2-Rev4 ET2024233 Meacham Airport - Drainage Study Report.pdf.pdf
PDF 9 MB Posted
- Solicitation number
- 27-0006
- Issued by
- Tarrant County, Texas
About this file
This is a drainage study report prepared by Evolving Texas for the City of Fort Worth, Texas, detailing hydrologic analysis and stormwater management recommendations for the proposed Meacham Airport Maintenance Facility located at 504 NW 35th Street, Fort Worth, Texas 76106. The report evaluates both pre-development and post-development drainage conditions using the Rational Method, with analysis based on 1-year, 5-year, and 100-year design storm frequencies in accordance with City of Fort Worth Stormwater Criteria Manual. The study identifies that the approximately 1.72-acre onsite drainage area (DA-1) contributes peak inflow of 12.19 cubic feet per second (cfs) to a proposed detention pond, which then discharges approximately 4.67 cfs into the existing storm network. The detention pond design was sized to attenuate post-development runoff such that peak discharge rates do not exceed existing conditions, ultimately reducing total runoff burden to the city's stormwater infrastructure by approximately 9.83 cfs compared to pre-development conditions. The site currently consists of grass-covered vacant land and is not located within a FEMA-designated floodplain; multiple design points were identified throughout the study area to monitor drainage patterns and existing curb inlet capacities.
The report concludes that with the detention pond in place, peak discharge at Design Point #1 decreases from 62.41 cfs under existing conditions to 59.52 cfs under proposed conditions, representing a net decrease of 2.89 cfs and demonstrating improved drainage conditions at this critical outfall location. Comprehensive appendices include existing and proposed drainage area maps, detention pond and grading plans with construction specifications, erosion control plans, geotechnical report findings, and as-built records for existing city storm infrastructure. The detention pond maintenance responsibility is designated to the City of Fort Worth Aviation Department, with provisions requiring proper pond function and adequate drainage capacity maintenance. Calculations and design parameters are based on City of Fort Worth design standards and ISWM Technical Manual specifications, with the final report dated August 6, 2026, prepared by Professional Engineer Chandler Davis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-SOQ-Design Proposals Meacham-Fuel.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Fort Worth, Texas Drainage Study for
Meacham Airport Maintenance Facility 504 NW 35TH STREET, Fort Worth, TX 76106
Evolving Texas Job #: 2024233
Prepared by:
Chandler Davis, P.E., CFM
August 6, 2026
Chandler Davis
08/06/2026
3000 Race Street, Suite 108 | Fort Worth, TX 76111 | 817-529-2700
TABLE OF CONTENTS
INTRODUCTION---------------------------------------------------------------------------------- PAGE 2
HYDROLOGIC ANALYSIS--------------------------------------------------------------------- PAGE 3
PRE-DEVELOPMENT CONDITIONS------------------------------------------------------- PAGE 3
POST-DEVELOPMENT CONDITIONS------------------------------------------------------PAGE 6
CONCLUSION------------------------------------------------------------------------------------- PAGE 7
APPENDIX A
EXHIBIT 1 – EXISTING DRAINAGE AREA MAP
EXHIBIT 2 – PROPOSED DRAINAGE AREA MAP
EXHIBIT 3 – DETENTION POND & DETENTION POND CALCULATIONS
EXHIBIT 4 – GRADING PLAN
EXHIBIT 5 – EROSION CONTROL PLAN
EXHIBIT 6 – EXISTING STORM MAP
EXHIBIT 7 – CITY OF FORT WORTH AS-BUILTS (K-0768)
EXHIBIT 8 – GEOTECH REPORT (CMJ ENGINEERING REPORT NO. 1705-25-04)
EXHIBIT 9 – FINAL PLAT
INTRODUCTION
Evolving Texas conducted a drainage study for the proposed Meacham Airport
Maintenance Facility, located at 504 NW 35TH Street, Fort Worth, Texas 76106. The site is bounded by NW 35th Street to the south, NW 36th Street to the north, 15-foot alley to the east and west. Reference Figure 1 below for the Vicinity Map. The site is currently a vacant lot. This report summarizes the pre- and post-development drainage conditions and evaluates the potential impacts of the future Meacham Airport Maintenance Facility on the surrounding drainage infrastructure.
Figure 1: Vicinity Map (N.T.S)
HYDROLOGIC ANALYSIS
The Rational Method was used to analyze stormwater runoff under pre-development and post-development conditions. For both scenarios, it is assumed that offsite areas remain unchanged surrounding the immediate site. Hydrology parameters, including the runoff coefficient, rainfall intensities, and maximum inlet times, were obtained from the City of
Fort Worth Stormwater Criteria Manual. The time of concentration for drainage areas is calculated as shown in Appendix A, Exhibit 1 & Exhibit 2 for the unimproved and improved areas in both pre- and post-development conditions. Evolving Texas received the boundary survey and topographic data from the client produced by Shield Engineering
Group, which serves as the basis for the design work outlined in this study.
PRE-DEVELOPMENT CONDITIONS
The existing drainage area map is provided in Appendix A, Exhibit 1 of this report. The site is currently undeveloped and consists primarily of grass-covered areas with scattered trees. The site is not located within a FEMA-designated floodplain.
An offsite drainage area contributes runoff to the western portion of the site. A 10-foot curb inlet located along Ross Avenue, identified as Design Point #5, captures runoff from the western portion of the site as well as the contributing offsite area. The eastern portion of the site drains directly toward NW 36th Street and is identified as Design
Point #1. Design Point #2 is located along 35th Street and receives runoff from the northern half of the roadway. Upon development of the proposed site, this design point should not receive stormwater discharge from the project site. Design Point #3 is located along the southern portion of 35th Street and is outside the limits of the proposed improvements; existing drainage patterns at this location should remain undisturbed. Design Point #4 is located on 34th Street and is similarly outside the limits of the proposed improvements; existing drainage patterns at this location should remain undisturbed. Design Point #6 is located at an existing drop inlet at the western end of
NW 36th Street and is outside the limits of the proposed improvements; existing drainage patterns at this location should remain undisturbed. Design Point #7 is located at an existing 10-foot curb inlet on Ross Avenue at the northern intersection of NW 36th
Street and Ross Avenue and is outside the limits of the proposed improvements;
existing drainage patterns at this location should remain undisturbed. Modeled site runoff patterns and drainage areas are further explained below and reflected in
Appendix A, Exhibit 1, the Existing Drainage Area Map.
• Drainage Point #1 o Exist DA 1 is approximately 1.74 acres and flows approximately 5.65 cfs to an existing 10’ curb inlet at the south westerly corner of the intersection of Clinton Ave and NW 36th Street.
• Design Point #2 o Exist DA 3 is approximately 0.2 acres and flows approximately 1.42 cfs down NW 35th Street where the runoff is ultimately collected in a curb inlet located at the south westerly intersection of NW 36th Street and Clinton
Avenue.
• Design Point #3 o Exist DA 4 is approximately 1.22 acres and flows approximately 4.03 cfs down NW 35th Street where the runoff is ultimately collected in a curb inlet located at the intersection of NW 36th Street and N Main Street.
• Design Point #4 o Exist DA 5 is approximately 4.81 acres and approximately 11.59 cfs offsite to an existing and eventually captured at a curb inlet located in the northern side of W Long Ave. The area within the current drainage area is not planned to have any improvements at the time this report is written.
• Design Point #5 o Exist DA 2 is approximately 2.67 acres and flows approximately 9.28 cfs to an existing 10’ curb inlet at the south westerly corner of the intersection of Ross Avenue and NW 36th Street.
• Design Point #6 o Exist DA 6 is approximately 13.56 acres and flows approximately 40.98 cfs to an existing drop inlet at the western end of NW 36th Street.
• Design Point #7 o Exist DA 7 is approximately 2.61 acres and flows approximately 6.49 cfs to an existing 10’ curb inlet at the north westerly corner of the intersection of Ross Ave and NW 36th Street.
The pre-development storm flow calculations for the site adhere to the City of Fort
Worth Stormwater Criteria Manual. The existing runoff calculations for design storm frequencies (1-yr, 5-yr, and 100-yr) are detailed and summarized in Table 1 below.
Table 1: Pre-Development Storm Water Runoff Computations
C Area
(ac) C
Area
(ac) C
Area
(ac)
E-DA 1 1.74 0.9 0.30 0.3 1.44 0.40
E-DA 2 2.67 0.9 0.50 0.3 1.95 0.95 0.22 0.47
E-DA 3 0.20 0.9 0.20 0.3 0.00 0.90
E-DA 4 1.22 0.9 0.26 0.3 0.96 0.43
E-DA 5 4.81 0.9 0.83 0.3 3.98 0.40
E-DA 6 13.56 0.9 5.20 0.3 8.13 0.95 0.23 0.54
E-DA 7 2.61 0.9 0.26 0.3 2.01 0.95 0.34 0.45
MEACHAM AIRPORT FIELD MAINTENANCE PRE DEVELOPMENT CONDITIONS RUNOFF COEFFICIENTS
NOTES: ISWM TECHNICAL MANUAL USED TO FIND RUNOFF COEFFIECIENT VALUES
Drainage Area
ID
Total
Area
(ac)
Roadway (Concrete) Open Space Roofs Composite
C
1 5 6
E-DA 1 100 3.89 0.0428 0.30 11.41 497.91 0.0254 3.24 2.56 13.98 15.00
E-DA 2 100 3.89 0.0210 0.30 15.16 459.84 0.0373 3.12 2.46 17.62 17.62
E-DA 3 100 3.89 0.0288 0.30 13.37 358.85 0.0171 2.66 2.25 15.62 15.62
E-DA 4 100 3.89 0.0263 0.30 13.88 372.00 0.0140 2.41 2.57 16.45 16.45
E-DA 5 100 3.89 0.0075 0.30 22.91 483.47 0.0223 2.41 3.35 26.25 26.25
E-DA 6 100 3.89 0.0093 0.30 21.04 1296.48 0.0155 2.01 10.77 31.82 30.00
E-DA 7 100 3.89 0.0009 0.30 52.57 555.38 0.0252 2.56 3.62 56.18 30.00
Rational Method
Tc
(min) tshallow
(min) n
2 3 4
SHEET FLOW SHALLOW FLOW CHANNEL FLOW
Channel
Slope
(ft/ft) n
Sheet Flow
Length
(ft)
P2
(in)
Average
Velocity
(ft/sec)
Shallow Flow
Length (ft)
Land
Slope
(ft/ft)
Drainage
Area
ID
Rational Method
Tc(used)
(min)
Cross
Sectional
Area
(sf)
Wetted
Perimeter
(ft)
Hydraulic
Radius
(ft)
Average
Velocity
(ft/sec) tchannel
(min)
Shallow Flow
Slope
(ft/ft) tsheet
(min)
Channel
Length
(ft)
EXISTING TIME OF CONCENTRATION CALCULATIONS TO OVERALL BASIN OUTLET
NOTE: COMPUTATIONS ARE BASED OFF OF THE ISWM MANUAL
1 2 3 4 5 6 7 8 9 10 11 12 13
E-DA 1 1.74 Undeveloped 0.40 0.70 15.00 3.25 2.28 4.57 3.21 8.05 5.65 Design Point #1
E-DA 2 2.67 Developed 0.47 1.25 17.62 3.00 3.74 4.23 5.27 7.44 9.28 Design Point #5
E-DA 3 0.20 Developed 0.90 0.18 15.62 3.18 0.57 4.49 0.81 7.90 1.42 Design Point #2
E-DA 4 1.22 Undeveloped 0.43 0.52 16.45 3.10 1.62 4.37 2.29 7.70 4.03 Design Point #3
E-DA 5 4.81 Undeveloped 0.40 1.94 26.25 2.42 4.69 3.41 6.62 6.02 11.69 Design Point #4
E-DA 6 13.56 Developed 0.54 7.34 30.00 2.24 16.43 3.16 23.20 5.59 40.98 Design Point #6
E-DA 7 2.61 Developed 0.45 1.16 30.00 2.24 2.60 3.16 3.68 5.59 6.49 Design Point #7
MEACHAM AIRPORT FIELD MAINTENANCE PRE DEVELOPMENT CONDITIONS HYDROLOGY COMPUTATIONS
Runoff
Q5
(cfs)
I100 Runoff
Q100
(cfs)
Drainage Area
ID
Area
(ac)
Land Use
Description
(1, 5, and 100-Year Design Frequency)
I1 Runoff
Q1
(cfs)
NOTES: ISWM TECHNICAL MANUAL USED TO FIND RUNOFF COEFFIECIENT VALUES
Outfall
DesignPoint #
Runoff
Coefficient
C
CA
Total
Tc
(Min)
I5
POST-DEVELOPMENT CONDITIONS
The developed site condition includes the construction of the Meacham Airport
Maintenance Facility and associated parking improvements. The site is designed to maintain the existing drainage patterns. The contributing offsite drainage area remains unchanged under post-development conditions. The post-development drainage area map is shown in Appendix A, Exhibit 2.
The drainage area, DA-2 encompasses 2.08 acres and drains to the existing 10-foot curb inlet located within Ross Avenue (Design Point #5). Under the Post Development
Conditions, these drainage areas contribute a total peak flow of 7.37 cfs to the existing
10-foot curb inlet (Design Point #5). The reference plans for the storm drain system within the City of Fort Worth Rights-of-Way is in Appendix A, Exhibit 7.
The onsite drainage area DA 1 encompasses approximately 2.08 acres and drains to the proposed detention pond located on the northern portion of the site. This drainage area contributes a total peak inflow of 12.19 cfs to the proposed detention pond. The detention pond then flows approximately 4.67 cfs into the existing storm network. DA 8 encompasses approximately 0.32 acres and contributes a peak inflow of 2.05 cfs. Both drainage areas ultimately flow 6.55 cfs into Design Point #1. Detention storage and outlet structures were sized in accordance with applicable city drainage criteria. Detention Pond
Plan and Calculations are provided in Appendix A, Exhibit 3. The hydrology calculations for various storm frequencies are detailed in Table 2 below. Parameters for the post-development storm flow calculations for the site adhere to the City of Fort Worth
Stormwater Criteria Manual.
Table 2: Post-Development Storm Water Runoff Computations
CONCLUSION
Based on the drainage analysis for Design Point #1, # 5, 6, and #7, proposed conditions initially resulted in an increase in runoff to the existing storm network in NW 36th Street.
Without detention, post-development peak discharge to Design Point #1 would increase due to increased impervious cover. A detention pond is therefore designed to attenuate runoff from development such that post-development peak discharge rates do not exceed existing conditions for the storm network at Design Point #1. Detention storage and outlet structures were sized in accordance with applicable City of Fort Worth, TX drainage criteria. The pond provides controlled release of stormwater while maintaining positive drainage and acceptable drain-down time following storm events. Detention Pond Plan and Calculations are provided in Appendix A, Exhibit 3.
C Area
(ac) C
Area
(ac) C
Area
(ac)
DA 1 1.72 0.9 0.76 0.3 0.88 0.95 0.32 0.73
DA 2 2.08 0.9 0.28 0.3 1.80 0.95 0.21 0.48
DA 3 0.49 0.9 0.49 0.90
DA 4 1.22 0.9 0.26 0.3 0.96 0.43
DA 5 4.81 0.9 0.83 0.3 3.98 0.40
DA 6 13.56 0.9 5.20 0.3 8.13 0.95 0.23 0.54
DA 7 2.61 0.9 0.26 0.3 2.01 0.95 0.34 0.45
DA 8 0.32 0.9 0.26 0.3 0.06 0.80
MEACHAM AIRPORT FIELD MAINTENANCE POST DEVELOPMENT CONDITIONS RUNOFF COEFFICIENTS
NOTES: ISWM TECHNICAL MANUAL USED TO FIND RUNOFF COEFFIECIENT VALUES
Drainage Area
ID
Total
Area
(ac)
Roadway (Concrete) Open Space Roofs Composite
C
1 5 6
DA 1 50 3.89 0.0386 0.013 0.55 323.86 0.0694 4.25 1.27 1.82 15.00
DA 2 100 3.89 0.0210 0.30 15.16 459.84 0.0373 3.12 2.46 17.62 17.62
DA 3 100 3.89 0.0115 0.30 19.33 185.56 0.0136 3.24 0.95 20.28 20.28
DA 4 100 3.89 0.0263 0.30 13.88 372.00 0.0140 2.41 2.57 16.45 16.45
DA 5 100 3.89 0.0075 0.30 22.91 483.47 0.0223 2.41 3.35 26.25 26.25
DA 6 100 3.89 0.0093 0.30 21.04 1296.48 0.0155 2.01 10.77 31.82 30.00
DA 7 100 3.89 0.0009 0.30 52.57 555.38 0.0252 2.56 3.62 56.18 30.00
DA 8 100 3.89 0.0674 0.30 9.52 316.48 0.0307 3.56 1.48 11.00 15.00
Shallow Flow
Slope
(ft/ft)
Average
Velocity
(ft/sec) tshallow
(min)
Channel
Length
(ft)
Channel
Slope
(ft/ft) tchannel
(min) n
Cross
Sectional
Area
Wetted
Perimeter
(ft)
Hydraulic
Radius
(ft)
Average
Velocity
(ft/sec)
PROPOSED TIME OF CONCENTRATION CALCULATIONS TO OVERALL BASIN OUTLET
2 3 4
Drainage
Area
ID
SHEET FLOW SHALLOW FLOW CHANNEL FLOW
Rational Method
Tc
(min)
Sheet Flow
Length
(ft)
P2
(in)
Land
Slope
(ft/ft) n tsheet
(min)
Shallow Flow
Length (ft)
NOTE: COMPUTATIONS ARE BASED OFF OF THE ISWM MANUAL
Rational Method
Tc(used)
(min)
1 2 3 4 5 6 7 8 9 10 11 12 13
DA 1 1.72 Developed 0.73 1.25 15.00 3.25 4.07 4.57 5.73 8.05 10.09 Design Point #1
DA 2 2.08 Developed 0.48 0.99 17.62 3.00 2.97 4.23 4.19 7.44 7.37 Design Point #5
DA 3 0.49 Developed 0.90 0.44 20.28 2.79 1.23 3.93 1.73 6.93 3.06 Design Point #2
DA 4 1.22 Undeveloped 0.43 0.52 16.45 3.10 1.62 4.37 2.28 7.70 4.03 Design Point #3
DA 5 4.81 Undeveloped 0.40 1.94 26.25 2.42 4.70 3.41 6.63 6.02 11.69 Design Point #4
DA 6 13.56 Developed 0.54 7.34 30.00 2.24 16.43 3.16 23.20 5.59 40.98 Design Point #6
DA 7 2.61 Developed 0.45 1.16 30.00 2.24 2.60 3.16 3.68 5.59 6.49 Design Point #7
DA 8 0.32 Developed 0.80 0.25 15.00 3.25 0.83 4.57 1.16 8.05 2.05 Design Point #1
Runoff
Q100
(cfs)
NOTES: ISWM TECHNICAL MANUAL USED TO FIND RUNOFF COEFFIECIENT VALUES
MEACHAM AIRPORT FIELD MAINTENANCE POST DEVELOPMENT CONDITIONS HYDROLOGY COMPUTATIONS (1, 5, and 100-Year Design Frequency)
Drainage Area
ID
Area
(ac)
Land Use
Description
Runoff
Coefficient
C
CA
Total
Tc
(Min)
I1 Runoff
Q1
(cfs)
Outfall
DesignPoint # I5
Runoff
Q5
(cfs)
I100
With the detention pond in place, peak total discharge at Design Point #1 decreases from 62.41 cfs under existing conditions to 59.52 cfs under proposed conditions, resulting in an approximate net decrease of 2.89 cfs. Accordingly, the proposed project design should improve the existing drainage conditions at Design Point #1 and is not anticipated to adversely affect hydrologic or hydraulic influences on adjacent or downstream properties. The comparison calculations are detailed in Table 3 below. The overall development reduced the runoff burden to existing City of Fort Worth stormwater infrastructure by an approximate total of 9.83 cfs.
Table 3: Storm Water Runoff Comparison Computations
1 2 3 4 5 6 7 8 9 10
Design Point #1 (Sheet Flow) 2.28 0.83 -1.45 3.21 1.16 -2.05 5.65 2.05 -3.60
Design Point #1 (Pipe Flow) 25.05 25.38 0.33 35.36 34.89 -0.46 62.41 59.52 -2.89
Design Point #2 0.57 0.00 -0.57 0.81 0.00 -0.81 1.42 0.00 -1.42
Design Point #3 1.62 1.62 0.00 2.29 2.28 0.00 4.03 4.03 0.00
Design Point #4 4.69 4.70 0.00 6.62 6.63 0.00 11.69 11.69 0.00
Design Point #5 3.74 2.97 -0.77 5.27 4.19 -1.08 9.28 7.37 -1.91
Design Point #6 16.43 16.43 0.00 23.20 23.20 0.00 40.98 40.98 0.00
Design Point #7 2.60 2.60 0.00 3.68 3.68 0.00 6.49 6.49 0.00
Total ∆ -9.83
Q1
Difference
Q100
Difference Outfall Design Point #
Pre-Development
Runoff Q100 (cfs)
Post-Development
Runoff Q100 (cfs)
(1, 5, and 100-Year Design Frequency)
Q5
Difference
Pre-Development
Runoff Q1 (cfs)
Post-Development
Runoff Q1 (cfs)
Pre-Development
Runoff Q5 (cfs)
Post-Development
Runoff Q5 (cfs)
MEACHAM AIRPORT FIELD MAINTENANCE PRE/POST COMPARISON
NW 34TH ST.
(55' ROW)
V O
N A
V E
(5 5'
R O
W
R O
SS
A
V E
(5 5'
R O
W
C
LI
N
TO
N A
V E
(5 5'
R O
W
LA
K
E A
V E
NW 36TH ST.
(55' ROW)
A
LL
EY
(1
5' R
O W
A
LL
EY
(1
5' R
O W
V O
N A
V E
(5 5'
R O
W
NW 35TH ST.
(55' ROW)
R O
SS
A
V E
(5 5'
R O
W
C
LI
N
TO
N A
V E
(5 5'
R O
W
A
LL
EY
(1
5' R
O W
A
LL
EY
(1
5' R
O W
)A
LL
EY
(1
5' R
O W
A
LL
EY
(1 5'
R O
W
NW 37TH ST.
(55' ROW)
C
LI
N
TO
N A
V E
(6 0'
R O
W
LA
K
E A
V E
(6 0'
R O
W
A
LL
EY
(2
0' R
O W
A
LL
EY
(2
0' R
O W
8 666
EX-DA 6
13.56 AC
EX-DA 5
4.81 AC
C
LI
N
TO
N A
V E
(6 0'
R O
W
A
LL
EY
(2
0' R
O W
NW 35TH ST.
(55' ROW)
NW 34TH ST.
(55' ROW)
A
LL
EY
(2
0' R
O W
V O
N A
V E
(5 5'
R O
W
A
LL
EY
(1
5' R
O W
NW 36TH ST.
(55' ROW)
V O
N A
V E
(5 5'
R O
W
NW 37TH ST.
(55' ROW)
A
LL
EY
(1
5' R
O W
C
LI
N
TO
N A
V E
(5 5'
R O
W
C
LI
N
TO
N A
V E
(5 5'
R O
W
A
LL
EY
(1
5' R
O W
EX-DA 2
2.67 AC
EX-DA 4
1.22 AC
EX-DA 1
1.74 AC
EX-DA 7
2.61 AC
EX-DA 3
0.20 AC
DRAINAGE ID
AREA (ACRES)
DRAINAGE FLOW
DIRECTION
EXISTING DRAINAGE DIVIDE
PROPOSED. CONTOURS
EXISTING CONTOURS
UTILITY LEGEND
100 YR FLOODPLAIN LIMIT
EXISTING STORM LINE
1) FORT WORTH DESIGN AND CONSTRUCTION
STANDARDS SHALL APPLY ON THESE PLANS.
2) RAINFALL INTENSITY ARE FROM ATLAS 14
RAINFALL DATA.
NOTES
Feet 0 150 300
BM-1: CITY OF FORT WORTH
BM #92182
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
EXISTING DRAINAGE AREA MAP
C10.1ET
MW
ET2024233
ET
SCALE: 1" = 150'
PROPERTY LINE
TIME OF CONCENTRATION
JULY
7/13/20262 ADDENDUM 02
EXHIBIT 1
Chandler
07/13/2026
8 666
C
LI
N
TO
N A
V E
(6 0'
R O
W
A
LL
EY
(2
0' R
O W
NW 35TH ST.
(55' ROW)
NW 34TH ST.
(55' ROW)
A
LL
EY
(2
0' R
O W
V O
N A
V E
(5 5'
R O
W
A
LL
EY
(1
5' R
O W
NW 36TH ST.
(55' ROW)
V O
N A
V E
(5 5'
R O
W
NW 37TH ST.
(55' ROW)
A
LL
EY
(1
5' R
O W
C
LI
N
TO
N A
V E
(5 5'
R O
W
C
LI
N
TO
N A
V E
(5 5'
R O
W
A
LL
EY
(1
5' R
O W
DA 6
13.56 AC
DA 5
4.81 AC
DA 1
1.72 AC
DA 2
2.08 AC
DA 7
2.61 AC
DA 8
0.32 AC
DA 4
1.22 AC
DA 3
0.49 AC
PROPOSED DRAINAGE DIVIDE
DRAINAGE ID
AREA (ACRES)
SCALE: 1" = 150'
EXISTING CONTOURS
PROPOSED Y-INLET
EXISTING GRATE INLET
EXISTING JUNCTION BOX
EXISTING CURB INLET
UTILITY LEGEND
PROPERTY LINE
PROPOSED GRATE INLET
PROPOSED. JUNCTION BOX
PROPOSED CURB INLET
PROPOSED STORM LINE
EXISTING STORM LINE
EXISTING Y-INLET
Feet 0 150 300
1) REFER TO GENERAL NOTES SHEET FOR CITY STANDARD
GENERAL NOTES, UTILITY NOTES AND CONSTRUCTION
DESIGN NOTES.
2) THE CITY OF FORT WORTH DESIGN AND CONSTRUCTION
STANDARDS APPLY WHETHER INDICATED ON THESE PLANS
OR NOT.
NOTES
BM-1: CITY OF FORT WORTH
BM #92182
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
PROPOSED DRAINAGE AREA MAP
C10.2ET
MW
ET2024233
ET
TIME OF CONCENTRATIO
133 PROPOSED CONTOURS
DRAINAGE FLOW
DIRECTION
7/13/20262 ADDENDUM 02
7/30/20263 REVISED GRADING & POND FROM SDS COMMENTS
8/06/20264 REVISED GRADING & POND FROM SDS COMMENTS
EXHIBIT 2
AUGUST
Chandler
NW 36TH ST
(55' RIGHT-OF-WAY)
R O
SS
A
VE
(5
5' R
IG
H
T- O
F- W
AY
STA 0+54-DETENTION POND
CONSTRUCT
18" 45° HORIZ. BEND
STA 0+10-DETENTION POND
CONSTRUCT
STD. 5' SQUARE JUNCTION BOX
RIM 650.3±
(RIM ELEV. TO BE FIELD VERIFIED)
EXIST. 36" FL 640.98 (IN)
18" FL 641.73 (IN)
EXIST. 36" FL 640.98 (OUT)
30 LF
Concrete
Pipe @ 0.20%
41 LF
Concrete Pipe @ 0.20%
STA 0+95-DETENTION POND
CONSTRUCT
3X3 JUNCTION BOX
OUTFALL STRUCTURE
DETAILS ON SHEET C11.1
FG 643.78
BW 646.40
BW 651.50
BW 653.00
BW 653.00 BW 648.00
BW 647.10
BW 644.00
TW 653.38
TW 652.64
TW 647.40
TW 653.00 TW 652.00
TW 650.25
TW 644.00FG 644.00
1.0% SLOPE
10.0'
PROPOSED 10'
RAMP @ 10% MAX
11.0'
STA 0+40-DETENTION POND
CONSTRUCT
3X3 JUNCTION BOX
19.0"19 .0
H:1"=20' V:1"=5'
STORM SEWER LINE "DETENTION POND"
0+001+002+002+30
ST
A
0+
.0
LI
N
E "D
ET
EN
TI
O
N P
O N
D
C O
N
ST
. S
TD
. 5 ' S
Q U
AR
E
JU
N
C
TI
O N
B O
X (C
O N
TR
AC
TO
R
T O
V
ER
IF
Y
D
EP
TH
PR
IO
R
T O
C O
N
ST
R U
C
TI
O N
R
IM
=6
.4
1±
ST
A
0+
.4
LI
N
E "D
ET
EN
TI
O
N P
O N
D
IN
ST
AL
L:
1-
" 4 5°
H O
R
IZ
. B
EN
D
ST
A
0+
.1
LI
N
E "D
ET
EN
TI
O
N P
O N
D
C O
N N
EC
T
TO
E
X.
1" S
TO
R
M S
EW
ER
(C O
N
TR
AC
TO
R T
O V
ER
IF
Y D
EP
TH
PR
IO
R T
O C
O N
ST
R
U C
TI
O
N
R
IM
=6
.6
FL
(O
U T)
=6
.1
FL
(O
U T)
=6
.0
FL
(I
N
2.
FL
(O
U T)
=6
.9
FL
(I
N
1.
FL
(I N
0.
30 LF 21" CLASS III
RCP @ 0.20%
(PUBLIC)
41 LF 21" CLASS III
RCP @ 0.20%
(CoFW AVIATION
DEPT)
1.
0'
EXIST.
SEWER CROSSING
639.98
ST
A
0+
.9
LI
N
E "D
ET
EN
TI
O
N P
O N
D
IN
ST
AL
L:
1- 3'
X3 ' J
U N
C
TI
O N
B O
X
14 LF 21" CLASS III
RCP @ 0.20%
(CoFW AVIATION
DEPT)
GRADING NOTES
1. ALL PROPOSED AND EXISTING GRADES IN
NON-PAVED AREAS ARE "FINISHED GRADE" (i.e. IN
LANDSCAPE BEDS, TOP OF MULCH/BEDDING
MATERIAL).
2. CONTRACTOR SHALL FORM SIDEWALK AND VERIFY
SLOPES PRIOR TO POURING CONCRETE.
CONTRACTOR SHALL ENSURE THAT CROSS SLOPES
AREA NO GREATER THAN 2% ALONG THE
ACCESSIBLE ROUTE AND RUNNING SLOPE IS NOT
GREATER THAN 5%, UNLESS THE RUNNING SLOPE
MATCHES THE EXISTING STREET SLOPE. IF ANY
DISCREPANCY ARISES, CONTRACTOR SHALL
CONTACT THE ENGINEER FOR SOLUTION.
3. LIMITS OF CONSTRUCTION AREA SHOWN ON THE
EROSION CONTROL PLAN.
4. AREAS AROUND THE PERIMETER OF THE BUILDING(S)
SHALL E AT A POSITIVE SLOPE AWAY FROM THE
BUILDING TO ENSURE PROPER DRAINAGE AWAY
FROM THE FOUNDATION.
5. THE CONTRACTOR MUST REFER TO THE
GEOTECHNICAL REPORT, FOUNDATION PLANS, AND
LANDSCAPE PLANS FOR 1) ALL BACKFILL AND
COMPACTION REQUIREMENTS, 2) FOUNDATION
WATER PROOFING AND 3) UNDERDRAINS AND
LANDSCAPE DRAINS AROUND THE PERIMETER OF
THE BUILDINGS(S).
6. CONTRACTOR SHALL REFER TO GEOTECHNICAL
REPORT DATED OCTOBER 31, 2025, PREPARED BY
CMJ ENGINEERING.
7. PROPOSED DETENTION POND MAINTENANCE
RESPONSIBILITY SHALL BE ASSUMED BY THE CITY OF
FORT WORTH AVIATION DEPARTMENT. MAINTENANCE
ACTIVITIES SHALL BE PERFORMED AS NEEDED TO
ENSURE PROPER POND FUNCTION AND DRAINAGE
CAPACITY.
Feet 0 20 40
BM-1: CITY OF FORT WORTH
BM #92182
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
DETENTION POND PLAN
C11.1ET
MW
ET2024233
ET
6/4/20261 ADDENDUM 01
GRADING LEGEND
PROPOSED. CONTOUR
PROPSOED DRAINAGE SWALE
TOP OF CURB
GUTTER
TOP OF PAVEMENT
PROPOSED GRADE BREAK
FINISHED GRADE
EXISTING SPOT GRADE
EXISTING CONTOUR
FINISHED FLOOR
TG 132.50
G 132.00
TP 132.50
FG 132.50
132.50
FF=132.50
TOP OF INLETTG 132.50
LOW POINTLP 132.50
HIGH POINTHP 132.50
TOP OF WALLTW 132.50
BW 132.00 BOTTOM OF WALL
PROPOSED RETAINING WALL
100 YEAR FLOODPAIN LINE
AUGUST
7/13/20262 ADDENDUM 02
7/30/20263 REVISED GRADING & POND FROM SDS COMMENTS
7" ORIFICE 1 OPENING
FL 643.78 (IN)
1' WEIR 1
FL 650.00' (IN)
21" CLASS III RCP
FL 942.37 (OUT)
21" CLASS III RCP
@ 0.2 % SLOPE
RIM 651.60
1' WEIR 1
TOP 651.10'
8/06/20264 REVISED GRADING & POND FROM SDS COMMENTS
4 EXHIBIT 3
Chandler
NW 36TH ST
(55' RIGHT-OF-WAY)
R O
SS
A
VE
(5
5' R
IG
H
T- O
F- W
AY
STA 0+54-DETENTION POND
CONSTRUCT
18" 45° HORIZ. BEND
STA 0+10-DETENTION POND
CONSTRUCT
STD. 5' SQUARE JUNCTION BOX
RIM 650.3±
(RIM ELEV. TO BE FIELD VERIFIED)
EXIST. 36" FL 640.98 (IN)
18" FL 641.73 (IN)
EXIST. 36" FL 640.98 (OUT)
30 LF
Concrete
Pipe @ 0.20%
41 LF
Concrete Pipe @ 0.20%
STA 0+95-DETENTION POND
CONSTRUCT
3X3 JUNCTION BOX
OUTFALL STRUCTURE
DETAILS ON SHEET C11.1
FG 643.78
BW 646.40
BW 651.50
BW 653.00
BW 653.00 BW 648.00
BW 647.10
BW 644.00
TW 653.38
TW 652.64
TW 647.40
TW 653.00 TW 652.00
TW 650.25
TW 644.00FG 644.00
1.0% SLOPE
10.0'
PROPOSED 10'
RAMP @ 10% MAX
11.0'
STA 0+40-DETENTION POND
CONSTRUCT
3X3 JUNCTION BOX
19.0"19 .0
GRADING NOTES
Feet 0 20 40
BM-1: CITY OF FORT WORTH
BM #92182
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
DETENTION POND PLAN
C11.2ET
MW
ET2024233
ET
GRADING LEGEND
PROPOSED. CONTOUR
PROPSOED DRAINAGE SWALE
TOP OF CURB
GUTTER
TOP OF PAVEMENT
PROPOSED GRADE BREAK
FINISHED GRADE
EXISTING SPOT GRADE
EXISTING CONTOUR
FINISHED FLOOR
TG 132.50
G 132.00
TP 132.50
FG 132.50
132.50
FF=132.50
TOP OF INLETTG 132.50
LOW POINTLP 132.50
HIGH POINTHP 132.50
TOP OF WALLTW 132.50
BW 132.00 BOTTOM OF WALL
PROPOSED RETAINING WALL
100 YEAR FLOODPAIN LINE
PR
O
PE
R
TY
L
IN
E
LO
T
LI
N
E
B
B
LO
T
LI
N
E
A
A
B B
R .O
.W
" 18
AUGUST
7/13/20262 ADDENDUM 02
6/4/20261 ADDENDUM 01
1. ALL PROPOSED AND EXISTING GRADES IN
NON-PAVED AREAS ARE "FINISHED GRADE" (i.e. IN
LANDSCAPE BEDS, TOP OF MULCH/BEDDING
MATERIAL).
2. CONTRACTOR SHALL FORM SIDEWALK AND VERIFY
SLOPES PRIOR TO POURING CONCRETE.
CONTRACTOR SHALL ENSURE THAT CROSS SLOPES
AREA NO GREATER THAN 2% ALONG THE
ACCESSIBLE ROUTE AND RUNNING SLOPE IS NOT
GREATER THAN 5%, UNLESS THE RUNNING SLOPE
MATCHES THE EXISTING STREET SLOPE. IF ANY
DISCREPANCY ARISES, CONTRACTOR SHALL
CONTACT THE ENGINEER FOR SOLUTION.
3. LIMITS OF CONSTRUCTION AREA SHOWN ON THE
EROSION CONTROL PLAN.
4. AREAS AROUND THE PERIMETER OF THE BUILDING(S)
SHALL E AT A POSITIVE SLOPE AWAY FROM THE
BUILDING TO ENSURE PROPER DRAINAGE AWAY
FROM THE FOUNDATION.
5. THE CONTRACTOR MUST REFER TO THE
GEOTECHNICAL REPORT, FOUNDATION PLANS, AND
LANDSCAPE PLANS FOR 1) ALL BACKFILL AND
COMPACTION REQUIREMENTS, 2) FOUNDATION
WATER PROOFING AND 3) UNDERDRAINS AND
LANDSCAPE DRAINS AROUND THE PERIMETER OF
THE BUILDINGS(S).
6. CONTRACTOR SHALL REFER TO GEOTECHNICAL
REPORT DATED OCTOBER 31, 2025, PREPARED BY
CMJ ENGINEERING.
7. PROPOSED DETENTION POND MAINTENANCE
RESPONSIBILITY SHALL BE ASSUMED BY THE CITY OF
FORT WORTH AVIATION DEPARTMENT. MAINTENANCE
ACTIVITIES SHALL BE PERFORMED AS NEEDED TO
ENSURE PROPER POND FUNCTION AND DRAINAGE
CAPACITY.
7/30/20263 REVISED GRADING & POND FROM SDS COMMENTS
8/06/20264 REVISED GRADING & POND FROM SDS COMMENTS
EXHIBIT 3
Chandler
BM-1: CITY OF FORT WORTH
BM #92182
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
DETENTION POND CALCULATIONS
ET
MW
ET2024233
ET
AUGUST
2026 C11.3
7/13/20262 ADDENDUM 02
6/4/20261 ADDENDUM 01
PROPOSED FLOW TO GRATE INLET IS FROM DRAINAGE AREA DA 3 WHICH EQUATES TO 3.55 CFS IN THE 100-YR, WITH A 50% CLOGGING FACTOR, THE INLET CAPACITY OF THE NEENAH FRAME 3297-1, GRATE L IS 6.98 CFS AT
0.57' OF DEPTH.
7/30/20263 REVISED GRADING & POND FROM SDS COMMENTS
8/06/20264 REVISED GRADING & POND FROM SDS COMMENTS
THE UPPER NOTCH WEIR
OPERATES UNDER FREE WEIR
FLOW CONDITIONS UNTIL
TAILWATER REACHES
APPROXIMATELY EL. 661.67.
WITH THE 100-YEAR PEAK POND
ELEVATION AT 651.10 FT (DESIGN
MAXIMUM), THE NOTCH WEIR
WILL NEVER EXPERIENCE
SUBMERGED WEIR FLOW.
FREE WEIR FLOW EQUATION:
Q = C × L × H^(3 2)
EXHIBIT 3
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
STORM DETAILS
C11.4ET
MW
ET202423JUNE
ET
6/4/20261 ADDENDUM 01
EXHIBIT 3
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
STORM DETAILS
C11.5ET
MW
ET2024233APRIL
ET
GRATE INLET DETAIL
6/4/20261 ADDENDUM 01
8/06/20264 REVISED GRADING & POND FROM SDS COMMENTS
EXHIBIT 3
AUGUSTJULY
APRIL
APRIL
AUGUST
ABSTRACT No. 1605
NW 35TH ST
(55' RIGHT-OF-WAY)
R O
SS
A
VE
(5
5' R
IG
H
T- O
F- W
AY
NW 36TH ST.
(55' ROW)
VO
N
A
VE
(5 5'
R O
W
A
LL
EY
(1
5' R
O W
A
LL
EY
(1
5' R
O W
A
LL
EY
(1
5' R
O W
TP 666.64
TP 666.65
TP 666.14
TP 665.75
TP 666.57
TP 667.32TP 667.57
TP 666.44
TP 665.70
TP 667.40
TP 667.70
TP 667.07
TP 666.82
TP 666.94TP 667.30
TP 668.00
TP 668.00
EW 668.00
TP 668.00 TP 668.00
TC 667.54
TP 667.40
TC 667.90
TC 666.73
TC 667.90
TC 667.90
TP 667.03
TP 667.31
TC 667.35
TC 667.82
TC 667.90
TC 666.55
TP 666.05
TP 667.40
TP 666.70
TP 666.37
EW 668.00
EW 668.00
TW 664.14
TW 666.21
TW 666.52
TW 665.77
TW 664.90
BW 658.82
BW 659.30
BW 660.22
BW 663.11
BW 663.90
BW 667.63
TC 668.20
TC 667.57
TC 667.32
TC 667.06
TC 666.96
TC 666.65
TP 666.46
TW 666.92
BW 661.98
HP 666.66
TP 667.40
TP 667.40
TP 667.09
TP 667.04
TP 666.85
TP 666.25
TP 666.87
TC 667.90
TC 666.59
TP 666.11
TP 666.16
TP 666.26
TP 666.34
TP 666.23
TP 665.96 TP 665.77
TP 668.76
TC 669.25
EW 668.00
TP 666.92
TC 655.23
TP 654.73 TP 654.14
TC 654.64
FG 654.87
FG 666.20
FG 666.54
FG 655.13
TW 653.38
TW 652.64
TW 647.40
TW 653.00 TW 652.00
TW 650.25
TW 644.00
BW 644.00
BW 647.10
BW 648.00BW 653.00
BW 653.00
BW 651.50
BW 646.40
667 666
652651
2 65
TW 659.50
BW 658.50
TP 665.51
666668
TP 666.97
TW 668.10
BW 666.65
TW 668.10
FG 663.40
FG 658.00
TG 664.00
TC 664.58
TG 664.00
TC 664.50
EX TC 664.73±
CONTRACTOR TO MATCH
EXIST TOP OF CURB
TC 664.70
EX 664.71
GRADING NOTES
1. ALL PROPOSED AND EXISTING GRADES IN
NON-PAVED AREAS ARE "FINISHED GRADE" (i.e. IN
LANDSCAPE BEDS, TOP OF MULCH/BEDDING
MATERIAL).
2. CONTRACTOR SHALL FORM SIDEWALK AND VERIFY
SLOPES PRIOR TO POURING CONCRETE.
CONTRACTOR SHALL ENSURE THAT CROSS SLOPES
AREA NO GREATER THAN 2% ALONG THE
ACCESSIBLE ROUTE AND RUNNING SLOPE IS NOT
GREATER THAN 5%, UNLESS THE RUNNING SLOPE
MATCHES THE EXISTING STREET SLOPE. IF ANY
DISCREPANCY ARISES, CONTRACTOR SHALL
CONTACT THE ENGINEER FOR SOLUTION.
3. LIMITS OF CONSTRUCTION AREA SHOWN ON THE
EROSION CONTROL PLAN.
4. AREAS AROUND THE PERIMETER OF THE BUILDING(S)
SHALL E AT A POSITIVE SLOPE AWAY FROM THE
BUILDING TO ENSURE PROPER DRAINAGE AWAY
FROM THE FOUNDATION.
5. THE CONTRACTOR MUST REFER TO THE
GEOTECHNICAL REPORT, FOUNDATION PLANS, AND
LANDSCAPE PLANS FOR 1) ALL BACKFILL AND
COMPACTION REQUIREMENTS, 2) FOUNDATION
WATER PROOFING AND 3) UNDERDRAINS AND
LANDSCAPE DRAINS AROUND THE PERIMETER OF
THE BUILDINGS(S).
6. PROPOSED DETENTION POND MAINTENANCE
RESPONSIBILITY SHALL BE ASSUMED BY THE CITY OF
FORT WORTH AVIATION DEPARTMENT. MAINTENANCE
ACTIVITIES SHALL BE PERFORMED AS NEEDED TO
ENSURE PROPER POND FUNCTION AND DRAINAGE
CAPACITY.
TOP OF INLETTG 132.50
Feet 0 30 60
BM-1: CITY OF FORT WORTH
BM #92182
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
GRADING PLAN
C08.0ET
MW
ET2024233APRIL
ET
GRADING LEGEND
PROPOSED. CONTOUR
PROPSOED DRAINAGE SWALE
TOP OF CURB
GUTTER
TOP OF PAVEMENT
PROPOSED GRADE BREAK
FINISHED GRADE
EXISTING SPOT GRADE
EXISTING CONTOUR
FINISHED FLOOR
TG 132.50
G 132.00
TP 132.50
FG 132.50
132.50
FF=132.50
SWALESW 132.50
LOW POINTLP 132.50
HIGH POINTHP 132.50
TOP OF WALLTW 132.50
BW 132.00 BOTTOM OF WALL
PROPOSED RETAINING WALL
100 YEAR FLOODPAIN LINE
5'
LANDSCAPE
BUFFER
5'
LANDSCAPE
BUFFER
DETENTION
POND
Q100 = 0.7 cfs n = 0.3 A = 0.490 sqft s = 3.56 % yc = 0.12 ft d = 0.27 ft
A A
4:1 (MAX)
7/13/20262 ADDENDUM 02
6/4/20261 ADDENDUM 014
7/30/20263 REVISED GRADING & POND FROM SDS COMMENTS
PROPOSED
GRADE BREAK
Capacity Check Q100 = 0.7 cfs n = 0.05 A = 0.436 sqft s = 3.56 % yc = 0.29 ft d = 0.33 ft
8/06/20264 REVISED GRADING & POND FROM SDS COMMENTS
5.0'
6.5'
EXHIBIT 4
Chandler Davis
08/06/2026
APRIL
AUGUST
PROPOSED
DETENTION
POND
CONSTRUCTION ENTRANCE
665666
651652
667 667
NW 35TH ST.
(55' ROW)
NW 36TH ST.
(55' ROW)
A
LL
EY
(1
5' R
O W
A
LL
EY
(1
5' R
O W
A
LL
EY
(1
5' R
O W
PROPOSED INLET
PROTECTION
PROPOSED INLET
PROTECTION
PROPOSED INLET
PROTECTION
PROPOSED
ROCK CHECK
PROPOSED EROSION
CONTROL LOG IN GUTTER
LIMITS ON NORTH SIDE OF
35TH STREET
NOTES
1. THE EROSION CONTROL PLAN MEASURES MAY ONLY
BE PLACED IN FRONT OF INLETS, OR IN CHANNELS,
DRAINAGE WAYS OR BORROW DITCHES AT THE RISK
OF CONTRACTORS. CONTRACTOR SHALL REMAIN
LIABLE FOR ANY DAMAGES CAUSED BY THE
MEASURES, INCLUDING FLOODING DAMAGE, WHICH
MAY OCCUR DUE TO BLOCKED DRAINAGE.
2. AT THE CONCLUSION OF ANY PROJECT, ALL
CHANNELS, DRAINAGE WAYS, AND BORROW
DITCHES IN THE WORK ZONE SHALL BE DREDGED OF
ANY SEDIMENT GENERATED BY THE PROJECT AND
DEPOSITED AS A RESULT OF EROSION CONTROL
MEASURE.
3. ALL EROSION CONTROL MEASURES SHALL BE
PROVIDED AND INSTALLED IN ACCORDANCE WITH
THE CITY OF FORT WORTH STANDARD
CONSTRUCTION DETAILS. SEE STORM WATER
POLLUTION PREVENTION PLAN PREPARED
SPECIFICALLY FOR THIS PROJECT FOR ADDITIONAL
DETAIL REGARDING EROSION CONTROL AND
MONITORING.
4. TOTAL AREA OF DISTURBANCE = 1.17 ACRES
Feet 0 30 60
BM-1: CITY OF FORT WORTH
BM #92182
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
T R C
P
TYPE
CHA
DATE
03/3
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
EROSION CONTROL PLAN
C12.1ET
MW
ET2024233
ET
LEGEND
PROPOSED SILT FENCE
INLET
PROTECTION
EX. CONTOUR
PR. CONTOUR
PROPOSED LIMITS OF CONSTRUCTION
PROPOSED SILT FENCE AT L.O.C
PROPOSED CHECK DAM
PROPOSED ROCK BERM
PROPOSED STABILIZED
CONSTRUCTION ENTRANCE
PROPOSED TEMPORARY ROCK
RIPRAP
100 YR FLOODPLAIN LIMIT
PROPERTY LINE
EASEMENT LINE
PROPOSED VEGETATIVE FILTER
STRIP
PROPOSED SOIL RETENTION
BLANKET
JULY
2 ADDENDUM 02
6/4/20261 ADDENDUM 01
SDS REVISIONSEXHIBIT 5 7/13/2026
Chandler
07/13/2026
ELEVATION=641.49
N: 6980281.39 E: 2320960.61
BM-2: CITY OF FORT WORTH
BM #92183
ELEVATION=642.63
N: 6978524.77 E: 2320932.52
BENCHMARK
MEACHAM MAINTENANCE DISPATCH
& VEHICLE STORAGE FACILITY
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
2570 RIVER PARK PLAZA
SUITE 100
FORT WORTH, TEXAS
76116
PHONE #: (817) 529-2700
FIRM NO. 12452
PL
EA
SE
R
EC
YC
LE
NO. DATE REVISION
PROJECT #DESIGNED:
DRAWN:
DATE SHEET
REVIEWER: PR
O
JE
C
T N
AM
E
PR
O
JE
C
T N
AM
E
EROSION CONTROL DETAILS
C12.2ET
MW
ET2024233JUNE
ET
EXHIBIT 5
6 6
6 6
E
E
E E
E
E
E
E
E
EEE
WASHINGTON
HEIGHTS
WASHINGTON
MEACHAM AIRPORT
M.G. ELLIS
FOSTEPCO HEIGHTS
HTS
119117
THIRTY FIFITH ST
THIRTY SIXTH
STEET
36TH ST
VON AVE
VON
COMMERCE
ROSS AVE
CLINTON
N HOUSTON AVE
N. HOUSTON
ELLIS
ROSS
37 TH.
ELLIS AVE
N. MAIN
CLINTON AVE
CLOSED
TED BY CITY ORD. 17915
1R
1A1
7 7
9 9
10 13
12 11
2A
2B
10 10 10
1R
14 14
11B
11R
W-0652_001.tif
C-0800-899_139.tif
A-0111_140.tif
A-0173_029.tif
A-0127_005.tif
C-0800-899_128.tif
C-0
0-8
_19 2.t if
1-M -00
_00
1c.
tif
A-0
3_0
.tif
A-0119_001.tif
S-2
3_0
.tif
K-0768_006.tif
S-2253_005.tif
K-0768_004.tif
K-1468_004.tif
K-0768_005.tif
S-2
3_0
.tif
S-2238_004.tif
K-0
2_0
.tif A-0173_032.tif K-0405_014.tif
C-1261-1280_016.tif
S-2253_004.tif
D-1101_001.tif
C-2200-2300_045.tif
C-1700-1799_149.tif
W-
_01
7.t if S-2253_007.tif
Un kn ow n G rav ity Ma in
30 RCP Gravity Main
72 RCP Gravity Main 6 PVC Lateral
Concrete Culvert
60 RCP Gravity Main
78 RCP Gravity Main
30 RCP Gravity Main
N
MA
IN
S
TR
EE
T
NW 35TH STREET
RO
SS
A
VE
NU
E
N
CO
MM
ER
CE
S
TR
EE
T
NW 36TH STREET
NW 37TH STREET
CL
IN
TO
N
A
VE
NU
E
N
HO
US
TO
N S
TR
EE
T
EL
LIS
A
VE
NU
E
NE 34TH STREET
EL
LIS
A
VE
NU
E
CL
IN
TO
N
A
VE
NU
E
RO
SS
A
VE
NU
E
N
HO
US
TO
N S
TR
EE
T
Disclaimer Copyright 2011 City of Fort Worth.Unauthrized reproduction is a violation of applicable laws.
This product is for informational purposes and may not have been prepared for or be suitable for legal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries. The City of Fort Worth assumes no responsibility for the accuracy of said data. .
EXHIBIT 6
PROJECT LOCATION
EXHIBIT 7
Proposed total Q @100yr
=109.1 CFS
Approximate tie in location.
Approximate Location of proposed storm tie in.
641.3'(+/-)
GEOTECHNICAL ENGINEERING STUDY
FIELD MAINTENANCE FACILITY
MEACHAM AIRPORT
ROSS AVENUE AT NW 35TH STREET
FORT WORTH, TEXAS
Presented To:
Evolving Texas
October 2025
PROJECT NO. 1705-25-04
EXHIBIT 8
October 31, 2025 Report No. 1705-25-04
Evolving Texas 2570 River Park Plaza, Suite 100 Fort Worth, Texas 76116
Attn: Mr. Ron Ramirez, P.E., President
GEOTECHNICAL ENGINEERING STUDY
FIELD MAINTENANCE FACILITY
MEACHAM AIRPORT
ROSS AVENUE AT NW 35TH STREET
FORT WORTH, TEXAS
Dear Mr. Ramirez:
Submitted here are the results of a geotechnical engineering study for the referenced project.
This study was performed in general accordance with our Proposal No. 24-9830 dated November 1, 2024. The geotechnical services were authorized on September 4, 2025 by Mr. Ron Ramirez, P.E., President of Evolving Texas.
Engineering analyses and recommendations are contained in the text section of the report.
Results of our field and laboratory services are included in the appendix of the report. We would appreciate the opportunity to be considered for providing the materials engineering and geotechnical observation services during the construction phase of this project.
We appreciate the opportunity to be of service to Evolving Texas. Please contact us if you have any questions or if we may be of further service at this time.
Respectfully submitted, CMJ ENGINEERING, INC.
TEXAS FIRM REGISTRATION NO. F-9177
James P. Sappington IV, P.E President Texas No. 97402 copies submitted: (1) Mr. Ron Ramirez, P.E.; Evolving Texas (email & mail)
(1) Mr. Joseph Williams, E.I.T.; Evolving Texas (email)
TABLE OF CONTENTS
Page
1.0 INTRODUCTION ------------------------------------------------------------------------------------------------------- 1
2.0 FIELD EXPLORATION AND LABORATORY TESTING ------------------------------------------------------ 2
3.0 SUBSURFACE CONDITIONS -------------------------------------------------------------------------------------- 3
4.0 FOUNDATION RECOMMENDATIONS --------------------------------------------------------------------------- 5
5.0 FLOOR SLABS AND EXTERIOR FLATWORK ----------------------------------------------------------------- 8
6.0 EXPANSIVE SOIL CONSIDERATIONS ------------------------------------------------------------------------- 12
7.0 SEISMIC CONSIDERATIONS ------------------------------------------------------------------------------------- 13
8.0 EARTHWORK ---------------------------------------------------------------------------------------------------------- 13
9.0 PAVEMENTS ----------------------------------------------------------------------------------------------------------- 17
10.0 CONSTRUCTION OBSERVATIONS ----------------------------------------------------------------------------- 21
11.0 REPORT CLOSURE ------------------------------------------------------------------------------------------------- 22
Plate Plan of Borings --------------------------------------------------------------------------------------------------------------- A.1 Unified Soil Classification System --------------------------------------------------------------------------------------- A.2 Key to Classification and Symbols -------------------------------------------------------------------------------------- A.3 Logs of Borings ------------------------------------------------------------------------------------------------------ A.4 – A.9 Free Swell Test Results --------------------------------------------------------------------------------------------------- A.10
Report No. 1705-25-04 CMJ ENGINEERING, INC.
1.0 INTRODUCTION
1.1 Project Description
The project site is located within Meacham Airpot, north of NW 35th Street, on the east and west sides of Ross Avenue in Fort Worth, Texas. The project, as currently planned, consists of a new field maintenance facility. The project is anticipated to consist of a 1- or 2-story building situated on the approximate 1-acre site. The building location(s) on the site has not been determined. It is assumed the building footprint will be on the order of 20,000 square feet or less. The existing Ross
Avenue roadway will be removed. No basements are anticipated. Parking and access driveways are also planned. Plate A.1, Plan of Borings, presents the approximate locations of the exploration borings.
1.2 Purpose and Scope
The purpose of this geotechnical engineering study has been to determine the general subsurface conditions, evaluate the engineering characteristics of the subsurface materials encountered, and develop recommendations for the type or types of foundations suitable for the project.
To accomplish its intended purposes, the study has been conducted in the following phases: (1) drilling sample borings to determine the general subsurface conditions and to obtain samples for testing; (2) performing laboratory tests on appropriate samples to determine pertinent engineering properties of the subsurface materials; and (3) performing engineering analyses, using the field and laboratory data to develop geotechnical recommendations for the proposed construction.
The design is currently in progress and the location and/or elevation of the structure could change.
Once the final design is near completion (80-percent to 90-percent stage), it is recommended that
CMJ Engineering, Inc. be retained to review those portions of the construction documents pertaining to the geotechnical recommendations, as a means to determine that our recommendations have been interpreted as intended.
1.3 Report Format
The text of the report is contained in Sections 1 through 11. All plates and large tables are contained in Appendix A. The alpha-numeric plate and table numbers identify the appendix in which they appear. Small tables of less than one page in length may appear in the body of the text and are numbered according to the section in which they occur.
Units used in the report are based on the English system and may include tons per square foot (tsf), kips (1 kip = 1,000 pounds), kips per square foot (ksf), pounds per square foot (psf), pounds per cubic foot (pcf), and pounds per square inch (psi).
2.0 FIELD EXPLORATION AND LABORATORY TESTING
2.1 Field Exploration
Subsurface materials at the project site were explored by six (6) vertical soil borings. Borings B-1 through B-4 are associated with the proposed building and were extended to depths of 20 to 25 feet.
Borings B-5 and B-6 are associated with area paving and were extended to a depth of 5 feet. The borings were drilled using continuous flight augers at the approximate locations shown on the Plan of Borings, Plate A.1. The boring logs are included on Plates A.4 through A.9 and keys to classifications and symbols used on the logs are provided on Plates A.2 and A.3.
Undisturbed samples of cohesive soils were obtained with nominal 3-inch diameter thin-walled
(Shelby) tube samplers at the locations shown on the logs of borings. The Shelby tube sampler consists of a thin-walled steel tube with a sharp cutting edge connected to a head equipped with a ball valve threaded for rod connection. The tube is pushed into the soil by the hydraulic pulldown of the drilling rig. The soil specimens were extruded from the tube in the field, logged, tested for consistency with a hand penetrometer, sealed, and packaged to limit loss of moisture.
The consistency of cohesive soil samples was evaluated in the field using a calibrated hand penetrometer. In this test a 0.25-inch diameter piston is pushed into the relatively undisturbed sample at a constant rate to a depth of 0.25 inch. The results of these tests, in tsf, are tabulated at respective sample depths on the logs. When the capacity of the penetrometer is exceeded, the value is tabulated as 4.5+.
To evaluate the relative density and consistency of the harder formations, a modified version of the
Texas Cone Penetration test was performed at selected locations. Texas Department of
Transportation (TxDOT) Test Method Tex-132-E specifies driving a 3-inch diameter cone with a 170-pound hammer freely falling 24 inches. This results in 340 foot-pounds of energy for each blow.
This method was modified by utilizing a 140-pound hammer freely falling 30 inches. This results in
350 foot-pounds of energy for each hammer blow. In relatively soft materials, the penetrometer cone is driven 1 foot and the number of blows required for each 6-inch penetration is tabulated at respective test depths, as blows per 6 inches on the log. In hard materials (rock or rock-like), the penetrometer cone is driven with the resulting penetrations, in inches, recorded for the first and second 50 blows, a total of 100 blows. The penetration for the total 100 blows is recorded at the respective testing depths on the boring logs.
2.2 Laboratory Testing
Laboratory soil tests were performed on selected representative samples recovered from the borings. In addition to the classification tests (liquid limits and plastic limits), moisture content, unit weight, and unconfined compressive strength tests were performed. Results of the laboratory classification tests, moisture content, unit weight, and unconfined compressive strength tests conducted for this project are included on the boring logs.
Swell tests were performed on specimens from selected samples of the clays. These tests were performed to help in evaluating the swell potential of soils in the area of the proposed structure. The results of the swell tests are presented on Plate A.10.
The above laboratory tests were performed in general accordance with applicable ASTM procedures, or generally accepted practice.
3.0 SUBSURFACE CONDITIONS
3.1 Soil Conditions
Specific types and depths of subsurface strata encountered at the boring locations are shown on the boring logs in Appendix A. The generalized subsurface stratigraphy encountered in the borings is discussed below. Note that depths on the borings refer to the depth from the existing grade or ground surface present at the time of the investigation, and the boundaries between the various soil types are approximate.
Soils encountered in the borings consist of dark brown, brown, and light brown silty clays and clays of moderate to high plasticity. The clayey soils contain calcareous nodules, calcareous deposits, calcareous seams, and occasionally contain ironstone nodules and limestone fragments. Tan weathered limestone layers with thicknesses of 3 to 6 feet are present within the clay soils in Borings
B-2 and B-4 at depths of 2 to 5 feet. The tan weathered limestone is considered moderately hard
(rock basis), with a Texas Cone Penetrometer (THD) test value of 6¼ inches of penetration for 100 hammer blows. Borings B-5 and B-6 were terminated within the clay soils at a depth of 5 feet.
The various clays encountered in the borings had Liquid Limits (LL) ranging from 43 to 68 with
Plasticity Indices (PI) ranging from 24 to 42 and classify as CL and CH by the USCS. The clayey soils are generally hard (soil basis) in consistency with pocket penetrometer readings of over 4.5 tsf.
Tested unit weight values varied from 102 to 121 pcf and tested unconfined compressive strength values were 8,860 to 40,300 psf.
Tan limestone was next encountered in Borings B-1 through B-4 below depths of 8 to 15 feet. The tan limestone occasionally contains clay seams and is considered moderately hard to hard (rock basis) with Texas Cone Penetrometer (THD) values of 2 to 2½ inches of penetration for 100 hammer blows.
Gray limestone containing occasional shale seams is next present in Borings B-1 through B-4 at depths of 14 to 18 feet, extending through boring termination at depths of 20 to 25 feet below existing grade. The gray limestone is considered moderately hard to hard (rock basis) with Texas Cone
Penetrometer (THD) values of 1⅜ to 2 inches of penetration for 100 hammer blows.
The Atterberg Limits tests indicate the various clays encountered at this site are active to highly active with respect to moisture induced volume changes. Active clays can experience volume changes (expansion or contraction) with fluctuations in their moisture content. Free swell test results indicate a very high potential for moisture-induced volume change from present in-situ moisture levels.
3.2 Groundwater Observations
The borings were drilled using continuous flight augers in order to observe groundwater seepage during drilling. No seepage was encountered during drilling and the borings were dry at completion.
While it is not possible to accurately predict the magnitude of subsurface water fluctuation that might occur based upon these short-term observations, it should be recognized that groundwater conditions will vary with fluctuations in rainfall.
Fluctuations of the groundwater level can occur due to seasonal variations in the amount of rainfall;
site topography and runoff; hydraulic conductivity of soil strata; and other factors not evident at the time the borings were performed. During wet periods of the year, seepage can occur in joints in the clays or atop/within the limestones. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.
4.0 FOUNDATION RECOMMENDATIONS
4.1 General Foundation Considerations
Two independent design criteria must be satisfied in the selection of the type of foundation to support the proposed structure. First, the ultimate bearing capacity, reduced by a sufficient factor of safety, must not be exceeded by the bearing pressure transferred to the foundation soils. Second, due to consolidation or expansion of the underlying soils during the operating life of the structure, total and differential vertical movements must be within tolerable limits. The recommended foundation alternatives for the proposed structure are discussed below.
The moisture induced volume changes associated with the active to highly active clays present at this site indicate that shallow or near surface footings could be subject to differential movements of a potentially detrimental magnitude. The most positive foundation system for the proposed building would be situated below the zone of most significant seasonal moisture variations. A deep foundation system transferring column loads to a suitable bearing stratum is considered the most positive foundation system. Straight drilled reinforced concrete shafts penetrating the gray limestone offer a positive foundation system and are recommended. Recommendations for this system are presented below.
4.2 Straight Shaft Design Parameters
4.2.1 Pier Depth and Allowable…