This is a Space Allocation Study document prepared by City Facility Management for the City of Cincinnati, presenting comprehensive interior design and space planning requirements across multiple municipal facilities including City Hall, Centennial 2, and other city buildings. The study, initiated in Fall 2024, identifies the need to optimize approximately 75,000 square feet of space across these facilities to address departmental growth, relocation needs, and operational inefficiencies. The project encompasses relocations and renovations for multiple departments including Law (Administrative Hearings, Prosecutors, Collections, Real Estate, and Interns), Fire Administration, Building and Inspections, Employee Health Services, PEAP, Office of Environment and Sustainability, Recreation Commission, and City Council Offices. Key facility details include City Hall (built 1893, 193,000 SF across basement and four floors) and Centennial 2 (built 1989, 188,616 SF across eight floors). The scope of work includes creating additional conference room spaces, establishing a permanent Training Academy in City Hall basement, renovating bathrooms throughout City Hall, and reconfiguring departmental footprints across multiple floors in both primary facilities, with certain scopes removed from the RFP and administered under separate contracts.
The study identifies several critical drivers for the space reorganization, including Fire Training relocation from Centennial 2's fourth floor, Income Tax department oversizing on the sixth floor, CLEAR's planned relocation in summer 2026, Fire Administration's need to relocate from Fire Station 14 due to ADA compliance issues, and significant staffing increases within the Law Department. The selected design services firm will be responsible for preparing construction documents and specifications, managing construction administration, and developing a phased project schedule. Approximately half of the Building and Inspections relocation scope and the Citizens Complaint Authority DEI design scope are being administered under separate contracts. The document indicates technology upgrades will be incorporated into the scope of work. No specific pricing, set-aside information, incumbent details, funding sources, or contract award dates are provided in this planning document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Space Allocation Study
City Hall and Centennial 2
City Facility Management
10/9/2025
Director’s Meeting
City Hall & Centennial 2
In the Fall of 2024, City Administration requested that City Facility Management (CFM) conduct a space allocation study to determine if there were underutilized areas at City Hall and Centennial 2 that could be repurposed for other City agencies. Some departments have had and continue to add full time employees to their roster or have other needs such as more storage or meeting room space requirements. Additionally, other departments have changed their operations or downsized which effectively reduces their need for space.
There are a few major changes occurring that are bringing the need of the space study to the forefront:
• Fire Training on the 4th floor of Centennial 2 has been relocated to a new facility.
• Income Tax on the 6th floor of Centennial 2 is significantly oversized.
• CLEAR on the 3rd floor of Centennial 2 will be relocating to another facility summer 2026.
• Fire Administration at Fire Station 14 needs to be relocated due to ADA issues at that facility.
• The Law Department has had a significant increase in staffing recently and not enough space to accommodate adequately. Especially Prosecution and Administrative Hearings. Collections needs a more secure entrance.
• Procurement and DEI should be adjacent to each other.
• Finance/ Employee Health Services and PEAP are too small for their current functions. Staff is sharing office space and the physical therapy space is inadequate
• Building and Inspections continues to add staff and needs a permanent Training Academy.
• Office of Environment & Sustainability should ideally be in one location.
• Council Offices are too small and are not uniform in size. Ideally, nine offices sized appropriately.
CFM conducted a survey of all the Departments to understand how each organization was staffed and if there were adding positions in FY25 and FY26. CFM walked through every space and updated floor plans and recorded vacancies. CFM followed up with questions regarding each Agency’s concerns on current inadequacies within their existing footprint so we could get a better understanding of the issues. CFM also examined potential adjacencies that could foster better efficiencies.
GENERAL INFORMATION:
• City Hall
Year Built: 1893
Basement and Four Floors
193,000 SF about 38,600 SF per floor
• Centennial 2
Year Built: 1989
Eight Floors
188,616 SF about 20,979 SF useable space per floor
Centennial 2
Proposed- First Floor
Law/ Administrative Hearings
Existing 2,280 SF
Proposed 3,540 SF
Expand to allow for additional staff.
Conference Spaces
Existing 2,380 SF
Proposed 3,370 SF
Potentially add 1,000 SF and two conference room spaces
Employee Health Services
Proposed- Second Floor
Citizens Complaint Authority
Inclusion (DEI)
Note: This scope has been removed from the RFP;
therefore, no work is to be performed on this floor.
Procurement
Existing 4,550 SF
Inclusion (DEI)
Existing 5,340 SF
Proposed 3,368 SF
The Citizens Complaint Authority’s Diversity, Equity, and Inclusion (DEI) design scope of work is being administered under a separate contract.
Proposed- Third Floor
CLEAR
Note: This scope has been removed from the RFP; therefore, no work is to be performed on this floor.
Enterprise Technology Solutions (ETS)
15,600 SF
CLEAR
3,950 SF
CCA is relocating into this space, and the scope of work is being administered under a separate contract.
Proposed- Fourth Floor
Fire Investigations and Inspections
Existing 9,000 SF
No Change
Fire Administration
Existing 6,400 SF
Proposed 6,500 SF
Currently Located at Fire Station 14
Building and Inspections
The total area is 2,700 SF (green). Of this, 1,800
SF is included in a separate contract for relocating
PLAP staff (3 FTE) and Elevator Inspectors (9
FTE) from the 5th floor, and for creating small workstations for calls and video conferences. This work is not part of this RFP.
Law/ Land Use and Infrastructure
240 SF
One office relocated from fifth floor
Fire Investigations and Inspections
Fire Administration
Building & Inspections and Law/Land Use & Infrastructure:
The black-dashed area to be included in the RFP.
This portion of the Buildings and Inspections design scope is being administered under a separate contract.
Proposed- Fifth Floor
Building and Inspections
20,400 SF
151 staff total/ approximately 125 at Centennial and 25 at City
Hall.
Relocate 13 FTE to fourth floor Centennial 2
Relocate 3 FTE to City Hall Basement
Needs: More conference space, a larger office for a Deputy
Director, (4) 9x9 cubes for Plan Examiners.
For FY26 need 2 offices for inspector division manager and HR-
SMA, (3) 9x9 cubes for supervising inspector, (1) 6x9 for an
Admin Tech, 7 workstations for inspectors
Law/ Land Use and Infrastructure
406 SF
Proposed: 150 SF Kasandra Maynes stays.
Relocate two offices to fourth floor
Proposed- Sixth Floor
Income Tax
Existing:13,800 SF
Proposed:7,580 SF
31 FTE includes 3 vacant FTE
Law/ Real Estate
Existing: 4,300 SF
Proposed: 4,000 SF
Law/ Prosecutors
Existing: 3,500 SF
Proposed: 7,000 SF
Inclusion (DEI)
Law/ Real Estate Law/ Prosecutors
Proposed- Eighth Floor
Recreation Commission (CRC)
Existing: 20,800 SF
Proposed: 16,900 SF
Reconfiguring and right-sizing Recreation for current staffing would allow for about 4,000 sf for another use.
Finance/ Employee Health Services
2,490 SF
6 FTE and 3 Contract Employees
Proposed: 4,000 SF
Employee Health Services From 1st Floor
City Hall
Proposed- Basement
Procurement/ Printing Services
4,800 SF
Proposed: 4,082 SF
Building & Inspections/ Inspectors
2,250 SF
Proposed: 3,887 SF
Increased office space for 2 Training Supervisors and an
Administrative Tech to serve the Training Academy
Learning Space for 20-30
Building & Inspections
Building & Inspections
Proposed- First Floor
Law/ Collections
Existing 743 SF
Proposed 1,190 SF
Relocating Collections will allow for a front desk to serve the public and provide better security for staff.
Law/ Interns
Existing 0
Proposed: 1,257 SF
Relocating the Interns to a central area will alleviate crowding on the 2nd floor.
Additional Space
Existing: 700 SF
Law/ Collections Law Interns From 2nd floor
Law/ Real Estate to Cent 2
Proposed- Second Floor
Law/ Overflow Space
730 SF
Law/ Conference Rooms
Existing: 650 SF (3rd floor City Hall)
Proposed:1,700 SF Three new conference rooms dedicated to Law.
Citizen Complaint Authority
Existing: 2,820 SF
Proposed: 2,545 SF Law/ Collections CH 1st Floor Law/ Prosecution Cent 2 6th floor
Citizen Complaint Authority
Proposed- Third Floor
DOTE/ Traffic Engineering
1,962 SF
DOTE has 167 workspaces combined
Between the 3rd and 4th floors of City Hall and 149
Filled and vacant FTEs. This leaves approximately 18 available cubicles. Relocate DOTE to 4th floor and vacate this space.
Renovation and Expansion of Council Offices
DOTE
Proposed- Fourth Floor
Transportation & Engineering
Relocate staff from the 3rd floor to this location.
DOTE from 3rd floor
3300 Central Parkway
Proposed First Floor
Note: This scope has been removed from the RFP. Finance/Risk Management and Finance/Employee Health Services will be relocated to another location.
There is 10,000 SF of space available on the first floor of 3300 Central
Parkway. Police Place Based Investigations of Violent Territories (PIVOT) and
Crime Gun Intelligence Center (CGIC) moved into a renovated second floor in
2021.
Finance/ Risk Management/ PEAP
2,700 SF
Proposed: 4,000 SF
Finance/ Employee Health Services
2,490 SF
6 FTE and 3 Contract Employees
Proposed: 4,000 SF
Relocating PEAP and Employee Health Services to this facility will offer both agencies room for growth to better serve staff. There will need to be careful considerations in the design to protect privacy and confidentiality.
PEAP Employee Health Services
Scope Removed
1115 Bates Avenue
Public Services Administration
Public Services Administration Building was built in 2012 and is about 30,000 sf on two floors. Keep Cincinnati Beautiful is currently on the first floor but will vacate the space sometime in the future which will leave about 9,000 sf available.
Office of Environment & Sustainability
Currently have 3,677 sf at City Hall
12 FTE , 10 FT Contractors, 2 PT Interns
It is unclear how many of the Federal grant funded positions will remain.
OES
Summary
The below will solve space issues for Law/ Administrative Hearings, Employee Health
Services, PEAP, Fire Administration, Office of Environment & Sustainability, Law, Building and Inspections and Council Offices. Additionally, there will be future office space carved out and more conference spaces at City Hall and Centennial 2.
Technology upgrades will be implemented into the scope of work.
Centennial 2 1st floor
• Relocate Employee Health Services to C2 8th floor
• Expand Administrative Hearings
• Create additional conference room spaces
Centennial 2 2nd floor – No Work
• Under separate contract: Relocate Citizens Complaint Authority to CH 2nd floor
• Relocate Inclusion on to the floor
• Modify Purchasing’s Space
Centennial 2 4th floor
• Note: half of the scope is covered under a separate contract agreement. To relocate some of Building and Inspections from 5th floor to 4th floor.
• Relocate Fire Administration from Fire Station 14 and C2 8th floor
Centennial 2 6th floor
• Reduce the size of Income Tax
• Under separate contract: Relocate Inclusion to C2 6th floor
• Relocate Law Prosecutors and Real Estate from CH 1st & 2nd floor
Centennial 2 8th floor
• Reduce the size of Recreation
• Relocate Employee Health Services from 1st floor
City Hall Basement
• Permanent Training Academy space
• Relocate additional B&I staff associated with the Training Academy from C2 5th floor
City Hall 1st Floor
• Relocate Law Real Estate to C2 6th floor
• Relocate Law Collections and Interns from CH 2nd floor
• Relocate OES to Public Services Administration Building
City Hall 2nd Floor
• Removed from RFP scope: Relocate Citizen Complaint Authority from C2 2nd floor
• New conference rooms
• Relocate Law Collections to CH 1st floor
• Relocate Law Prosecutors to C2 6th floor
City Hall 3rd Floor
• Relocate DOTE staff to CH 4th floor
• Build out Council offices along South of building
City Hall 4th Floor
• Relocated DOTE staff from 3rd floor
Renovate Bathrooms throughout City Hall
3300 Central Parkway
• Removed from RFP scope: Relocate Employee Health Services and PEAP to 1st floor
Public Services Administration
• Relocate OES to first floor
Total Square Feet to be Renovated: about 75,000