This is an Invitation to Bid (ITB) packet issued by Reeves County, Texas for asphalt materials and delivery services (ITB No. 26-002). The procurement seeks fixed-price bids for three types of asphalt products: CSS-1H (approximately 110,000 gallons), CRS-2 (approximately 635,000 gallons), and CRS-2P winter asphalt (approximately 80,000 gallons). All materials must be delivered F.O.B. to 7 County Road 231, Pecos, Texas 79772, with delivery required between 7:00 AM and 9:00 AM on the date requested. Sealed bids were due on February 13, 2026, before 11:00 AM CST, to be opened the same day at 11:05 AM. Questions regarding the bid were required to be submitted by February 10, 2026. The award of the contract was tentatively scheduled for February 23, 2026, at the Commissioners' Court. The contract period runs from the effective date (January 1, 2026, or later) through March 28, 2026, with options for renewal under the same terms and conditions for two additional one-year periods at the County's discretion, and further month-to-month extension capability not to exceed three months.
All pricing is fixed for the duration of the contract with no price increases permitted during any extension period. The County reserves the right to award the bid by individual line item to the lowest and best bidder for each item, potentially splitting awards among multiple vendors based on pricing and location considerations. No substitutes are allowed; all asphalt materials must meet TXDOT specifications and requirements outlined in Item 300 of the specifications. Bidders must submit analyses demonstrating that their stockpiles can meet specified requirements, with testing to be performed at the vendor's expense. Vendors must acknowledge all addendums issued prior to bid opening and complete all required forms including the Vendor Acknowledgement form, Conflict of Interest Questionnaire, Non-Collusion Affidavit, Health Insurance Benefits Questionnaire, and various statutory verification forms (House Bill 89, Senate Bill 19, Senate Bill 13, and Senate Bill 252). The County requires proof of liability insurance with limits of $1,000,000 general liability and $1,000,000 automobile liability, payable net 30 days after delivery. Additional fuel surcharges may be included if clearly stated with the triggering fuel price and calculation methodology; no minimum invoice fees or other additional charges are permitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-26-003 Aggregate Bid Packet.pdf | ||
| 3-REEVES COUNTY BID PACKET 26-002 Asphalt.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Department 1714 Schmidt Dr.
Pecos, TX 79772
NOTICE TO INTERESTED PARTIES
The Purchasing Department is receiving sealed bids at 1714 Schmidt Dr. Pecos, Texas 79772 before 11:00 A.M (CST) Friday, February 13, 2026 to be opened at the Purchasing Department Office at 11: 05 AM (CST) on the same day.
Mark Sealed Envelope:
“ITB NO. 26-002”
Asphalt
Proposals should be typed or printed in ink. Proposals shall be placed in a sealed envelope, with the cover page manually signed by a person having the authority to bind the firm in a contract and marked clearly on the outside as shown above. Facsimile transmittals and email submitted bids will not be accepted. Loss runs and history for insurance proposals are provided where available.
Do not contact the requesting department. Any questions or additional information required by interested vendors must be emailed to bidquestions@reevescounty.org before Tuesday, February 10, 2026. Bid number and title must be on the “Subject Line” of the email. Attempts to circumvent this requirement may result in rejection of the bid as non-compliant.
Any changes in the specifications will be posted on the Bonfire portal as an addendum. It shall be the bidder’s responsibility to check the portal prior to the opening date to verify whether any addendums have been posted.
Reeves County appreciates your time and effort in preparing a bid. All proposals must be received in the Purchasing Agent’s Office before opening date and time. Bids received after the deadline will not be considered for the contract, and shall be considered void and unacceptable.
Award of the proposals is tentatively scheduled for 10:00 a.m. (CST), in Commissioners’ Court, Monday, February 23, 2026, Third Floor Courtroom of the Reeves County Courthouse. You are invited to attend.
Reeves County has united with Bonfire Interactive, an online E-bidding and procurement software platform, for vendor registration, solicitation notification and electronic bid submission.
The vendor registration portal is now open allowing vendors to register for bid alerts.
Note that vendors who are not registered with Bonfire will not be notified of Reeves County solicitations and will not be able to access solicitations until registration is complete.
Lucero Sandoval Purchasing Agent mailto:bidquestions@reevescounty.org
26-002 2
INVITATION TO BID
No. 26-002
ASPHALT
SCHEDULE
Notices Published: January 29, 2026 & February 5, 2026 Questions Due: February 10, 2026 Proposals Due: February 13, 2026 before 11 AM CST Tentative Award Date: February 23, 2026 Issued by: Lucero Sandoval, Purchasing Agent
The County of Reeves does not discriminate on the basis of race, color national origin, sex, religion, age and disability in employment or the provision of services.
The County reserves the right to terminate this process at any time and no guarantee is expressed or implied that obligates the County to contract for the proposed project.
OFFERORS NOTE
1. Carefully read all instructions, requirements and specifications.
2. Fill out all forms properly and completely.
3. Submit bids/proposals with all appropriate required documents.
26-002 3
VENDOR ACKNOWELEDGEMENT
ITB 26-002
ASPHALT
Submissions will be accepted as hard copy or electronically via Bonfire Portal
The undersigned hereby certifies that he/she understands the specifications and any addendums, has read the document in its entirety and the prices submitted in this bid/proposal have been carefully reviewed and are submitted as correct and final. If Bid/Proposal is accepted, proposer further certifies and agrees to furnish any or all products/services upon which prices are extended at the price offered, and upon conditions in the specifications of the Invitation for Bid/Proposal.
The undersigned hereby certifies the foregoing proposal submitted by the company listed below hereinafter called "Bidder" is the duly authorized agent of said company and the person signing said proposal has been duly authorized to execute the same. Bidder affirms that they are duly authorized to execute this contract; this company, corporation, firm, partnership or individual has not prepared this bid in collusion with any other Bidder; and that the contents of this bid as to prices, terms or conditions of said bid have not been communicated by the undersigned nor by any employee or agent to any other person engaged in this type of business prior to the official opening of this bid.
Company Name
Address of Principal Place of Business
City, State, Zip
Remittance Address
City, State, Zip
Phone of Principal Place of Business
Active Sam Registration Y N
Acknowledgement of Addenda
(Please circle EACH acknowledged Addendum(s)) #1 #2 #3 #4 #5
Authorized Representative Name
Email Address of Representative
Authorized Representative Title
Authorized Signature
Date
***THIS MUST BE THE FIRST PAGE ON ALL BIDS***
26-002 4
PURPOSE OF BID/PROPOSAL
The purpose of this specification is to receive fixed prices and delivery response times for various types of Asphalt for Road & Bridge. Reeves County reserves the right to award the bid by line item to whichever bidder makes the lowest and best bid for that particular item. By entering a bid, vendors acknowledge they will accept any item of the bid awarded to them.
SCOPE OF WORK
It is the intention of these specifications that the successful contractors shall furnish and deliver aggregate to Reeves County Road & Bridge. The County reserves the right to order such materials as may be required during the said period, it also reserves the right not to order any materials bid upon by the contractor if it is found that the County does not require such materials during the period of time covered by this agreement.
LENGTH OF BID
Contract shall begin upon the effective date of the ordinance awarding the contract, January 1, or whichever is later, and terminate on March 28, 2026.
At the County’s option, this Contract may be renewed under the same terms and conditions for two (2) additional one (1) year periods. Renewals shall be in writing and signed by the Purchasing Department or her designee, without further action by the Reeves County Commissioners, subject to and contingent upon appropriation of funding therefore.
County shall also have the right to extend this contract under the same terms and conditions beyond the original term or any renewal thereof, on a month to month basis, not to exceed 3 months. Said month to month extensions shall be in writing, signed by the County’s Purchasing Agent or her designee, and shall not require County Commissioner approval, subject to and contingent upon appropriation of funding therefore.
PRICING
All prices are fixed for the duration of the contract. There shall be no increase in price should an extension be granted.
If during the life of this contract, the successful bidder’s net prices to other customers for items awarded herein are reduced below the contracted price, it is understood and agreed that the benefits of such reduction shall be extended to Reeves County. In the event bidder breaches this condition, the price of the item shall be reduced to the bidder’s current prices on orders by others, or in the alternative, Reeves County may cancel this contract without liability to bidder for breach or bidder’s actual expense.
LOWEST PRICE
In determining the lowest and best bid for a contract for the purchase of road construction material, the commissioners’ court may consider the pickup and delivery locations of the bidders and the cost to the county of delivering or hauling the material to be purchased. The commissioners’ court may award contracts for the purchase of road construction material to more than one bidder if each of the selected bidders submits the lowest and best bid for a particular location or type of material.
BONDS
Bonds will not be required for this bid as items shall be paid net 30 terms after delivery is complete.
Silence of Specification: The apparent silence of these specifications as to any detail or to the apparent omission of a detailed description concerning any point, shall be regarded as meaning only the best commercial practices are to prevail. All interpretations of these specifications shall be made based on this statement.
26-002 5
SPECIFICATIONS
All items shall follow TXDOT Requirements as noted after page 5. NO substitutes allowed.
An analysis shall be provided for each item vendor intends to bid on to verify stockpiles can meet requirements and shall be tested again upon award at the expense of the vendor OR prior to first pickup or delivery.
DELIVERY
All products shall be shipped F.O.B. Reeves County, Texas and delivered to the location designated by the Road and Bridge Administrator or personnel.
The bid shall be based on a transport load of 5,500 gallons. Freight shall be based on a full load even if a full load is not ordered.
The vendor shall provide all equipment necessary to transport, store, sample, heat, and incorporate asphalts, oils, and emulsions. The vendor shall provide pump and deliver the asphalt to the specified work site of the day, County wide, at the time requested, 7:00 am and no later than 9:00 am, where it shall be transferred to County owned equipment for the application process, 2-hour time allowance for transfer. The County shall provide storage facility for excess asphalt or emulsion.
RESPONSE TIME
Response time shall be interpreted as the time between when an order is placed with contractor and point of delivery to location specified.
Response times are to ensure no delays occur during projects and County can complete projects in a timely and efficient manner.
ESTIMATED QUANTITIES
The quantities of products shown on Bid Price Sheet are approximate amounts only and are to be used only for calculation of total bid. The quantities are determined from past purchasing history and, as far as can be determined, are realistic. Actual quantities ordered may be higher or lower than estimated quantities.
INVOICES
The Vendor shall submit an accurate invoice within five (5) working days from the date of delivery of the products. Invoices shall be sent to the requesting department via email.
ADDITIONAL FEES
The successful bidder will not be allowed to add minimum invoice fees or surcharge fees to invoice purchase totals. If fuel surcharges are to be charged, the calculation method of the surcharge and the fuel price that triggers the surcharge must be stated on the bid document.
If any charges for demurrage, diversion, pumping, return freight, restocking, etc. are to be added to bid price, they must be stated as a fee or percentage of the bid and attached to this bid sheet. Price shall be bid F.0.B. Destination, Reeves County, Texas, location as specified by the Road and Bridge Administrator on the day of delivery.
INFRIDGEMENTS CLAUSE
As part of this contract for sale, bidder agrees to ascertain whether goods manufactured in accordance with the specifications attached to this agreement, will give rise to the rightful claim of any third person by way of infringement or the like. Reeves County makes no warranty that the production of goods according to the specification will not give rise to such a claim, and in no event shall Reeves County be liable to the bidder for indemnification in the event that bidder issued on the grounds of infringement or the like.
2024 Specifications 300
Item 300 Asphalts, Oils, and Emulsions
1. DESCRIPTION
Provide asphalt cements, cutback and emulsified asphalts, performance-graded asphalt binders, and other miscellaneous asphalt materials as shown on the plans.
2. MATERIALS
Provide asphalt materials that meet the stated requirements when tested in conformance with the referenced Department, AASHTO, and ASTM test methods. Use asphalt containing recycled materials only if the recycled components meet the requirements of Article 6.9., “Recycled Materials.” Provide asphalt materials that the Department has preapproved for use in accordance with Tex-545-C.
Inform the Department of all additives or modifiers included in the asphalt binder as part of the facility quality plan, as required by Tex-545-C, and provide that information to Department personnel. The Department reserves the right to prohibit the use of any asphalt additive or modifier.
Limit the use of polyphosphoric acid to no more than 0.5% by weight of the asphalt binder.
The use of re-refined engine oil bottoms is prohibited.
Acronyms used in this Item are defined in Table 1.
Table 1 Acronyms
Acronym Definition Test Procedure Designations
Tex Department T or R AASHTO
D ASTM
Polymer Modifier Designations P polymer-modified SBS styrene-butadiene-styrene block co-polymer TR tire rubber modifier (obtained from ground truck and passenger vehicle post-consumer tires) AC asphalt cement AE asphalt emulsion AE-P asphalt emulsion prime A-R asphalt-rubber ARA emulsified asphalt recycling agent C cationic CRM crumb rubber modifier CSS cationic slow setting EAP&T emulsified asphalt prime and tack EBL emulsified bonding layer FDR full-depth reclamation H-suffix harder residue (lower penetration) HA hot-applied HF high float HRSS hard residue surface sealant HY high yield https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph545.pdf https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph545.pdf
Acronym Definition MC medium-curing MS medium-setting MSCR multiple stress creep recovery NT non-tracking PCE prime, cure, and erosion control PG performance grade RC rapid-curing RS rapid-setting S-suffix stockpile usage SCM special-use cutback material SS slow-setting SY standard yield TRAIL tracking resistant asphalt interlayer
2.1. Asphalt Cement. Provide AC that is homogeneous, water-free, and non-foaming when heated to 347°F, and in accordance with Table 2.
Table 2
Asphalt Cement
Property Test Procedure
Viscosity Grade
AC-0.6 AC-1.5
Min Max Min Max Viscosity T 202
140°F, poise 40 80 100 200 275°F, poise 0.4 – 0.7 –
Penetration, 77°F, 100g, 5 sec. T 49 350 – 250 – Flash point, C.O.C., °F T 48 425 – 425 – Solubility, % T 44 99.0 – 99.0 – Spot test Tex-509-C Neg. Neg.
Tests on residue from RTFOT: T 240
Viscosity, 140°F, poise T 202 – 400 – 1,000 Ductility,1 77°F T 51 100 – 100 –
5 cm/min., cm
1. If AC-0.6 or AC-1.5 ductility at 77°F is less than 100 cm, material is acceptable if ductility at 60°F is more than 100 cm.
2.2. Polymer-Modified Asphalt Cement. Provide polymer-modified AC that is smooth, homogeneous, and meets the requirements shown in Table 3. Supply samples of the base AC and polymer additives if requested.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph501.pdf
Table 3 Polymer-Modified Asphalt Cement
Property Test Procedure
Polymer-Modified Viscosity Grade
AC-12-5TR NT-HA1 AC-15P AC-20XP AC-10-2TR AC-20-5TR
Min Max Min Max Min Max Min Max Min Max Min Max
Polymer TR – SBS SBS TR TR Polymer content, % (solids basis) Tex-533-C or Tex-553-C
5.0 – – – 3.0 – – – 2.0 – 5.0 –
Dynamic shear, G*/sin δ, 82°C, 10 rad/s, kPa
T 315 – – 1.0 – – – – – – – – –
Dynamic shear, G*/sin δ, 64°C, 10 rad/s, kPa
T 315 – – – – – – 1.0
– – – 1.0 –
Dynamic shear, G*/sin δ, 58°C, 10 rad/s, kPa
T 315 1.0 – – – – – – – 1.0 – – –
Viscosity 140°F, poise T 202 1,200 – – – 1,500 – 2,000 – 1,000 – 2,000 – 275°F, poise
275°F, Pa-s T 202 T 316
4.0
8.0
8.0
10.0
Penetration, 77°F, 100 g, 5 sec. T 49 110 150 – 25 100 150 75 115 95 130 75 115 Elastic recovery, 50°F, % Tex-539-C 55 – – – 55 – 55 – 30 – 55 – Polymer separation Tex-540-C None – None None None None Flash point, C.O.C., °F T 48 425 – 425 – 425 – 425 – 425 – 425 – Tests on residue from RTFOT aging and pressure aging:
T 240 and R 28
Creep stiffness T 313 S, -18°C, MPa – 300 – – – 300 – 300 – 300 – 300 m-value, -18°C 0.300 – – – 0.300 – 0.300 – 0.300 – 0.300 –
1. This is a hot-applied TRAIL product.
2.3. Cutback Asphalt. Provide cutback asphalt that meets the requirements shown in Tables 4, 5, and 6 for the specified type and grade. Supply samples of the base AC and polymer additives if requested.
Table 4
Rapid-Curing Cutback Asphalt
Property Test Procedure
Type–Grade
RC-250
Min Max Kinematic viscosity, 140°F, cSt T 201 250 400 Water, % D95 – 0.2 Flash point, T.O.C., °F T 79 80 – Distillation test: T 78
Distillate, percentage by volume of total distillate to 680°F to 437°F 40 75 to 500°F 65 90 to 600°F 85 –
Residue from distillation, volume % 70 – Tests on distillation residue:
Viscosity, 140°F, poise T 202 600 2,400 Ductility, 5 cm/min., 77°F, cm T 51 100 – Solubility, % T 44 99.0 – Spot test Tex-509-C Neg.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph533.pdf https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph553.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph539.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph540.pdf
Table 5 Medium-Curing Cutback Asphalt
Property Test Procedure
Type–Grade
MC-30 MC-800 MC-3000
Min Max Min Max Min Max Kinematic viscosity, 140°F, cSt T 201 30 60 800 1,600 3,000 6,000 Water, % D95 – 0.2 – 0.2 – 0.2 Flash point, T.O.C., °F T 79 95 – 140 – 149 – Distillation test: T 78
Distillate, percentage by volume of total distillate to 680°F to 437°F – 35 – – – – to 500°F 30 75 – 40 – 15 to 600°F 75 95 45 85 15 75
Residue from distillation, volume % 50 – 75 – 80 – Tests on distillation residue:
Viscosity, 140°F, poise T 202 300 1,200 300 1,200 300 1,200 Ductility, 5 cm/min., 77°F, cm T 51 100 – 100 – 100 – Solubility, % T 44 99.0 – 99.0 – 99.0 – Spot test Tex-509-C Neg. Neg. Neg.
Table 6 Special-Use Cutback Asphalt
Property Test Procedure
Type–Grade
SCM I
Min Max Kinematic viscosity, 140°F, cSt T 201 500 1,000 Water, % D95 – 0.2 Flash point, T.O.C., °F T 79 175 – Distillation test: T 78
Distillate, percentage by volume of total distillate to 680°F to 437°F – – to 500°F – 0.5 to 600°F 20 60
Residue from distillation, volume % 76 – Tests on distillation residue:
Penetration, 100 g, 5 sec., 77°F T 49 180 – Solubility, % T 44 99.0 –
2.4. Emulsified Asphalt. Provide emulsified asphalt that is homogeneous, does not separate after thorough mixing, and meets the requirements for the specified type and grade shown in Tables 7, 8, 9, 10, and 10A–C.
Table 7
Emulsified Asphalt
Property Test Procedure
Type–Grade Rapid- Setting
Medium- Setting Slow-Setting
HFRS-2 MS-2 SS-1 SS-1H
Min Max Min Max Min Max Min Max
Viscosity, Saybolt Furol T 72 77°F, sec. – – – – 20 100 20 100 122°F, sec. 150 400 100 300 – – – –
Sieve test, % T 59 – 0.1 – 0.1 – 0.1 – 0.1 Miscibility T 59 – – Pass Pass Cement mixing, % T 59 – – – – – 2.0 – 2.0 Demulsibility, 35 mL of 0.02 N CaCl2, % T 59 50 – – 30 – – – –
Storage stability, 1 day, % T 59 – 1 – 1 – 1 – 1 Freezing test, 3 cycles1 T 59 – Pass Pass Pass Distillation test: T 59
Residue by distillation, % by wt. 65 – 65 – 60 – 60 – Oil distillate, % by volume of emulsion – 0.5 – 0.5 – 0.5 – 0.5
Tests on residue from distillation:
Penetration, 77°F, 100 g, 5 sec. T 49 100 140 90 160 90 160 40 100 Solubility, % T 44 97.5 – 97.5 – 97.5 – 97.5 – Ductility, 77°F, 5 cm/min., cm T 51 100 – 100 – 100 – 80 – Float test, 140°F, sec. T 50 1,200 – – – – – – –
1. Applies only when the Engineer designates material for winter use.
Table 8 Cationic Emulsified Asphalt
Property Test Procedure
Type–Grade Rapid- Setting
Medium- Setting Slow-Setting
CRS-2 CMS-2 CSS-1 CSS-1H
Min Max Min Max Min Max Min Max
Viscosity, Saybolt Furol T 72
77°F, sec. – – – – 20 100 20 100 122°F, sec. 150 400 100 350 – – – – Sieve test, % T 59 – 0.1 – 0.1 – 0.1 – 0.1 Cement mixing, % T 59 – – – – – 0.2 – 0.2 Coating ability and water resistance:
T 59
Dry aggregate/after spray – Good/Fair – – Wet aggregate/after spray – Fair/Fair – – Demulsibility, 35 mL of 0.8% Sodium dioctyl sulfosuccinate, % T 59 70 – – – – – – –
Storage stability, 1 day, % T 59 – 1 – 1 – 1 – 1 Particle charge T 59 Positive Positive Positive Positive Distillation test:
T 59
Residue by distillation, % by wt. 65 – 65 – 60 – 60 – Oil distillate, % by volume of emulsion
– 0.5 – 7 – 0.5 – 0.5
Tests on residue from distillation:
Penetration, 77°F, 100 g, 5 sec. T 49 90 160 90 200 90 160 40 110 Solubility, % T 44 97.5 – 97.5 – 97.5 – 97.5 – Ductility, 77°F, 5 cm/min., cm T 51 100 – 100 – 100 – 80 –
Table 9 Polymer-Modified Emulsified Asphalt
Property Test Procedure
Type–Grade Rapid-Setting
HFRS-2P
Min Max
Viscosity, Saybolt Furol T 72 122°F, sec. 150 400
Sieve test, % T 59 – 0.1 Demulsibility, 35 mL of 0.02 N CaCl2, % T 59 50 – Storage stability, 1 day, % T 59 – 1 Distillation test:1 T 59
Residue by distillation, % by wt. 65 – Oil distillate, % by volume of emulsion – 0.5
Tests on residue from distillation:
Polymer content, wt. % (solids basis) Tex-533-C 3.0 – Penetration, 77°F, 100 g, 5 sec. T 49 90 140 Solubility, % T 44 97.0 – Viscosity, 140°F, poise T 202 1,500 – Float test, 140°F, sec. T 50 1,200 – Ductility,2 39.2°F, 5 cm/min., cm T 51 50 – Elastic recovery,2 50°F, % Tex-539-C 55 –
1. Exception to T 59: Bring the temperature on the lower thermometer slowly to 350 ± 10°F. Maintain at this temperature for 20 min. Complete total distillation in 60 ± 5 min. from the first application of heat.
2. HFRS-2P must meet one of either the ductility or elastic recovery requirements.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph533.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph539.pdf
Table 10 Polymer-Modified Cationic Emulsified Asphalt
Property Test Procedure
Type-Grade Rapid-Setting Medium-Setting Slow-Setting
CRS-2P CHFRS-2P CRS-2TR CMS-1P3 CMS-2P3 CSS-1P
Min Max Min Max Min Max Min Max Min Max Min Max
Viscosity, Saybolt Furol T 72 77°F, sec. – – – – -- -- 10 100 – – 20 100 122°F, sec. 150 400 100 400 150 500 – – 50 400 – –
Sieve test, % T 59 – 0.1 – 0.1 -- 0.1 – 0.1 – 0.1 – 0.1 Demulsibility, 35 ml of 0.8% sodium dioctyl sulfosuccinate, % T 59 70 – 60 – 40 -- – – – – – –
Storage stability, 1 day, % T 59 – 1 – 1 -- 1 – 1 – 1 – 1 Particle charge T 59 Positive Positive Positive Positive Positive Positive Distillation test1: T 59
Residue by distillation, % by weight 65 – 65 – 65 -- 30 – 60 – 62 – Oil distillate, % by volume of emulsion
– 0.5 – 0.5 -- 3 – 0.5 – 0.5 – 0.5
Tests on residue from distillation:
Polymer content, wt. % (solids basis) Tex-533-C or Tex-553-C 3.0 – 3.0 – 5.04 -- – – – – 3.0 –
Penetration, 77°F, 100 g, 5 sec. T 49 90 150 80 130 90 150 30 – 30 – 55 90 Viscosity, 140°F, poise T 202 1,300 – 1,300 – 1,000 -- – – – – – – Solubility, % T 44 97.0 – 95.0 – 98 -- – – – – 97.0 – Ductility, 77°F, 5 cm/min., cm T 51 – – – – 40 -- – – – – 70 – Float test, 140°F, sec. T 50 – – 1,800 – -- -- – – – – Ductility,2 39.2°F, 5 cm/min., cm T 51 50 – – – -- -- – – – – – – Elastic recovery,2 50°F, % Tex-539-C 55 – 55 – -- -- – – – – – –
Tests on residue from evaporative recovery:
R 78, Procedure B
Nonrecoverable creep compliance of residue, 3.2 kPa, 52°C, kPa-1 T 350
– – – – – – – 2.0 – 4.0 – –
1. Exception to T 59: Bring the temperature on the lower thermometer slowly to 350 ± 10°F. Maintain at this temperature for 20 min.
Complete total distillation in 60 ± 5 min. from the first application of heat.
2. CRS-2P must meet one of either the ductility or elastic recovery requirements.
3. With all precertification samples of CMS-1P or CMS-2P, submit certified test reports showing the type and percent of rejuvenator and/or latex added. Submit samples of these raw materials if requested by the Engineer.
4. Modifier type is TR. Determined in accordance with Tex-553-C.
Table 10A Non-Tracking Tack Coat Emulsion1
Property Test Procedure
NT-HRE NT-RRE NT-SRE
Min Max Min Max Min Max
Viscosity, Saybolt Furol, 77°F, sec. T 72 15 – 15 – 10 100 Storage stability, 1 Day, % T 59 – 1 – 1 – 1 Settlement, 5-day, % T 59 – 5 – 5 – 5 Sieve test, % T 59 – 0.30 – 0.30 – 0.1 Distillation test:2 T 59
Residue by distillation, % by wt. 50 – 58 – 50 – Oil distillate, by volume of emulsion – 1.0 – 1.0 – 1.0
Test on residue from distillation:
Penetration, 77°F, 100 g, 5 sec.
Solubility, % Dynamic shear, G*/sin(δ), 82°C, 10 rad/s, kPa
97.5
T 49 T 44 T 315
97.5 1.0
97.5
1. These are emulsion-based TRAILs. Due to the hardness of the residue, these emulsions should be heated to 120–140° F prior to thorough mixing as the emulsion is being prepared for testing.
2. Exception to T 59: Bring the temperature on the lower thermometer slowly to 350 ± 10°F. Maintain at this temperature for 20 min. Complete total distillation in 60 ± 5 min. from first application of heat.
https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph533.pdf https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph553.pdf https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph539.pdf https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph553.pdf
Table 10B Spray-Applied Underseal Membrane Polymer-Modified Emulsions
Property Test Procedure
EBL
Min Max
Viscosity @ 77°F, SSF T 72 20 100 Storage Stability1, % T 59 – 1 Demulsibility2
Anionic emulsions — 35 mL of 0.02 N CaCl2, % Cationic emulsions — 35 mL 0.8% sodium dioctyl sulfosuccinate, %
T 59 55 –
Sieve Test3, % T 59 – 0.05 Distillation Test4
Residue by distillation, % by wt.
Oil portion of distillate, % by vol.
T 59
0.5
Test on Residue from Distillation Elastic Recovery @ 50°F, 50 mm/min., % Tex-539-C 60 – Penetration @ 77°F, 100 g, 5 sec, 0.1 mm T 49 80 130
1. After standing undisturbed for 24 hr., the surface must be smooth, must not exhibit a white or milky colored substance, and must be a homogeneous color throughout.
2. Material must meet demulsibility test for emulsions.
3. May be required by the Engineer only when the emulsion cannot be easily applied in the field.
4. The temperature on the lower thermometer should be brought slowly to 350 ± 10°F and maintained at this temperature for 20 min. The total distillation should be completed in 60 ± 5 min.
from the first application of heat.
Table 10C Full-Depth Reclamation Emulsion
Property Test Procedure
Standard Yield
(FDR EM-SY)
High Yield
(FDR EM-HY)2
Min Max Min Max Viscosity Saybolt Furol @ 77°F, sec.
Sieve test, % Cement mixing, % % Storage stability, 1 day, % Distillation test1:
Residue by distillation, % by wt.
Oil portion of distillate, % by vol.
T 72 T 59 T 59 T 59 T 59
0.1 2.0
0.5
0.1 2.0
0.5
Test on residue from distillation:
Penetration @ 77°F, dmm T 49 40 95 120 –
1. The temperature on the lower thermometer should be brought slowly to 350 ± 10°F and maintained at this temperature for 20 min. The total distillation should be completed in 60 ± 5 min. from the first application of heat.
2. Provide a manufacturer’s certificate of analysis (COA) with the type and percent of rejuvenator added.
2.5. Specialty Emulsions. Provide specialty emulsion that is either asphalt-based or resin-based and meets the requirements shown in Table 11 or Table 11A.
Table 11 Specialty Emulsions
Property Test Procedure
Type–Grade Medium-Setting Slow-Setting
AE–P EAP&T PCE1
Min Max Min Max Min Max
Viscosity, Saybolt Furol T 72 77°F, sec. – – – – 10 100 122°F, sec. 15 150 – – – –
Sieve test, % T 59 – 0.1 – 0.1 – 0.1 Miscibility2 T 59 – Pass Pass Demulsibility, 35 mL of 0.10 N CaCl2, % T 59 – 70 – – – – Storage stability, 1 day, % T 59 – 1 – 1 – – Particle size,5 % by volume < 2.5 µm Tex-238-F3 – – 90 – 90 – Asphalt emulsion distillation to 500°F followed by Cutback asphalt distillation of residue to 680°F:
T 59 and T 78
Residue after both distillations, % by wt. 40 – – – – – Total oil distillate from both distillations, % by volume of emulsion 25 40 – – – –
Residue by distillation, % by wt. T 59 – – 60 – – – Residue by evaporation,4 % by wt. T 59 – – – – 60 – Tests on residue after all distillation(s):
Viscosity, 140°F, poise T 202 – – 800 – – – Kinematic viscosity,5 140°F, cSt T 201 – – – – 100 350 Flash point C.O.C., °F T 48 – – – – 400 – Solubility, % T 44 97.5 – – – – – Float test, 122°F, sec. T 50 50 200 – – – –
1. Supply with each shipment of PCE:
a copy of a lab report from an approved analytical lab, signed by a lab official, indicating the PCE formulation does not meet any characteristics of a Resource Conservation Recovery Act (RCRA) hazardous waste;
a certification from the producer that the formulation supplied does not differ from the one tested and that no listed RCRA hazardous wastes or Polychlorinated Biphenyls have been mixed with the product; and a Safety Data Sheet.
2. Exception to T 59: In dilution, use 350 mL of distilled or deionized water and a 1,000-mL beaker.
3. Use Tex-238-F, beginning at “Particle Size Analysis by Laser Diffraction,” with distilled or deionized water as a medium and no dispersant, or use another approved method.
4. Exception to T 59: Leave sample in the oven until foaming ceases, then cool and weigh.
5. PCE must meet either the kinematic viscosity requirement or the particle size requirement.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit238.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit238.pdf
Table 11A Hard Residue Surface Sealant
Property Test Procedure HRSS Min Max
Viscosity, Krebs unit, 77°F, Krebs units D 562 45 75 Softening point, °F Tex-505-C1 250 – Uniformity D 2939 Pass2
Resistance to heat D 2939 Pass3 Resistance to water D 2939 Pass4
Wet flow, mm D 2939 – 0 Resistance to Kerosene (optional)5 D 2939 Pass6 Ultraviolet exposure, UVA-340, 0.77 W/m2, 50°C chamber, 8 hr. UV lamp, 5 min. spray, 3 hr. 55 min. condensation, 1,000 hr. total exposure7
G 154 Pass8
Abrasion loss, 1.6 mm thickness, liquid only, % ISSA TB-100 – 1.0 Residue by evaporation, % by weight D 2939 33 –
Tests on residue from evaporation:
Penetration, 77°F, 100 g, 5 sec. T 49 15 30 Flash point, Cleveland open cup, °F T 48 500 –
Tests on base asphalt before emulsification Solubility, % T 44 98 –
1. Cure the emulsion in the softening point ring in a 200 ± 5°F oven for 2 hr.
2. Product must be homogenous and show no separation or coagulation that cannot be overcome by moderate stirring.
3. No sagging or slippage of film beyond the initial reference line.
4. No blistering or re-emulsification.
5. Recommended for airport applications or where fuel resistance is desired.
6. No absorption of Kerosene into the clay tile past the sealer film. Note sealer surface condition and loss of adhesion.
7. Other exposure cycles with similar levels of irradiation and conditions may be used with Department approval.
8. No cracking, chipping, surface distortion, or loss of adhesion. No color fading or lightening.
2.6. Diluted Emulsions. Provide emulsified asphalt that is homogeneous, does not separate after thorough mixing, and meets the requirements for the specified type and grade shown in Tables 12 and 12A, where the suffixes 50/50, 40/60, and 30/70 mean 50% emulsion diluted with 50% water; 40% emulsion diluted with 60% water, and 30% emulsion diluted with 70% water, respectively. For example, CSS-1H 40/60 means 40% CSS-1H diluted with 60% water and AE-P 30/70 means 30% AE-P diluted with 70% water.
Table 12 Cationic Diluted Emulsified Asphalt
Property Test Procedure
Type-Grade Diluted Slow-Setting
CSS-1H 50/50 CSS-1H 40/60 CSS-1H 30/70
Min Max Min Max Min Max
Viscosity, Saybolt Furol 77°F, sec. T 72 Report only Report only Report only
Distillation test T 59 Residue by distillation, % by wt. 30 – 24 – 18 –
Oil distillate, % by volume of emulsion – 0.5 – 0.5 – 0.5 Tests on residue from distillation:
Penetration, 77°F, 100 g, 5 sec. T 49 40 110 40 110 40 110 Solubility, % T 44 97.5 – 97.5 – 97.5 – Ductility, 77°F, 5 cm/min., cm T 51 80 – 80 – 80 –
Table 12A Diluted Specialty Emulsions
Property Test Procedure
Type-Grade Diluted Slow-Setting
AE-P 50/50 AE-P 40/60 AE-P 30/70
Min Max Min Max Min Max
Viscosity, Saybolt Furol T 72 122°F, sec. Report only Report only Report only
Asphalt emulsion distillation to 500°F followed by cutback asphalt distillation of residue to 680°F: T 59 and
T 78 Residue after both distillations, % by wt. 20 – 16 – 12 – Total oil distillate from both distillations, % by volume of emulsion
12.5 20 10.0 16 7.5 12
Tests on residue after all distillations:
Solubility, % T 44 97.5 – 97.5 – 97.5 – Float test, 122°F, sec. T 50 50 200 50 200 50 200
2.7. Recycling Agent. Recycling agent and emulsified asphalt recycling agent (ARA) must meet the requirements shown in Table 13. Additionally, recycling agent and residue from ARA, when added in the specified proportions to the recycled asphalt, must meet the properties shown on the plans.
Table 13 Recycling Agent and Emulsified Asphalt Recycling Agent
Property Test Procedure
Recycling Agent ARA-1 ARA-1P Min Max Min Max Min Max
Viscosity, Saybolt Furol, 77°F, sec. T 72 – – 15 100 15 110 Sieve test, % T 59 – – – 0.1 – 0.1 Miscibility1 T 59 – No coagulation – Residue by evaporation2, % by wt. T 59 – – 60 – – – Distillation test3:
Residue by distillation, % by wt.
Oil distillate, % by volume of emulsion
T 59
Penetration of distillation residue at 39.2°F, 100 g, 5 sec.
T 49 – – – – 110 190
Tests on recycling agent or residue from evaporation:
Flash point, C.O.C., °F T 48 400 – 400 – 400 – Kinematic viscosity T 201
140°F, cSt 75 200 75 200 – – 275°F, cSt – 10.0 – 10.0 – –
1. Exception to T 59: Use 0.02 N CaCl2 solution in place of water.
2. Exception to T 59: Maintain sample at 300°F until foaming ceases, then cool and weigh.
3. Exception to T 59: Bring the temperature on the lower thermometer slowly to 350 ± 10°F. Maintain at this temperature for 20 min. Complete total distillation in 60 ± 5 min. from first application of heat.
2.8. Crumb Rubber Modifier. CRM consists of automobile and truck tires processed by ambient temperature grinding.
CRM must be:
free of contaminants, including fabric, metal, and mineral and other non-rubber substances;
free-flowing; and non-foaming when added to hot asphalt binder.
Ensure rubber gradation meets the requirements of the grades shown in Table 14 when tested in accordance with Tex-200-F, Part I, using a 50-g sample.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit200.pdf
Table 14 CRM Gradations
Sieve Size (% Passing)
Grade A Grade B Grade C Grade D Grade E Min Max Min Max Min Max
As shown on the plans
As approved
#8 100 – – – – – #10 95 100 100 – – – #16 – – 70 100 100 – #30 – – 25 60 90 100 #40 – – – – 45 100 #50 0 10 – – – – #200 – – 0 5 – –
2.9. Crack Sealer. Provide polymer-modified emulsified asphalt crack sealer meeting the requirements shown in Table 15. Provide rubber-asphalt crack sealer meeting the requirements shown in Table 16.
Table 15
Polymer-Modified Emulsified Asphalt Crack Sealer Property Test Procedure Min Max
Rotational viscosity, 77°F, cP D2196, Method A 10,000 25,000 Sieve test, % T 59 – 0.1 Storage stability, 1 day, % T 59 – 1 Evaporation Tex-543-C Residue by evaporation, % by wt. 65 – Tests on residue from evaporation:
Penetration, 77°F, 100 g, 5 sec. T 49 35 75 Softening point, °F T 53 140 – Ductility, 39.2°F, 5 cm/min., cm T 51 100 –
Table 16
Asphalt-Rubber Crack Sealer
Property Test Procedure Class A Class B Min Max Min Max
CRM content, Grade A or Grade B, % by wt. Tex-544-C 22 26 – – CRM content, Grade B, % by wt. Tex-544-C – – 13 17 Virgin rubber content1, % by wt. – – 2 – Flash point2, C.O.C., °F T 48 400 – 400 – Penetration3, 77°F, 150 g, 5 sec. T 49 30 50 30 50 Penetration3, 32°F, 200 g, 60 sec. T 49 12 – 12 – Softening point, °F T 53 – – 170 – Bond test, non-immersed, 0.5 in specimen, 50% extension, 3 cycles, 20°F4 D5329 – Pass
1. Provide certification that the Min % virgin rubber was added.
2. Agitate the sealing compound using a 3/8–1/2-in. (9.5–12.7-mm) wide, square-end metal spatula to bring the material on the bottom of the cup to the surface (i.e., turn the material over) before passing the test flame over the cup. Start at one side of the thermometer, move around to the other, and then return to the starting point using 8–10 rapid circular strokes. Accomplish agitation in 3–4 sec. Pass the test flame over the cup immediately after stirring is completed.
3. Exception to T 49: Substitute the cone specified in D217 for the penetration needle.
4. Allow no crack in the crack-sealing materials or break in the bond between the sealer and the mortar blocks more than 1/4 in. deep for any specimen after completion of the test.
2.10. Asphalt-Rubber Binders. Provide A-R binders that are mixtures of asphalt binder and CRM that have been reacted at elevated temperatures. Provide A-R binders meeting D6114 and containing at least 15% CRM by weight. Provide Type I or Type II, containing CRM Grade C, for use in hot-mix aggregate mixtures. Provide Type II or Type III, containing CRM Grade B, for use in surface treatment binder.
Ensure binder properties meet the requirements shown in Table 17.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph543.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph544.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph544.pdf
Table 17 A-R Binders
Property Test Procedure
Binder Type Type I Type II Type III
Min Max Min Max Min Max
Apparent viscosity, 347°F, cP D2196, Method A 1,500 5,000 1,500 5,000 1,500 5,000
Penetration, 77°F, 100 g, 5 sec. T 49 25 75 25 75 50 100 Penetration, 39.2°F, 200 g, 60 sec. T 49 10 – 15 – 25 – Softening point, °F T 53 135 – 130 – 125 – Resilience, 77°F, % D5329 25 – 20 – 10 – Flash point, C.O.C., °F T 48 450 – 450 – 450 – Tests on residue from RTFOT: T 240
Retained penetration ratio, 39.2°F, 200 g, 60 sec., % of original T 49 75 – 75 – 75 –
2.11. Performance-Graded Binders. Provide PG binders that are smooth and homogeneous, show no separation when tested in accordance with Tex-540-C, and meet the requirements shown in Table 18.
Separation testing is not required if:
a modifier is introduced separately at the mix plant by injection in either the asphalt line or mixer, the binder is blended onsite in continuously agitated tanks, or binder acceptance is based on field samples taken from an in-line sampling port at the hot-mix plant after the addition of modifiers.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph540.pdf
Table 18 Performance-Graded Binders
Property and Test Method Performance Grade
PG 58 PG 64 PG 70 PG 76 PG 82
-22 -28 -34 -16 -22 -28 -34 -16 -22 -28 -34 -16 -22 -28 -34 -16 -22 -28
Average 7-day Max pavement design temperature, °C1 58 64 70 76 82
Min pavement design temperature, °C1 -22 -28 -34 -16 -22 -28 -34 -16 -22 -28 -34 -16 -22 -28 -34 -16 -22 -28 Original Binder
Flash point, T 48, Min, °C 230 Viscosity, T 3162, 3: 135 Max, 3.0 Pa⋅s, test temperature, °C Dynamic shear, T 3154:
58 64 70 76 82 G*/sin(δ), Min, 1.00 kPa, Max,
2.00 kPa5, Test temperature @ 10 rad/sec., °C
Elastic recovery, D6084, 50°F, % Min6 – – 30 – – 30 50 – 30 50 60 30 50 60 70 50 60 70 Rolling Thin Film Oven (RTFO) (T 240)
Mass change, T 240, Max, % 1.0 Dynamic shear, T 315
58 64 70 76 82 G*/sin(δ), Min, 2.20 kPa, Max,
5.00 kPa5, Test temperature @ 10 rad/sec., °C
MSCR, T 350, recovery, 0.1 kPa, high PG temperature, % Min6 – – 20 – – 20 30 – 20 30 40 20 30 40 50 30 40 50
Pressure Aging Vessel (PAV) Residue (R 28) PAV aging temperature, °C 100 Dynamic shear, T 315
25 22 19 28 25 22 19 28 25 22 19 28 25 22 19 28 25 22 G*.sin (δ), Max, 5,000 kPa (Max, 6,000 kPa for δ ≥42°) Test temperature @ 10 rad/sec., °C
Creep stiffness, T 3137, 8
-12 -18 -24 -6 -12 -18 -24 -6 -12 -18 -24 -6 -12 -18 -24 -6 -12 -18S, Max, 300 MPa, m-value, Min, 0.300 Test temperature @ 60 sec., °C
Direct tension, T 3148 -12 -18 -24 -6 -12 -18 -24 -6 -12 -18 -24 -6 -12 -18 -24 -6 -12 -18Failure strain, Min, 1.0%
Test temperature @ 1.0 mm/min., °C
1. Pavement temperatures are estimated from air temperatures using an algorithm contained in a Department-supplied computer program, may be provided by the Department, or may be obtained by following procedures outlined in AASHTO M 323 and R 25.
2. This requirement may be waived at the Department’s discretion if the supplier warrants that the asphalt binder can be adequately pumped, mixed, and compacted at temperatures that meet all applicable safety, environmental, and constructability requirements. At test temperatures where the binder is a Newtonian fluid, any suitable standard means of viscosity measurement may be used, including capillary (T 201 or T 202) or rotational viscometry (T 316).
3. Viscosity at 135°C is an indicator of mixing and compaction temperatures that can be expected in the lab and field. High values may indicate high mixing and compaction temperatures. Additionally, significant variation can occur from batch to batch. Contractors should be aware that variation could significantly impact their mixing and compaction operations. Contractors are therefore responsible for addressing any constructability issues that may arise.
4. For quality control of unmodified asphalt binder production, measurement of the viscosity of the original asphalt binder may be substituted for dynamic shear measurements of G*/sin (δ) at test temperatures where the asphalt is a Newtonian fluid. Any suitable standard means of viscosity measurement may be used, including capillary (T 201 or T 202) or rotational (T 316) viscometry.
5. Max values for unaged and RTFO-aged dynamic shear apply only to materials used as substitute binders, as described in Item 341, “Dense-Graded Hot-Mix Asphalt,” and Item 344, “Superpave Mixtures.”
6. Elastic recovery (D6084) is not required unless MSCR (T 350) is less than the Min % recovery. Elastic recovery will be used for the acceptance criteria in this instance.
7. Silicone beam molds, as described in AASHTO TP 1-93, are acceptable for use.
8. If creep stiffness is below 300 MPa, direct tension test is not required. If creep stiffness is between 300 and 600 MPa, the direct tension failure strain requirement can be used instead of the creep stiffness requirement. The m-value requirement must be satisfied in both cases.
3. EQUIPMENT
Provide all equipment necessary to transport, store, sample, heat, apply, and incorporate asphalts, oils, and emulsions.
4. CONSTRUCTION
4.1. Typical Material Use. Use materials shown in Table 19, unless otherwise determined by the Engineer.
Table 19 Typical Material Use
Material Application Typically Used Materials Hot-mixed, hot-laid asphalt mixtures PG binders, A-R binder Types I and II
Surface treatment
PG 58-22, AC-15P, AC-20XP, AC-10-2TR, AC-20-5TR, HFRS-2, MS-2,
CRS-2, CRS-2TR, CMS-2P, HFRS-2P, CRS-2P, CHFRS-2P, A-R binder Types II and III
Surface treatment (cool weather) AC12-5TR, RC-250, MC-800, MC-3000, CMS-2P Precoating PG 58-22, PG 64-22, SS-1, SS-1H, CSS-1, CSS-1H Tack coat PG binders, SS-1H, CSS-1H, EAP&T, TRAIL, EBL
Fog seal SS-1, SS-1H, CSS-1, CSS-1H, CSS-1H 50/50, CSS-1H 40/60, CSS-1H
30/70, CMS-1P
Hot-mixed, cold-laid asphalt mixtures AC-0.6, AC-1.5, PG 58-22, CMS-2 Patching mix MC-800, SCM I Recycling AC-0.6, AC-1.5, recycling agent, ARA-1, ARA-1P
Crack sealing Polymer-modified AE crack sealant, asphalt-rubber crack sealers (Class A, Class B)
Microsurfacing CSS-1P Prime MC-30, AE-P, AE-P 50/50, AE-P 40/60, AE-P 30/70, EAP&T, PCE Curing membrane SS-1, SS-1H, CSS-1, CSS-1H, PCE Erosion control SS-1, SS-1H, CSS-1, CSS-1H, PCE FDR-foaming PG 64-22, FDR EM-SY, FDR EM-HY
4.2. Storage and Application Temperatures. Use storage and application temperatures in accordance with Table 20. Store and apply materials at the lowest temperature yielding satisfactory results. Follow the manufacturer’s instructions for any agitation requirements in storage. Manufacturer’s instructions regarding recommended application and storage temperatures supersede those shown in Table 19.
Table 20 Storage and Application Temperatures
Type-Grade Application Storage
Max (°F)
Recommended Range (°F)
Max Allowable (°F)
AC-0.6, AC-1.5 200–300 350 350
AC-15P, AC-20-5TR, AC12-5TR, and AC10-2TR 300–375 375 360
RC-250 125–180 200 200
MC-30, AE-P 70–150 175 175
MC-800, SCM I 175–260 275 275
MC-3000 225–275 290 290
HFRS-2, MS-2, CRS-2, HFRS-2P, CRS-2P, CMS-2,
CRS-2TR 120–160 180 180
SS-1, SS-1H, CSS-1, CSS-1H, PCE, EAP&T, CSS-1P,
recycling agent, emulsified recycling agent, polymer-modified AE crack sealant
50–130 140 140
PG binders 275–350 350 350 Asphalt-rubber crack sealers (Class A, Class B) 350–375 400 – A-R binder Types I, II, and III 325–425 425 425
5. MEASUREMENT AND PAYMENT
The work performed, materials furnished, equipment, labor, tools, and incidentals will not be measured or paid for directly, but will be subsidiary to or are included in payment for other pertinent Items.
Item 316
Seal Coat
1. DESCRIPTION
Construct a surface treatment consisting of one or more applications of a single layer of asphalt material covered with a single layer of aggregate.
2. MATERIALS
Furnish materials of the type and grade shown on the plans in accordance with the following:
2.1. Asphalt. Furnish asphalt materials meeting the requirements of Item 300, “Asphalts, Oils, and Emulsions.”
Furnish Type II or Type III A-R binder in accordance with Section 300.2.9., “Asphalt-Rubber Binders,” as shown on the plans. Furnish a blend design for approval. Include in the design, at a minimum, the following:
manufacturer and grade of asphalt cement;
manufacturer and grade of crumb rubber;
manufacturer, type, and percentage of extender oil, if used;
test report on crumb rubber gradation in accordance with Tex-200-F, Part I;
design percentage of crumb rubber versus asphalt content;
blending temperature; and test results on the properties at reaction times of 60, 90, 240, 360, and 1,440 min. in accordance with
Section 300.2.9., “Asphalt-Rubber Binders.”
Furnish a new asphalt-rubber blend design if the grade or source for any of the components changes.
If a tack coat is specified when using asphalt-rubber, unless otherwise shown on the plans or approved, furnish CSS-1H, SS-1H, or a performance grade (PG) binder with a minimum high temperature grade of PG 58 for tack coat binder. Do not dilute emulsified asphalts at the terminal, in the field, or at any other location before use. If required, verify that emulsified asphalt proposed for use meets the minimum residual asphalt percentage specified in Item 300, “Asphalts, Oils, and Emulsions.”
2.2. Aggregate. Furnish aggregate meeting Item 302, “Aggregates for Surface Treatments,” of the type and grade shown on the plans. Unless otherwise shown on the plans, furnish aggregate with a minimum B Surface Aggregate Classification.
2.3. Materials Selections. Furnish asphalt and aggregate shown on the plans.
3. EQUIPMENT
3.1. Distributor. Furnish a distributor that will apply the asphalt material uniformly at the specified rate or as directed.
3.1.1. Transverse Variable Rate. When a transverse variable rate is shown on the plans, ensure that the nozzles outside the wheel paths will output a predetermined percentage more asphalt material by volume than the nozzles over the wheel paths. Use a dual spray bar distributor as desired to provide for a transverse variable rate.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit200.pdf
3.1.2. Agitation for Asphalt-Rubber. If using asphalt-rubber, furnish a distributor capable of keeping the rubber in uniform suspension and adequately mixing the asphalt, rubber, and any additional additives.
3.1.3. Calibration.
3.1.3.1. Transverse Distribution. Furnish a distributor test report, less than 1 yr. old, when tested in accordance with Tex-922-K, Part III. The Department reserves the right to witness the calibration testing. Notify the Engineer 3 days before calibration testing.
Include the following documentation on the test report:
the serial number of the distributor, a method that identifies the actual nozzle set used in the test, and the fan width of the nozzle set at a 12-in. bar height.
When a transverse variable rate is required, and a single spray bar is to be used, perform the test using the type and grade of asphalt material to be used on the project. The Engineer may verify the transverse rate and distribution at any time. If verification does not meet the requirements, correct deficiencies and furnish a new test report.
3.1.3.2. Tank Volume. Furnish a volumetric calibration and strap stick for the distributor tank in accordance with Tex-922-K, Part I.
Provide documentation of distributor calibration performed not more than 5 yr. before the date first used on the project. The Engineer may verify calibration accuracy in accordance with Tex-922-K, Part II.
3.1.4. Computerized Distributor. When paying for asphalt material by weight, the Engineer may allow use of the computerized distributor display to verify application rates. Verify application rate accuracy at a frequency acceptable to the Engineer.
3.2. Aggregate Spreader. Use a continuous-feed, self-propelled spreader to apply aggregate uniformly at the specified rate or as directed. If racked in aggregate is specified on the plans, furnish a second aggregate spreader for the racked in aggregate to apply aggregate uniformly at the specified rate.
3.3. Rollers. Unless otherwise shown on the plans, furnish light pneumatic-tire rollers in accordance with Item 210, “Rolling.”
3.4. Broom. Furnish rotary, self-propelled brooms.
3.5. Asphalt Storage and Handling Equipment. When the plans or the Engineer allows storage tanks, furnish a thermometer in each tank to indicate the asphalt temperature continuously. Keep equipment clean and free of leaks. Keep asphalt material free of contamination.
3.6. Aggregate Haul Trucks. Unless otherwise approved, use trucks of uniform capacity to deliver the aggregate. Provide documentation showing measurements and calculation in cubic yards. Clearly mark the calibrated level. Truck size may be limited when shown on the plans.
3.7. Digital Distance Measuring Instrument. Furnish a vehicle with a calibrated digital distance measuring instrument accurate to ±6 ft. per mile.
4. CONSTRUCTION
4.1. General. Comply with the seal coat season as shown on the plans. Asphalt and aggregate rates shown on the plans are for estimating purposes only. Adjust the rates for existing conditions as directed.
http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/900-K_series/pdfs/cal922.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/900-K_series/pdfs/cal922.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/900-K_series/pdfs/cal922.pdf
4.2. Temporary Aggregate Stockpiles. The Engineer will approve the location of temporary aggregate stockpiles on…