FRICTIONLESS*
PLATES TO PERMIT THERMAL EXPANSION AND CONTRACTION PARALLEL TO AXIS BRIDGE.
16. AUGERCAST DRILLED SHAFTS SHALL BE CONSTRUCTED PER SECTION 502 OF THE NMDOT
STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION.
17. CONTRACTOR IS RESPONSIBLE FOR PROVIDING BRIDGE LIGHTING AND SHALL COORDINATE
WITH BRIDGE FABRICATOR REGARDING FIXTURES, MOUNTING AND ACCESS. LUMINAIRES
SHALL CONFORM TO THE LUMINAIRE PARAMETERS TABLE, THIS SHEET.
18. A SUBSURFACE SOIL INVESTIGATION HAS BEEN PREFORMED BY GEOMAT, JOB NO. 252-5532A , REPORT DATED JANUARY 20, 2026. SCOUR DEPTH, AND SHAFT ALLOWABLE CAPACITIES (AS
NOTED IN THE BRIDGE DESIGN DATA, THIS SHEET) IS BASED UPON THE GEOTECHNICAL
REPORT RECOMMENDATIONS.
FOUNDATION DESIGN DATA TABLE
BRIDGE COLOR TABLE
LOCATION DIAMETER
(IN.) QUANTITY ESTIMATED
LENGTH (FT)
TOP
ELEVATION
(FT)
BOTTOM
ELEVATION
(FT)
SERVICE
DESIGN LOAD
(KIPS)
FACTORED
DESIGN LOAD
(KIPS)
ALLOWABLE
CAPACITY
(KIPS)
FACTORED
CAPACITY
(KIPS)
ABUTMENT No. 1 24 2 46 6252.83 6206.83 49 72 200 88 ABUTMENT No. 2 24 2 46 6252.33 6206.33 49 72 260 112
BRIDGE COLOR TABLE
AREAS FOR COLOR TREATMENT TREATMENT COLOR
1. BRIDGE STRUCTURE 2 -
2. ABUTMENT CAPS/ WINGWALLS 1 1
TREATMENTS:
1. SMOOTH FORM FINISH
2. SELF-WEATHERING STEEL
COLORS:
1. SUBMIT COLOR WHEEL TO
OWNER FOR SELECTION
ABBREVIATIONS
C.I.P. = CAST-IN-PLACE
EXIST. = EXISTING
LT. = LEFT
RT. = RIGHT
D.L. = DRIVING LANE
SHLD. = SHOULDER
CLR. = CLEAR, CLEARANCE
O.C. = ON CENTER
C.S.L = CROSS-HOLE SONIC LOGGING
F.V. = FIELD VERIFY
E.F. = EACH FACE
O.F. = OUTSIDE FACE
F.F. = FAR FACE
I.F. = INSIDE FACE
N.F. = NEAR FACE
N.T.S. = NOT TO SCALE
TYP. = TYPICAL
MINIMUM REBAR SPLICE LENGTHS FOR CONCRETE
BAR SIZE MIN LAP SPLICE
#4 21 IN
#5 26 IN
#6 33 IN
#7 45 IN
#8 58 IN
S-01
ESTIMATED QUANTITIES
BACKFILL GRADATION
SIEVE SIZE PERCENT PASSING
3 INCH 100
No. 4 50-100
No. 200 50 MAX
COMPACTION REQUIREMENTS
THE PLASTICITY INDEX SHALL BE NO GREATER THAN 15 WHEN TESTED IN ACCORDANCE WITH ASTM D4318.
SUBGRADE SOILS AND STRUCTURAL FILL MATERIALS SHALL BE COMPACTED TO THE FOLLOWING PERCENTAGES OF THE
ASTM D1557 MAXIMUM DRY DENSITY AT ±3% OPTIMUM MOISTURE CONTENT:
MATERIAL: MINIMUM PERCENT COMPACTION
BENEATH FOUNDATIONS 95%
BENEATH SLABS 95%
BENEATH PAVEMENTS 95%
AGGREGATE BASE 95%
MISCELLANEOUS BACKFILL 90%
TESTS FOR DEGREE OF COMPACTION SHALL BE DETERMINED BY THE ASTM D1556 METHOD OR ASTM D2922.
OBSERVATION AND FIELD TEST SHALL BE CARRIED ON DURING FILL AND BACKFILL PLACEMENT BY THE GEOTECHNICAL ENGINEER TO ASSIST THE CONTRACTOR IN OBTAINING THE REQUIRED DEGREE OF COMPACTION. IF LESS THAN 95 PERCENT RELATIVE COMPACTION IS INDICATED, ADDITIONAL COMPACTION EFFORT SHALL BE MADE WITH ADJUSTMENT
OF THE MOISTURE CONTENT AS NECESSARY UNTIL 95 PERCENT COMPACTION IS OBTAINED.
ITEM SPEC DESCRIPTION UNIT QUANTITY
1 541 PREFABRICATED PEDESTRIAN BRIDGE LS 1
2 511 REINFORCED CONCRETE C.Y. 18
3 543 RAILING L.F. 81
4 502 DRILLED SHAFT FOUNDATION 24" DIAMETER L.F. 184
5 210 STRUCTURAL EXCAVATION C.Y. 1196
6 210 STRUCTURAL BACKFILL C.Y. 985
7 203 UNCLASSIFIED EXCAVATION C.Y. 21
8 602 SOIL-FILLED RIPRAP C.Y. 170
9 608 CONCRETE SIDEWALK 4" S.Y. 25
10 706 BRIDGE LIGHTING L.S. 1
11 667 REMOVEABLE BOLLARD EACH 1
12 601 ASPHALT REMOVAL S.Y. 16
13 632 SEEDING ACRE 1
14 632 TOPSOIL C.Y. 30
15 621 CONSTRUCTION MOBILIZATION LS 1
16 801 CONSTRUCTION STAKING LS 1
17 618 CONSTRUCTION TRAFFIC CONTROL & BARRICADING LS 1
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
LUMINAIRE PARAMETERS
AVERAGE HORIZONTAL FOOTCANDLE 1
MINIMUM HORIZONTAL FOOTCANDLE 0.2
AVERAGE/MINIMUM RATIO 4
MINIMUM VERTICAL FOOTCANDLE AT 1.5M 0.5
COLOR RENDERING INDEX (MINIMUM) 80
CORRELATED COLOR TEMPERATURE 3000 K
EXPECTED LIFETIME (MINIMUM) 60000 HOURS AT 25°C
MANUFACTURER'S WARRANTY 5+ YEARS
VOLTAGE 120 VOLTS AC
AMBIENT OPERATING TEMPERATURE -30°C TO 60°C
124'-0" C BRG. TO C BRG.L L
CLBRG. = C ABUT No. 1L CLBRG. = C ABUT No. 2L
FIXED EXP.
0+00 1+00 1+60
24" Ø DRILLED
SHAFT
PROFILE GRADE
24" Ø DRILLED
SHAFT
FINISHED
GRADE EXISTING
GRADE
FINISHED
GRADE
RAILING, CONT.
ATTACHED TO
EXISTING RAILING
ON CONC. RAMP
WINGWALL
WINGWALL
FOOTING
RAILING, CONT. ST
A
= 0 +2
0.0
EL
EV
.75
100-YR WSEL
50 62
51 62 52 62
124'-0" C BRG. TO C BRG.
TIJ
ER
AS
C
RE
EK
CLBRG. = C ABUT No. 1
1'-4"1'-4"
126'-8" BACK-TO-BACK OF BACKWALLS
125'-0" PRE-ENGINEERED STEEL TRUSS BRIDGE
6253 6254
L L
N14°43'28"E
L
0+
1+
1+
CLBRG. = C ABUT No. 2L
C BRG. ABUT No. 1
STA 0+20.00
C BRG. ABUT No. 2
STA 1+44.00
L
L
CONC. RAMP
IF REQ.
UGRD. ELEC. CONDUIT FOR
BRIDGE LIGHTING, APPROX.
103'-0"
WINGWALL,
TYP.
PREVIOUS BRIDGE,
REMOVED SUMMER 2025 RAILING,
DETAILS 1
AND 2/S-08B-02
B-01
REMOVABLE BOLLARD,
DETAIL 6/S-08
RAILING, DETAILS 4
AND 5/S-08
C
BR
ID
GE
L
No. 1
8'- 0"
CL
R.
20260174 7 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
STRUCTURE LOCATION PLAN AND PROFILE
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:14:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_07_S-02_STRUCTURE PLAN & PROFILE.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
S-02
1 STRUCTURE LOCATION PLAN
SCALE: 1" = 10'-0"
2 STRUCTURE PROFILE
SCALE: 1" = 10'-0"
WATERWAY DATA - 100 YEAR EVENT
DRAINAGE AREA 56 SQ. MI.
DESIGN DISCHARGE 9117 CFS
VELOCITY 11 FT/SEC
WSEL 6258.6 FT
EXPECTED MAX SCOUR 16.1 FT
BRIDGE POINT TABLE
POINT NORTHING EASTING STATION DESCRIPTION
1 1484217.60' 1598275.83' 0+00.00' BEGINNING OF ALIGNMENT
2 1484236.94' 1598280.91' 0+20.00' CENTER OF BRG. ABUT. No. 1 3 1484356.87' 1598312.43' 1+44.00' CENTER OF BRG. ABUT. No. 2
4 1484372.34' 1598316.50' 1+60.00' END OF ALIGNMENT
X
LEGEND
APPROXIMATE BOREHOLE LOCATIONB-XX
1. MOUNT JUNCTION ON BRIDGE ABUTMENT SUPPORT AND
RISE CONDUIT TO BOX. CONTINUE CONDUIT /
CONDUCTOR TO NEW BRIDGE LIGHT FIXTURE.
2. UNDERGROUND ELECTRICAL CONDUIT FOR BRIDGE
LIGHTING, EXTEND CONDUIT/CONDUCTOR FROM
EXISTING MULTI-PURPOSE CENTER BUILDING TO NEW
BRIDGE JUNCTION BOX, APPROXIMATELY 150'-0".
X ELECTRICAL KEYED NOTES
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
1'-
C BRG = C ABUTMENTL L
124'-0" (C BRG TO C BRG)L L
FINISHED GRADE
ABUT. No. 1 - 6256.75' ABUT. No. 2 - 6256.25'
90°TYP.
TOE PLATE,
TYP.
RECESSED LIGHTING, TYP.,
SEE DETAIL 3 THIS SHEET
SAFETY RAILING,
TYP.
20260174 8 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
TRUSS ELEVATION
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:14:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_08_S-03_TRUSS ELEVATION.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
L = 124'-0"
CAMBER = ΔDL + ΔLL
(12" MAX)
S-03
1 HALF TRUSS ELEVATION
SCALE: NTS
SHEET NOTES
1. VERIFY ALL E DIMENSIONS MARKED WITH "*" WITH THE PRE-ENGINEERED BRIDGE
MANUFACTURER.
2. THE ELEVATIONS SHOWN REPRESENT THE AS-BUILT CONFIGURATION OF THE TRUSSES
WITH COMPOSITE DECK IN PLACE. THE BRIDGE MANUFACTURER SHALL PROVIDE CAMBER
AS NECESSARY TO COUNTERACT THE DEAD LOAD AND LIVE LOAD DEFLECTION OF THE
BRIDGE TRUSSES AND COMPOSITE DECK.
3. RAILING IS PARALLEL TO DECK.
2 CAMBER DIAGRAM
SCALE: NTS
3 LIGHTING FIGURE
SCALE: NTS
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
SEAT ELEVATION -
SEE SHEETS S-05
AND S-06
1'-
AT
BE
AR
IN
G
6'- 1"
M
IN
4'- 0"
M
IN
SA
FE
TY
R
AI
L
3'- 6"
RU
B
RA
IL
RUB RAIL
RECESSED LIGHTING
IN VERTICALS*
SAFETY RAILING TO BE
SPACE SO AS TO
PREVENT THE PASSAGE
OF A 4"Ø SPHERE, TYP.
RECESSED LIGHTING IN
VERTICALS*
DISCONTINUE SAFETY
RAILING AT LIGHTING
LOCATIONS
CLBRIDGE = C TRAILL
2'- 0"
A
BV
DE
CK
HSS TOP CHORD
HSS BOTT. CHORD
HSS WEB DIAGONAL
COMPOSITE DECK
w/ SURFACE GRIP
STRINGER
FLOOR
BEAM
HSS DIAGONAL
BRACE
HSS WEB VERTICAL
TOE PLATE
8'-0" CLR. BTW. RAILS
ELECTRICAL CONDUIT FOR
RECESSED LIGHTING
NOTES:
1. BRIDGE MANUFACTURER SHALL PROVIDED CUTOUTS IN VERTICALS
MATCHING SIZE OF LIGHT BOX, LIGHT ATTACHMENT PLATE INSIDE
VERTICAL, 1 1/8"Ø ACCESS HOLE BETWEEN DECK AND TOE RAIL.
2. SHOP/CONTRACTOR TO COORDINATE AND VERIFY LIGHT CUT OU SIZE
WITH ACTUAL LIGHT FIXTURE PRIOR TO CUTTING HOLES.
CONT. 1"x5 1/2" (ACTUAL) DFL RUB RAIL S4S, E4E w/ 1/8" EDGE EASE
RADIUS
L1 1/4"x1 1/4"x1/8"x5" LONG w/ (2) 1/4"Øx1 1/2" SELF WEATHERING
CARRIAGE BOLS @ EA. VERT.
1/4
TY
P.
COMPOSITE DECK
w/ SURFACE GRIP
HSS BOTT. CHORD
(2) 1" Ø x18" MIN. EMBED ASTM F1554 GR. 55
ANCHOR RODS. CONTRACTOR SHALL
COORDINATE FINAL DESIGN WITH BRIDGE
FABRICATOR AND EOR.
STRINGER
FLOOR
BEAM
BACKWALL
CLBRG. = C ABUT.L
DOUBLE NUT,
TACK WELDCONCRETE
ABUTMENT
1/4"x12" GALV. STEEL
JNT. COVER PLATE,
DETAIL 4/S-05
HSS WEB VERTICAL
PLANK HOLDDOWN
BUTTON HEAD SCREW,
(1) PER PLANK EA. END
FLAT HEAD SCREW, (2)
PER PLANK
HSS BOTT.
CHORD STRINGER
CENTER
NAILER
20260174 9 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
TRANSVERSE SECTION AND BEARINGS
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:14:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_09_S-04_TRANSVERSE SECTION.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
S-04
1 TRANSVERSE SECTION
SCALE: NTS -
3 RUB RAIL DETAIL
SCALE: NTS
2 BEARING SIDE VIEW
SCALE: NTS
4 COMPOSITE DECK DETAIL
SCALE: NTS
SHEET NOTES
1. VERIFY ALL E DIMENSIONS MARKED WITH "*" WITH THE
PRE-ENGINEERED BRIDGE MANUFACTURER.
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
CLBRIDGE = C TRAILL
C LB
RG
C
AB
UT
L
1'- 4"
1'- 4"
2'- 8"
8" 2'-
0"
4'-0" 8" 5'-4" 5'-4" 8" 4'-0"
6'-0" 6'-0"
12'-0"
RAILING, DETAILS 4 AND 5/S-08
CLBRIDGE = C TRAILL
1'-
3'-
0"
4'-
4'-0"
WINGWALL
2'-6" 3'-6" 3'-6" 2'-6" 4'-0"
WINGWALL
12'-0"
WINGWALL
24"Ø DRILLED
SHAFT, TYP.
CONCRETE
ABUTMENT
BACKWALL
2"x4" KEYWAY, TYP.
1/2" EXP. JNT.
MATERIAL
±1'-5" ±1'-5"
1'-
3'-
0"
4'-
WINGWALL
8"
ABUTMENT SEAT
(BEYOND)
3/4" CHAMFER, TYP.
ALL EXP. EDGES
(2) 1" Øx18" MIN. EMBED ASTM
F1554 GR. 55 ANCHOR RODS.
COORDINATE FINAL DESIGN
1'-
3'-
0"
4'-
24"Ø DRILLED
SHAFT, TYP.
CLABUT = C DRILLED SHAFTL
2"
JNT.
8" 2'-0" 1'-4" 1'-4"
2'-8"
ABUTMENT CAP
SEAT ELEV. -
6254.83'
FLOOR BEAM
COMPOSITE
STRINGER
HSS BOTT. CHORD
BEARING ASSEMBLY
1/4"x12" GALV. STEEL JNT. COVER P w/ STOVE
BOLTS CENTERED IN
BACKWALL, FULL
WIDTH OF DECK
L
(2) 1" Øx18" MIN. EMBED ASTM
F1554 GR. 55 ANCHOR RODS.
CONTRACTOR SHALL
COORDINATE FINAL DESIGN
WITH BRIDGE FABRICATOR
AND EOR.
CLABUT = C DRILLED SHAFTL
2" C
LR
TO
P
#4 VERT. @ MAX
12" O.C.
#4 HORIZ. @ MAX 6"
O.C. ABV. SEAT
(4) #6 BARS T&B
(2) #4 BARS, EVENLY
SPACED EA. SIDE
#4 STIRRUPS @ MAX
12" O.C.
2"x4" KEY, TYP.
3" CLR. SIDES
& BOTT.
#4 VERT. @
12" O.C.
#4 HORIZ @ MAX 6"
O.C. ABV. SEAT
2" CL
R.
2" CL
R.
#4 HORIZ @ MAX 12"
O.C. BLW. SEAT
ABUTMENT SEAT
(BEYOND)
#4 BARS w/ STD. HK.
@ MAX 12" O.C.(4) #4 BARS VERT.
BARS
#4 HORIZ. @ MAX
6" O.C. ABV. SEAT
#4 STIRRUPS @
MAX 12" O.C.
#4 HORIZ. @ MAX 12"
O.C. BLW. SEAT
(4) #6 BARS
T&B
(2) #4 BARS, EVENLY
SPACED EA. SIDE
#4 VERT. @ MAX 12"
O.C. IN BACKWALL
(4) #4 BARS VERT.
BARS
#4 BARS w/ STD. HK.
@ MAX 12" O.C.
20260174 10 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
ABUTMENT 1 DETAILS
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:14:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_10_S-05_ABUTMENT 1 DETAILS.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
S-05
1 ABUT. No. 1 LAYOUT PLAN
SCALE: 1/2" = 1'-0"
2 ABUT. No. 1 ELEVATION
SCALE: 1/2" = 1'-0"
SHEET NOTES
1. VERIFY ALL E DIMENSIONS MARKED WITH "*" WITH THE
PRE-ENGINEERED BRIDGE MANUFACTURER.
3 SECTION
SCALE: N.T.S. -
4 SECTION
SCALE: N.T.S.
5 ABUT. No. 1 REINFORCING PLAN
SCALE: 1/2" = 1'-0"
6 ABUT. No. 1 REINFORCING ELEVATION
SCALE: 1/2" = 1'-0"
7 SECTION
SCALE: N.T.S. -
8 SECTION
SCALE: N.T.S.
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
CLBRIDGE = C TRAILL
C LB
RG
C
A
BU
T.
L
1'- 4"
8" 2'-
0" 8" 5'-4" 5'-4" 8"
6'-0" 6'-0"
12'-0"
1'- 4"
2'- 8"
3'-9 5/8" BTW.
JNTS.
CONC. IF REQ. RAMP
~ 1 0'-
7/
FIE
LD
VE
RI
FY
RAILING,
DETAIL 1 AND
2/S-08
EXISTING RAILING
EXISTING RAMP
±1'-5"CLBRIDGE = C TRAILL
2'-6" 3'-6" 3'-6" 2'-6"
12'-0"
24"Ø DRILLED
SHAFT, TYP.
CONCRETE
ABUTMENT
2"x4" KEYWAY, TYP.
±1'-5"
3'- 0"
1'-
4'-
BACKWALL
RAILING, TYP.
1'-
3'-
0"
4'-
24"Ø DRILLED
SHAFT, TYP.
CLABUT = C DRILLED SHAFTL
2"
JNT.
8" 2'-0" 1'-4" 1'-4"
2'-8"
ABUTMENT SEAT
SEAT ELEV. -
6254.83'
FLOOR BEAM
COMPOSITE DECK
STRINGER
HSS BOTT. CHORD
BEARING ASSEMBLY
1/4"x12" PAINTED STEEL JNT. COVER P w/ STOVE
BOLTS CENTERED IN
BACKWALL, FULL
WIDTH OF DECK
L
(2) 1" Øx18" MIN. EMBED ASTM
F1554 GR. 55 ANCHOR RODS.
CONTRACTOR SHALL
COORDINATE FINAL DESIGN
WITH BRIDGE FABRICATOR
AND EOR.
1'-
2'-
0"
MA
X.
6'- 2"
WINGWALL
8"
ABUTMENT SEAT
3/4" CHAMFER, TYP.
ALL EXP. EDGES
1'-3" 2'-6"
3'-9"
1'- 3"
1'- 0"
MI
N.
F.G.
2"x4" KEYWAY, TYP.
1/2" EXPANSION JOINT
MATERIAL SEALED
WITH 1/2" NP1
(2) 1" Øx18" MIN. EMBED ASTM
F1554 GR. 55 ANCHOR RODS.
COORDINATE FINAL DESIGN
WITH BRIDGE FABRICATOR
CLABUT = C DRILLED SHAFTL
2" C
LR
TO
P
#4 VERT. @ MAX
12" O.C.
#4 HORIZ. @ MAX 6"
O.C. ABV. SEAT
(4) #6 BARS T&B
(2) #4 BARS, EVENLY
SPACED EA. SIDE
#4 STIRRUPS @ MAX
12" O.C.
2"x4" KEY, TYP.
#4 BARS w/ STD. HK.
@ MAX 12" O.C.(4) #4 BARS VERT.
BARS
#4 HORIZ. @ MAX
6" O.C. ABV. SEAT
#4 STIRRUPS @
MAX 12" O.C.
(4) #6 BARS
T&B
(2) #4 BARS, EVENLY
SPACED EA. SIDE
#4 VERT. @ MAX 12"
O.C. IN BACKWALL
(4) #4 BARS VERT.
BARS
#4 BARS w/ STD. HK.
@ MAX 12" O.C.
#5 VERT. @
6" O.C.
#4 HORIZ. @
12" O.C.
#5 VERT. @
6" O.C. T&B
(5) #4 HORIZ. EVENLY
SPA. T&B
3" C
LR
BO
TT
SI
DE
S
2" C
LR
TO
P
2" CLR.
20260174 11 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
ABUTMENT 2 DETAILS
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:14:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_11_S-06_ABUTMENT 2 DETAILS.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
S-06
SHEET NOTES
1. VERIFY ALL E DIMENSIONS MARKED WITH "*" WITH THE
PRE-ENGINEERED BRIDGE MANUFACTURER.
1 ABUT. No. 2 LAYOUT PLAN
SCALE: 1/2" = 1'-0"
2 ABUT. No. 2 ELEVATION
SCALE: 1/2" = 1'-0"
4 SECTION
SCALE: N.T.S.
3 SECTION
SCALE: N.T.S.
5 ABUT. No. 2 REINFORCING PLAN
SCALE: 1/2" = 1'-0"
7 ABUT. No. 2 REINFORCING ELEVATION
SCALE: 1/2" = 1'-0"
8 SECTION
SCALE: N.T.S.
7 SECTION
SCALE: N.T.S.
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
3" CL
R.
(91 ) S
PA
CE
S
6" O
C = 4
5'- 6"
(92 ) B
AR
S
3" (9)
S
PA
3"
O.
C.
2'-
3" (1
0)
BA
RS
3"3"
24"Ø DRILLED
SHAFT
ABUTMENT
CAP
#7 VERT.,
TYP.
C.S.L.TUBE, TYP.
'-0
24"Ø
3"
CLR.
(8) #7 BARS, TYP.
#4 TIES w/ 135° HK. EA.
END @ 6" O.C., TYP.
STAGGER TIE SPLICES
@ ALT. TIES 6" MIN.
20260174 12 13
JE
C
KX
M
JE
C
B
EN
C H
M A
R K
S
DRILLED SHAFT DETAILS
TIJERAS PEDESTRIAN BRIDGE REPLACEMENT
www.bhinc.com 800.877.5332
Thu, 22-Jan-2026 - 2:15:pm, Plotted by: KMANCINAS P:\20260174\STRUCT\Drawings\ACAD\20260174_12_S-07_DRILLED SHAFT DETAILS.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
S-07
2 TYPICAL DRILLED SHAFT SECTION
SCALE: NTS
1 TYPICAL DRILLED SHAFT ELEVATION
SCALE: NTS
24"Ø24"Ø
BERNALILLO COUNTY
PUBLIC WORKS DIVISION
TECHNICAL SERVICES DEPARTMENT
8'-0" MAX. POST SPACING
SADDLE CUT & GRIND
SMOOTH, TYP.3/16"
2" Ø SCH. 40
HANDRAIL.
3/8" x 4" x CONT. TOE PLATE, WELDED TO POSTS
EDGE OF WALL
NOTE: PROVIDE RAIL
EXPANSION JOINTS PER DETAIL
3/S-0X @ MAX. 40'-0" O.C.
EQ. EQ.
C POSTL
4 1 /2"
EM
BE
D.
1 1/2" 5" 1 1/2"
DRILL AND EPOXY 1/2" Ø x4 1/2" EMBED THREADED RODS w/ HILTI HIT-RE 500
V3, TYP. OF (4) PER POST.
P 3/8"x8"x0'-8"L 2 3 /4"
3 1 /2"
2 3 /4"
1 3 /4"
5 1 /2"
1 3
/4"1/2" Ø A307 THRU
BOLT, (2) PER
POST, TYP.
2" Ø SCHEDULE 40
POST
HSS3"x3"x1/4"x0'-9"
(3/16") 8"
MOUNT - PLAN MOUNT - ELEVATION
5'-3 1/2" F.V.
3/4" CHAMFER,
TYP.
1'- 0"
VA
RI
ES
2'-
0" M
AX
FIN. GR.
1'- 6"
2" C
LR
TO
P
T.O.C.
8"
1'-0"
TYP.
3" CLR.
3" C
LR
#4 @ 12" O.C. E.W.
#4 @ 12" O.C. E.W.
8"
3'- 0"
1'-0"
6" 6"
3" 2'-
9"
MOUNT - ELEVATION
SEE FILL MOUNTED
RAILING DETAIL
8'-0" MAX. POST SPACING
SADDLE CUT & GRIND
SMOOTH, TYP. 3/16"
2" Ø SCH. 40
HANDRAIL.
3/8" x 4" x CONT. TOE PLATE, WELDED TO POSTS, TERMINATE AT END RAIL.
NOTE: PROVIDE RAIL EXPANSION
JOINTS PER DETAIL 3/S-0X @ MAX.
40'-0" O.C.
2" Ø SCH. 40
HANDRAIL.
3"
ABUTMENT
BACKWALL
PROVIDE 3" CLR.
FROM BRIDGE
END VERTICAL
3'- 0"
2'- 8"
3" MI
N
1'-3"Ø
1"
6" DIA. NOM SCH 40 GALV STL PIPE
PAINTED PIPE w/ AN OIL BASE
ALKYD PRIMER AND AN OIL BASED
ALKYD ENAMEL TO COAT; COLOR
TO BE BRIGHT YELLOW.
BIT JNT FILLER @ CONC PAV
FIN GR OR PAV
CONC COLLAR, 3000 PSI @ 28 DAYS
w/ SMOOTH OR BROOM FINISH
WHERE PAV IS ADJ
5"
5" DIA. NOM SCH 40 GALV. STEEL
PIPE TO BE FILL w/ CONC
1/4
2" WIDE REFLECTIVE TAPE,
AS APPROVED BY
ENGINEER, LOCATE
AROUND PIPE AS SHOWN
1/4" x 6 5/8" DIA. GALV. STEEL
PLATE COVER, WELDED TO PIPE.
SEE DETAILS A AND B, THIS SHEET
DETAIL A
DETAIL B
3"
4"
1/4 3 1/2"
4" NOMINAL DIA. SCHEDULE
40 GALV. STEEL PIPE, 5'-2"
TO BE FILLED W/ CONC.
PAINT PIPE BRIGHT
YELLOW ABOVE FINISHED
GRADE.
ALI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .