2_Submittal Schedule Paint Markings.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Pavement Paint Markings Federal contract opportunity
- Solicitation number
- FA4626-24-R-0003
About this file
This document is a Schedule of Submittals for a federal contract opportunity to maintain pavement paint markings at Malmstrom AFB, Montana. The contract has a Solicitation/Contract number of FA4626-24-R-xxxx and is set-aside for 100% small businesses.
The Schedule of Submittals lists the various technical submittals required from the contractor, such as a Quality Control Plan, Schedule of Work, Paint Removal Process Plan, Waste Management Plan, product data sheets for equipment and materials, and application instructions. The submittals have specified due dates, ranging from 14 days to 30 days prior to starting work. The contract has an initial 5-year ordering period with a 2-year optional period, and the total contract value shall not exceed $2,999,999.99.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 9_Special Contract Requirements.pdf | ||
| 5_MT20240079 - 05Jan24.pdf | ||
| 8_Past Performance Reference Sheet.pdf | ||
| 6_Sections L and M.pdf | ||
| Solicitation - FA462624R0003.pdf | ||
| 3_Statement of Work Paint Mkg.pdf | ||
| 1_Combined Specs.pdf | ||
| 4_Bid Schedule.xlsx | XLSX spreadsheet | |
| 7_Technical Focus Areas.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| Maintain Pavement Paint Markings IDIQ | FA4626-24-R-xxxx | ||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | NOTIFICATION | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | Start of Work Notification 01 00 00 3.11 | 1 | 14 PTSW | ||||||||||||||||||
| 2 | Notice of Final Inspection 01 00 00 3.12 | 1 | 7 PTFI | ||||||||||||||||||
| 3 | Utility Outage Notices 01 00 00 3.14 | 1 | 14 PTO | ||||||||||||||||||
| 4 | Quality Control Plan 01 00 00 3.18.2 | 2 | PTSW | ||||||||||||||||||
| 5 | Quality Control Records 01 00 00 3.18.4 | 2 | EWD | ||||||||||||||||||
| 6 | Progress Schedule 01 00 00 3.20 (AF Form 3064) | 2 | PTSW | ||||||||||||||||||
| 5 | Entry Authorization Documents - 01 00 00 3.17 | 1 | 30 PTSW | ||||||||||||||||||
| 6 | Schedule of Work 32 01 11.51 1.4 | 2 | PTSW | ||||||||||||||||||
| 7 | Paint Removal Process Plan 32 01 11.51 1.4 | 2 | PTSW | ||||||||||||||||||
| 8 | Waste Management Plan 32 01 11.51 1.4 | 2 | PTSW | ||||||||||||||||||
| 9 | Mechanical Paint Removal Equipment product data 32 01 11.51 1.4 | 2 | PTSW | ||||||||||||||||||
| 10 | Surface Preparation Equipment List 32 17 23 1.3 | 2 | PTSW | ||||||||||||||||||
| 11 | Application Equipment List 32 17 23 1.3 | 2 | PTSW | ||||||||||||||||||
| 12 | Safety Data Sheets 32 17 23 1.3 | 2 | PTSW | ||||||||||||||||||
| 13 | Exterior Surface Preparation product data 32 17 23 1.3 | 2 | 2 | PTSW | |||||||||||||||||
| 14 | Reflective Media for Airfields product data 32 17 23 1.3 | 2 | PTSW | ||||||||||||||||||
| 15 | Reflective Media for Roads product data 32 17 23 1.3 | 2 | PTSW | ||||||||||||||||||
| 16 | Waterborne Paint product data 32 17 23 1.3 | 2 | 2 | PTSW | |||||||||||||||||
| 17 | Epoxy Paint product data 32 17 23 1.3 | 2 | 2 | PTSW | |||||||||||||||||
| 18 | Thermoplastic Compound product data 32 17 23 1.3 | 2 | 2 | PTSW | |||||||||||||||||
| 26 | Waterborne Paint application instructions 32 17 23 1.3 | 2 | PTSW | ||||||||||||||||||
| 27 | Epoxy Paint application instructions 32 17 23 1.3 | 2 | PTSW | ||||||||||||||||||
| 28 | Thermoplastic Compound application instructions 32 17 23 1.3 | 2 | PTSW |
| Schedule of Abbreviations: | ||||
| AWC | = After Work Completed | BMD | = | Before Material Delivery |
| PTSW | = Prior to Starting Work | AN | = | Advance Notification |
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence |
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection |
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment |
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work |
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection |
| PTFA | = Prior to Final Acceptance | PTSA | = | Prior To Start of Action |
| ACA | = After Contract Award | PSS | = | Per Submittal Schedule |
&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA &"Times New Roman,Regular"&12FA4626 24-R-xxxx
&"Times New Roman,Regular"&12AF Form 66 &F-&D &"Times New Roman,Regular"&12
REQUIRED TECHNICAL SUBMITTALS