2-Susquehanna WTP - Sludge, Grit and Screenings Removal - Meeting Minutes.pdf
PDF 130 KB Posted
- Solicitation number
- US.251507
- Issued by
- Lancaster County, Pennsylvania
About this file
This document is pre-bid meeting minutes for the City of Lancaster, Pennsylvania regarding sludge, grit, and screenings removal services at the Susquehanna Water Treatment Plant. The meeting was held on September 15, 2026, in both in-person and virtual formats and included site tours of the treatment plant and the Low Service Pumping Station. The City seeks competitive bids to furnish and maintain three 30-cubic-yard containers at the Susquehanna Water Treatment Plant and one 30-cubic-yard container at the Low Service Pumping Station with regular removal and disposal of waste material. Bids were initially due September 30, 2026, at 11:00 AM but were extended to October 14, 2026, at 11:00 AM, with questions remaining open until October 7, 2026. Site visits are required during normal working hours and can be arranged by appointment by contacting Andreas Pabon. All bidders must submit bids through the PennBid online bidding platform, and the City will award to the lowest responsible bidder based not solely on price but also on quality of services, bidder responsiveness, past performance, and compatibility of processes.
The current disposal cost is $57.32 per ton, with waste material currently disposed of in Maryland as a soil conditioner. Removal volumes vary significantly based on river conditions, with approximately 1,168.50 tons removed since January, ranging from five loads in February (63.345 tons) to twenty loads in March (309.52 tons), and potentially up to three loads per day during high-flow periods. Loads average approximately 17 tons per load, with sludge consistency described as "muddy" and containing variable percent solids; analytical results and Safety Data Sheets for polymer are to be provided in a later addendum. Pick-up scheduling is flexible, with the first load typically before 6:00 AM and a two-hour service window being acceptable. The dumpsters must be sealed to prevent road leakage, and straw may be used if needed. Grit and screenings from the Low Service Pumping Station are disposed of infrequently and are loaded by City staff into contractor-supplied dumpsters.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-B562-26-08 SWTP Sludge Grit Disposal.docx | DOCX document | |
| 3-Susquehanna Intake and Low Service Form 43.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Meeting Minutes
Susquehanna Water Treatment Plant
Sludge, Grit, and Screenings Removal
September 15, 2026
On September 15, 2026, The City of Lancaster held an in-person and virtual pre-bid meeting for the contract to remove grit and screening and sludge from water treatment processes at the
Susquehanna Water Treatment Plant. Grit and screenings are generated at the Low Service
Pumping Station. Sludge is generated from the treatment process at the Susquehanna Water
Treatment Plant. Periodically, sludge is also removed from the drying beds at the Treatment
Plant. Tours o both locations were provided.
Attendance:
From the City of Lancaster
Ethan Carlisle
Nancy Miller
Todd Neiss
Andreas Pabon
Ben Perwien
Chris Volkay-Hilditch
From KBS
Matthew Miller
Jeff Sentz
Logan O.
From Wind River
Kevin Long
From Denali
Anthony Nguyen
Ryan Cherwinski
Brian C.
Discussion
After City staff introductions, City Purchasing Manger Nancy Miller noted that the City would accept bids through the bidding platform, PENNBID. She reviewed features on PENNBID.
Bidders were also reminded that after today, all questions must be submitted on-line through
PENNBid. She noted that bidder can upload bids prior to the bid date, and that the City cannot see your bid prices until the date and time of the bid opening. Bids are due October 14, 2026 at
11:00 AM. She also showed that there is a feature where sub-contractors can connect with bidders. There is an area where prospective sub-contractor/bidders can indicate if they are interested in providing specific services so that they can connect with bidders. Nancy also showed the public Q and A (question and answer) feature. You can also see the questions that were asked and answered.
Following the questions and answers bidders were shown the dumpsters, drying beds and then went to the Low Service Pumping Station, NOTE: The City will be extending bids to October 16, 2026. The SDS for the polymer and an analytical provile will be provided in a later addendum.
Site visits are required and can be arranged through Andreas Pabon as note in the bid documents.
Note the bidder’s checklist and the fillable bid forms.
Questions and Answers:
Q1. What is the current bid price?
A. $ 57.32 per ton
Q2. Where is the current disposal?
A. It is disposed of in Maryland as a soil conditioner.
Q3. Are load/pick-ups scheduled?
Calls and/or texts are made to pick up loads. Pick-up times can be variable, and depending on what is pulled from the Susquehanna at Low Service and the composition of the water withdrawn. Removal can be daily.
Note that since January 1168.50 tons were removed. Amounts can be variable depending on river conditions. In the month of March, a high of 20 loads of sludge were removed at 309.52 while in February 5 loads were removed for a total of 63.345 tons.
River conditions can greatly increase the sludge generated. When there is significant flow treated and the river is muddy, more sludge is generated and the centrifuges are run hard. Then there is more mud/sludge, and there could be up to three loads a day. The City cannot afford to be shut down.
First pick-up is early, before 6 AM. (The plant is staffed 24/7). Todd (operations supervisor) will give the contractor as much advance time as possible that a pick-up is needed.
Q4. What is used (for the sludge)?
A. Roll-off dumpsters at the plant. Note that at the pumping station, bidders were shown the dump pad. This is infrequently disposed of.
Q5. How many tons per load?
A. About 17 tons
Q6. What is the percent solids?
A. It can be described as ‘muddy”. Note that drying bed sludge also varies in consistency.
Analytical results will follow in a later addendum. Also note that the sludge in the drying beds has not been removed this year.
Q7. Is there a SDS for the polymer?
A. The SDS will be supplied in a later addendum.
Q8. Are the dumpsters sealed?
A. Yes – cannot leak over the road.
Q9. Can we use straw if needed?
A. Yes
Q10. Do bidders have to use the same site as used now? Where is that?
A. No. The bid form asks that you identify where it will go. (Note that the sludge is used as a soil conditioner at a private facility.)
Q11. Are you looking for 24-hour service? Two-hour window?
A. We will give you as much time as possible for pick-up. First load is early morning and there can be as many as three loads a day in bad river conditions (worst case). Some months there is only pick up a few times a month. Two hours would work.
Q12. What about the pad disposal?
A. There is periodic disposal of the grit and screenings at the Low Service Pumping Station.
That material (river debris, shells, etc.) is infrequently disposed of, and is loaded by the City into a dumpster supplied by the Contractor.
File details come from the government source that posted it. Updated .