Gage Elementary School Community Resource Room Remodel Project Manual

This is a comprehensive project manual for Rochester Public Schools ISD #535 in Rochester, Minnesota, detailing a remodeling project for Gage Elementary School's Community Resource Room. The project involves approximately 1,700 square feet of interior space renovation to create teaching kitchen stations and additional community resource room space. Work scope includes selective demolition, concrete slab cutting and patching, underground plumbing, light gauge metal framing with gypsum board, resilient and carpet tile flooring, custom casework, acoustical ceilings, and modifications to HVAC, plumbing, fire suppression, electrical, and low-voltage systems. The project manual contains detailed specifications across multiple divisions covering concrete work, masonry, metals, carpentry, countertops, casework, thermal insulation, sheet metal flashing, gypsum board, acoustic ceilings, flooring systems, wall coverings, painting, and visual display surfaces. The bid date is March 31, 2026, at 2:00 PM Central Time through the Rochester Public Schools Bonfire E-Procurement Platform. A mandatory pre-bid conference and site tour is scheduled for March 17, 2026, at 2:30 PM at the school location. The estimated Notice to Proceed is April 22, 2026, with construction start on June 8, 2026, and substantial completion targeted for August 7, 2026, with final completion by August 14, 2026. Rochester Public Schools Bid Number is 033126.

Bid security in the form of a surety bid bond, cashier's check, or certified check is required in an amount not less than ten percent of the maximum base bid for bids over $25,000. The successful bidder must furnish performance and payment bonds each in the full amount of the contract. Minnesota prevailing wage statutes apply to this work. The Contractor must comply with Minnesota State Statute 16C.285 and submit the Responsible Contractor Act Verification Form with the bid. Contractors are responsible for obtaining copies of construction documents through the online procurement portal or through printing services such as Franz Reprographics, Rochester Builders Exchange, and Minnesota Builders Exchange. The Owner reserves the right to reject any or all bids, accept any bid deemed in the Owner's best interest, and waive any irregularities. No liquidated damages are specified in the contract documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

RPS GAGE ELEMENTARY SCHOOL

COMMUNITY RESOURCE ROOM

ROCHESTER PUBLIC SCHOOLS – ISD #535

ROCHESTER, MINNESOTA

CRW PROJECT #25-018

March 10, 2026

CRW #25-018 00 01 05 – 1 Certifications RPS Gage ES Community Resource Room Remodel

SECTION 00 01 05

CERTIFICATION

Project Date: March 10, 2026

Project Title: Gage Elementary School Community Resource Room Rochester Public Schools – ISD #535 Rochester, Minnesota

Architect’s Project Number: 25-018

ARCHITECT:

I hereby certify that this plan, specification or report was prepared by me, or under my direct supervision, and that I am a duly licensed architect under the laws of the State of Minnesota.

Jason G. Woodhouse, AIA, #44421 Date

MECHANICAL ENGINEER:

I hereby certify that this plan, specification or report was prepared by me, or under my direct supervision, and that I am a duly licensed professional engineer under the laws of the State of Minnesota.

Steve Harmon, PE, #23501 Date

ELECTRICAL ENGINEER:

I hereby certify that this plan, specification or report was prepared by me, or under my direct supervision, and that I am a duly licensed professional engineer under the laws of the State of Minnesota.

Dustin D. Mueller, PE, #52622 Date

3/9/26

3/9/26

3/9/2026

CRW #25-018

00 01 10 – 1 Table of Contents

SECTION 00 01 10

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

00 01 01 Title Page 00 01 05 Certification 00 01 10 Table of Contents 00 01 13 Project Data

PROCUREMENT REQUIREMENTS

00 11 00 Advertisement for Bids 00 21 00 Instructions to Bidders 00 41 00 Bid Form 00 41 00 Responsible Contractor Form 00 72 63 General Conditions

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 23 00 Alternates 01 25 00 Substitution Procedures 01 29 00 Payment Procedures 01 31 19 Project Meetings 01 33 19 Field Testing Reports 01 33 21 Submittals and Reports 01 33 23 Shop Drawings 01 33 23 Shop Drawings – Electronic File Release Form 01 40 00 Quality Requirements 01 45 33 Code Required Special Inspections 01 62 00 Product Options 01 74 00 Cleaning and Waste Management 01 77 00 Closeout Procedures 01 78 23 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS

02 41 19 Selective Demolition

DIVISION 03 - CONCRETE

03 11 00 Concrete Forming 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete

DIVISION 04 - MASONRY

04 05 13 Masonry Mortaring 04 20 00 Unit Masonry

00 01 10 – 2 Table of Contents

DIVISION 05 - METALS

05 50 00 Metal Fabrications

DIVISION 06 - WOOD AND PLASTIC

06 10 53 Miscellaneous Rough Carpentry 06 20 00 Finish Carpentry 06 41 00 Countertops 06 41 10 Custom Casework 06 61 10 Solid Polymer Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 00 Thermal Insulation 07 62 00 Sheet Metal Flashing and Trim 07 84 00 Firestopping 07 92 00 Joint Sealants

DIVISION 08 - OPENINGS, WINDOWS AND GLASS

08 11 13 Hollow Metal Doors and Frames 08 14 00 Wood Doors 08 31 00 Access Doors and Panels 08 71 00 Door Hardware 08 80 00 Glazing

DIVISION 09 - FINISHES

09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 51 23 Acoustical Tile Ceilings 09 65 13 Resilient Base and Accessories 09 65 19 Resilient Tile Flooring 09 68 13 Tile Carpeting 09 72 00 Wall Coverings 09 91 00 Painting

DIVISION 10 - SPECIALTIES

10 11 00 Visual Display Surfaces 10 14 00 Interior Signage 10 26 00 Stainless Steel Corner Guards

DIVISION 11 - EQUIPMENT

NOT USED

00 01 10 – 3 Table of Contents

DIVISION 12 - FURNISHINGS

12 24 00 Chain and Clutch Roller Shades 12 32 00 Manufactured Laminate Clad Casework

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14 - CONVEYING SYSTEMS

DIVISION 21 - FIRE SUPPRESION

21 05 00 Common Work Results For Fire Suppression 21 05 29 Hangers and Supports for Fire Suppression Piping and Equipment 21 05 53 Identification for Fire Suppression Piping and Equipment 21 13 00 Fire Suppression Sprinkler Systems

DIVISION 22 - PLUMBING

22 05 00 Common Work Results for Plumbing 22 05 23 General-Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 10 05 Plumbing Piping 22 10 06 Plumbing Piping Specialties 22 40 00 Plumbing Fixtures

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 05 00 Common Work Results for HVAC 23 05 13 Common Motor Requirements for HVAC Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing of Systems 23 07 13 Duct Insulation 23 09 93 Sequence of Operations for HVAC Controls 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories 23 34 23 HVAC Power Ventilators 23 37 00 Air Outlets and Inlets

DIVISION 26 - ELECTRICAL

00 01 10 – 4 Table of Contents

26 05 00 Common Work Results for Electrical Communications and Electronic Safety and Security 26 05 05 Selective Demolition and Remodeling 26 05 10 Temporary Construction Lighting and Power 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 29 Hangers and Supports for Electrical Systems 26 05 33.13 Conduit for Electrical Systems 26 05 33.16 Boxes for Electrical Systems 26 05 83 Wiring Connections 26 09 23 Lighting Control Devices 26 27 26 Wiring Devices 26 51 00 Interior Lighting

DIVISION 27 - COMMUNICATIONS

SEE DRAWINGS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SEE DRAWINGS

DIVISION 31 - EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

DIVISION 33 - UTILITIES

CRW #25-018 00 01 13 – 1 Project Data

SECTION 00 01 13

PROJECT DATA

Project Date: March 10, 2026

Rochester Public Schools – ISD #535 Rochester, Minnesota

Architect’s Project Number: 25-018

Project Contact Information:

Owner:

Rochester Public Schools Construction Services Department 3935 Highway 14 East Rochester, Minnesota 55904 507.328.4508 Contact: Bill Burt Email: bburt@rochesterschools.org

Mechanical Engineer:

Dunham 421 First Ave SW, Suite 201W Rochester, MN 55902 612.465.7273 Contact: Steve Harmon, PE Email: steve.harmon@dunhameng.com

Structural Engineer:

SEH, Inc 421 First Ave SW, Suite 201W Rochester, MN 55902 507.316.6648 Contact: Benjamin Wolfe, PE Email: bwolf@sehinc.com

Architect:

CRW Architecture + Design Group 211 11th Ave NW Rochester, Minnesota 55901 507.206.6201 Contact: Jason Woodhouse, AIA, LEED AP Email: jwoodhouse@crwarchitecture.com

Electrical Engineer:

Dunham 421 First Ave SW, Suite 201W Rochester, MN 55902 507.424.6855 Contact: Dustin D. Mueller, PE Email: dustin.mueller@dunhameng.com mailto:bburt@rochesterschools.org mailto:steve.harmon@dunhameng.com mailto:jwoodhouse@crwarchitecture.com mailto:dustin.mueller@dunhameng.com

RPS Gage ES Community Resource Room Remodel

00 11 00 – 1 Advertisement for Bids

SECTION 00 11 00

ADVERTISEMENT FOR BIDS

1.01 PROJECT IDENTIFICATION

A. Rochester Public Schools, Independent School District No. 535, will receive bids from qualified contractors on a single Prime Contract for the Rochester Public School’s Gage Elementary School Community Resource Room Remodel, 1300 40th St NW, Rochester, Minnesota, in accordance with the plans and specifications prepared by CRW architecture + design group.

B. Rochester Public Schools Bid Number: 033126

1.02 PROJECT DESCRIPTION

A. The project consists of remodeling of approximately 1.700 square feet of interior space to create teaching kitchen stations along with additional community resource room space.

Work involves selective demolition of existing construction and new construction including concrete slab cutting and patching, underground plumbing, light gauge metal walls with gypsum board, flooring, casework, ACT ceilings, along with modifications to HVAC, plumbing, fire suppression, electrical and low voltage systems.

1.03 TYPE OF BIDS

A. Bidders shall be submitting a Base Bid for the Work described in the Bidding Documents.

A single prime contract will be awarded for work based on Bid Amount and Qualifications.

1.04 BID DATE

A. Day/Date: March 31, 2026 at 2:00 PM (local time)

1.05 DELIVERY AND OPENING OF BIDS

A. All Bids must be submitted through the Rochester Public Schools online Bonfire E-

Procurement Platform at https://rochesterschools.bonfirehub.com

B. Bids will be opened and read aloud on the below virtual meeting link or call in number.

Bids received after 2:00 PM in the Bonfire E-Procurement Platform will not be accepted or opened.

RPS Gage Elementary School Community Resource Room Remodel - Bid Opening Date: Tuesday, March 31

Time: 2:00 – 2:30 PM (Central Time)

Google Meet joining info: Video call link: https://meet.google.com/sdq-dxjs-hxa

Or dial: 3028-271-(US) +1 832 PIN: 816 966 317#

More phone numbers: https://tel.meet/sdq-dxjs-hxa?pin=2787965612087

00 11 00 – 2 Advertisement for Bids

C. Contact Tanner Sorenson at Rochester Public Schools at tasorensen@rochesterschools.org or 507.328.4410 with any questions on the Bonfire E- Procurement Platform site.

1.06 BID BONDS AND SECURITY

A. The bid shall be accompanied by bid security in the form of a surety bid bond, cashier’s check or certified check, drawn on a state or national bank domiciled within the State of Minnesota in an amount not less than ten percent (10%) of the maximum base bid submitted, payable without condition to the Owner as a guarantee that the bidder will promptly enter into a contract with the Owner for the work described and that they will furnish a bond to the Owner covering payment and performance of the contract. Bids under $25,000 will not require a bid security.

1.07 PAYMENT AND PERFORMANCE BONDS

A. The successful bidder will be required to furnish and pay for a “Performance Bond” and

“Labor and Materials Payment Bond” each in the full amount of the contract by a surety (or sureties) approved by the Owner. The cost of the bonds shall be included in the lump sum pricing.

1.08 BID WAIVER

A. Bids may not be withdrawn within ninety (90) days after the scheduled closing time for receiving bids. Rochester Public Schools, Independent School District 535, reserves the right to reject any or all bids and to waive any irregularities within the bids.

1.09 WAGE DETERMINATION REQUIREMENTS

A. Minnesota prevailing wage statutes do apply to this work.

1.10 RESPONSIBLE CONTRACTOR ACT VERFICATION FORM

A. Per Minnesota State Statute 16C.285, the Vendor shall complete the endorsed form verifying compliance with the minimum responsibility requirements in the statute. Submit completed form with the bid.

B. The Responsible Contractor Act Verification Form is enclosed with the bid form.

1.11 PROCUREMENT OF DOCUMENTS BY BIDDERS

A. Bidding documents will be ready for viewing beginning on March 10, 2026.

B. Drawings, specifications, and other contract documents may be viewed and downloaded by going to the Rochester Public Schools online procurement portal at https://rochesterschools.bonfirehub.com . If this is your first time on the Rochester Public Schools online procurement portal you will need to register and retain your login information for future access.

C. Bidders/Contractors are responsible for obtaining copies of the construction documents for bidding and construction and any costs incurred therein.

00 11 00 – 3 Advertisement for Bids

D. Bid Documents are made available only for the purpose of obtaining offers for this project.

Their use does not grant a license for other purposes.

E. Bid Notices, Bid Addenda, and Bid Documents for this project will be distributed by Rochester Public Schools through their online procurement portal with the Bonfire e-procurement platform.

F. The issuance of this Advertisement for bids is not a license to incur reimbursable expenses by the bidder(s) to seek, prepare or submit their bid. No fees or expenses associated with providing bids will be paid to any contractor submitting a bid by the Owner, Architect or Engineer.

G. Bid Documents, Bid Notices and Bid Addenda for this project will also be available at:

1. The online procurement portal at https://rochesterschools.bonfirehub.com

H. Questions regarding design and technical specifications must be submitted through online procurement portal with the Bonfire e-procurement platform.

1.12 PRE-BID CONFERENCE AND TOUR OF PROJECT SITES

A. A pre-bid conference is scheduled for March 17, 2026 at 2:30 pm starting at Rochester Public Schools Gage Elementary School, 1300 40th St NW, Rochester, MN 55901. Prime Bidders are strongly encourage to attend. Direct any communications to CRW architecture + design group, 507-206-6201.

1.13 TIME OF COMMENCEMENT

A. Bids will be reviewed and Work shall commence upon receipt of a Notice to Proceed.

Estimated date of Notice to Proceed is April 22, 2026 to allow for material procurement.

B. The contractor will have full access to the project site no later than June 8, 2026 to begin construction.

1.14 TIME OF COMPLETION

A. Tentative Board Approval: April 21, 2026

B. Tentative Notice to Proceed: April 22, 2026

C. Tentative Construction Start: June 8, 2026

D. Substantial Completion: August 7, 2026

E. Final Completion: August 14, 2026

1.15 OWNER’S RIGHTS

A. The Owner reserves the right to reject any and all bids, accept any bid it deems to be in its best interest, to waive informalities or irregularities in bids submitted, and waive minor irregularities or discrepancies in quote procedure.

END OF SECTION

CRW #25-018 00 21 00 – Page 1 of 6 Instructions to Bidders

SECTION 00 21 00

INSTRUCTIONS TO BIDDERS

PART 1 GENERAL

1.01 BID INFORMATION

A. Bids will be received by the Owner at the time, date, and place stated in the

Advertisement for Bids, Section 00 11 00.

B. Bid requirements:

1. Bids shall be made upon forms provided in the Contract Documents or identical reproduction thereof.

2. All information requested shall be provided and all blanks filled in by typing or manually in ink.

a. Bid amounts shall be stated in words and numerals with the written word governing in case of discrepancies.

b. All requested alternates shall be bid. If "no change" is the intent for an alternate it shall be so stated on the form.

3. Bids which are signed by others than individuals making them should have attached thereto Power of Attorney evidencing authority to sign the bid in the name of their person for whom it is signed.

4. Bids which are signed for a partnership should be signed in the firm name by at least one of the partners, or if by another party, there should be attached to the bid a Power of Attorney evidencing authority to sign the bid for the partners.

5. If bids are signed for a corporation or any other legal entity, evidence of authority of person signing for such legal entity should be attached to the bid.

C. Submit bids in a sealed envelope with Contractor's name and address and Project name clearly written or typed on envelope front.

D. Bid Opening:

1. Proposals will be opened publicly and read aloud.

2. Proposals received after the time set for receiving bids will not be accepted.

3. No telephone, faxed or emailed bids will be accepted.

4. After opening of bids, no bid or any part thereof, shall be modified, withdrawn or canceled for the next 60 days. The Owner reserves the right to accept or reject any or all bids and to waive any informalities or irregularities in the bid process.

5. Modified or withdrawn proposal confirmation letter postmark must be an official post office postmark. A stamp machine date is not acceptable.

1.02 BID SECURITY

A. Each proposal shall be accompanied by bid security in the form of a surety bid bond, cashier’s check or certified check, drawn on a state or national bank domiciled within the State of Minnesota in an amount not less than ten percent (10%) of the maximum base bid submitted, payable without condition to the Owner as a guarantee that the bidder will enter into a contract with the Owner for the work described.

CRW #25-018 00 21 00 – Page 2 of 6 Instructions to Bidders

Resource Room Remodel

B. The successful bidder's security will be retained by the Owner until bidder has provided a properly executed contract and required performance and payment bonds. The Owner reserves the right to retain the bid security of the next two contending bidders in each work category until the selected bidder enters into contract with the Owner or until the proposal expiration time set in the invitation to bid, whichever is shorter. All other bid security will be returned as soon as is practical.

C. If any bidder refuses or fails to execute and deliver the contract and bonds required within ten days after he/she received notice of acceptance of his/her proposal, the Owner will retain his/her bid security as liquidated damages, but not as a penalty.

1.03 BONDS

A. The successful bidder will be required to furnish and pay for a "Performance Bond" and

"Labor and Materials Payment Bond" each in the full amount of the contract by a surety (or sureties) approved by the Owner.

1.04 BASIS FOR AWARD OF CONTRACT

A. Owner Considerations

1. The Owner reserves the right to reject any or all proposals and to waive irregularities.

2. The Owner reserves the right to accept any bid deemed to be in the best interest of the Owner.

3. In the event the proposal of the lowest responsible bid exceeds available funds for the project, the Owner may request additional alternates to reduce the total cost of the project to an amount acceptable to the Owner.

4. It is the Owner's intent to encourage the use of local labor and material suppliers on this project. Therefore, when requested on the Bid Form, all bids must be accompanied by a list of major subcontractors and suppliers included in the bid proposal for the project. This list will be used in conjunction with the bid as a basis for award of the contract.

1.05 PROJECT SCHEDULE

A. The starting date for construction shall be: Refer to Section 00 11 00.

B. This project shall be substantially complete by: Refer to Section 00 11 00.

C. Liquidated Damages: N/A

D. An extension of this completion time shall be allowed only by written approval (or by

Change Order) of the Owner and Architect.

1.06 EXAMINATION OF DOCUMENTS

A. Drawings, specifications, and other contract documents will be distributed beginning

April 9, 2024. It is the Prime Contractor’s responsibility to distribute as needed for subcontractor bidding.

CRW #25-018 00 21 00 – Page 3 of 6 Instructions to Bidders

B. Questions regarding design and technical specifications may be addressed to CRW

Architecture + Design Group. See Section 00 01 13 for contact information.

1.07 PROCUREMENT OF DOCUMENTS BY BIDDERS

A. Bid Documents, Bid Notices and Bid Addenda for this project will be available at:

1. Franz Reprographics, 507.287.1090, www.franzrepro.com

2. Rochester Builders Exchange, 507.282.6531, www.bexroch.com

3. Minnesota Builders Exchange, 612.381.2620, www.mbex.org

4. LaCrosse Builders Exchange, 608.781.1819, www.laxbx.com

B. Bidders/Contractors are responsible for obtaining copies of the construction documents for bids and construction, and for any costs incurred therein.

C. Bid Documents are made available only for the purpose of obtaining offers for this project. Their use does not grant a license for other purposes.

D. Bid Notices, Bid Addendums, and Electronic Downloads for this project will be distributed by Franz Reprographics.

E. The issuance of this Advertisement for Bids is not a license to incur reimbursable expenses by the bidder(s) to seek, prepare or submit their bid (proposal). No fees or expenses associated with providing bids will be paid to any contractor submitting a bid by the Owner, Architect or Engineer.

1.08 DEFINITIONS

A. Project, Owner, Architect, Engineers and Consultants as used in these documents shall be the same as stated on the "PROJECT DATA" sheet near the front of this Project Manual.

B. “Provide”: Under this contract, Contractor shall furnish and install item or system specified. Contractor shall perform all labor and furnish all materials and equipment necessary so that the item or system will be complete and operational in every respect.

C. “Furnish”: Under this contract, Contractor shall deliver to the site, unload and properly store item(s) specified, as well as additional specialized materials and/or accessories necessary for the use and operation of item(s) specified.

D. “Install”: Under this contract, Contractor shall uncrate, set in position, connect (including sub-assemblies furnished) and adjust for use. Contractor shall provide miscellaneous specialty items such as fasteners, hangars, valves, unions, piping, sheet metal, etc., as obviously necessary for a complete and operating installation.

1.09 EXAMINATION OF DOCUMENTS AND SITE OF WORK

A. Before submitting a bid, each contractor shall examine the Drawings carefully, shall read the Specifications and all other proposed Contract Documents, and shall visit the site of the work. Each contractor shall fully inform him/herself prior to submitting a bid as to http://www.franzrepro.com/ http://www.bexroch.com/ http://www.mbex.org/ http://www.laxbx.com/

CRW #25-018 00 21 00 – Page 4 of 6 Instructions to Bidders

Resource Room Remodel existing conditions and limitations under which the work is to be performed, and shall include in his/her bid a sum to cover the cost of items necessary to perform the work as set forth in the proposed contract documents. No allowance for extra compensation will be made to a contractor because of lack of such examination or knowledge. The submission of a bid will be considered conclusive evidence that the contractor has become fully informed of all such conditions and limitations.

B. These Specifications as a whole are an integral part of the Bid Documents. Items of work shown on the Drawings, but not described herein, shall become part of these specifications and vice versa. It is further to be understood that materials and finishes specified shall be furnished and applied on all similar portions of the building, whether they are specifically described on each corresponding detail or not.

C. Contractors are expected to base their bids on materials and equipment complying fully with the Bid Documents. In the event a contractor figures their bid with materials or equipment, which do not conform, the contractors will be responsible for furnishing materials and equipment, which fully conform at no change in his/her bid price.

1.10 PRE-QUOTE CONFERENCE AND TOUR OF PROJECT SITE

A. Refer to Section 00 11 00

1.11 QUESTIONS, INTERPRETATIONS OF DOCUMENTS

A. Submit all questions about the Contract Documents immediately to the Architect in writing. Discrepancies, ambiguities and omissions will be clarified by written addenda issued to all bidders of record and will become a part of the contract. The Architect and Owner will not be responsible for oral instructions. No Addenda will be issued later than 48 hours prior to the time set for receipt of proposals.

1. Failure of a bidder to receive any addendum shall not release the bidder from any obligations under his/her proposal, provided addendum was sent by U.S.

mail to the address furnished by the bidder for transmittal of U.S. mail.

2. In the event that such conflicts are not reported, or such clarifications, interpretations or decisions are not given, the most stringent (or most costly) course of action shall be followed unless otherwise agreed in writing with the Architect and Owner.

B. Construction and work shown or indicated on one Contract Document and not shown or indicated on any other document shall be provided the same as if shown or indicated on all Documents.

C. See Section 00 72 63 - General Conditions for additional information regarding Contract

Document interpretation.

1.12 SUBMITTAL OF BIDS

A. Bid requirements:

1. Bids shall be made upon forms provided in the Contract Documents or identical reproduction thereof.

2. All information requested shall be provided and all blanks filled in by typing or manually in ink.

CRW #25-018 00 21 00 – Page 5 of 6 Instructions to Bidders

Resource Room Remodel

a. Bid amounts shall be stated in words and numerals with the written word governing in case of discrepancies.

b. All requested alternates shall be bid. If "no change" is the intent for an alternate it shall be so stated on the form.

3. Bid which are signed by others than individuals making them should have attached thereto Power of Attorney evidencing authority to sign the bid in the name of their person for whom it is signed.

4. Bids which are signed for a partnership should be signed in the firm name by at least one of the partners, or if by another party, there should be attached to the bid a Power of Attorney evidencing authority to sign the bid for the partners.

5. If bids are signed for a corporation or any other legal entity, evidence of authority of person signing for such legal entity should be attached to the bid.

B. Submit bids in a sealed envelope with Contractor's name and address and Project name clearly written or typed on envelope front.

1.13 PRODUCT OPTIONS

A. Materials, equipment, methods and services required by the Specifications establish the required standard of quality, function, dimension and appearance. Proprietary items are specified which have been proven by evidence satisfactory to the Architect to meet the required standard.

1. The Contractor's quotes shall be based only on products and systems specified in the Contract Documents.

1.14 SUBSTITUTION PROPOSALS

A. Substitution Proposals: Submit a separate written request of each Product, supported with a complete description of the proposed substitution, including product data, drawings, performance and test data and samples as appropriate, and with the following information:

1. Comparison of the qualities of the proposed substitution with those of the product specified.

2. Changes required in other components of the work because of the substitution.

3. Effect on the construction schedule and on the Contract Sum.

4. Cost data comparing the proposed substitution with the Product specified, and including incidental cost of modification to related work.

5. License fees or royalties, if applicable.

6. Availability of maintenance service and source of replacement materials.

B. The decision of the Architect's approval or disapproval of a proposed substitution shall be final.

C. Any additional cost in other work incurred as a result of a substitution proposed by a Contractor shall be borne by the Contractor, including all costs for modifying other related materials and the cost of any additional engineering or architectural design required to accommodate the substitution.

1.15 FORMS REQUIRED

CRW #25-018 00 21 00 – Page 6 of 6 Instructions to Bidders

Resource Room Remodel

A. The following is a list of standard American Institute of Architect's (AIA) forms which may be required for use during construction of this Project.

A-101 "Owner-Contractor Agreement/Stipulated Sum" A-311 "Performance, Labor and Material Payment Bond" G-701 "Change Order" G-702 and G-702A "Application and Certificate for Payment" (latest edition) G-704 "Certificate of Substantial Completion" CHIC-701 "Certificate of Insurance" or G-705 "Certificate of Insurance" G-706 "Contractor's Affidavit or Release of Liens" and "Payment of Debts and Claims" G-707 "Consent of Surety Company to Final Payment" G-708 "Architect's Field Order"

All above forms to be furnished by Contractor except A-101, G-701, G-704, and G-708.

1.16 COMPLIANCE WITH HUMAN RIGHTS LAW

A. Prior to receiving a contract, the selected bidder will be required to submit a copy of a valid certificate or submit a copy of the application for a "Certificate of Compliance" issued by the Minnesota State Department of Human Rights, testifying that the bidder is in compliance with the Minnesota Statutes and their latest amendments.

1.17 WAGE DETERMINATIONS

A. Minnesota prevailing wage statutes do apply to this Work.

1.18 RESPONSIBLE CONTRACTOR ACT VERFICATION FORM

A. Refer to Section 00 11 00

CRW #25-018 00 41 00 – Page 1 of 2 Bid Form

SECTION 00 41 00

BID FORM

Rochester, Minnesota

Architect’s Project Number: 25-018 Rochester Public School’s Bid Number: 043024

Bid Time (Central Standard Time): 2:00 P.M.

Bid Date: March 31, 2026

Deliver To:

Rochester Public Schools Construction Services Department Attn: Tanner Sorensen 3935 Highway 14 East Rochester, Minnesota 55904

Architect:

CRW Architecture + Design Group 211 11th Avenue Northwest Rochester, Minnesota 55901

From: ________________________________________________________ (Company Name)

Addenda:

I have received the following Addenda and have included their provisions in my bid:

Addendum No.______ Dated: _____________

Addendum No.______ Dated: _____________

Addendum No.______ Dated: _____________

Addendum No.______ Dated: _____________

Base Proposal:

I (the undersigned) have examined the site where the work is to be executed and become familiar with local conditions affecting the cost of the work. I have carefully examined all the contract documents, including the "Invitation to Bid", "Instruction to Bidders", "General Conditions", "Supplementary General Conditions", Division 01 - General Requirements, the Drawings, Specifications and Addenda thereto. I propose and agree to provide all labor, materials, plant equipment, transportation and facilities necessary for the complete and satisfactory execution of the general construction work for the Base Bid sum of:

Base Bid: ____________________________________________________________________

_______________________________________________ Dollars ($____________________ )

CRW #25-018 00 41 00 – Page 2 of 2 Bid Form

Acknowledgements:

In submitting this Bid Proposal, I agree:

1. To hold this Bid open for 60 days.

2. To enter into and execute a contract, if awarded, on the basis of this Bid.

3. To accomplish work in accord with the Contract Documents and guarantee the work for one year in accordance with the "General Conditions"

4. To accept the provisions for progress payments and retainage of payments as stated in the General Conditions.

5. To complete the Project by the completion date.

6. I have attached the Responsible Contractor Verification Form

Company Name: ______________________________________________________________

By: _________________________________________________________________________

Title: ________________________________________________________________________

By: _________________________________________________________________________

Title: ________________________________________________________________________

(Affix seal if corporation)

Official Address: __________________________________________________________ Address

City State Zip

Phone: __________________________

RESPONSIBLE CONTRACTOR ACT VERIFICATION

The undersigned owner/officer of (“Company”) hereby certifies that it complies with each of the minimum criteria in Minn. Stat. § 16C.285, subd. 3, as of the time of the submission of its bid for the above-referenced project (“Project”).

The first-tier Subcontractors that Company intends to retain for work on the Project are:

The first-tier Subcontractors listed above have provided verification required by Minn. Stat.§ 16C.285, subd. 3(7).

The remaining first-tier subcontractors that Company intends to retain for work on the Project have not yet been determined. Company will obtain and submit signed verifications from each of its subsequently retained subcontractors, confirming compliance with Minn. Stat. § 16C.285, subd. 3, within 14 days of retaining the subcontractors.

Dated: Company:

By:

Its:

Owner/Officer

Subscribed and sworn to before me this day of , 20 .

Notary Public

Executive Order 12549--Debarment and suspension

Source: The provisions of Executive Order 12549 of Feb. 18, 1986, appear at 51 FR 6370, 3

CFR, 1986 Comp., p. 189, unless otherwise noted.

By the authority vested in me as President by the Constitution and laws of the United States of

America, and in order to curb fraud, waste, and abuse in Federal programs, increase agency accountability, and ensure consistency among agency regulations concerning debarment and suspension of participants in Federal programs, it is hereby ordered that:

Section 1. (a) To the extent permitted by law and subject to the limitations in Section 1(c), Executive departments and agencies shall participate in a system for debarment and suspension from programs and activities involving Federal financial and nonfinancial assistance and benefits. Debarment or suspension of a participant in a program by one agency shall have government-wide effect.

(b) Activities covered by this Order include but are not limited to: grants, cooperative agreements, contracts of assistance, loans, and loan guarantees.

(c) This Order does not cover procurement programs and activities, direct Federal statutory entitlements or mandatory awards, direct awards to foreign governments or public international organizations, benefits to an individual as a personal entitlement, or Federal employment.

Sec. 2. To the extent permitted by law, Executive departments and agencies shall:

(a) Follow government-wide criteria and government-wide minimum due process procedures when they act to debar or suspend participants in affected programs.

(b) Send to the agency designated pursuant to Section 5 identifying information concerning debarred and suspended participants in affected programs, participants who have agreed to exclusion from participation, and participants declared ineligible under applicable law, including

Executive Orders. This information shall be included in the list to be maintained pursuant to

Section 5.

(c) Not allow a party to participate in any affected program if any Executive department or agency has debarred, suspended, or otherwise excluded (to the extent specified in the exclusion agreement) that party from participation in an affected program. An agency may grant an exception permitting a debarred, suspended, or excluded party to participate in a particular transaction upon a written determination by the agency head or authorized designee stating the reason(s) for deviating from this Presidential policy. However, I intend that exceptions to this policy should be granted only infrequently.

Sec. 3. Executive departments and agencies shall issue regulations governing their implementation of this Order that shall be consistent with the guidelines issued under Section

6. Proposed regulations shall be submitted to the Office of Management and Budget for review within four months of the date of the guidelines issued under Section 6. The Director of the

Office of Management and Budget may return for reconsideration proposed regulations that the Director believes are inconsistent with the guidelines. Final regulations shall be published within twelve months of the date of the guidelines.

Sec. 4. There is hereby constituted the Interagency Committee on Debarment and

Suspension, which shall monitor implementation of this Order. The Committee shall consist of representatives of agencies designated by the Director of the Office of Management and

Budget.

Sec. 5. The Director of the Office of Management and Budget shall designate a Federal agency to perform the following functions: maintain a current list of all individuals and organizations excluded from program participation under this Order, periodically distribute the list to Federal agencies, and study the feasibility of automating the list; coordinate with the lead agency responsible for government-wide debarment and suspension of contractors; chair the

Interagency Committee established by Section 4; and report periodically to the Director on implementation of this Order, with the first report due within two years of the date of the Order.

Sec. 6. The Director of the Office of Management and Budget is authorized to issue guidelines to Executive departments and agencies that govern which programs and activities are covered by this Order, prescribe government-wide criteria and government-wide minimum due process procedures, and set forth other related details for the effective administration of the guidelines.

Sec. 7. The Director of the Office of Management and Budget shall report to the President within three years of the date of this Order on Federal agency compliance with the Order, including the number of exceptions made under Section 2(c), and shall make recommendations as are appropriate further to curb fraud, waste, and abuse.

Document A101® – 2017 Exhibit A Insurance and Bonds

Init.

AIA Document A101 – 2017 Exhibit A. Copyright © 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:37:18 on 02/18/2026 under Order No.20250128942 which expires on 05/17/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1819831404)

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

This document is intended to be used in conjunction with AIA Document A201®–2017, General Conditions of the Contract for Construction. Article 11 of A201®–2017 contains additional insurance provisions.

This Insurance and Bonds Exhibit is part of the Agreement, between the Owner and the Contractor.

(Paragraph deleted) for the following PROJECT:

(Name and location or address)

THE OWNER:

(Name, legal status and address)

Rochester Public Schools, ISD 535 615 7th Street SW Rochester, MN 55902 Phone: 507.328.3000

THE CONTRACTOR:

(Name, legal status and address)

TABLE OF ARTICLES

A.1 GENERAL

A.2 OWNER’S INSURANCE

A.3 CONTRACTOR’S INSURANCE AND BONDS

A.4 SPECIAL TERMS AND CONDITIONS

ARTICLE A.1 GENERAL

The Owner and Contractor shall purchase and maintain insurance, and provide bonds, as set forth in this Exhibit. As used in this Exhibit, the term General Conditions refers to AIA Document A201™–2017, General Conditions of the Contract for Construction.

ARTICLE A.2 OWNER’S INSURANCE

§ A.2.1 General Prior to commencement of the Work, the Owner shall secure the insurance, and provide evidence of the coverage, required under this Article A.2 and, upon the Contractor’s request, provide a copy of the property insurance policy or policies required by Section A.2.3. The copy of the policy or policies provided shall contain all applicable conditions, definitions, exclusions, and endorsements.

§ A.2.2 Liability Insurance The Owner shall be responsible for purchasing and maintaining the Owner’s usual general liability insurance.

§ A.2.3 Required Property Insurance § A.2.3.1 Unless this obligation is placed on the Contractor pursuant to Section A.3.3.2.1, the Owner shall purchase and maintain, from an insurance company or insurance companies lawfully authorized to issue insurance in the jurisdiction where the Project is

Init.

AIA Document A101 – 2017 Exhibit A. Copyright © 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:37:18 on 02/18/2026 under Order No.20250128942 which expires on 05/17/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1819831404) located, property insurance written on a builder’s risk "all-risks" completed value or equivalent policy form and sufficient to cover the total value of the entire Project on a replacement cost basis. The Owner’s property insurance coverage shall be no less than the amount of the initial Contract Sum, plus the value of subsequent Modifications and labor performed and materials or equipment supplied by others. The property insurance shall be maintained until Substantial Completion and thereafter as provided in Section A.2.3.1.3, unless otherwise provided in the Contract Documents or otherwise agreed in writing by the parties to this Agreement. This insurance shall include the interests of the Owner, Contractor, Subcontractors, and Sub-subcontractors in the Project as insureds. This insurance shall include the interests of mortgagees as loss payees.

§ A.2.3.1.1 Causes of Loss. The insurance required by this Section A.2.3.1 shall provide coverage for direct physical loss or damage, and shall not exclude the risks of fire, explosion, theft, vandalism, malicious mischief, collapse, earthquake, flood, or windstorm. The insurance shall also provide coverage for ensuing loss or resulting damage from error, omission, or deficiency in construction methods, design, specifications, workmanship, or materials. Property insurance provided by the Owner shall not cover any tools, apparatus, machinery, scaffolding, hoists, forms, staging, shoring, and other similar items commonly referred to as construction equipment that may be on the site and the capital value of which is not included in the Work. The Contractor shall make its own arrangements for any insurance it may require on such construction equipment, which shall not be considered a Cost of the Work. Sub-limits, if any, are as follows:

(Indicate below the cause of loss and any applicable sub-limit.)

Causes of Loss Sub-Limit

§ A.2.3.1.2 Specific Required Coverages. The insurance required by this Section A.2.3.1 shall provide coverage for loss or damage to falsework and other temporary structures, and to building systems from testing and startup. The insurance shall also cover debris removal, including demolition occasioned by enforcement of any applicable legal requirements, and reasonable compensation for the Architect’s and Contractor’s services and expenses required as a result of such insured loss, including claim preparation expenses. Sub-limits, if any, are as follows:

(Indicate below type of coverage and any applicable sub-limit for specific required coverages.)

Coverage Sub-Limit

§ A.2.3.1.3 Unless the parties agree otherwise, upon Substantial Completion, the Owner shall continue the insurance required by Section A.2.3.1 or, if necessary, replace the insurance policy required under Section A.2.3.1 with property insurance written for the total value of the Project that shall remain in effect until expiration of the period for correction of the Work set forth in Section 12.2.2 of the General Conditions.

§ A.2.3.1.4 Deductibles and Self-Insured Retentions. If the insurance required by this Section A.2.3 is subject to deductibles or self-insured retentions, the Owner shall be responsible for all loss not covered because of such deductibles or retentions.

§ A.2.3.2 Occupancy or Use Prior to Substantial Completion. The Owner’s occupancy or use of any completed or partially completed portion of the Work prior to Substantial Completion shall not commence until the insurance company or companies providing the insurance under Section A.2.3.1 have consented in writing to the continuance of coverage. The Owner and the Contractor shall take no action with respect to partial occupancy or use that would cause cancellation, lapse, or reduction of insurance, unless they agree otherwise in writing.

§ A.2.3.3 Insurance for Existing Structures If the Work involves remodeling an existing structure or constructing an addition to an existing structure, the Owner shall purchase and maintain, until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General Conditions, "all-risks" property insurance, on a replacement cost basis, protecting the existing structure against direct physical loss or damage from the causes of loss identified in Section A.2.3.1, notwithstanding the undertaking of the Work. The Owner shall be responsible for all co-insurance penalties.

AIA Document A101 – 2017 Exhibit A. Copyright © 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:37:18 on 02/18/2026 under Order No.20250128942 which expires on 05/17/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1819831404)

§ A.2.4 Optional Extended Property Insurance.

The Owner shall purchase and maintain the insurance selected and described below.

(Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es) next to the description(s) of selected insurance. For each type of insurance selected, indicate applicable limits of coverage or other conditions in the fill point below the selected item.)

[ ] § A.2.4.1 Loss of Use, Business Interruption, and Delay in Completion Insurance, to reimburse the Owner for loss of use of the Owner’s property, or the inability to conduct normal operations due to a covered cause of loss.

[ ] § A.2.4.2 Ordinance or Law Insurance, for the reasonable and necessary costs to satisfy the minimum requirements of the enforcement of any law or ordinance regulating the demolition, construction, repair, replacement or use of the Project.

[ ] § A.2.4.3 Expediting Cost Insurance, for the reasonable and necessary costs for the temporary repair of damage to insured property, and to expedite the permanent repair or replacement of the damaged property.

[ ] § A.2.4.4 Extra Expense Insurance, to provide reimbursement of the reasonable and necessary excess costs incurred during the period of restoration or repair of the damaged property that are over and above the total costs that would normally have been incurred during the same period of time had no loss or damage occurred.

[ ] § A.2.4.5 Civil Authority Insurance, for losses or costs arising from an order of a civil authority prohibiting access to the Project, provided such order is the direct result of physical damage covered under the required property insurance.

[ ] § A.2.4.6 Ingress/Egress Insurance, for loss due to the necessary interruption of the insured’s business due to physical prevention of ingress to, or egress from, the Project as a direct result of physical damage.

[ ] § A.2.4.7 Soft Costs Insurance, to reimburse the Owner for costs due to the delay of completion of the Work, arising out of physical loss or damage covered by the required property insurance: including construction loan fees; leasing and marketing expenses; additional fees, including those of architects, engineers, consultants, attorneys and accountants, needed for the completion of the construction, repairs, or reconstruction; and carrying costs such as property taxes, building permits, additional interest on loans, realty taxes, and insurance premiums over and above normal expenses.

§ A.2.5 Other Optional Insurance.

The Owner shall purchase and maintain the insurance selected below.

(Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es) next to the description(s) of selected insurance.)

AIA Document A101 – 2017 Exhibit A. Copyright © 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:37:18 on 02/18/2026 under Order No.20250128942 which expires on 05/17/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1819831404)

[ ] § A.2.5.1 Cyber Security Insurance for loss to the Owner due to data security and privacy breach, including costs of investigating a potential or actual breach of confidential or private information.

(Indicate applicable limits of coverage or other conditions in the fill point below.)

[ ] § A.2.5.2 Other Insurance (List below any other insurance coverage to be provided by the Owner and any applicable limits.)

Coverage Limits

ARTICLE A.3 CONTRACTOR’S INSURANCE AND BONDS

§ A.3.1 General § A.3.1.1 Certificates of Insurance. The Contractor shall provide certificates of insurance acceptable to the Owner evidencing compliance with the requirements in this Article A.3 at the following times: (1) prior to commencement of the Work; (2) upon renewal or replacement of each required policy of insurance; and (3) upon the Owner’s written request. An additional certificate evidencing continuation of commercial liability coverage, including coverage for completed operations, shall be submitted with the final Application for Payment and thereafter upon renewal or replacement of such coverage until the expiration of the periods required by Section A.3.2.1 and Section A.3.3.1. The certificates will show the Owner as an additional insured on the Contractor’s Commercial General Liability and excess or umbrella liability policy or policies. These certificates and the insurance policies required by this Article A.3 shall contain, to the fullest extent commercially available, a provision that coverages afforded under the policies will not be canceled or allowed to expire until at least thirty (30) days’ prior written notice has been given to the Owner and. at least ten (10) days for non-payment of premium. If insurance carrier is unable to provide, Contractor will be responsible for such notification.