2 - SOW CDRL A002.pdf

PDF 81 KB Posted

Attached to
Preventative Maintenance for Forging Presses Federal contract opportunity
Solicitation number
N4215821QS052
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Preventative Maintenance for Forging Presses, newest first.
File Type Posted
2 - Combined Synopsis Soliciation.pdf PDF
2 - SOW CDRL A004.pdf PDF
2 - SOW CDRL A001.pdf PDF
2 - SOW CDRL A005.pdf PDF
2 - SOW CDRL A003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A002
2_TITLE_OF_DATA_ITEM: Remedial Maintenance Repair Report
3_SUBTITLE: Repair Work Completed
4_AUTHORITY_Data_Acquisit: DI-MGMT-81893
5_CONTRACT_REFERENCE: PWS Paragraph 5.5.2.
6_REQUIRING_OFFICE:
7_DID_250_REQ:
8_APP_CODE: N/A
DIST_STATEMENT: D
10_FREQUENCY: ASREQ
11_AS_OF_DATE: Contract Award Date
12_DATE_OF_FIRST_SUBMISSI: 10 days after event
13_DATE_OF_SUBSEQUENT_SUB: N/A
addressee1: Norfolk Naval Shipyard
draft1:
reg1:
repro1:
addressee2: Portsmouth, VA
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS:

The contractor shall submit a comprehensive, detailed Remedial Maintenance Repair Report within 10 calendar days after each event for all unscheduled minor and major adjustments, repairs, urgent repairs, non-urgent repairs and repair resolution services conducted on any equipment listed in Table 1 of the PWS. Unscheduled repair reports shall include all applicable information regarding tests, calibrations and/or measurements taken to verify repair and operation of the machine.

The submission of this report is acceptable in the contractor's format.

Reports shall contain a minimum of the following:

• Identification of Personnel Performing Work

• Date

• DoD Asset Number

• Dates and Time of Maintenance Action

• Description of Repairs Completed

• Changes in Operating Procedures (if any).

• Changes in Preventative Maintenance (if any) - See Data Item A001

• List of References Used

• List of Replaced Parts (Note if OEM, Upgrade or Approved Equal Replacement)

• Cost Breakdown of each Replaced Parts and Labor

• Number of Mechanical Man-Hours

• Number of Electrical/Electronic Man-Hours

• Total Man-Hours

Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S DoD contractors only. Other requests for this document shall be referred Program Officer listed in the contract.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 0
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: A
TDP: X
TM:
OTHER:
DSYSTEMITEM: Forging Equipment
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:

File details come from the government source that posted it. Updated .