2-Scope of work Attachment B.pdf

PDF 1 MB Posted

Attached to
Helicopter flights to drop off guzzler material at the Swan Creek WMA in Rich County, Utah JF27-128
Solicitation number
JF27-128
Issued by
Cache County, Utah

About this file

This is a Scope of Work document prepared by the Utah Division of Wildlife Resources (UDWR) under the State of Utah Department of Natural Resources for a Request for Quotes (RFQ) to provide helicopter sling-load and transport services. The project involves transporting guzzler tanks, personnel, and supplies to two remote drop sites within the Swan Creek Wildlife Management Area in Rich County, Utah. The contract requires up to 5 hours of on-site helicopter flight time operating from a single landing zone/fuel staging area at an elevation of 6,258 feet, with deliveries to two drop sites ranging from 6,580 to 7,100 feet in elevation and located 0.3 to 0.7 miles from the staging area. Each drop site requires three trips for long-line material delivery. The work must be completed in one contiguous day during daylight hours (one-half hour before sunrise to one-half hour after sunset) between November 2 and November 10, 2026. Bidders must provide references from their last three related projects, including employer contact information, work type, helicopter type, completion timeline, and crew size. No site tour will be provided, and all bidder questions must be submitted in writing through Sciquest. The contractor must begin work within seven calendar days of receiving the notice to proceed.

Bids shall be submitted on a per-hour and total project cost basis, with all mobilization and operation costs included; no fuel surcharges or adjustments will be negotiated. The planned budget for the project is $15,000.00, with payment to be made in one lump sum upon project completion for up to 5 hours of on-site flight time. The helicopter must be capable of lifting 800 to 1,000 pounds and be equipped for external loads and long-line operations; a Hughes 500 helicopter is explicitly deemed unacceptable, with larger aircraft such as the Bell Ranger preferred. The contractor must provide all labor, equipment, supervision, transportation, operating supplies, long-lines, netting, sling equipment, and a fuel truck available at the staging area at all times. Contract award will be determined at the government's sole discretion based on bid price, prior performance, and references. The contractor is responsible for site cleanup, refuse disposal, environmental compliance, hazardous materials management, crew supervision with an on-site English-literate supervisor, emergency transportation, and protection of cultural and archaeological resources in accordance with applicable federal and state regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Swan Creek WMA Guzzler Contract Specification

Introduction:

The Utah Division of Wildlife Resources (UDWR) is acquiring services in this contract to provide up to 5 hours of on-site helicopter time to transport guzzler tanks, personnel, and various supplies to 2 sites in Rich County, Utah. Bids should be submitted on a per/hour basis. Attach references of the last 3 previous related jobs. At a minimum it should include: employer, contact number, type of work, type of helicopter use, days to complete job, and size of crew.

This contract will be bid on an average per hour and total project cost basis. Per hour and total bid prices will include all mobilization and operation costs. There will be no fuel surcharges or adjustments negotiated. Bidders must provide references of prior experience on similar projects. The contract will be awarded based on bid price, prior performance and references as provided by the bidder or obtained independently by the government and will be evaluated and awarded at the sole discretion of the government.

Site Specifics

Location Description:

The project area consists of one staging area (landing zone) in Rich County, Utah ( See attached map). Elevation of the LZ1/Fuel staging area is 6,258 feet and the two drop sites associated with the LZ range from 6,580 to 7,100 feet with a flight distance from 0.3 miles to 0.7 miles to each drop site. The staging area can be changed if needed. Each drop site requires 3 trips for long-lining materials. This project has 2 drop sites operating out of 1 landing zone.

Vicinity maps showing the project sites are attached.

Staging Area/LZ1: 12 T 464839 m E 4648464 m N

Lat/Long (41.9874, -111.42448)

Drop Site 1 UTMs: 12 T 464221 m E 4648582 m N

Lat/Long (41.98843, -111.43194)

Drop Site 2 UTMs: 12 T 463688 m E 4648528 m N

Lat/Long (41.98792, -111.43837)

Access to the site:

The main access route is north of Garden City, Utah on HWY 89. Turn left on West Swan Creek Spring Road and travel on the well-maintained dirt road until you turn right on Swan Creek Canal Road. This will lead to all landing/fuel zones.

Specific Tasks:

Utah Division of Wildlife (UDWR) staff will have a pre-work conference with the contractor to review and agree on a workday plan that maximizes use of helicopter and UDWR personnel time. Work shall be performed in an organized systematic manner as determined in the pre-work conference.

UDWR will provide experienced ground crews at all staging areas and drop zones. UDWR staff have been involved in multiple projects similar to this one and will help contractors streamline work in any way that helps maximize safety while minimizing loss of time.

A helicopter must be capable of lifting personnel, wildlife guzzlers, and supplies (800-1000 pounds min-max) in a timely manner to remote work sites. Hughes 500 helicopter is not sufficient and will not be acceptable. Larger ships, such as the Bell Ranger have proven very effective and fast for these projects. Must be carded for external loads/ long-line. Must have a fuel truck available at the staging area at all times. The job must be completed in one day during a contiguous twelve hour span of daylight. Project date may be rescheduled due to poor weather conditions, breakdowns, airspace clearance, etc.

A Helicopter must be able to sling loads that are a minimum of 800 pounds, not to exceed 1,000 pounds. Materials to be transported include UDWR personnel, large guzzler tanks, various size lumber, sheeting, and roofing materials, and assorted supplies. All loads will be bundled and secured by UDWR personnel in a way that is acceptable to the contractor. Weight of loads will not exceed 1,000 pounds. Materials and tanks will have eye-bolts on four corners for cable slings.

A fuel truck and all long lines, neeting, and other equipment for sling loads must be provided by the helicopter company. Project staging areas that are clear, flat, and away from obstructions have been selected to minimize distances flown while hauling materials. A central fueling location may be used to help minimize driving time for the fuel truck between staging areas. Coordinates for the initial staging area (LZ1/Fuel) are 12 T 464839 m E 4648464 m N (Lat/Long: 41.9874, -111.42448).

Records and Notification:

The contractor shall maintain adequate records to allow the UDWR to monitor contract progress and for the contractor to be accountable for work quality.

Contractor Furnished Property and Services:

The Contractor shall furnish all labor, equipment, supervision, transportation, operating supplies and incidentals to perform all work as set forth in the specifications.

Equipment Requirements:

The contractor shall furnish all equipment needed for the project as set forth in the contract specifications with competent, fully-qualified operators.

Government Furnished Property:

There is no government furnished property.

Equipment and Workmanship:

All equipment and/or materials incorporated into the work covered by this contract shall be of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. All work under this contract shall be performed in a skillful and workmanlike manner.

The State may require, in writing, that the contractor remove from the work any employee deemed by the State to be incompetent, careless, or otherwise objectionable.

Environmental Considerations:

1. Project sites shall be cleaned up, and all refuse removed by the Contractor. The Contractor shall be responsible for disposal of materials in a manner consistent with State, Federal and local laws and for all expenses incurred with disposal. Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work.

2. Use of 2-wheel and 4-wheel vehicles is only permitted on existing dirt roads, power lines, and fence-lines. Off-road driving is strictly prohibited.

Hazardous Materials:

1. Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Materials Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).

2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized.

On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.

3. Incidental (de minimus) leaks from fittings, gaskets or ruptured hoses will not subject the contractor to remedial requirements. They will be considered to be normal and unavoidable losses. Continual leaks will be noted on inspection reports and correction through maintenance required.

4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on site only if the fluids are captured, containerized, and removed from public lands for proper disposal.

Public Access:

Access into and through the project site shall remain open to the public at all times. The contractor shall maintain roadways free of vehicles, tools and debris.

Security of Equipment and Property:

The contractor may leave equipment at the work site. The contractor shall be fully responsible for equipment if it should be lost, stolen or damaged.

Crew Supervision:

1. The contractor shall designate one English literate supervisor who will be on-site during operation hours. Supervisors shall be identified during the pre-work conference. Any changes in supervisory designations must be submitted in writing to the Project manager at least 24 hours prior to the change taking effect.

2. A person designated by the Contractor as supervisor must remain with and effectively direct the crew by (1) making periodic inspections of the crew’s work, (2) advising them as to improper work methods, (3) providing instructions for correcting any improper work methods encountered.

3. Emergency transportation will be provided by the Contractor at all times.

Work Camps: Hotels are available in Weber and Box Elder County, Utah.

Work Hours: Work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset.

Work Schedule: The work schedule shall be submitted at the pre-work conference.

Site Visit:

There will be no site tour. It is the responsibility of the bidder to take into account logistics for fuel truck delivery, helicopter staging area location, flight paths, distances, etc. when placing a bid. Attached maps detail all this information and additional information can be provided at the bidder’s request through Sciquest question submission.

All questions related to this solicitation, specifications, or bidding procedures MUST be asked in writing in Sciquest. THERE ARE NO EXCEPTIONS TO THIS. Questions asked, and subsequent answers will be recorded and posted on Sciquest so that all potential bidders can review questions and answers.

Contract Time:

The Contractor shall begin work within seven (7) calendar days from the effective date of the notice to proceed. The Contractor shall continue performance of the work under the contract without delay or interruption except by causes beyond his/her control. The Contractor shall complete all work required within the time specified in the work schedule.

Performance Time:

Helicopter Slinging/delivery of materials: One day, up to 5 hours of on-site flight time, to occur between Monday, November 2nd and Tuesday November 10th, 2026.

Delays:

The contractor is expected to complete all contract performance in a timely manner, regardless of the contractor or subcontractor's other work load, including any work being performed under other state contracts. A delay or failure to perform may be considered excusable when the delay or failure arises from causes beyond the control and without the fault or negligence of the Contractor or subcontractor. Examples of these causes are (1) acts of God or of the public enemy, (2) acts of the State in either its sovereign or contractual capacity, (3) fires, (4) floods,

(5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor or subcontractor.

Upon request of the Contractor, the Contracting Officer shall ascertain the facts and extent of the failure. If the Contracting Officer determines that any failure to perform results from one or more of the causes above, the delivery schedule may be revised, subject to the State’s contract termination rights under the contract.

Acceptance:

Based on inspection results, if the quality level falls below contract specifications, the Project Manager will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of work. If the quality of the work is not raised to an acceptable level after written notification, the Project Manager may issue a suspended work order to resolve the problem, during which time contract time will continue to run.

Budget and Payment:

Planned budget for this project is 15,000.00. Payment will be made for up to 5 hours of on-site flight time on the scheduled project date selected from November 2nd to November 10th, 2026.

Payment will be made in one lump sum at completion of the project.

Fire Danger Season:

If the Project Manager allows the Contractor to continue work during the periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the Project Manager.

Preservation of Historical and Archaeological Data:

1. The Contractor agrees that should he or any of his employees in the performance of this contract discover evidence of possible scientific, pre-historical, historical, or archeological data he will notify the Project Manager immediately giving the location and nature of the findings.

2. Where appropriate by reason of discovery, the Project Manager may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted.

3. The Contractor agrees to insert this paragraph in all subcontracts, which involve the performance of work on the terrain of the site.

Protection of Cultural Resources:

Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (16 U.S.C. 470aa-ll) (36 CFR 296.4 and 36 CFR 261.9(g)), shall be identified on the ground by the Government. The Government may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object which is or may be entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified. Discovery of such areas by either party shall be promptly reported to the other party and operations will be suspended at that location until the significance or potential significance of the site is determined.

Contractor shall protect all known and identified historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology and culture against destruction, obliteration, removal or damage during Contractor's operations. Contractor shall immediately notify the Government if disturbance occurs to any known site, and shall immediately halt operations in the vicinity of the site until the Government authorizes the Contractor to proceed. Contractor shall bear costs of evaluation and restoration in accordance with 36 CFR 296.14(c), provided that such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.

Notice to Proceed:

After the award of the contract, the Project Manager will issue a notice to proceed to the contractor. Issuance of such notice may be delayed for a reasonable time if adverse soil, vegetative, or climatological conditions exist.

Swan Creek Guzzlers

Glenc

Site 2 Site 1

LZ1/Fuel

Lakota

Project Site

Drop Site 2

Drop Site 1

LZ1/Fuel

Swan Creek WMA

0 0.3 0.5 Miles

Vantor, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community

Requisition Request
Submit all backup documentation with this form
To be completed by Fiscal Staff
Introduction:
Site Specifics
Specific Tasks:
Records and Notification:
Contractor Furnished Property and Services:
Equipment Requirements:
Government Furnished Property:
Equipment and Workmanship:
Environmental Considerations:
Hazardous Materials:
Public Access:
Security of Equipment and Property:
Crew Supervision:
Site Visit:
Contract Time:
Performance Time:
Delays:
Acceptance:
Payment:
Fire Danger Season:
Preservation of Historical and Archaeological Data:
Protection of Cultural Resources:
Notice to Proceed:
Swan Creek Guzzlers
Project Site