This document is a draft subcontract between The Regents of the University of California (Lawrence Berkeley National Laboratory) and an unspecified subcontractor for the manufacture, assembly, inspection, and delivery of 20-millimeter turnbuckle struts for the Advanced Light Source-Upgrade (ALS-U) Storage Ring project. The subcontract covers the procurement of one first article strut and 261 production struts, with the total contract value yet to be determined (marked as "TBD"). The procurement is being conducted under Department of Energy (DOE) Prime Contract No. DE-AC02-05CH11231, with the subcontractor required to be registered in the System for Award Management (SAM) database.

Key technical and administrative requirements include submitting monthly progress reports, conducting first article testing and approval, complying with environmentally preferable product guidelines, and following specific shipping and packaging instructions. The subcontractor must produce both the first article and production quantity at the same facility, with extensive quality control and inspection provisions. Invoicing will be done electronically, with payments processed within 15 days of receipt, and the subcontractor must adhere to sustainable procurement practices, including minimizing toxic materials, implementing e-waste recycling standards, and using recyclable or compostable packaging materials.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontract No. TBD Page 1

SUBCONTRACT

NO. TBD

The Regents of the University of California Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720

Subcontractor:

LBNL TEMPORARY VENDOR

Attention: TBD

VENDOR: TBD

TBD, TBD

Phone: TBD Fax: TBD E-Mail: TBD

University Procurement Representative:

Name: Martha Gamarano Grausz Title: Sr. Subcontracts Administrator Phone: (510) 486-6618 E-Mail: MGGrausz@lbl.gov

Introduction This is a fixed price subcontract (hereinafter "Subcontract") for the manufacture, assembly, inspection, and delivery for 20-millimeter (mm) strut assemblies, as further described herein. The North American Industry Classification System (NAICS) for this acquisition is 333248 All Other Industrial Machinery Manufacturing.

This Subcontract is between The Regents of the University of California, (hereinafter "University") and the party identified above as the "Subcontractor".

This Subcontract is issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter "U.S. Government"), represented by the Department of Energy (hereinafter "DOE") for the management and operation of the Lawrence Berkeley National Laboratory (hereinafter "LBNL") and the performance of certain research and development work.

Agreement The parties agree to perform their respective obligations in accordance with the terms, conditions, and provisions of the attached SCHEDULE OF ARTICLES and the documents referenced or incorporated therein, which together with this Signature Page shall collectively constitute the entire Agreement and shall supersede all prior negotiations, representations, or agreements, whether verbal or written.

LBNL TEMPORARY VENDOR

THE REGENTS OF THE

UNIVERSITY OF CALIFORNIA

By:

By:

Name:

Name:

Title:

Title:

Date:

Date:

SCHEDULE OF ARTICLES

Subcontract No. TBD Page 2

ARTICLE 1 – ORDERED ITEMS

Description The Subcontractor shall furnish and deliver the following ordered item(s), in accordance with this Subcontract:

Item

LBNL ID Description Quantity UOM Price Extended Amount

Delivery Schedule:

1 AL-1072-3380

20 MM

TURNBUCKLE

STRUT (FIRST

ARTICLE)

1 EA $TBD $TBD TBD

2 AL-1072-3380

20 MM

TURNBUCKLE

STRUT

(PRODUCTION)

261 EA $TBD $TBD TBD

3 Per SOW Appendix B Closeout Checklist 1 EA $TBD $TBD TBD

Total subcontract Amount: $TBD

The above delivery schedule identifies the date(s) by which the specified item(s) shall be delivered to the shipping address indicated in the article below entitled Shipping Requirements.

Acceptance Acceptance of the items described above is based upon successful completion of the acceptance criteria per the Statement of Work (SOW) AL-1687-0894 Titled Statement of Work for the ALS-U Storage Ring Struts, Rev. B, dated 03/19/2025 incorporated into this Subcontract.

Notice to Proceed The following documents shall be submitted to the University. Acceptable documents, as determined by the University, must be submitted and a Notice to Proceed must be issued before any work may commence, unless otherwise noted below.

• Hold Point (HP) – The Subcontractor must not proceed beyond a hold point (HP) per the incorporated Statement of Work (SOW) AL-1687-0894 Titled Statement of Work for the ALS-U Storage Ring Struts, Rev. B, dated 03/19/2025 Section 4.5 – Hold Points, without a formal written Notice to Proceed (NTP).

ARTICLE 2 – PRICE AND PAYMENT

Fixed Price The Subcontractor shall furnish and deliver the ordered item(s) for the total fixed price of $TBD.

Sales or Use Tax

Subcontract No. TBD Page 3

Items purchased by the University hereunder are treated as for resale, per the University's California State Resale Permit No. SR-CH 21-835970 for LBNL, and shall not be subject to any California or other State sales or use tax if shipped to California. Any items furnished hereunder for rentals or leases are subject to California State sales or use tax, and such tax is included in the fixed prices/rates stated herein.

The University of California State Resale Permit No. SR-CH 21-835970 for LBNL is available at:

http://procurement.lbl.gov/supplier-forms/.

Invoices

• The Subcontractor shall email invoice(s) directly to the LBNL Accounts Payable Office at APInvoice@lbl.gov, within thirty days of the acceptance of the item(s). The "subject" line of the email shall state the Subcontractor's name and the Subcontract number. If final invoices are not submitted within 180 days of acceptance, then any amounts paid by the University to that point will represent satisfaction in full by LBNL under this Subcontract and an Accord and Satisfaction.

This means that LBNL will not be obligated to make any further payments under this Subcontract.

To avoid delays in processing and payment, Subcontractors should include only one attachment per email. Multiple invoices should be combined and attached as a single portable document format (PDF) or Microsoft Word or rich text format (RTF) file (up to 30 individual invoices per attachment) or emailed separately (one attachment per email). Do not include icons/pictures in the email (logos, etc.) and ensure only one subcontract number is listed on the invoice.

• Invoice(s) shall state: the Subcontract number; the Subcontractor (including business heading or logo); bill to address (same address as above); invoice date; unique invoice number; remittance address; sufficiently identify the items/services being invoiced; and identify any separately payable freight charges (with receipts if available) and taxes. Invoice(s) in a spreadsheet format are not acceptable, but a spreadsheet can be used to support an invoice. The Subcontractor shall maintain records which support all invoiced amounts, and provide them to the University Procurement Representative upon request.

Payment Terms All invoices except the final invoice shall be payable within 15 days of receipt if the invoice submission is complaint with the subcontractor requirements for invoicing; provided, however, that payments made thereafter shall not be subject to any penalty, interest, or late charges. Only those items/services identified in this Subcontract or a Subcontract Modification will be considered for payment. Payment amounts may be adjusted for any applicable credits, offsets, or withholds. Full payment shall not be due until any final acceptance requirements of this Subcontract have been satisfied. For inquiries about the status of an invoice, call (510) 486-6954 or aphelp@lbl.gov.

ARTICLE 3 – SUBCONTRACT ADMINISTRATION

Notices, Requests, and Modifications The Subcontractor shall submit all notices and requests for approval by email to the University Procurement Representative indicated on the signature page.

Only the University Procurement Representative is authorized to modify the terms, conditions, and requirements of this Subcontract, including any changes to the description of the work, and to issue any notices and approvals required by this Subcontract. Certain changes to this subcontract may be made only by the University Procurement Representative without subcontractor agreement or negotiation prior to the http://procurement.lbl.gov/supplier-forms/ mailto:APInvoice@lbl.gov mailto:vendordesk@lbl.gov

Subcontract No. TBD Page 4 change. Such changes may include: changes of an administrative nature, directed changes pursuant to the clause incorporated herein entitled: “CHANGES,” unilateral modifications authorized by clauses other than the Changes clause, and termination notices. Apart from the University Procurement Representative’s authority to issue unilateral changes, the parties may mutually agree to make changes in the work ordered, or modify any other term or condition of the subcontract, resulting in an amendment to the subcontract, but only by a written modification signed by the authorized representatives of both parties.

Technical Representative TBD is the Technical Representative for this Subcontract. This individual is designated to monitor performance of the work and to interpret and clarify the technical requirements, but is not authorized to make changes to the work or to modify any of the terms and conditions of this Subcontract, including those related to the completion schedule or pricing.

TBD

TechRep@lbl.gov

(510) 486-XXXX

Technical Direction and Changes Performance of the work under this Subcontract shall be subject to the technical direction of the University Technical Representative. The Subcontractor shall promptly proceed with the performance of technical direction of the nature prescribed by this article issued by the University Technical Representative.

The term "technical direction" is defined to include directions to the Subcontractor within the Scope of Work of the Subcontract which: (1) clarify the desired work emphasis between work areas or tasks; (2) direct the pursuit of certain lines of inquiry; (3) assist in the interpretation of drawings, specifications, or technical portions of the work description; or (4) fill in details necessary to perform and complete the Scope of Work. All technical direction must be issued in writing by the University Technical Representative.

The University Technical Representative is not authorized to issue any technical direction which would:

(1) constitute an assignment of work outside the general scope of the work covered by this Subcontract;

(2) change the description of the work to be performed or any applicable drawings, designs, and specifications; (3) change the time or place of performance; the method of shipment or packaging, or the place of inspection, delivery or acceptance; (4) increase the estimated cost for performance of the work, the fixed fee, or the time required for performance of the work; (5) change any expressed term or condition of the Subcontract; or (6) unreasonably interfere with the Subcontractor’s ability to perform and complete the work.

Any such technical direction must first be authorized by a written modification to this Subcontract issued by the University Procurement Representative, as provided in the clause of these General Provisions entitled Changes.

If any instruction or direction by the University Technical Representative falls within one of the types described in the paragraph above, the Subcontractor shall not proceed to act on such technical direction and shall promptly notify the University Procurement Representative. Upon receipt of a notification from the Subcontractor, the University Procurement Representative shall promptly advise the Subcontractor either that, in accordance with the Changes clause: (1) the technical direction is within the general scope of the Subcontract and does not constitute a change and to proceed to act on such technical direction; or

Subcontract No. TBD Page 5

(2) the technical direction is not within the general scope of the Subcontract or would constitute a change, and to not act on such technical direction unless and until the University issues a written modification to the subcontract.

Closeout The Subcontractor shall, as a condition of full payment, assist the University after the completion of the work in accomplishing the administrative closeout of this Subcontract, including, as necessary or required, the furnishing of documentation and reports, the disposition of property, the disclosure of any inventions, the execution of any required documents (including an Assignment and Release form if this form is an incorporated document), the performance of any audits, and the settlement of any interim or disallowed costs.

ARTICLE 4 – FURNISHED AND ACQUIRED PROPERTY

The University will not furnish any U.S. Government Property for use under this Subcontract.

The University will furnish the materials per the Statement of Work (SOW) AL-1687-0894 Titled Statement of Work for the ALS-U Storage Ring Struts, Rev. B, dated 03/25/2025 Section 2.1 for use under this Subcontract. The Subcontractor is required to incorporate these materials into the Struts and return any unused materials with the delivery of the ordered items as referenced in Article 1.

ARTICLE 5 – SHIPPING REQUIREMENTS

Shipping Terms The shipping terms are FOB Destination, freight prepaid, and add. All shipments shall be shipped via the Subcontractor's vehicles or a licensed common carrier selected by the Subcontractor, at the University's expense.

Shipping Value Items shall be shipped at the maximum declared value for the lowest applicable transportation rate or classification, and the bill of lading shall note it as such.

Shipping Cost The Subcontractor is required to declare the full value of the item(s) when shipped.

Airway bills shall be marked with the appropriate “Government Package” entry. Shipping costs in excess of those per the shipping instructions specified in the Subcontract shall be deducted from the Subcontractor’s invoice.

Shipping Address All shipments shall be shipped to the following address:

Lawrence Berkeley National Laboratory For the U.S. Department of Energy One Cyclotron Road, Building 69 Berkeley, CA 94720

Shipping Point The shipping point is: TBD

Subcontract No. TBD Page 6

ARTICLE 6 – REPORTS

Type of Reports.

• Monthly Progress Reports

Monthly progress reports shall be submitted by the fifth business day of each month. The progress reports may be informal letter summaries in a format approved by the University representatives. These reports must contain a description of work performed during the report period and the work planned for the succeeding periods. They must also include an explanation for schedule changes, if applicable, as well as a list of completed quantities of key components throughout the production sequence.

• Reports and Meetings as identified within the Statement of Work

Site visits by LBNL personnel, scheduled meetings, and additional reports are to be submitted as identified within the Statement of Work section 4.2. Reports shall be prepared and submitted in accordance with the instruction provided therein.

Submittal.

Reports shall be separately submitted to the following recipients at the following email or mailing address:

Lawrence Berkeley National Laboratory Attention: [Intended Recipient; see below] One Cyclotron Rd., Mail Stop [see below] Berkeley, CA 94720

Recipient Mail Stop Email Technical Representative TBD TechRep@lbl.gov Martha G. Grausz 90R1121-PROC mggrausz@lbl.gov

ARTICLE 7 – APPROVAL OF TECHNICAL DATA

If this Subcontract requires the Subcontractor to furnish any drawings, specifications, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance or test data, or other technical data for approval by the University prior to Subcontractor performance, the approval of the data by the University shall not relieve the Subcontractor from responsibility for any errors or omissions in such data or from responsibility for complying with the requirements of this Subcontract, except as specified below.

Any work done prior to such approval shall be at the Subcontractor's risk.

Unless otherwise specified, the University requires a period of 10 working days from date of receipt to review and approve the data. If the University does not approve the data within the allotted time period, the parties will establish a new time period for review and approval of the data and, if necessary, the delivery schedule or completion date will be equitably adjusted.

If the data includes any variations from the Subcontract requirements, the Subcontractor shall describe such variations in writing at the time of submission of the data. If the University approves any such

Subcontract No. TBD Page 7 variation(s), a change order to the Subcontract shall be issued by the University and, if appropriate, a bilateral modification to the Subcontract shall be negotiated.

ARTICLE 8 – PRELIMINARY INSPECTION

Preliminary in-process and source inspections may be performed at the Subcontractor's facility or at any of its sub-tier subcontractors' facilities. The inspection shall allow the University to verify that the Subcontractor has met the requirements of this Subcontract. Prior to University inspection, the Subcontractor shall perform a complete inspection and document the results. The Subcontractor shall present this documentation to the University at the time of the preliminary inspection. Such preliminary inspection does not waive the right of the University to inspect and accept or reject at the destination. The University reserves the right to subcontract with a qualified third party to conduct on its behalf any or all of the University inspections.

ARTICLE 9 – ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES

The Laboratory is subject to several interacting initiatives and federal and DOE requirements related to sustainability, including waste reduction, Recycled Content Products (EPA Designated Products), Biobased (BioPreferred®), energy efficient products (EnergyStar®), environmentally preferable and energy efficient electronics (EPEAT® and Federal Energy Management Program (FEMP) Designated Products), Non-Ozone Depleting Alternative Products (SNAP) and Water Efficient Plumbing Products (EPA Watersense®). The Laboratory also implements State of California requirements on packaging and electronic waste recycling.

The subcontractor must deliver products and services in compliance with this article which implements the requirements of DOE’s Sustainable Acquisition Program, as well as other federal- and state-mandated sustainability requirements.

In the performance of this Subcontract, the Subcontractor must specify, furnish, and use environmentally preferable products and services (i.e., products and services with a lesser or reduced effect on human health and the environment), to the maximum possible extent consistent with the Subcontract requirements herein, the General Provisions, and the intended end use of the products or services. The Laboratory generally considers the requirements practicable unless a specific program exception applies. Refer to SFTool.gov/Vendor Resources for links to sustainability resources and information on environmental programs the Laboratory and its suppliers/subcontractors are required to comply with, including exceptions.

The subcontractor must maximize, to the extent feasible, the procurement of materials and operations with lower embodied emissions and alternatives to ozone-depleting substances and high global warming potential hydrofluorocarbons.

The subcontractor must minimize, to the extent feasible, the supply of products and services determined by the EPA to be contaminants of emerging concern (CEC), including pharmaceuticals and personal care products and CECs found therein. The subcontractor shall provide Safer Choice labeled products under this subcontract, as applicable. The subcontractor is encouraged to visit https://www.epa.gov/saferchoice for updated lists of qualifying products.

https://sftool.gov/learn/about/652/vendor-resources#sftoolpages https://www.epa.gov/saferchoice

Subcontract No. TBD Page 8

The subcontractor must minimize the supply of products with toxic and hazardous characteristics, and minimize the generation of toxic and hazardous waste, to the maximum extent practicable.

E-Waste Recycling Requirements. All recyclers of electronic equipment must be e-Steward certified by the Basel Action Network (BAN).

For any equipment removed by the subcontractor and scheduled to be refurbished or recycled, the subcontractor must attest that those actions will be handled by a refurbisher or recycler that is third-party certified to one of the known electronics recycling certification programs that is used in the United States, the Responsible Recycling Standard (R2) or the E-Stewards Standard.

Information on environmentally preferable products and services is also available at:

https://www.epa.gov/contracts/greening-government-procurement. State of California sustainable procurement information can be found at: https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html

Questions regarding these sustainable acquisition requirements may be directed to the Laboratory Sustainable Procurement Representative (Business-Assurance-Sustainable@lbl.gov).

Packaging The subcontractor must minimize the supply of single use items including single-use plastic foodware (e.g., plates, cups, utensils, beverage bottles and bags).

The subcontractor must make good faith efforts to utilize smart-size packing; to customize box sizes in order to reduce packaging waste, and to minimize the number of shipments per order. Recycling practices and methods should be used to minimize the adverse effects on the environment. The subcontractor must use every reasonable effort to use cardboard and paper-based packaging materials for shipments to the Laboratory.

Packaging Requirements All packaging must be compliant with the California Toxics in Packaging Prevention Act (California AB 455). and must meet all additional standards and requirements set forth in the UC Sustainable Practices Policy. In addition, the Laboratory requires that all packaging meet at least one of the criteria listed below:

• Uses bulk packaging;

• Uses reusable packaging (e.g. totes reused by delivery service for next delivery);

• Uses innovative packaging that reduces the weight of packaging, reduces packaging waste, or utilizes packaging that is a component of the product;

• Maximizes recycled content and/or meets or exceeds the minimum post-consumer content level for packaging in the U.S. Environmental Protection Agency Comprehensive Procurement Guidelines;

• Uses locally recyclable or certified compostable material.

Foam packaging is prohibited as follows:

• Foam Ban – Food Service Packaging - The Laboratory does not allow packaging foam or expanded polystyrene (EPS) for takeaway containers or other food service items, in any University-owned or -operated food service facility.

• Foam Ban – Product Packaging - The Laboratory prohibits all subcontracted and non-subcontracted suppliers from selling or distributing packaging foam (other than that utilized for laboratory supply or medical packaging) to the Laboratory. Packaging foam is defined as any open https://www.epa.gov/contracts/greening-government-procurement https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html https://ucop.edu/procurement-services/for-suppliers/sustainable-procurement/sustainable-procurement-training-resources.html mailto:Business-Assurance-Sustainable@lbl.gov

Subcontract No. TBD Page 9 or closed cell, solidified, polymeric foam used for cushioning or packaging, including but not limited to: low-density polyethylene foam, polypropylene foam, polystyrene foam (i.e. EPS), polyurethane foam, polyethylene foam, polyvinyl chloride (PVC) foam, and microcellular foam.

Not included in this ban are easily biodegradable, plant-based foams such as those derived from corn or mushrooms.

ARTICLE 10 – SYSTEM FOR AWARD MANAGEMENT (SAM)

By acceptance of this Subcontract, the Subcontractor certifies that it will be registered in the SAM database (http://www.sam.gov/) within 30 days of Subcontract award per Federal Acquisition Regulation (FAR) 52.204-7, System for Award Management, and acknowledges the requirement heretofore to maintain said registration in the database in accordance with FAR 52.204-13, System for Award Management Maintenance, during performance of this Subcontract. The Subcontractor is responsible for the accuracy and completeness of its data within the SAM database in accordance with the stated requirements. In any event, failure to complete the registration within the required timeframe or to maintain such registration throughout Subcontract performance is considered a breach of Subcontract.

ARTICLE 11 – FIRST ARTICLE APPROVAL

The Subcontractor shall test the first article item as described in Article 1, in accordance with the requirements of this Subcontract. The Subcontractor shall perform these tests in sufficient time to allow delivery of the ordered items by the delivery date(s) specified in this Subcontract. At least 30 work days before the beginning of first article tests, the Subcontractor shall notify the University Technical Representative, in writing, of the time and location of the testing so the University may witness the tests.

The Subcontractor shall submit a first article test report within five work days from completion of the test to the University Technical Representative, marked "FIRST ARTICLE TEST REPORT: Subcontract No.

TBD, 20 MM TURNBUCKLE STRUT.

Within ten business days after the University receives the test report, the University shall notify the Subcontractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Subcontractor from complying with all requirements of the specifications and all other terms and conditions of this Subcontract. A notice of conditional approval shall state any further action required of the Subcontractor. A notice of disapproval shall cite reasons for the disapproval.

If the first article is disapproved, the Subcontractor, upon the University's request, shall repeat any or all first article tests. After each request, the Subcontractor shall make any necessary changes, modifications, or repairs to the first article or select another unit for first article testing. All costs related to these tests are to be borne by the Subcontractor, including any and all costs for additional tests following a disapproval. The Subcontractor shall then conduct the tests and deliver another report to the University under the terms and conditions and within the time specified by the University. The University shall take action on this report within the time specified in the third paragraph, above. The University reserves the right to require an equitable adjustment of the Subcontract price for any extension of the delivery schedule or for any additional costs to the University related to these tests.

If the Subcontractor fails to deliver any first article report on time, or the University disapproves any first article, the Subcontractor shall be deemed to have failed to make delivery within the meaning of the termination for default provisions of this Subcontract.

http://www.sam.gov/

Subcontract No. TBD Page 10

If the University does not act within the time specified in the third or fourth paragraphs, above, the University shall, upon timely written request from the Subcontractor, equitably adjust the delivery or performance dates and/or the Subcontract price, and any other subcontractual term affected by the delay.

The Subcontractor shall produce both the first article and the production quantity at the same facility.

Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the Subcontract quantity is at the sole risk of the Subcontractor. Before first article approval, the costs thereof shall not be allocable to this Subcontract for (1) progress payments, or

(2) termination settlements if the Subcontract is terminated for the convenience of the University.

The Subcontractor shall produce both the first article and the production quantity at the same facility.

ARTICLE 12 – REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED

COMPUTER SOFTWARE

The Federal Acquisition Regulation clause FAR 52.214-14, RIGHTS IN DATA-GENERAL, is incorporated by reference as part of this Subcontract. Under the clause, the Subcontractor may withhold from delivery data that qualify as limited rights data or restricted computer software, and deliver form, fit, and function data instead. By acceptance or performance of this Subcontract, the Subcontractor certifies that none of the data proposed for fulfilling the data delivery requirements qualifies as limited rights data or restricted computer software. If the Subcontractor believes data to be provided for fulfilling the data delivery requirements under this Subcontract qualify as limited rights data or restricted computer software, the Subcontractor must notify the University procurement representative and the University technical representative identified in the Subcontract, within 10 days of award and identify such data.

ARTICLE 13 – INCORPORATED DOCUMENTS

The following documents are hereby incorporated as a part of this Subcontract. The order of precedence for each document must be as specified in the Entire Agreement and Order of Precedence clause in the General Provisions. Any other documents not incorporated herein by specific reference are excluded from this Subcontract. The documents marked with an asterisk are available at http://procurement.lbl.gov/supplier-forms/.

• AL-1687-0894 Titled Statement of Work for the ALS-U Storage Ring Struts, Rev. B, dated 03/19/2025

• AL-1805-4061Titled Advanced Light Source Magnet Supports, Rev. A, dated 03/19/2025

ARTICLE 14 – GENERAL PROVISIONS

The following General Provisions are incorporated by reference into this Subcontract and are available at:

http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/.

General Provisions for Commercial Supplies & Services, dated 01/31/25 http://procurement.lbl.gov/supplier-forms/ http://procurement.lbl.gov/welcome-to-procurement-property/become-a-supplier/general-provisions/

Subcontract No. TBD Page 11

The clauses listed in the referenced General Provisions shall be applicable to this Subcontract, based on the value of the Subcontract, the status of the Subcontractor, or the nature and location of the Services, as indicated in the General Provisions.

(END OF SCHEDULE OF ARTICLES)

Article 1 – ORDERED ITEMS
Article 2 – PRICE AND PAYMENT
Article 3 – SUBCONTRACT ADMINISTRATION
Article 4 – FURNISHED AND ACQUIRED PROPERTY
Article 5 – SHIPPING REQUIREMENTS
Article 6 – REPORTS
Article 7 – APPROVAL OF TECHNICAL DATA
Article 8 – PRELIMINARY INSPECTION
Article 9 – ENVIRONMENTALLY PREFERABLE PRODUCTS AND SERVICES
Article 10 – SYSTEM FOR AWARD MANAGEMENT (SAM)
Article 11 – FIRST ARTICLE APPROVAL
Article 12 – representation of limited RIGHTS DATA and restricted computer software
Article 13 – INCORPORATED DOCUMENTS
Article 14 – GENERAL PROVISIONS

File details come from the government source that posted it. Updated .