This Erosion and Sediment Pollution Control (E&S) Plan document prepared by Pennoni Associates Inc. outlines environmental protection measures for the repair of Bridge No. TBT-1, T-301 (Upper Buck Ridge Road) over Sherman Creek in Toboyne Township, Perry County, Pennsylvania. The project involves bridge superstructure repairs including a 30-foot steel I-beam structure, steel open grid deck, concrete backwall reconstruction, asphalt approach roadway reconstruction, and associated traffic maintenance and protection. The work site encompasses a total disturbed area of 0.17 acres with a concrete washout area of 0.02 acres and staging area of 0.03 acres. The project drains to Sherman Creek, which is designated as a Class A trout water and High Environmental Quality Cold Water Fishery (HQ-CWF) water requiring specific environmental protections. Construction restrictions will be in place from October 1 through April 1 to protect the naturally reproducing trout stream. Sealed bids for this project were due September 2, 2026, with public bid opening scheduled for September 14, 2026, at 5:00 p.m. at the Toboyne Township Board of Supervisors meeting.
The E&S plan specifies detailed erosion control measures including compost filter socks (12-inch diameter) positioned at existing contour grades, concrete washout facilities with impermeable geomembranes, and stabilization requirements for all disturbed areas. Contractors must comply with Pennsylvania Department of Environmental Protection standards for temporary and permanent stabilization, including seeding requirements using designated native seed mixes (Conservation Mix Formula C and Seasonally Flooded Formula R) with specified mulch application rates. The plan mandates that clearing and grubbing activities be limited to designated areas with perimeter controls installed prior to disturbance, and all erosion control BMPs must be inspected weekly and after each runoff event with maintenance records maintained throughout construction. Topsoil placement, permanent vegetative cover achievement of 70% minimum perennial coverage, and compliance with Pennsylvania One Call System utility notification requirements (800-242-1776) are required. The contractor must contact the Perry County Conservation District and the Fish and Boat Commission's Waterways Conservation Officer at least two weeks before construction begins.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NI
C
LLACE
YSNI
O A
N
I
S P
O T
L Y
S N
N E
P
1- 800-
242-
A V
S
UOYEROF
LA
B L
E
C
D
G
M
ET
PENNSYLVANIA ONE CALL SYSTEM, INC.
15122-1078
MIFFLIN, PENNSYLVANIA
925 IRWIN RUN ROAD WEST
BLAST OR DEMOLISH
NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL,
DIRECTLY PA LAW REQUIRES THREE WORKING DAYS
800-242-1776 NON-MEMBERS MUST BE CONTACTED
BEFORE YOU DIG ANYWHERE IN PENNSYLVANIA! CALL 1-
STANDARD E&S PLAN NOTES (CONTINUED)
ONSITE CONSTRUCTION INSPECTOR TO DETERMINE MEANS TO MINIMIZE IMPACTS.
13. PRIOR TO DISTURBING ANY TREE ROOTS, THE CONTRACTOR SHALL MEET WITH THE
ENTRANCE.
FROM THE PROJECT AREA EXCEPT THROUGH ESTABLISHED CONSTRUCTION
12. VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT DIRECTLY
SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED
ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER
11. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT
PRIOR TO BEING ACTIVATED.
THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED
10. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY
MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING
WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND
RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID
9. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND
DEPARTMENT.
LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE OF THE
MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE
OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO
POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE
8. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE
SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS
THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE
AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS
STOCKPILED AT THE LOCATION(S) ESTABLISHED BY THE CONTRACTOR IN THE
7. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE
STANDARD E&S PLAN NOTES (CONTINUED)
SCALE IN MILES
0.5 100.5
PROJECT LOCATION MAP
DEPARTMENT.
ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE
TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY
E&S BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY 28.
SLIDING, OR OTHER MOVEMENTS.
FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING,
WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND
70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER
PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 27.
STABILIZATION SPECIFICATIONS.
YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT
SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1
STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION
FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE
BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT
AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE
SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED
IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR 26.
BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL
FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A
REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK
ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON 25.
SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR
SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE 24.
FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.23.
SHALL NOT BE INCORPORATED INTO FILLS.
FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS 22.
WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE
FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, 21.
EXCEED 9 INCHES IN THICKNESS.
ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO 20.
BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL
SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL
ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, 19.
SPECIFICATIONS SHOWN ON THESE PLANS.
PUBLICATION 408, SECTIONS 802 AND 803. ALSO REFER TO THE
TOPSOIL SHALL BE FURNISHED AND PLACED AS SPECIFIED IN PENNDOT'S 18.
MANNER DESCRIBED ON THE PLAN DRAWINGS.
ALL SEDIMENT REMOVED FROM BMP'S SHALL BE DISPOSED OF IN THE 17.
WATER.
WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH OR SURFACE
THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE
THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN
SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY SHALL BE RETURNED TO 16.
OFFICIALS AT THE TIME OF INSPECTION.
MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY
DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE
A LOG SHOWING DATES THAT E&S BMP'S WERE INSPECTED AS WELL AS ANY 15.
MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
E&S BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR
REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE
INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING,
WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK,
EROSION AND SEDIMENT BMP'S AFTER EACH RUNOFF EVENT AND ON A
MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S SHALL BE
STANDARD E&S PLAN NOTES (CONTINUED)
2-3
SHEET INDEX
DESCRIPTION
SHEET
LOCATION MAP AND GENERAL NOTES
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
EROSION AND SEDIMENT POLLUTION CONTROL DETAILS
AND GRUBBING OPERATIONS BEGIN.
THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING
OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS.
6. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS
DESCRIBED IN THIS E&S PLAN.
FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS
PHASE OF THE PROJECT UNTIL THE E&S BMP'S SPECIFIED BY THE BMP SEQUENCE
GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR
AREAS DESCRIBED IN THE CONSTRUCTION PLANS. GENERAL SITE CLEARING,
5. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE
TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
4. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL
EXISTING UNDERGROUND UTILITIES.
CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF
EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR
SITE PRECONSTRUCTION MEETING.
RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF THE PROJECT TO AN ON-
OFFICIALS, THE E&S PLAN PREPARER, AND THE LICENSED PROFESSIONAL
INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL
INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES,
FOR REVIEW AND APPROVAL AT ITS DISCRETION.
REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES
APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE
TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE
THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL
PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY
CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS
STANDARD E&S PLAN NOTES
BE STABILIZED IN ACCORDANCE WITH PERMANENT SEEDING SPECIFICATIONS.
ARE EITHER AT FINISHED GRADE OR WILL NOT BE REDISTURBED WITHIN 1 YEAR MUST
ACCORDANCE WITH TEMPORARY SEEDING SPECIFICATIONS. DISTRUBED AREAS WHICH
GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN
SEEDING AND SOIL SUPPLEMENTS. DISTURBED AREAS WHICH ARE NOT FINISHED
FOR MORE THAN 20 DAYS MUST BE STABILIZED IMMEDIATELY WITH FORMULA E
37. ANY DISTURBED AREA ON WHICH ACTIVITY HAS CEASED AND WHICH WILL REMAIN IDLE
CONTROLS.
FUNCTIONAL BEFORE SITE DISTURBANCE WITHIN THE TRIBUTARY AREAS OF THOSE
36. EROSION AND SEDIMENTATION CONTROLS MUST BE CONSTRUCTED, STABILIZED, AND
IMMEDIATELY UPON RECEIPT OF NOTICE TO PROCEED.
1704 PINE ROAD, NEWVILLE, PENNSYLVANIA 17241, TELEPHONE (717) 486-7087,
(WCO) OF THE PENNSYLVANIA FISH AND BOAT COMMISSION, SOUTH-CENTRAL REGION,
35. THE CONTRACTOR SHALL CONTACT THE LOCAL WATERWAYS CONSERVATION OFFICER
WEEKS BEFORE CONSTRUCTION ACTIVITIES BEGIN.
BOX 36, NEW BLOOMFIELD, PENNSYLVANIA 17068. TELEPHONE (717) 921-8100, TWO
34. CONTACT THE PERRY COUNTY CONSERVATION DISTRICT, 31 WEST MAIN STRET, P.O.
OF 2 INCHES OF TOPSOIL.
PLACE PRIOR TO SEEDING AND 1MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM
TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN
TO 5 INCHES - 6 TO 12 INCHES ON COMPACTED SOILS - PRIOR TO PLACEMENT OF
33. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3
MATERIALS.
VEGETATION, ORGANIC MATERIAL, LARGE STONES, AND OTHER OBJECTIONABLE
32. FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY
VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS
31. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED
WATERS OR GROUNDWATER SYSTEMS.
PADEP STANDARDS. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE
30. CONCRETE WASH WATER SHALL BE HANDLED IN ACCORDANCE WITH PENNDOT AND
MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN
LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL
DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS
ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE
CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMP'S MAY RESULT IN
RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE
29. FAILURE TO CORRECTLY INSTALL E&S BMP'S, FAILURE TO PREVENT SEDIMENT-LADEN
O P
E R
A T
O R
F I L
E N
A M
E
D C
A D
D
R
E V
I S
E D
P L
O T
T E
D
A
P R
APPROVED
SHEET
DRAWING NO.
CONSULTING ENGINEERS
PENNONI ASSOCIATES INC.
TOBOYNE TOWNSHIP
BLAIN, PENNSYLVANIA 17006
AS NOTED
DATE
DRAWN BY
APPR.BYREVISIONSNO.
SCALE
DATE
PROCEEDING WITH THE WORK
NOTIFIED OF ANY DISCREPANCIES BEFORE
CONTRACTOR AND OWNER MUST BE
ALL DIMENSIONS MUST BE VERIFIED BY
OF
5072 RITTER ROAD, SUITE 102
MECHANICSBURG, PENNSYLVANIA 17055
PREPARED BY
PENNONI ASSOCIATES INC.
MECHANICSBURG, PA 17055
SUITE 102
5072 RITTER ROAD
DATE:
CONTROL
EROSION AND SEDIMENT POLLUTION
T-301 (UPPER BUCK RIDGE ROAD)
U
A c c o u n t s
T B
T W
P
T B
T W
P
C o n s u l t i n g
S e r v i c e s
D E
S I
G N
C T
D G
N
E
P L
A N
T B
T W
P
E
S C d g n
B
IG
S
P R
IN
G R
D S R
(T -3
U P P E R B
U C
K R
ID
G E R
DRAWINGS:
DETAILS, OTHER THAN THOSE INDICATED, ARE ON THE FOLLOWING STANDARD
INDICATES LIMIT OF SLOPE
THE COMBINED SCALE FACTOR = 0.999975716
THE VERTICAL CONTROL IS BASED ON THE NORTH AMERICAN DATUM OF 1988 (NAVD 88) (GEOID 12A)
THE HORIZONTAL CONTROL IS TIED TO THE PENNSYLVANIA STATE PLANE COORDINATE SYSTEM (SOUTH ZONE), NORTH AMERICAN DATUM (NAD) 1983 (2011).
THE SAFETY OF THE TRAVELING PUBLIC.
MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL TO THE NECESSARY SUPPORT AND PROTECTION OF THE HIGHWAY RIGHT-OF-WAY AND
RECONSTRUCT AND ALTER DRAINAGE FACILITIES AND THE CONTOUR OF THE LAND. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM
SLOPE EASEMENT. AN EASEMENT FOR THE SUPPORT AND PROTECTION OF THE HIGHWAY, INCLUDING THE RIGHT TO CONSTRUCT, INSPECT, MAINTAIN, REPAIR, TO THE DEPARTMENTS PIPE OR DITCH WITHOUT ADVANCED WRITTEN APPROVAL BY THE DEPARTMENT OF TRANSPORTATION.
TO THE NECESSARY FLOW OF WATER. HOWEVER, NO STRUCTURE OF ANY KIND MAY BE ERECTED IN THE AREA, NOR, MAY ANY PIPE OR DITCH BE CONNECTED
DRAINAGE FACILITIES. THE EASEMENT SHALL NOT PREVENT THE PROPERTY OWNER FROM MAKING ANY LEGAL USE OF THE AREA WHICH IS NOT DETRIMENTAL
DRAINAGE EASEMENT. AN EASEMENT FOR THE CONSTRUCTION, INSPECTION, MAINTENANCE, REPAIR, RECONSTRUCTION AND ALTERATION OF HIGHWAY
DEPARTMENT.
REQUIRED ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLAN IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY THE
TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS
DISCOVERED AS REQUIRED BY PENNSYLVANIA'S UNDERGROUND UTILITY LINE PROTECTION LAW ACT 50 (P.L.852, NO 287 AMENDED OCT. 30, 2017).
THROUGH THE PA ONE CALL SYSTEM, PA1CALL.ORG, WITHIN TEN (10) BUSINESS DAYS AFTER A UTILITY LINE IS STRUCK, DAMAGED, OR PREVIOUS DAMAGE IS
THE CONTRACTOR IS REQUIRED TO NOTIFY THE DEPARTMENT AND SUBMIT AN ALLEGED VIOLATION REPORT (AVR) TO THE PA PUBLIC UTILITY COMMISSION
AT HTTPS://WWW.PA1CALL.ORG/PA811/PUBLIC.
___________________ FOR HAMILTON TOWNSHIP, AND SERIAL NO. ___________________ FOR CHAMBERSBURG BOROUGH. ADDITIONAL INFORMATION IS AVAILABLE
THREE WORKING DAYS PRIOR TO EXCAVATION, THE CONTRACTOR MUST CONTACT THE PA ONE CALL SYSTEM, INC., PHONE 1-800-242-1776, SERIAL NO.
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION.
THIS IS A FEDERAL-AID PROJECT AND AS SUCH IS SUBJECT TO INSPECTION BY REPRESENTATIVES OF THE FEDERAL HIGHWAY ADMINISTRATION AND THE
DO NOT INTERFERE WITH THE OPERATION OF ANY FIRE HYDRANT, FIRE CALL BOX, OR POLICE CALL BOX.
THE PAYMENT OF PROPERTY DAMAGES AND SUCH WORK IS NOT PART OF THE CONTRACT.
BUILDINGS AND STRUCTURES MARKED HAVE BEEN OR ARE TO BE REMOVED OR ALTERED BY THE DEPARTMENT OR OTHER AUTHORITY RESPONSIBLE FOR
SECTION 052 R/W SIGNED BY THE GOVERNOR ON JANUARY 10, 2007.
THE LEGAL RIGHT-OF-WAY ON SR 4013, FORMERLY 28071, FROM STATION 100+00.00 TO STATION 100+81.00) VARIES BASED ON THE PLAN OF SR 0030, 9, 1814 RECORDED IN STATE LAW LIBRARY P.L. PAGE 85. AS PER PLAN OF LR 37-1A, JULY 27, 1937
THE LEGAL RIGHT-OF-WAY ON SR 0030, FORMERLY LR 37, IS FIFTY (50) FEET IN WIDTH FROM STATION 903+17.99 TO STATION 904+65.69 BY ACT OF MARCH
DATED JUNE 1, 1916 AND RECORDED IN THE COUNTY COURT HOUSE.
THE LEGAL RIGHT-OF-WAY ON SR 0030 FROM STATION 3+31.00 TO STATION 4+00.00 IS FIFTY (50) FEET BASED ON CHAMBERSBURG BOROUGH ORDINANCE
OR MORE BY HAMILTON TOWNSHIP, A SECOND CLASS TOWNSHIP. THERE IS NO PUBLIC RECORD OF ANY OTHER WIDTH.
103, SECTION 1105, AS AMENDED PRIOR TO THE ADOPTION OF SR 0030 AS A STATE HIGHWAY IN 1942, IT HAS BEEN OPENED AND MAINTAINED FOR 21 YEARS
THE LEGAL RIGHT-OF-WAY ON SR 0030 FROM STATION 0+00.00 TO STATION 3+31.00 IS THIRTY-THREE (33) FEET BASED ON THE ACT OF MAY 1, 1935, P.L.
GOVERNOR JULY 27, 1937.
THE LEGAL RIGHT-OF-WAY ON SR 0030 FROM STATION 887+50.00 TO STATION 914+00.00 IS FIFTY (50) FEET BASED ON PLAN OF L.R.37 SEC I-A, SIGNED BY
PERRY COUNTY
TOBOYNE TOWNSHIP
T-301 (UPPER BUCK RIDGE ROAD)
STA 0+04.48
LIMIT OF WORK
PERRY COUNTY
TOBOYNE TOWNSHIP
T-301 (UPPER BUCK RIDGE ROAD)
STA 2+31.47
LIMIT OF WORK
TA
MADAMS@FIRSTENERGYCORP.COM
CONTACT: MELLYSSA ADAMS
AKRON, OH 44320
341 WHITE POND DRIVE
PENNSYLVANIA ELECTRIC CO.
PROJECT.
POTENTIAL IMPACTS WERE IDENTIFIED IN ASSOCIATION WITH THE
(PNDI) RECEIPT FOR THE PROJECT, DATED JUNE 18, 2025, NO
ACCORDING TO THE PENNSYLVANIA NATURAL DIVERSITY INVENTORY
RESTRICTIONS WILL BE IN PLACE FROM OCTOBER 1 THROUGH APRIL 1.
AS AN APPROVED TROUT WATER. AS SUCH, INSTREAM WORK
NATURALLY REPRODUCING TROUT STREAM, BUT IT IS NOT DESIGNATED
DESIGNATED SHERMAN CREEK AS CLASS A TROUT WATERS AND A
(MF) WATERS. THE PENNSYLVANIA FISH AND BOAT COMMISSION
QUALITY COLD WATER FISHERY (HQ-CWF) AND MIGRATORY FISHERY
UNNAMED TRIBUTARIES HAS AN EXISTING USE DESIGNATION OF HIGH
ENVIRONMENTAL PROTECTION, CHAPTER 93, SHERMAN CREEK AND IT'S
SHERMAN CREEK. ACCORDING TO THE PENNSYLVANIA CODE, TITLE 25,
SITE DRAINS TO SHERMAN CREEK AND UNNAMED TRIBUTARY TO
OVER SHERMAN CREEK
50 LOWER BUCK RIDGE ROAD
REGISTERED
AI
N A
VYS
N
N E
P
L
C O
M
M
O NWEALT
H O
F
PROFESSIONAL
WILLIAM DURYEA CAMERON
No. PE37283E
ENGINEER
April 14, 2026
DISTURBED AREA
FILTER SOCK
COMPOST UNDISTURBED AREA
CENTER
PLACED 10 FT ON
WOODEN STAKES
2 IN. x 2 IN.
CONTOURS
EXISTING
F L O
W
F L O
W
COMPOST FILTER SOCK
FILTER MEDIA
BLOWN/PLACED
DISTURBED AREA
PLACED 10 FT ON CENTER
2 IN. x 2 IN. WOODEN STAKES
UNDISTURBED AREA
M I N
I N
SECTION
PLAN VIEW
COMPOST FILTER SOCK, 12" DIAMETER
PLACED 5' O.C.
2" X 2" X 36" WOODEN STAKES
WATER INTO FILTER RING
DIRECT CONCRETE WASHOUT
SIDE OF FILTER RING
OVERLAP ON UPSLOPE
FILTER SOCK. 4' MIN
24" DIAMETER COMPOST
PLACED 5' O.C.
2" X 2" X 36" WOODEN STAKES
RING HEIGHT
WASHOUT WATER IS 50% OF FILTER
MAXIMUM DEPTH OF CONCRETE
MIN
12"
SECTION NTS
CONCRETE WASHOUT
(INCIDENTAL)
FILTER SOCK.
24" DIAMETER COMPOST
CONFIGURATION FOR ADDED HEIGHT.
DOUBLE 24" DIAMETER SOCKS IN PYRAMIDAL
18" DIAMETER FILTER SOCK MAY BE STACKED ONTO3.
INSTALLING THE SOCKS.
AT THE LOCATION OF THE WASHOUT PRIOR TO
A SUITABLE IMPERVIOUS GEOMEMBRANE SHALL BE PLACED2.
INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE1.
NOTES:
NOT TO SCALE
OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT
7. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK
RECOMMENDATIONS.
SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURERS
6. BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE
HOURS OF INSPECTION.
SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24
5. COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED
THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
4. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF
3. TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.
THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.
MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF
SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT.
2. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER
COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.
1. SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL.
NOTES:
O P
E R
A T
O R
F I L
E N
A M
C
A D
D
R
E V
I S
E D
P L
O T
T E
D
A
P R
EXPENSES ARISING OUT OF OR RESULTING THEREFROM
CIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
INDEMNIFY AND HOLD HARMLESS PENNONI ASSO-
POSURE TO PENNONI ASSOCIATES; AND OWNER SHALL
SOLE RISK AND WITHOUT LIABILITY OR LEGAL EX-
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
ON EXTENSIONS OF THE PROJECT OR ON ANY OTHER
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
APPROVED
SHEET
DRAWING NO.
CONSULTING ENGINEERS
PENNONI ASSOCIATES INC.
TOBOYNE TOWNSHIP
BLAIN, PENNSYLVANIA 17006
AS NOTED
DATE
DRAWN BY
APPR.BYREVISIONSNO.
SCALE
DATE
PROCEEDING WITH THE WORK
NOTIFIED OF ANY DISCREPANCIES BEFORE
CONTRACTOR AND OWNER MUST BE
ALL DIMENSIONS MUST BE VERIFIED BY
OF
5072 RITTER ROAD, SUITE 102
MECHANICSBURG, PENNSYLVANIA 17055
CONTROL
EROSION AND SEDIMENT POLLUTION
T-301 (UPPER BUCK RIDGE ROAD)
COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
TABLE 4.1
TYPE
MATERIAL
HDPE
3 MIL
HDPE
5 MIL
HDPE
5 MIL
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
(HDMFPP)
POLYPROPYLENE
MULTI-FILAMENT
HEAVY DUTY
CHARACTERISTICS
MATERIAL
DIAMETERS
SOCK
DEGRADABLE
PHOTO-
DEGRADABLE
PHOTO-
DEGRADABLE
PHOTO-
DEGRADABLE
PHOTO-
DEGRADABLE
BIO-
18"
12"
32"
24"
18"
12"
32"
24"
18"
12"
32"
24"
18"
12"
32"
24"
18"
12"
OPENING
MESH
3/8" 3/8" 3/8" 3/8" 1/8"
26 PSI 26 PSI 44 PSI 202 PSI
STRENGTH
TENSILE
(ASTM G-155)
STRENGTH
ORIGINAL
STABILITY %
ULTRAVIOLET
1000 HR
AT
23%
1000 HR
AT
23%
1000 HR
AT
100%
1000 HR
AT
100%
LONGEVITY
FUNCTIONAL
MINIMUM
6 MONTHS 9 MONTHS 6 MONTHS 1 YEAR 2 YEAR
TWO-PLY SYSTEMS
HDPE BIAXIAL NET
HDPE BIAXIAL NET
CONTINUOUSLY WOUND
FUSION-WELDED JUNCTURES
INNER CONTAINMENT NETTING
OUTER FILTRATION MESH
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS
3/16" MAX. APERTURE SIZE
MECHANICALLY FUSED VIA NEEDLE PUNCH)
(WOVEN LAYER AND NON-WOVEN FLEECE
COMPOSITE POLYPROPYLENE FABRIC
COMPOST STANDARDS
TABLE 4.2
ORGANIC MATTER CONTENT
ORGANIC PORTION
pH
MOISTURE CONTENT
PARTICLE SIZE
SOLUBLE SALT CONCENTRATION
80%-100% (DRY WEIGHT BASIS)
FIBROUS AND ELONGATED
5.5-8.0
35% - 55%
98% PASS THROUGH 1" SCREEN
5.0 dS/m (mmhos/cm) MAXIMUM
U
A c c o u n t s
T B
T W
P
T B
T W
P n s u l t i r v i c e s
D E
S I
G N
C T
D G
N
E
A N
T B
T W
P
E
S C d g n
FOR COMPOST FILTER SOCK
SLOPE TO SLOPE RELATIONSHIP
(FT) ABOVE SOCK
MAX SLOPE LENGTH
SLOPE
PERCENT 12" SOCK HEIGHT
2% OR LESS
50 LOWER BUCK RIDGE ROAD
OVER SHERMAN CREEK
REGISTERED
AI
N A
VYS
N
N E
P
L
C O
M
M
O NWEALT
H O
F
PROFESSIONAL
WILLIAM DURYEA CAMERON
MULCH APPLICATION RATES
MULCH TYPE
APPLICATION RATE (MIN.)
NOTES
ACRE
PER
SQUARE FEET
PER 1,000
SQUARE YARDS
PER 1,000
STRAW
HAY
WOOD CHIPS
HYDROMULCH
3 TONS
3 TONS
4-6 TONS
1 TON 47 LB.
140 LB.
140 LB.
185-275 LB.
1,240 LB.
1,240 LB.
415 LB.
2,500 LB.
1,650 -
FINELY BROKEN
NOT CHOPPED OR
STRAW, FREE OF WEEDS,
EITHER WHEAT OR OAT
NATIVE FORAGE GRASSES
AND TIMOTHY OR OTHER
TIMOTHY, MIXED CLOVER
OF GRASSES AND LEGUMES
MAY PREVENT GERMINATION
ABOVE
SEE LIMITATIONS
O P
E R
A T
O R
F I L
E N
A M
C
A D
D
R
E V
I S
E D
P L
O T
T E
D
A
P R
EXPENSES ARISING OUT OF OR RESULTING THEREFROM
CIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
INDEMNIFY AND HOLD HARMLESS PENNONI ASSO-
POSURE TO PENNONI ASSOCIATES; AND OWNER SHALL
SOLE RISK AND WITHOUT LIABILITY OR LEGAL EX-
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
ON EXTENSIONS OF THE PROJECT OR ON ANY OTHER
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
APPROVED
SHEET
DRAWING NO.
CONSULTING ENGINEERS
PENNONI ASSOCIATES INC.
TOBOYNE TOWNSHIP
BLAIN, PENNSYLVANIA 17006
AS NOTED
DATE
DRAWN BY
APPR.BYREVISIONSNO.
SCALE
DATE
PROCEEDING WITH THE WORK
NOTIFIED OF ANY DISCREPANCIES BEFORE
CONTRACTOR AND OWNER MUST BE
ALL DIMENSIONS MUST BE VERIFIED BY
OF
5072 RITTER ROAD, SUITE 102
MECHANICSBURG, PENNSYLVANIA 17055
CONTROL
EROSION AND SEDIMENT POLLUTION
T-301 (UPPER BUCK RIDGE ROAD)
REQUIREMENTS
E&S FACILITIES MAINTENANCE
IMMEDIATELY WITH REPLACEMENT OR MODIFICATION OF BMPS.
IF BMPS FAIL TO PERFORM AS EXPECTED, THE SITUATION MUST BE ADDRESSED
REPAIR AND REPLACEMENT IMMEDIATELY FOLLOWING INSPECTION.
PERFORM ALL REMEDIAL AND PREVENTATIVE MAINTENANCE INCLUDING CLEAN-OUT,
INSPECT BMPS EACH WEEK AND AFTER EACH RUNOFF EVENT.
PERMANENTLY STABLIZED.
MAINTENANCE AND INSPECTION OF BMPS MUST BE CONTINUED UNTIL THE SITE IS
REACHING FINISHED GRADE.
UPON ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY 9.
SE FORMULA C CONSERVATION MIX ALONG STEEP SIDE SLOPES.U8.
CHANNELS AND BASIN FOOTPRINTS
IN FLOODPLAIN AREAS, SE FORMULA R SEASONALLY FLOODED CONSERVATION MIXU7.
BROKEN.
FINELY STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR 6.
HAY OR STRAW MULCH MUST BE APPLIED AT 1240 LBS./1000 SY.5.
FINISHED GRADE WHEN SEEDING OPERATIONS ARE UNFAVORABLE.
USED TO PROTECT CONSTRUCTED SLOPES AND OTHER BARE AREAS BROUGHT TO
MATERIAL) MAY BE MULCH ALONE (SUCH AS WOOD CHIPS, STRAW, HAY OR APPROVED 4.
AND OTHER MOVEMENTS.
SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING
NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED
HAS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT
STABILIZATION WHEN IT AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL 3.
ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS.
OR WHICH WILL NOT BE REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN
STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINISHED GRADE
MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE
WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR
PERIODS, MULCH MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS
STABILIZE ANY AREAS DISTURBED BY THE ACTIVITIES. DURING NON-GERMINATING
OPERATOR SHALL IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE 2.
PADOT PUBLICATION 408, SECTIONS 804 AND 805.
ACCORDANCE WITH ALL SEEDING, MULCHING, AND SOIL SUPPLEMENTS SHALL BE IN 1.
TEMPORARY STABILIZATION AND PERMANENT STABILIZATION:
U
A c c o u n t s
T B
T W
P
T B
T W
P n s u l t i r v i c e s
D E
S I
G N
C T
D G
N
E
A N
T B
T W
P
E
S C d g n
NOTESSPECIES
OATS
CEREAL RYE
LITTLE BLUESTEM
SHOWY TICK-TREFOIL
PARTRIDGE PEA
SMOOTH BLUE ASTER
BLACK-EYE SUSAN
PURPLE TOP
BIG BLUESTEM
CANADA WILDRYE
VIRGINIA WILDRYE
RICE CUTGRASS
PRAIRIE CORDGRASS
LURID SEDGE
WOOLGRASS
SOFTSTEM BULRUSH
DEERTONGUE
SOFT RUSH
REDTOP PANICGRASS
SCIENTIFIC NAME
AVENA SATIVA
SECALE CEREALE
SCHIZACHYRIUM SCOPARIUM
DESMODIUM CANADENSE
CHAMAECRISTA FASCICULATA
SYMPHYOTRICHUM LAEVA
RUDBECKIA HIRTA
TRIDENS FLAVUS
ANDROPOGON GERARDII
ELYMUS CANADENSIS
ELYMUS VIRGINICUS
LEERSIA ORYZOIDES
SPARTINA PETINATA
CAREX LURIDA
SCIRPUS CYPERINUS
SCHOENOPLECTUS TABERNAEMONTANI
PANICUM CLANDESTINUM
JUNCUS EFFUSUS
PANICUM RIGIDULUM
OVERALL SEED WEIGHT (LB/1000 SY)
SEEDING SEASON DATES
SPRING NURSERY
FALL NURSERY
MULCH TYPE (SEE PLAN SHEETS FOR ADDITIONAL INFORMATION)
S E
E D
M A
X
W E
0.1
0.19095
0.2
80 60 0.2
85 0.270
85 70 0.2
PULVERIZED AGRICULTURAL LIMESTONE
10-20-20 ANALYSIS COMMERCIAL FERTILIZER
OR 31-0-0 IBDU FERTILIZER
OR 32-0-0 TO 38-0-0 SULFUR COATED UREA FERTILIZER
38-0-0 UREAFORM FERTILIZER
TOPSOIL PLACEMENT
SEE PENNDOT PUBLICATION 408, SECTION 804 FOR SEEDING TABLES.
SEEDING RATE TABLE - FOR INFORMATION PURPOSES ONLY
80 70
95/97 90/85
P U
R
IT
Y
M
IN
G
E R
M
IN
A T
IO
N
M
IN
--- NOT SPECIFIED IN PENNDOT PUB. 408 SECTION 804
*** THE FIRST NUMBER LISTED IS FOR FORMULA C CONSERVATION MIX, THE SECOND NUMBER IS FOR ALL OTHER APPLICATIONS.
AT AN AASHTO ACCREDITED TESTING FACILITY AND REPORT RESULTS TO THE DEPARTMENT AND BSA MANUFACTURER.
** CONDUCT ONE TEST PER ACRE TO BE TREATED, OR AS DIRECTED. USE TREATMENT RECOMMENDED BY LABORATORY. OBTAIN AND TEST SAMPLES ACCORDING TO ASTM D 586. TEST SAMPLES
* AS DIRECTED
% BY WEIGHT (SEEDING RATE LB/1000 SY)
CONSERVATION MIX
SUPPLEMENTS - FORMULA C
SEEDING AND SOIL
CONSERVATION MIX
SEASONALLY FLOODED
FORMULA R
SEEDING AND SOIL SUPPLEMENTS -
SEEDING TABLE
50 (6.0)
50 (6.0)
10 (1.2)
2 (0.24)
10 (1.2)
3 (0.36)
7.5 (0.9)
13.3 (1.6)
0.5 (0.06)
3.67 (0.44)
66.67 (6.0)
66.67 (6.0)
3.33 (0.3)
1.11 (0.1)
2.22 (0.2)
2.22 (0.2)
3.33 (0.3)
3.33 (0.3)
3.33 (0.3)
6.11 (0.55)
8.33 (0.75)
9.0
RECP
AS INDICATED BY SOIL TESTING**
AS INDICATED BY SOIL TESTING**
AS INDICATED BY SOIL TESTING**
4" OR 6", SEE PENNDOT PUBLICATION 408 SECTION 802 AND 803
NATIVE PORTION: OCTOBER 15 TO MAY 15
NURSERY CROP PORTION: ANYTIME
RECP
12.0
SYMBOL
SOIL CLASSIFICATION
DESCRIPTION SLOPE SURFACE RUNOFF ERODIBILITY PERMEABILITY WATER TABLE DEPTH DEPTH TO BEDROCK
AbB
Mf
ALBRIGHTS SILT LOAM
MIDDLEBURY SOILS
3-8% MODERATELY WELL DRAINED MODERATE MODERATELY LOW 12-28" 18-32"
0-3% WELL DRAINED MODERATELY HIGHHIGH 6-24" 60-99"
50 LOWER BUCK RIDGE ROAD
OVER SHERMAN CREEK
REGISTERED
AI
N A
VYS
N
N E
P
L
C O
M
M
O NWEALT
H O
F
PROFESSIONAL
WILLIAM DURYEA CAMERON
H E R
M A N S C
R E E K
B
IT
A C
C E S S D
R
IV
E
T-301 (UPPER BUCK RIDGE ROAD)
789 7
T-30 1 (U
PPE
R BUCK RI
DGE ROAD)
ZIMMERMAN
RYAN L. AND JANITA D.
JAN C ETAL BEASTON
ZIMMERMAN
RYAN L. AND JANITA D.
ZIMMERMAN
RYAN L. AND JANITA D.
UNT T
O S
HERMANS C
REEK
UNT TO S
HERMANS C
REEK
AbB
Mf
Mf
Mf
Mf
AbB
C F S -1
CFS-12
CFS-12
CFS-2
CFS-3
CFS-
C
FS
-1
C
FS
-1
CFS-12
CFS
-4
O P
E R
A T
O R
F I L
E N
A M
C
A D
D
R
E V
I S
E D
P L
O T
T E
D
A
P R
EXPENSES ARISING OUT OF OR RESULTING THEREFROM
CIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
INDEMNIFY AND HOLD HARMLESS PENNONI ASSO-
POSURE TO PENNONI ASSOCIATES; AND OWNER SHALL
SOLE RISK AND WITHOUT LIABILITY OR LEGAL EX-
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
ON EXTENSIONS OF THE PROJECT OR ON ANY OTHER
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
APPROVED
SHEET
DRAWING NO.
CONSULTING ENGINEERS
PENNONI ASSOCIATES INC.
TOBOYNE TOWNSHIP
BLAIN, PENNSYLVANIA 17006
AS NOTED
DATE
DRAWN BY
APPR.BYREVISIONSNO.
SCALE
DATE
PROCEEDING WITH THE WORK
NOTIFIED OF ANY DISCREPANCIES BEFORE
CONTRACTOR AND OWNER MUST BE
ALL DIMENSIONS MUST BE VERIFIED BY
OF
5072 RITTER ROAD, SUITE 102
MECHANICSBURG, PENNSYLVANIA 17055
CONTROL
EROSION AND SEDIMENT POLLUTION
T-301 (UPPER BUCK RIDGE ROAD)
SCALE
0 10 20 FEET
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
STAGING OF CONSTRUCTION ACTIVITIES
LEGEND
PROPOSED CONTOUR
EXISTING CONTOUR
CFS-12
LIMIT OF DISTURBANCE (TOTAL DISTURBED AREA = 0.17 AC)
COMPOST FILTER SOCK - 12 INCH DIAMETER
LOD
SOIL NAMEMf
SOIL BOUNDARY
CONCRETE WASHOUT
(TOTAL AREA = 0.02 AC.)
REPAIRED
LIMITS OF ASPHALT ROADWAY TO BE
SOILS LEGEND
Mf - MIDDLEBURY SOILS
AbB - ALBRIGHTS SILT LOAM
U
A c c o u n t s
T B
T W
P
T B
T W
P n s u l t i r v i c e s
D E
S I
G N
C T
D G
N
E
A N
T B
T W
P
E
S C d g n
(TOTAL AREA = 0.03 AC.)
LIMITS OF 14' X 50' STAGING AREA
TO PLACEMENT OF RIPRAP
REMOVE/ADJUST COMPOST FILTER SOCK PRIOR
PERRY COUNTY
TOBOYNE TOWNSHIP
T-301 (UPPER BUCK RIDGE ROAD)
STA 0+04.48
LIMIT OF WORK
PERRY COUNTY
TOBOYNE TOWNSHIP
T-301 (UPPER BUCK RIDGE ROAD)
STA 2+31.47
LIMIT OF WORK
NOTE: FEMA FLOODPLAIN LIMITS OUTSIDE OF PLAN EXTENTS.
CRANE PAD
EASEMENT
CONSTRUCTION
TEMPORARY
CONSTRUCTION
ALL TIMES THOUGH THE DURATION OF
*MAINTAIN ACCESS TO DRIVEWAY AT
16.5'
+82
34'
+00
27'
+14
16.5'
+20
ASSUMED 50' FLOODWAY
DELINEATED STREAM BOUNDARY
A S S
U M
E D
' F
L O
O D
W A
Y
A S S
U M
E D
' F
L O
O D
W A
Y
A S S U
M E D
' F
L O
O D
W A
Y
A S S
U M
E D
' F
L O
O D
W A
Y
ROCK, R-7 CHOKED WITH R-4
OVER SHERMAN CREEK
50 LOWER BUCK RIDGE ROAD
APPLY SEEDING, SOIL SUPPLEMENTS AND MULCH AS NEEDED.28.
APPROACHES, AS INDICATED ON PLANS.
REMOVE THE STAGING AREA AND REMOVE AND PAVE 27.
AND COMPOST FILTER SOCK.
REMOVE AND PROPERLY DISPOSE OF THE CONCRETE WASHOUTS
AFTER COMPLETING THE ABUTMENT BACKWALLS MODIFICATIONS, 26.
RECONNECT EXISTING RAILINGS AS INDICATED ON PLANS.25.
STRUCTURE PLAN.
MODIFY EXISTING ABUTMENT BACKWALLS AS INDICATED ON THE 24.
THE PLAN.
INSTALL CONCRETE WASHOUT, AT THE LOCATION INDICATED ON 23.
DONE IN SHOP.
DIAPHRAMS AND EXISTING OPEN GRID DECK, IF NOT PREVIOUSLY
CONNECT EXISTING FASCIA BEAMS AND RAILINGS TO NEW 22.
PLAN.
ERECT SUPERSTRUCTURE AS INDICATED ON THE STRUCTURE 21.
TRANSPORT SUPERSTRUCTURE TO SITE.20.
MOBILIZE CRANE.19.
AND NEW BEAMS AS INDICATED ON THE STRUCTURE PLAN.
INSTALL NEW PLAIN NEOPRENE BEARING PADS FOR EXISTING 18.
STRUCTURE PLAN.
INSTALL NEW BEARING ANCHOR BOLTS AS INDICATED ON THE 17.
4 RIPRAP, AT THE LOCATION INDICATED ON THE PLANS.
R-INSTALL ROCK, CLASS R-7 RIPRAP CHOKED WITH ROCK, CLASS 16.
MODIFY EXISTING ABUTMENT BEAM SEATS AS NEEDED.15.
DECK IN SHOP.
CONNECT NEW BEAMS TO EXISTING FIRST INTERIOR BEAMS AND 14.
AND PAINT EXISTING DECK.
PAINT EXISTING AND NEW BEAMS, DIAPHRAMS, AND SOLE PLATES 13.
FABRICATE NEW DIAPHRAMS AND SOLE PLATES FOR NEW BEAMS.12.
AND STEEL OPEN GRID DECK.
BLAST CLEAN EXISTING BEAMS, DIAPHRAMS AND SOLE PLATES 11.
TRANSPORT SUPERSTRUCTURE TO FABRICATION SHOP.10.
STREAM IMMEDIATELY.
REMOVE ANY DEBRIS THAT FALLS FROM THE BRIDGE FROM THE 9.
REMOVE SUPERSTRUCTURE AND PLACE IT ON A TRUCK.8.
MOBILIZE CRANE.7.
REMOVE EXISTING ANCHOR BOLT NUTS FROM BEARINGS.6.
TRANSPORT WIDTH.
FROM REMAINDER OF SUPERSTRUCTURE, IF NEEDED FOR
INTERIOR BEAMS AND SEPARATE EXTERIOR BEAMS AND RAILINGS
CUT EXISTING DIAPHRAMS BETWEEN EXTERIOR BEAMS AND FIRST 5.
ON THE PLAN.
CONSTRUCT THE STAGING AREAS AND CRANE PAD, AS INDICATED 4.
AT THE LOCATIONS INDICATED ON THE PLAN.
INSTALL COMPOST FILTER SOCK ALONG THE EXISTING CONTOUR, 3.
AS WORK IS SCHEDULED FOR A PARTICULAR AREA.
TO INSTALL PERIMETER CONTROLS AND/OR UNTIL SUCH A TIME
GRUBBING SHOULD BE LIMITED TO WHAT IS INITIALLY NECESSARY
CLEAR AND GRUB TREE AND VEGETATION. CLEARING AND 2.
APPROPRIATE PLANS.
INSTALL TRAFFIC CONTROLS AND DETOUR AS SHOWN ON THE 1.
BE COMPLETED BEFORE A SUBSEQUENT STEP IS INITIATED.
WITH THE FOLLOWING CONSTRUCTION SEQUENCE. EACH STEP SHALL
ALL CONSTRUCTION ACTIVITIES SHOULD PROCEED IN ACCORDANCE
(ASSUMED 33
' WI
DTH)
RIG
HT-O
F-W
AY LI
NE
(ASSUMED 33
' WI
DTH)
RIG
HT-O
F-W
AY LI
NE
(ASSUMED 33' WIDTH)
RIGHT-OF-WAY LINE
(ASSUMED 33' WIDTH)
RIGHT-OF-WAY LINE
REGISTERED
AI
N A
VYS
N
N E
P
L
C O
M
M
O NWEALT
H O
F
PROFESSIONAL
WILLIAM DURYEA CAMERON
No. PE37283E
ENGINEER
CRANE PAD
18'
+17
| TBTWP25001_ESC01 |
| TBTWP25001_ESC02 |
| TBTWP25001_ESC03 |
| TBTWP25001_ESC04 |