CIVIL LEGEND
LIMIT OF DISTURBANCE
Bh SwD
MATCH LINE REFER TO DWG C-101
PROPOSED SANITARY MAIN
PROPOSED TEXT
DRAWING MATCHLINE
TEXT
S PROPOSED SANITARY MANHOLE
REFERENCE: USGS 7.5 MINUTE SERIES (TOPOGRAPHIC MAP) - OXFORD, PENNSYLVANIA
VICINITY MAP
G
EN
ER
AL
G
EN
ER
AL
P R
O
JE
C T
N O
TE
S, D R
AW
IN
G
IN
D
EX
, A N
D D
R
AW
IN
G
C O
N
VE
N
TI
O N
S
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\G-001.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
G-001
GENERAL PROJECT NOTES
SECTION INDICATOR
DETAIL INDICATOR
ELEVATION INDICATOR
DRAWING CONVENTIONS
?-201
A ?-301
A ?-301
?-501
Scale:1 1" = 1'-0"
DRAWING TITLE
DRAWING NUMBER
SECTION LETTER
DRAWING NUMBER
ELEVATION LETTER
IDENTIFICATION NUMBER/LETTER
DRAWING TITLE
A
SHEET KEYNOTE SYMBOL
DEMOLITION KEYNOTE
SYMBOL
PHOTOGRAPH INDICATOR
PHOTOGRAPH
IDENTIFICATION
DRAWING NUMBER
DETAIL NUMBER
TEXT
INDICATES EXIST
CONDITIONS/FEATURES
INDICATES NEW
WORK/FEATURES
A. FIELD SURVEY BY BRINKASH AND ASSOCIATES, INC.
DATED SEPTEMBER, 2023.
B. PROPERTY LINES SHOWN ARE APPROXIMATE AND HAVE NOT BEEN
SURVEYED OR FIELD VERIFIED.
C. THE LOCATION AND DIMENSIONS OF ALL SITE FEATURES SHOWN ARE
APPROXIMATE AND MUST BE VERIFIED IN THE FIELD BY THE
CONTRACTOR PRIOR TO BIDDING.
D. ALL UNDERGROUND UTILITIES SHALL BE LOCATED BY THE CONTRACTOR
PRIOR TO ANY EARTH MOVING ACTIVITIES, PURSUANT TO ACT 287.
UNDERGROUND UTILITY LOCATIONS MUST BE VERIFIED BY CALLING
1-800-242-1776.
E. ALL UNDERGROUND UTILITY LOCATIONS AND ELEVATIONS ON THE
CONSTRUCTION PLANS APPROXIMATE LOCATIONS DELINEATED FROM
LIMITED FIELD MARKINGS AND AVAILABLE RECORDS. THEREFORE, ANY
UTILITIES NOT SHOWN OR NOT LOCATED AS SHOWN, SHALL NOT BE THE
CAUSE OF THE CONTRACTOR TO DENY RESPONSIBILITY FOR
PROTECTION AND/OR REPAIR DURING CONSTRUCTION. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING FACILITIES AND PROVIDE ALL
PROTECTIVE MEASUREMENTS, RESTRAINTS AND APPURTENANCES AS
NECESSARY.
F. THESE DESIGN DRAWINGS MUST BE WORKED IN CONJUNCTION WITH THE
PROJECT MANUAL/SPECIFICATIONS.
G. CONTRACTOR SHALL USE, MAINTAIN AND PROVIDE ADEQUATE, PROPER
SHORING DEVICES ON SITE AT ALL TIMES. CONTRACTOR SHALL
CONFORM TO ALL LOCAL, STATE AND FEDERAL REGULATIONS.
H. CONTRACTOR SHALL USE RUBBER - TRACKED EXCAVATOR OR PROVIDE
1" THICK (MINIMUM) MATTING TO PROTECT PAVED LOCAL MUNICIPAL,
STATE AND PRIVATE ROAD SURFACES, DURING TRENCHING, EXCAVATION
AND GENERAL CONSTRUCTION OPERATIONS.
I. CONTRACTOR IS RESPONSIBLE TO MAINTAIN ACCESS TO ALL
RESIDENCES THROUGHOUT CONSTRUCTION.
1-800-242-1776
(TOLL FREE)
"Pa. Law requires advance notification"
PA ONE CALL FOR DESIGN
CPA PROJECT ID: 7148454
SERIAL NUMBERS ISSUED:
20233312077 (PRELIM DESIGN 11.27.23)
20233312078 (PRELIM DESIGN 11.27.23)
20252451263 (FINAL DESIGN 09.02.25)
20252451264 (FINAL DESIGN 09.02.25)
1-800-242-1776
PE
NN
SY
LV
AN
IA ONE CALL SYSTEM
, INC
STOP-CALL BEFORE YOU D
IG
DESIGN PA ONE CALL
UTILITY RESPONSE ADDRESS CONTACT INFORMATION CONTACT PERSON CONTACT NUMBER
ARMSTRONG 122 S QUEEN ST
RISING SUN, MD. 21911 creynolds@agoc.com CHRISTOPHER
REYNOLDS 410-214-2063
CHESTER WATER AUTHORITY 437 W FRONT ST, PO BOX 467
CHESTER, PA. 19013 jeff.derusso@chesterwater.com JEFF DERUSSO 610-876-8185 EXT. 1218
EAST NOTTINGHAM TOWNSHIP 158 ELECTION ROAD
OXFORD, PA. 19363 townshiproadmaster@eastnottingham.org CHRIS WEAVER 610-932-8494
OXFORD BOROUGH 1 OCTORARO ALLEY PO BOX 380
OXFORD, PA. 19363 publicworks@oxfordboro.org JOHN SCHAIBLE 610-932-8322
COMCAST 1004 CORNERSTONE BLVD
DOWNINGTOWN, PA. 19335 johncedrick_salvatierra@comcast.com JOHN CEDRICK
SALVATIERRA 267-271-9781
PECO AN EXELON COMPANY C/O USIC 450 S HENDERSON ROAD SUITE B
KING OF PRUSSIA, PA. 19406 nikkiasimpkins@usicllc.com NIKKIA SIMPKINS 484-681-5720
OXFORD AREA SEWER AUTHORITY 2196 BALTIMORE PIKE
OXFORD, PA. 19363 davidbusch@oxfordsewer.org DAVID BUSCH 610-932-3493
TERRADEX INC 855 EL CAMINO REAL #13A
PALO ALTO, CA. 94301 operator@terradex.com KEITH HOOPER 650-227-3254
UGI UTILITIES INC 1 UGI DR
DENVER, PA. 17517 jmay@ugi.com JAMES MAY 610-736-5994
VERIZON BUSINESS FORMALLY MCI 7000 WESTON PKWY
CARY, NC. 27513 victor.s.wood@verizon.com VICTOR WOOD 919-414-2782
PROJECT SITE
00 2000' 4000'
SCALE:1 1" = 2000'
LOCATION / TOPOGRAPHICAL MAP
PROJECT
LOCATION
SEPTEMBER 5, 2025
ISSUED FOR
BIDDING
2196 BALTIMORE PIKE
OXFORD, PA. 19363
DRAWING INDEX
DWG. NO. DRAWING DESCRIPTION/TITLE
GENERAL
G-001 GENERAL PROJECT NOTES, DRAWING INDEX, AND DRAWING CONVENTIONS
G-101 INDEX PLANS
CIVIL
C-101 FORCE MAIN PLAN AND PROFILE (STA 0+00 TO STA 4+50)
C-102 FORCE MAIN PLAN AND PROFILE (STA 4+50 TO STA 9+90)
C-103 FORCE MAIN PLAN AND PROFILE (STA 9+90 TO STA 14+11)
C-401 RAILROAD CROSSING PLAN, PROFILE AND DETAILS
C-501 CONSTRUCTION DETAILS
C-502 RESTORATION DETAILS
CIVIL DEMOLITION
CD-101 PUMP STATION DEMOLITION PLAN, PHOTOGRAPHS AND NOTES
EROSION AND SEDIMENT
ES-501 EROSION AND SEDIMENT CONTROL NOTES
ES-502 EROSION AND SEDIMENT CONTROL DETAILS
OXFORD AREA SEWER AUTHORITY
GRANT STREET AND TWIN PONDS
PUMP STATION AND FORCEMAIN PROJECT
GRANT STREET
PUMP STATION
LAT: 39° 46' 35.9"N
LONG: -75° 58' 37.2"W
TWIN PONDS
PUMP STATION
LAT: 39° 46' 13.3"N
LONG: -75° 58' 26.3"W
14+11
0+00
0+60
1+20
1+80
2+40
3+00
3+60 4+20
4+80 5+40
6+00 6+60
7+20 7+80
8+40 9+00
9+60
10+20
10+80
11+40
12+00
12+60 13+20
13+80
S S0+00
0+60
1+20
1+32
CS
-1
CS
-1
CS
-1
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\G-101.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
G-101
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
IN
D
EX
P
LA
N
S G
EN
ER
AL
00 60' 120'
SCALE:1 1" = 60'
INDEX PLAN
DRAWING C-102
DRAWING C-103
DRAWING C-102
DRAWING C-101
0+00
0+60
1+20 1+80 2+40 3+00 3+60
4+
UrnB UrmB
UrnB UrmB
UrmB
UrmB
UrmB
UrmB
0+00 0+30 0+60 0+90 1+20 1+50 1+80 2+10 2+40 2+70 3+00 3+30 3+60 3+90 4+20 4+50
SILT SACK INLET PROTECTION
CS-12 CS-12 12" COMPOST FILTER SOCK
LIMIT OF DISTURBANCE
SOIL LINE
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\C-101.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
C-101
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
SCALE:1 1" = 30'
FORCE MAIN PLAN (STA 0+00 TO STA 4+50)
MATCH LINE REFER TO DWG C-102
FO
R
C E
M
AI
N P
LA
N
A N
D P
R O
FI
LE
(S
TA
+0
TO
S
TA
+5
0) C
IV
IL
00 30' 60'
Ba BAILE SILT LOAM GgB GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES UrbB URBAN LAND-BAILE COMPLEX, 0 TO 8 PERCENT SLOPES UrmB URBAN LAND-GLENELG COMPLEX, 0 TO 8 PERCENT SLOPES UrnB URBAN LAND-GLENVILLE COMPLEX, 0 TO 8 PERCENT SLOPES
SOIL TYPES
SHEET KEYNOTES
1. CONTRACTOR TO USE BORING/RECEIVING PIT LOCATION TO COMPLETE
DIRECTIONAL DRILLING.
2. CONTRACTOR TO FUSE PROPOSED HDPE FORCE MAIN INTO RECENTLY
INSTALLED HDPE FORCE MAIN.
SCALE:2 H: 1" = 30'
FORCE MAIN PROFILE (STA 0+00 TO STA 4+50)
V: 1" = 3'
00 30' 60'
6" HDPE
30' X 12'
RECEIVING PIT
30' X 12'
BORING PIT
30' X 12'
BORING PIT
30' X 12'
RECEIVING PIT
6" HDPE
6" H
D
PE
BORING/RECEIVING PIT
E&S LEGEND
LIMIT OF
DISTURBANCE
0.18 ACRES
AIR RELEASE/
VACUUM RELEASE
MANHOLE
C-501
AIR RELEASE/
VACUUM RELEASE
MANHOLE
C-501
6" DI
6" TRANSITION
COUPLING (TYP)
4' -0
" M
IN
75 LF OF
12" STEEL CASING
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM4+80 5+40 6+00 6+60 7+20 7+80 8+40 9+00 9+60
UrmB
UrmBUrmB
UrmB GgB
GgB
GgB
GgB
4+50 4+80 5+10 5+40 5+70 6+00 6+30 6+60 6+90 7+20 7+50 7+80 8+10 8+40 8+70 9+00 9+30 9+60 9+90
SILT SACK INLET PROTECTION
CS-12 CS-12 12" COMPOST FILTER SOCK
LIMIT OF DISTURBANCE
SOIL LINE
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\C-102.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
C-102
SCALE:1 1" = 30'
FORCE MAIN PLAN (STA 4+50 TO STA 9+90)
M A
T C
H
LIN
E R
E
FE
R T
O D
W G
C -103
FO
R
C E
M
AI
N P
LA
N
A N
D P
R O
FI
LE
(S
TA
+5
TO
S
TA
+9
0) C
IV
IL
00 30' 60'
M A
T C
H
LIN
E R
E
FE
R T
O D
W G
C -101
SCALE:2 H: 1" = 30'
FORCE MAIN PROFILE (STA 4+50 TO STA 9+90)
V: 1'=3'
00 30' 60'
6" HDPE
6" HDPE
6" HDPE 6" HDPE
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
Ba BAILE SILT LOAM GgB GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES UrbB URBAN LAND-BAILE COMPLEX, 0 TO 8 PERCENT SLOPES UrmB URBAN LAND-GLENELG COMPLEX, 0 TO 8 PERCENT SLOPES UrnB URBAN LAND-GLENVILLE COMPLEX, 0 TO 8 PERCENT SLOPES
SOIL TYPES
SHEET KEYNOTES
E&S LEGEND 30'x12' BORING/
RECEIVING PIT
LIMIT OF
DISTURBANCE
0.18 ACRES
1. CONTRACTOR TO USE BORING/RECEIVING PIT LOCATION TO COMPLETE
DIRECTIONAL DRILLING.
4' -0
" M
IN
INV ±8"PVC=507.3'(N)
FM
FM FM FM FM FM FM FM FM
FM
FM 14+11
10+20 10+80 11+40 12+00 12+60
13+20
+8
S
MH-134B
STA 0+00
S
MH-134C
STA 0+12
0+00
0+60
1+20
1+32
GgB
GgB
Ba
Ba
Ba
Ba
Ba
UrbB
UrbB
UrbB
UrbB
CS-12
C S-
C
S-
C S-
C
S-
C S-
C
S-
CO
9+90 10+20 10+50 10+80 11+10 11+40 11+70 12+00 12+30 12+60 12+90 13+20 13+50 13+80 14+1014+1114+1114+10
4' -0
" M
IN
0+00 0+30 0+60 0+90 1+20 1+32
116' of 8" PVC @ 1.00%
MH-134C
STA 0+12
TOP 516.79
INV IN 508.53 (8")
INV OUT 508.43 (8")
MH-134B
STA 0+00
TOP 516.92
INV IN 508.92 (8")
INV OUT 508.60 (8")
MH TP-10E
STA 1+32
TOP 515.03
INV IN 507.28 (8")
INV OUT 507.20 (8")
8' of 8" PVC @ 0.83%
SILT SACK INLET PROTECTION
CS-12 CS-12 12" COMPOST FILTER SOCK
LIMIT OF DISTURBANCE
SOIL LINE
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\C-103.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
C-103
SCALE:1 1" = 30'
FORCE MAIN PLAN (STA 9+90 TO STA 14+11)
FO
R
C E
M
AI
N P
LA
N
A N
D P
R O
FI
LE
(S
TA
+9
TO
S
TA
4+
C
IV
IL
00 30' 60'
M A
T C
H
LIN
E R
E
FE
R T
O D
W G
C -102
SCALE:2 H: 1" = 30'
SEWER FORCE MAIN PLAN (STA 9+90 TO STA 14+11)
V: 1" = 3'
00 30' 60'
6" HDPE
6" HDPE
PUMP STATION
DEMOLITION PLAN
CD-101
SCALE:3 H: 1" = 30'
SEWER GRAVITY MAIN PLAN (STA 0+00 TO STA 1+32)
V: 1" = 3'
00 30' 60'
6" HDPE
30' X 12'
BORING PIT
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
Ba BAILE SILT LOAM GgB GLENELG SILT LOAM, 3 TO 8 PERCENT SLOPES UrbB URBAN LAND-BAILE COMPLEX, 0 TO 8 PERCENT SLOPES UrmB URBAN LAND-GLENELG COMPLEX, 0 TO 8 PERCENT SLOPES UrnB URBAN LAND-GLENVILLE COMPLEX, 0 TO 8 PERCENT SLOPES
SOIL TYPES
SHEET KEYNOTES
E&S LEGEND STREAM CROSSING
ES-502
TYPE M INLET
PROTECTION
ES-502
12" COMPOST
FILTER SOCK (TYP)
ES-502
TOPSOIL
STOCK PILE
LIMIT OF
DISTURBANCE
0.18 ACRES
1. CONTRACTOR TO USE BORING/RECEIVING PIT LOCATION TO COMPLETE
DIRECTIONAL DRILLING.
2. CONTRACTOR TO TIE INTO EXISTING MANHOLE TP-10E.
3. CONTRACTOR TO TIE PROPOSED HDPE FORCE MAIN INTO EXISTING PVC
FORCE MAIN. REFER TO DETAIL 4 ON DWG. C-103.
4. CONTRACTOR TO PROTECT ALL EXISTING UTILITIES DURING
EXCAVATION FOR PROPOSED FORCE MAIN INSTALLATION.
5. CONTRACTOR TO ABANDON EXISTING FORCE MAIN IN PLACE.
6. CONTRACTOR TO RECONNECT EXISTING SEWER LATERAL INTO
PROPOSED GRAVITY SEWER PIPE.
ES-502
3' -0
M
IN
6" HDPE
CONCRETE BLOCK
6" SDR21 PVC
FORD BRASS COMPRESSION
COUPLING C77-77-NL
WITH INSERT STIFFENER
INSERT-75-DR11 AT HDPE
6" SDR21 PVC
TEE - CUT INTO THE EXISTING
LINE USING A REPAIR COUPLING
EXISTING 6" SDR21
PVC FORCE MAIN
CONCRETE
THRUST BLOCK
SCALE:4 NONE
HDPE TO SDR 21 PVC PIPE
OASA CONNECTION DETAIL
FM
FM
FM
FM
FM
0+00
0+60
1+20
1+80
UrnB
UrmB
UrmB
UrmB
EAST PENN
RAILROAD CROSSING
LAT: 39°49'38.30" N
LONG: -75°58'51.06" W
30' x 12'
RECEIVING PIT
14'
7' -2
0+00 0+30 0+60 0+90 1+20
14' 36'39'
RAILROAD CROSSING
LAT: 39°49'38.30" N
LONG: -75°58'51.06" W
THEORETICAL RR
EMBANKMENT LINE (TYP)
30' x 12'
BORING PIT
100' R/R R-O-W
6" DI
75LF OF 12" STEEL CASING
C
IV
IL
R
AI
LR
O
AD
C R
O
SS
IN
G
P
LA
N A
N D
P R
O
FI
LE
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\C-401.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
C-401
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
Scale:1 1" = 30'
RAILROAD CROSSING PLAN
00 30' 60'
Scale:2 H: 1" = 30'
LOOKING NORTHEAST
RAILROAD CROSSING PROFILE VIEW
V: 1" = 3'
00 30' 60'
AS
R
EQ
U
IR
ED
AS
R
EQ
U
IR
ED
Scale:3 NONE
BORING DETAIL
CASING END SEAL
CARRIER PIPE SUPPORT DETAIL
STAINLESS STEEL CASING SPACERS
W/ POLYMER RUNNERS, APS MODEL
SSI (TYP.) SPACING AS PER
MANUFACTURERS RECOMMENDATIONS
16"Ø STEEL
CASING PIPE
8"Ø DIP
CARRIER PIPE
RUBBER MOLDED PULL ON
END SEALS W/ STAINLESS
STEEL BANDS (TYP. BOTH
ENDS OF CASING)
CARRIER PIPE
CASING PIPE
CRUSHED STONE
12.75"
12" DIA.
CASING PIPE
12.25"
STEEL
33.38 LBS.
WELDED
CARRIER/CASING PIPE DATA TABLE FOR RAILROAD BORING
PROCESS OF MANUFACTURE
MATERIAL
WEIGHT PER FOOT
CENTRIFUGALLY
16 LBS.
DUCTILE IRON
........................NOMINAL SIZE OF PIPE
NORMAL OPERATING PRESSURE
CONTENTS TO BE HANDLED
O.S. DIAMETER
I.S. DIAMETER
WALL THICKNESS
6.40"
0.25"
6.90"
6" DIA.
SEWER
100 PSI
................ 0.25"
N/A
N/A
CARRIER PIPE CASING PIPE
........METHOD OF INSTALLATION
DETAILS OF SEAL OR PROTECTION
........................... AT ENDS OF CASING
BORING
N/A SEALS
BORING
RUBBER
DETAILS/CATHODIC PROTECTION
SPECIFICATION
GRADE OR CLASS
TYPE OF JOINT
TEST PRESSURE
TYPE OF COATING
BIT. COATED
NONE
300 PSI
AWWA C151
CONTINUOUS
UNCOATED
NONE
BUTT WELD ...
GRADE 2
ASTM A252
N/A
CARRIER PIPE
CAST
M.J. W/ FIELD
LOK GASKETS
63°'
30' X 12' BORING PIT
30' X 12'
RECEIVING PIT
LIMIT OF
DISTURBANCE
0.18 ACRES
6" TRANSITION
COUPLING (TYP)
6"
HDPE
6" HDPE
MP 50 APPROX.
1725' SOUTH
VALVE AND INLINE
FLUSHING VAULT (TYP)
GRADED LEVEL/
IN-GROUND ACCESS
BOX OR TRACER TEST
STATION MOUNTED
NEXT TO CONTROL
PANEL. ALSO INSTALL
MAGNESIUM GROUNDING
ANODE (DETAILS 10 & 11
ON C-501)
MAINLINE TO LATERAL
LUG CONNECTOR (TYP)
TRACER WIRE SHALL BE
ROUTED INSIDE VAULT
PROVIDE TEST STATION
FOR THE CONNECTION OF
LOCATOR
(TYP).
DRIVE-IN MAGNESIUM
GROUNDING ANODE(TYP)
#8 AWG COPPER CLAD
STEEL - GREEN (TYP)
NON-FERROUS SEWER MAINS,
FORCEMAINS, LATERALS OR SERVICE
LINE
ANODE
INSTALLED INTO
GROUND AT
BOTTOM ON
TRENCH
ANODE WIRE
CONNECTED TO
TRACER WIRE
UNDISTURBED EARTH
TRACER WIRE TEST STATION (COBRA
T3 - T3-G75)
CONDUIT BRACKETS
4" CONDUIT
PIPE BEDDING
2.
0'
(R
EF
PIPE CL
2" ARI D-020 INDUSTRIAL
COMBINATION AIR RELEASE
VALVE (OR EQUAL)
3" BLIND FLANGE
W/ 2" THREADED TAP
NIPPLE
6" HDPE
ADAPTER
FLANGE
REFER TO TYP. SANITARY
MANHOLE DETAIL
VA
R
IE
S
6" HDPE 6" HDPE
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
C
IV
IL
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\C-501.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
C-501
SCALE:6 NONE
TRACER WIRE PLAN DETAIL
SCALE:7 NONE
FOR ANODES AND TEST STATIONS
TRACER WIRE INSTALLATION
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
2. PROVIDE TRACER WIRE SYSTEM IN BOTH OPEN CUT AND DIRECTIONAL
DRILLING / ADJACENT TO NON-MATALIC PIPING IN ACCORDANCE WITH
DRAWING DETAILS 5 THRU 9 ON DRAWING C-501 AND PER
SPECIFICATIONS.
SCALE:1 TYPICAL SANITARY SEWER MANHOLE DETAIL
VA
R
IE
S
9"
M
AX
6"
4'-0"
INSIDE
5"
8"
NOTES:
1. ALL PIPE TO MANHOLE CONNECTIONS SHALL BE MADE BY GROUTING
THE SPACE BETWEEN THE PIPE AND WALL OF THE MANHOLE.
2. STEPS SHALL BE A MINIMUM OF 12" WIDE AND POLYPROPYLENE
COATED AT 12" O.C.; SECURED WITH NON-SHRINK GROUT.
3. WATER TIGHT MANHOLE FRAMES AND COVERS WILL BE USED ON
MANHOLES LOCATED OUTSIDE OF CARTWAY.
24" x 48"
ADAPTER
MANHOLE EXTERIOR
TO BE COATED W/
BITUMASTIC SEALANT
(TYP.)
HEAT SHRINKABLE WRAP
ON ALL MANHOLE JOINTS
MANHOLE FRAME AND COVER
MINIMUM 24" OPENING
HEAT SHRINKABLE WRAP
ON RISER RINGS AND
MANHOLE FRAME
PROPOSED PIPE
CONCRETE BENCH
PRE-CAST BASE
6" MIN. PENNDOT 2A
AGGREGATE
COMPACTED
STEPS (REFER
TO NOTE 2)
48" RISER
O-RING JOINT
PREFORMED PLASTIC
SEALING COMPOUND
FS-SS-S-210A, TYPE
1, ROPE FORM (TYP.)
PRE-CAST CONCRETE
GRADE RINGS (VARIES,
MIN. 6", MAX. 12")
WORDS "SANITARY SEWER"
TO BE CAST IN LID MANHOLE DISH
INSERT
SCALE:3 MANHOLE FRAME & COVER DETAIL
TYPICAL CAST IRON WATERTIGHT
24" 32"
34" MIN.
8"
1 1/2"
27 3/4" 30"
1 3/4"
PICK HOLE DETAIL
PLAN
SECTION
3/4" W FLAT
NEOPRENE
GASKET
(4) 1"Ø CORED OR DRILLED
HOLES ON 32" BOLT CIRCLE
AS SHOWN
FRAME
LETTER TO BE
2" HIGH MIN.
PICK HOLE
(TYP. 2 PLACES)
NON-SKID
LUGS
3/8"3/8" 1/2"
5/8"
(6) 1/2" S.S.
BOLT @ 60°
NONE
NONE
MANHOLE
SCALE:2 NONE
TYPICAL INSERTION MANHOLE
3'-0"+-
TYP. BOTH SIDES
M
IN
3" MIN.
VARIES6"
6" MIN. OF COMPACTED
ASSHTO #57 ON UNDISTURBED
OR COMPACTED SUBGRADE
POURED IN PLACE FLOW CHANNEL
DEPTH 3/4 OF PIPE DIAMETER
W/NON-SKID BROOM FINISH ON BENCH
COUPLING
(TYP. BOTH SIDES)
SCALE:4 ABANDONED PIPE / CONDUIT PLUG DETAIL
8" MIN.12" MIN.
PIPE TO BE ABANDONED
EARTH
10" DIAMETER PIPE AND SMALLER
CONCRETE PLUG
24" #1 BALLAST STONE
8" ASSHTO #57
CRUSHED TANK WALL AND
OTHER SITE CONCRETE
VA
R
IE
S
8" GRAVEL
REMOVE TANK / BUILDING WALL TO 18"
BELOW GRADE. CRUSH CONCRETE AND
USE AS FILL. PROVIDE CLEAN FILL FOR
BALANCE OF TANK FILL
SCALE:5 BUILDING BASEMENT DEMO DETAIL
4" DIA. CORE HOLES @ 8' O.C.
GEOTEXTILE FABRIC
NEW PIPE STUB
(TYP. BOTH SIDES)
PIPE SLEEVE
(TYP. BOTH SIDES)
SCALE:8 1/2" = 1'-0"
AIR RELEASE VALVE MANHOLE
1.
2.
NOTES:
ALL PIPE TO MANHOLE CONNECTIONS SHALL BE MADE WITH A CAST-IN-PLACE GASKET.
STEPS SHALL BE A MINIMUM OF 12" WIDE AND POLYPROPYLENE COATED AT 12" O.C.; SECURED WITH NON-SHRINK GROUT.
3. ALL REQUIREMENTS OF RC-39M (RECOMMENDED 6-1-10) AS PER PENNDOT PUB 72 SHALL BE MET FOR USE OF THIS MANHOLE.
DETAIL WITHIN PENNDOT RIGHT-OF-WAY.
4. ALL FITTINGS AND HARDWARE TO BE STAINLESS STEEL.
0 2' 4'1'
24" 32"
34" MIN.
8"
1 1/2"
27 3/4" 30"
1 3/4"
SCALE:9 MANHOLE FRAME & COVER DETAIL
TYPICAL CAST IRON STANDARD
PICK HOLE DETAIL
PLAN
SECTION
3/4" W FLAT
NEOPRENE
GASKET
(4) 1"Ø CORED OR DRILLED
HOLES ON 32" BOLT CIRCLE
AS SHOWN
FRAME
LETTER TO BE
2" HIGH MIN.
PICK HOLE
(TYP. 2 PLACES)
NON-SKID
LUGS
3/8"3/8" 1/2"
5/8"
WITHIN ROADWAY AREAS OFF ROAD AREAS
6"
"8"
8"
SCALE:10 NONE
FORCE MAIN TRACER WIRE TEST STATION DETAIL
NOTES:
1. C.I. BOX SHALL BE TYLER 10" C.I. VALVE BOX TOP SECTION SLIP MODEL 10T-A WITH 5 1/4" DROP
LID MODEL 145349 MARKED "SEWER".
2. DO NOT SPLICE TRACER WIRE UNDERGROUND.
3. PROVIDE 3 FEET OF LOOPED WIRE WITHIN TEST STATION BOX.
4. SPACE TEST STATIONS 500 FEET MAX. AND AT ALL CHANGES IN FORCE MAIN DIRECTION.
5. PROVIDE METALLIC CAUTION TAPE CENTERED ON FORCE MAIN 12" BELOW FINISHED GRADE.
TAPE TRACER WIRE
BELOW PIPE SPRINGLINE
@ 10'-0" MAX. SEE NOTE 2
CONTINUOUS AWG #10
SOLID CORE INSULATED
COPPER TRACER WIRE
PIPE STONE BEDDING
3" SCH. 40 PVC PIPE
AASHTO #57 STONE(3) #4 BARS E.W.
2'-0" x 2'-0" 4,000
PSI CONCRETE PAD
NON-METALLIC PIPELINE
2'-0" x 2'-0" 4,000
PSI CONCRETE PAD
(2) #4 BARS E.W.
SEE NOTE 3
SEE NOTE 1
ROADWAY SUB-BASE STONE
BASE PAVING
SURFACE PAVING
NONE
NONE
NONE
R
ES
TO
R
AT
IO
N D
ET
AI
LS
C
IV
IL
3" SUPERPAVE 25.00 MM, PG 64-22
BITUMINOUS CONCRETE BASE COURSE
OR MATCH EXISTING WHICHEVER IS GREATER
6" SUBBASE (#2A COARSE AGGREGATE) OR
MATCH EXISTING, WHICHEVER IS GREATER
REFER TO TRENCH
RESTORATION DETAILS
SCALE:4 NONE
TEMPORARY SURFACE RESTORATION DETAIL
SAW-CUT FULL DEPTH
EXISTING PAVEMENT
(INITIAL SAW CUT) (TYP.)
REFER TO TRENCH
RESTORATION DETAILS
4" TOPSOIL AND SEED
ALL DISTURBED AREAS
SCALE:5 NONE
FOR GRASS AREAS
SURFACE RESTORATION DETAIL
6" - 2A AGGREGRATE
COMPACTED
MAINTAIN
EXISTING
SLOPES
6" B
ED
D
IN
G
H
AU
N C
H
IN
G12"
N O
. 2 A
O R
R
C A
G G
R
EG
AT
E
M
AT
ER
IA
L
SH
AL
L
M
EE
T
TH
E R
EQ
U
IR
EM
EN
TS
O F
PE
N
N D
O T
PU
BL
IC
AT
IO
N
, 1
P
R O
C
TO
R D
EN
SI
TY
C
O M
PA
C
TE
D
IN
" L
IF
TS
, 8
" V
IB
R
AT
O R
Y
12"
REFER TO SURFACE
RESTORATION DETAILS
4' -6
" D
EP
TH
F
R O
M F
IN
IS
H
ED
G R
AD
E
SCALE:1 NONE
TRENCH RESTORATION DETAIL
AGGREGATE BACKFILL
PIPE
12"
N O
. 2 A
O R
R
C A
G G
R
EG
AT
E
M
AT
ER
IA
L
SH
AL
L
M
EE
T
TH
E R
EQ
U
IR
EM
EN
TS
O F
PE
N
N D
O T
PU
BL
IC
AT
IO
N
, 1
P
R O
C
TO
R D
EN
SI
TY
C
O M
PA
C
TE
D
IN
4"
L
IF
TS
, 8
" V
IB
R
AT
O R
Y
12"
H
AU
N C
H
IN
G
6" B
ED
D
IN
G
SE
LE
C T
BA
C
KF
IL
L
" I
N
IT
IA
L
BA
C
KF
IL
L
REFER TO SURFACE
RESTORATION DETAILS
4' -6
" D
EP
TH
F
R O
M F
IN
IS
H
ED
G R
AD
E
SCALE:2 NONE
TRENCH RESTORATION DETAIL
SELECT BACKFILL
PIPE
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\C-502.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
C-502
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
1'-0"
CUTBACK
(TYP.)
REFER TO TRENCH
RESTORATION DETAILS
SCALE:3 NONE
FOR PAVED ROADWAY W/ MILL AND OVERLAY
SURFACE RESTORATION DETAIL
VARIES VARIES
R O
AD
W
AY
C
EN
TE
R
LI
N E
12" WIDE BITUMINOUS
SEAL PG 64-22 (TYP.)
SAW-CUT FULL DEPTH
EXIST. PAVEMENT
(INITIAL SAW-CUT) (TYP.)
SAW-CUT FULL DEPTH
EXIST. PAVEMENT (TYP.)
1-1/2" MILL EXISTING PAVEMENT AND
INSTALL1-1/2" SUPERPAVE ASPHALT
MIXTURE DESIGN, BINDER COURSE,
PG 64-22, 3 TO < 30 MILLION ESALS,
9.5 MM, MATCH EXISTING SRL OR GREATER
NOTES:
1. EXISTING PAVEMENT MARKINGS SHALL BE REPLACED IF DISTURBED.
2-1/2" MIN. SUPERPAVE ASPHALT MIXTURE
DESIGN, BINDER COURSE, PG 64-22,
3 TO < 30 MILLION ESALS, 19.0 MM
5" MIN. SUPERPAVE ASPHALT MIXTURE
DESIGN, BINDER COURSE, PG 64-22,
0.3 TO < 3 MILLION ESALS, 25.0 MM
SCALE:6 STONE AREAWAY W/ GEOTEXTILE DETAIL
NONE
6" PENNDOT 2A
COARSE AGGREGATE
PENNDOT CLASS 2
TYPE B GEOTEXTILE
COMPACTED SUBSOIL
4637.026
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Sep. 5, 2025 \\ENTECH-FS01\Projects\0004637.026\04-CAD\SheetFiles\CD-101.dwgLa st
E di te d by : m hi es te r
AS NOTED
MAH
MW
MLB
/0
5/
BI
D
D
IN
G M
LB
O
XF
O R
D A
R
EA
S
EW
ER
A
U
TH
O R
IT
Y
O
XF
O R
D B
O R
O U
G H
, C H
ES
TE
R C
O U
N
TY
, P
EN
N
SY
LV
AN
IA
G
RA
NT
S
TR
EE
T
AN
D
TW
IN
P
O
ND
S
PU
M P
ST
AT
IO
N
AN
D
FO
RC
EM
AI
N
PR
O
JE
CT
CD-101
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR GENERAL PROJECT NOTES, DRAWING
INDEX, AND DRAWING CONVENTIONS.
2. CONTRACTOR TO ACQUIRE THE SERVICES OF A THIRD PARTY LINE
LOCATOR TO ACCURATELY LOCATE AND IDENTIFY ALL UTILITIES ON
THE DEMOLITION SITE.
3. CONTRACTOR SHALL TERMINATE ALL UTILITIES IN ACCORDANCE WITH
THE UTILITY CODE.
4. ANY EQUIPMENT AND/OR MATERIAL THAT CANNOT BE USED AS FILL
ON SITE SHALL BECOME PROPERTY OF THE CONTRACTOR. THE
CONTRACTOR IS RESPONSIBLE FOR PROPER DISPOSAL OF SUCH
MATERIAL.
5. THE DEMOLISHED CONCRETE FROM THE BUILDING MAY BE USED AS
FILL FOR THE PUMP STATION AS LONG AS ALL REINFORCING STEEL
HAS BEEN REMOVED AND ALL CONCRETE SHALL BE CRUSHED TO
THREE QUARTER INCH MAXIMUM SIZE.
SCALE:1 1" = 10'
PUMP STATION DEMOLITION PLAN
PU
M
P
ST
AT
IO
N D
EM
O
LI
TI
O N
P
LA
N , P
H O
TO
G
R
AP
H S
AN
D
N O
TE
S
C
IV
IL
D
EM
O
LI
TI
O N
00 10' 20'
DEMOLITION KEYNOTES
A. BUILDING DEMOLITION NOTES
1. CONTRACTOR SHALL REMOVE ALL MECHANICAL SYSTEMS, PIPING, AND
CONDUIT WITHIN THE BUILDING. CONTRACTOR IS RESPONSIBLE FOR THE
PROPER DISPOSAL OF ALL DEMOLITION DEBRIS.
2. CONTRACTOR SHALL SEVER ALL UNDERGROUND ELECTRICAL CONDUITS
AROUND THE BUILDING AND ABANDON IN PLACE. THE CONDUITS SHALL
BE SEVERED WITHIN 2FT OF THE BUILDING AND ABANDONED IN PLACE.
CONTRACTOR SHALL UTILIZE DETAIL 4 ON SHEET C-501 FOR THE
ABANDONMENT OF THE CONDUIT.
3. CONTRACTOR SHALL SEVER ALL UNDERGROUND PIPING INTO AND OUT
OF THE PUMP STATION AND ABANDON IN PLACE. THE PIPING SHALL BE
SEVERED WITHIN 2FT OF THE PUMP STATION. CONTRACTOR SHALL
UTILIZE DETAIL 4 ON SHEET C-501 FOR THE ABANDONMENT OF THE
PIPING.
4. CONTRACTOR SHALL PLUG ANY AND ALL PIPE PENETRATIONS IN THE
BUILDING WALLS WITH CONCRETE.
5. CONTRACTOR SHALL CORE 4-INCH DIAMETER HOLES IN THE PUMP
STATION BASE SLAB. THE HOLES SHALL BE PLACED EVERY 4FT ON
CENTER. THE HOLES SHALL BE PLACED FULL DEPTH OF THE SLAB.
PROVIDE TEMPORARY PUMPING SO ALL WORK CAN BE DONE. THE
TEMPORARY PUMPING SHALL RUN 24 HOURS A DAY, 7 DAYS A WEEK.
BYPASS PUMPING SHALL BE CAPABLE OF A MINIMUM OF 325 GPM.
6. CONTRACTOR SHALL DEMOLISH WALLS TO A DEPTH OF 2FT BELOW THE
ADJOINING GRADE ELEVATION.
7. CONTRACTOR TO PROVIDE 2FT OF AASHTO #1 AGGREGATE IN THE BASE
OF THE PUMP STATION.
8. CONTRACTOR TO PROVIDE 8-INCHES OF AASHTO #57 AGGREGATE IN THE
BASE OF THE PUMP STATION.
B. YARD PIPING / CONDUIT NOTES
1. DEMOLISH ALL MANHOLE AND CATCH BASIN STRUCTURES TO A DEPTH OF
2FT BELOW GRADE AND BACKFILL.
2. CONTRACTOR SHALL PLUG ALL INCOMING/OUTGOING PIPES WITH
CONCRETE PRIOR TO BACKFILLING.
3. ALL EXISTING VALVES SHALL BE CLOSED, VALVE BOX REMOVED AND THE
SURFACE RESTORED.
SCALE:A NONE
WET WELL
SCALE:B NONE
BAR SCREEN
SCALE:C NONE
BAR SCREEN
SCALE:D NONE
GENERATOR
SCALE:E NONE
OLD GENERATOR
SCALE:F NONE
DIESEL FUEL TANK
F
E D
A
B
SCALE:F NONE
PUMP STATION BASEMENT FLOOR
SCALE:G NONE
PUMP STATION BASEMENT FLOOR
C O
N
TR
O L
N O
TE
S
ER
O
SI
O
N A
N D
S
ED
IM
EN
T
STANDARD NOTES
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN
ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND
APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR
THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL
CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED
OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL
BE 2H: 1V OR FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL
CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE OF THE DEPARTMENT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE
BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION
DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL.
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED
ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE).
CLEAN FILL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE: FILL MATERIALS AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL PROVIDED THE TESTING REVEALS THAT THE FILL MATERIAL CONTAINS CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE RESIDENTIAL LIMITS IN TABLES FP-1A AND FP-1B FOUND IN THE DEPARTMENT'S POLICY "MANAGEMENT OF
FILL".
ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE MUST USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE
OWNER OF THE PROPERTY RECEIVING THE FILL.
ENVIRONMENTAL DUE DILIGENCE: THE APPLICANT MUST PERFORM ENVIRONMENTAL DUE DILIGENCE TO DETERMINE IF THE FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE PERFORMED IN
ACCORDANCE WITH APPENDIX A OF THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST BE MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS APPLICABLE. THESE REGULATIONS ARE AVAILABLE ON-LINE AT WWW.PACODE.COM
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DIRECTED INTO A PUMPED WATER FILTER BAG AND
DISCHARGED TO AN UNDISTURBED VEGETATED AREA.
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY.
MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RESEEDING, RE-MULCHING AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF
THOSE INSTALLED WILL BE REQUIRED.
15. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY
OFFICIALS AT THE TIME OF INSPECTION.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR
SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN
DRAWINGS.
18. AREAS WHICH ARE TO BE TOP SOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES - 6 TO 12 INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL SLOPES SHALL HAVE A
MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL
BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
21. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR
OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY
FILLS.
22. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED
INTO FILLS.
23. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
24. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE
STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
25. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT
SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING
TO THE STANDARDS OF THIS PLAN.
26. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE
STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
27. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER
MOVEMENTS.
28. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION
DISTRICT OR THE DEPARTMENT.
29. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT FOR AN
INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
30. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID RE-VEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY
DURING THE GERMINATING SEASON.
31. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A
FINAL INSPECTION.
32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
33. UPON TEMPORARY CESSATION OF AN EARTH DISTURBANCE OR ANY STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH DISTURBANCE ACTIVITIES EXCEED 4 DAYS, THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM ACCELERATED EROSION AND SEDIMENTATION PENDING FUTURE
EARTH DISTURBANCE ACTIVITIES.
34. THE CHESTER COUNTY CONSERVATION DISTRICT SHOULD BE NOTIFIED AT LEAST 72 HOURS PRIOR TO COMMENCEMENT OF ON-SITE EARTHMOVING AND CCCD WILL CONDUCT PERIODIC SITE INSPECTION.
CONSTRUCTION SEQUENCE
1. PRIOR TO CONSTRUCTION THE PROPOSED LIMIT OF DISTURBANCE (LOD) SHALL BE DELINEATED AND STAKED IN
THE FIELD
2. INSTALL PERIMETER BMP'S AS SHOWN ON THE PLANS WHICH INCLUDES COMPOST FILTER SOCK AND INLET
PROTECTION.
3. THE CONTRACTOR WILL INSPECT WEEKLY AND AFTER EACH RAIN EVENT, THE PROJECT'S EROSION AND
SEDIMENTATION CONTROLS DURING THE ENTIRE ACTIVE CONSTRUCTION STAGES. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION, OPERATION, MAINTENANCE, AND REMOVAL OF ALL EROSION AND
SEDIMENTATION CONTROLS THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT.
4. CLEAR AND GRUB PROJECT AREA AS NECESSARY.
5. INSTALL FORCE MAIN USING BORING TECHNIQUES. BORE PUTS WILL BE LOCATED AS INDICATED ON PLANS.
UTILIZE VACUUM TRUCK (OR MUD RECLAIMER, IF NECESSARY) TO REMOVE SLURRY FROM THE BORE PITS AND DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA
CODE 260.1 ET SEQ., 271.1 E. SEQ. AND 287.1 ET SEQ.
6. THE CONTRACTOR SHALL THEN PERFORM THE NECESSARY EXCAVATION, BACKFILL, AND COMPACTION FOR THE REMAINING FORCE MAIN INSTALLATION. REMOVE EXISTING SECTIONS AND STRUCTURES ALONG THE PROPOSED ALIGNMENT AS CONSTRUCTION OF THE NEW FORCE MAIN PROGRESSES. TRENCHING WORK WILL BE LIMITED TO THE AMOUNT THAT CAN BE EXCAVATED, BACKFILL INSTALLED AND STABILIZED WITHIN ONE WORKING DAY.
TRENCHING SHALL CONFORM TO THE FOLLOWING BMP PROCEDURE:
· WHEN CALLED FOR, BACKFILL WITH “SELECT BACKFILL”, IN WHICH CASE SOIL WILL BE STORED UNTIL PIPE
INSTALLATION IS COMPLETE. THIS EXCAVATED MATERIAL WILL BE LAID UP GRADIENT OF THE OPEN TRENCH DIRECTING DRAINAGE BACK INTO THE TRENCH, THUS PREVENTING SEDIMENT FROM MIGRATING TO NEARBY
DRAINAGE CHANNELS.
· ALL EXCAVATION SHALL BE PERFORMED IN A DOWN SLOPE TO UP SLOPE SEQUENCE. IF EXCAVATIONS NEED TO BE DEWATERED, THE WATER IN THE EXCAVATIONS SHALL BE PUMPED AND DISCHARGED INTO A PUMPED WATER FILTER BAG OR OTHER APPROVED FACILITY. DISCHARGE POINTS SHOULD BE ESTABLISHED TO
PROVIDE FOR MAXIMUM DISTANCE TO ACTIVE WATERWAYS.
8. LITTLE ELK CREEK STREAM CROSSING:
· FOR THE CULVERT CROSSINGS:
O FOR THE STREAM CROSSING, THE FORCE MAIN WILL BE CONSTRUCTED VIA HDD BORED UNDERNEATH
THE STREAM WITH A MINIMUM 3' OF COVER.
9. BEGIN PUMP STATION DEMOLITION STRIP TOPSOIL. STOCKPILE TOPSOIL IN DESIGNATED LOCATION.
10. ONCE FORCE MAIN IS INSTALLED AND OPERATIONAL, AND PUMP STATION DEMOLITION IS COMPLETE. THE LIMIT
OF DISTURBANCE CAN BE RETURNED TO FINISHED GRADE. PERMANENTLY SEED THE REMAINING DISTURBED AREAS OF THE PIPELINE ROW. SEED FOLLOWING PERMANENT SEEDING GUIDELINES OUTLINED ON ES-501.
11. IF CONSTRUCTION IS TERMINATED OR SUSPENDED PRIOR TO CONSTRUCTION COMPLETION, ALL EXPOSED SOIL AREAS SHALL BE SEEDED WITH TEMPORARY SEEDING AND MULCHED IMMEDIATELY. SEED FOLLOWING
TEMPORARY SEEDING GUIDELINES ON ES-501.
12. STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS. FINAL STABILIZATION OF VEGETATED AREAS WILL OCCUR WHEN A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. PAVED AREAS SHALL BE CONSIDERED PERMANENTLY STABILIZED WITH THE APPLICATION OF THE BASE COURSE LAYER.
RESTORE IMPERVIOUS AREAS TO PRE-CONSTRUCTION CONDITIONS PER THE RESTORATION DETAILS C-502.
13. AFTER FINAL STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMPS SHALL BE REMOVED. AREAS
DISTURBED DURING REMOVAL OF TEMPORARY E&S BMPS ARE TO BE IMMEDIATELY STABILIZED.
NOTE: A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT SITE
DURING CONSTRUCTION UNTIL THE SITE IS STABILIZED.
GROUND COVER
AFTER THE EARTH DISTURBANCE ACTIVITY IS COMPLETED, THE DISTURBED AREA MUST BE REVEGETATED. THE VEGETATIVE COVER MUST BE A UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. ANOTHER OPTION IS TO USE AN ACCEPTABLE BMP, WHICH
PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION.
TEMPORARY SEEDING
TEMPORARY SEEDING WILL BE PERFORMED DURING THE GERMINATION SEASON (APRIL TO OCTOBER) FOR THE ESTABLISHMENT OF GRASS SEED ON DISTURBED AREAS BEFORE THE START OF THE DORMANT SEASON. DURING THE NON-GERMINATION SEASON, MULCH SHALL BE APPLIED TO THE DISTURBED SURFACES AND THE SEED
MIXTURE WILL BE ADDED AT THE START OF THE GERMINATION PERIOD.
· ALL GRASS AREAS DISTURBED BY THE WORK OF THIS PROJECT SHALL BE SEEDED AS FOLLOWS:
O APPLY AGRICULTURAL LIME AND FERTILIZER AS FOLLOWS FOR TEMPORARY SEEDING:
¨ AGRICULTURAL LIME - 40 POUNDS PER 1,000 SQUARE FEET
¨ FERTILIZER - 12.5 POUNDS PER 1,000 SQUARE FEET
O FERTILIZER SHALL BE A COMMERCIAL TYPE 10-10-10.
O TEMPORARY SEED MIXTURE ANNUAL RYEGRASS -- 1 POUND PER 1,000 SQUARE FEET.
· ALL TEMPORARY SEEDING SHALL BE MULCHED. TEMPORARY SEEDING SHALL BE WATERED AS REQUIRED TO
DEVELOP COVER. NON-POTABLE UTILITY WATER SHALL BE PROVIDED BY THE CONTRACTOR.
· MULCH SHALL BE STRAW, SHALL BE CLEAN AND FREE FROM NOXIOUS WEEDS, AND SHALL BE APPLIED AT
THE RATE OF 140 POUNDS PER 1,000 SQUARE FEET (3.0 TONS PER ACRE).
O APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A TACKIFIER OR A SIMILAR
METHOD IN ORDER TO PREVENT MULCH FROM BEING WINDBLOWN.
PERMANENT SEEDING
PERMANENT SEEDING SHALL TAKE PLACE IN ALL DISTURBED AREAS AS FOLLOWS:
· UPON COMPLETION OF EARTH DISTURBANCE ACTIVITIES, THE SITE SHALL BE IMMEDIATELY STABILIZED.
· THE FOLLOWING SHALL BE SPREAD AND WORKED INTO THE TOPSOIL TO A DEPTH OF 2 TO 4 INCHES.
O AGRICULTURAL LIME - 240 POUNDS PER 1,000 SQUARE FEET
O FERTILIZER - 25 POUNDS PER 1,000 SQUARE FEET
· THE FERTILIZER SHALL BE A COMMERCIAL TYPE 10-20-20.
· NOTE - IF AGRICULTURAL LIME AND FERTILIZER HAVE BEEN APPLIED PREVIOUSLY TO THE GROUND WHERE
THE PERMANENT SEED IS TO BE APPLIED, THE LIME AND FERTILIZER RATES SHALL BE REDUCED BY THE
AMOUNT BY WHAT HAS BEEN APPLIED PREVIOUSLY.
· PERMANENT SEED MIXTURE: THE FOLLOWING SEED MIXTURES SHALL BE APPLIED AS FOLLOWS:
O APPLY MULCH TO ALL PERMANENTLY SEEDED AREAS.
O MATERIALS: STRAW, AIR-DRIED AND FREE FROM UNDESIRABLE SEEDS AND COURSE MATERIALS.
APPLICATION: 140 POUNDS PER 1,000 SQUARE FEET.
· APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A TACKIFIER OR A SIMILAR
METHOD IN ORDER TO PREVENT MULCH FROM BEING WINDBLOWN.
· EROSION CONTROL BLANKETS SHALL BE USED ON SLOPES 3:1 (H:V) OR GREATER.
MAINTENANCE PROGRAM
EMERGENCY EROSION PROTECTION
IF EROSION DOES OCCUR, THE CONTRACTOR SHALL REPAIR AND RESEED THOSE AREAS OR USE OTHER STABILIZATION METHODS AS REQUIRED. THE CONTRACTOR SHALL USE JUTE, WOOD FIBER, OR OTHER TIE DOWN FILTER NETTING ON TOP OF THE NEW SEED AS REQUIRED, REGARDLESS OF THE SLOPE OF THE LAND.
MULCHED AREAS SHALL BE CHECKED WEEKLY AND AFTER EACH RAIN EVENT FOR DAMAGE, UNTIL THE MULCHING IS NO LONGER NECESSARY FOR PROTECTION AGAINST EROSION. DAMAGED PORTIONS OF THE MULCH OR TIE DOWN
MATERIALS SHALL BE REPAIRED AS SOON AS DISCOVERED.
PERIODIC INSPECTION PROGRAM
THE CONTRACTOR WILL INSPECT THE PROJECT'S EROSION AND SEDIMENTATION CONTROLS WEEKLY AND AFTER EACH RAIN EVENT UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION, OPERATION, MAINTENANCE, AND REMOVAL OF ALL EROSION AND SEDIMENTATION CONTROLS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING MUST BE PERFORMED IMMEDIATELY. SEDIMENT THAT HAS BEEN TRAPPED BY THE COMPOST SOCK WILL BE REMOVED AS REQUIRED, AND IN ALL CASES, BEFORE THE ACCUMULATION HAS REACHED HALF THE HEIGHT OF THE SOCK. COMPOST SOCK WILL BE RE-ANCHORED, REPAIRED, OR REPLACED AS NECESSARY. SEDIMENT MUST BE REMOVED FROM SILT SACKS AFTER EACH RUNOFF EVENT, OR WHEN THE DISTANCE BETWEEN THE GRATE AND THE SEDIMENT LEVEL IN THE SILT SACK IS REDUCED TO 18". SILT SACKS WILL BE REPAIRED, OR REPLACED AS NECESSARY. ALL OTHER CONTROLS WILL BE INSPECTED ON THE SAME SCHEDULE. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR
MODIFICATION OF THOSE INSTALLED WILL BE REQUIRED.
MAINTENANCE OPERATIONS
AS PART OF THE LONG TERM OPERATION AND MAINTENANCE, ROUTINE MAINTENANCE INSPECTIONS WILL BE REQUIRED TO INSURE THE EFFICIENCY OF ALL THE SEDIMENT CONTROL DEVICES. AT A MINIMUM, ALL BMP'S SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH MEASURABLE RUNOFF EVENT, INCLUDING THE REPAIR OF THE BMP'S TO ENSURE EFFECTIVE AND EFFICIENT OPERATION. THIS INSPECTION SHALL BE FOLLOWED UP WITH A REPAIR SCHEDULE OF ALL NOTED DEFICIENCIES. VEGETATION PROGRESS SHALL ALSO BE INCLUDED IN THIS INSPECTION.
VOID AREAS SHALL PROMPTLY BE RESEEDED AND MULCHED TO ESTABLISH PROTECTION.
BMP'S THAT FAIL AFTER INSTALLATION MUST BE REPAIRED TO FUNCTION PROPERLY OR BE REPLACED BY ALTERNATIVE BMP'S THAT WILL SERVE THE INTENDED PURPOSE. IF UNFORESEEN CONDITIONS OCCUR ON A SITE, AND THE INSTALLED BMP'S ARE OBVIOUSLY NOT EFFECTIVE, THEN ALTERNATE BMP'S MUST BE DESIGNED AND
INSTALLED. THE NEED FOR REDESIGN WILL BE DETERMINED ON A CASE-BY-CASE BASIS.
ANY CHANGES OR ADDITIONS MADE TO THIS PLAN WILL BE DONE SO IN WRITING WITH A SIGNATURE FROM A PERMITTEE OR CO-PERMITTEE REPRESENTATIVE. THESE CHANGES OR ADDITIONS MUST BE APPROVED AND INITIALED BY A PA DEP OR CONSERVATION DISTRICT REPRESENTATIVE AND KEPT ON-SITE WITH THIS NPDES PERMIT.
REMOVAL OF CONTROLS AND CONTINUING MAINTENANCE
ALL REQUIRED TEMPORARY EROSION AND SEDIMENTATION CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE AREA THEY PROTECT HAS BEEN STABILIZED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS
MUST BE STABILIZED IMMEDIATELY.
STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS. FINAL STABILIZATION OF VEGETATED AREAS WILL OCCUR WHEN A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. PAVED AREAS SHALL BE
CONSIDERED PERMANENTLY STABILIZED WITH THE APPLICATION OF THE BASE COURSE LAYER.
REVEGETATION SHALL OCCUR AS SOON AS PRACTICAL AFTER COMPLETION OF THE FINAL GRADING. SHOULD CONDITIONS PROHIBIT PERMANENT REVEGETATION EFFORTS, THE AREA WILL BE TEMPORARILY STABILIZED THROUGH THE USE OF QUICK-GROWING GRASSES, NYLON EROSION CONTROL MATS OR SIMILAR MEASURES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERMANENT STABILIZATION OF ALL AREAS EXPOSED OR DISTURBED
DURING THE PROJECT.
THE CONTRACTOR SHALL MAINTAIN ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES IN GOOD CONDITION UNTIL ESTABLISHMENT OF GROUND COVER OVER TRIBUTARY AREAS. THIS WILL INCLUDE CLEANING AND, IF REQUIRED, REPAIR OF ANY SEDIMENT CONTROL BMPS, AND SEEDING OF ERODED AREAS, AS NECESSARY.
PERMANENT EROSION AND SEDIMENTATION CONTROL MEASURES WILL BECOME THE RESPONSIBILITY OF THE
FACILITY OWNER UPON COMPLETION OF ALL ASPECTS OF THE PROJECT.
UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE PERMITTEE AND CO-PERMITTEE SHALL ASSURE THAT THE BEST MANAGEMENT PRACTICES ARE IMPLEMENTED, OPERATED, AND MAINTAINED PROPERLY AND COMPLETELY.
MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL BEST MANAGEMENT PRACTICE FACILITIES ON A WEEKLY BASIS AND AFTER EACH MEASURABLE RAINFALL EVENT, AND MAINTAIN AND MAKE AVAILABLE TO THE REVIEWING AGENCY COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE INSPECTIONS. ALL MAINTENANCE WORK, INCLUDING CLEANING, REPAIR, REPLACEMENT, REGARDING, RESEEDING, AND RE-STABILIZATION SHALL BE PERFORMED
IMMEDIATELY.
RECYCLING AND DISPOSAL METHODS
CONSTRUCTION MATERIALS AND OTHER CONSTRUCTION SITE WASTES MUST BE PROPERLY MANAGED AND DISPOSED OF TO REDUCE POTENTIAL FOR POLLUTION TO SURFACE AND GROUND WATERS AS PER 25 PA. CODE § 102.4(B)(5)(XI).
PROPER TRASH DISPOSAL, RECYCLING OF MATERIALS, PROPER MATERIALS HANDLING, AND SPILL PREVENTION AND CLEAN-UP REDUCE THE POTENTIAL FOR CONSTRUCTION SITE WASTES TO BE MOBILIZED BY STORMWATER RUNOFF
AND CONVEYED TO SURFACE WATERS.
· COLLECTED SEDIMENT WILL BE PLACED ON FILL SLOPES AND GRADED, SEEDED AND MULCHED AS NEEDED
TO ATTAIN STABILIZATION.
· THE CONTRACTOR SHALL REMOVE FROM THE SITES, RECYCLE OR DISPOSE OF ALL MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE 260.1
ET SEQ., 271.1 E. SEQ. AND 287.1 ET SEQ.
REMEDIAL MEASURES TO ADDRESS SITE SOIL LIMITATIONS
CUTBANKS CAVE
CUT SLOPES SHALL BE EXCAVATED AT A MAXIMUM SLOPE OF 2 HORIZONTAL TO 1 VERTICAL TO PROVIDE STABLE SLOPES. FURTHER STABILIZE THE SLOPE WITH EROSION PROTECTION BLANKETS IF NECESSARY. LIMIT TRENCH EXCAVATION TO A DEPTH NECESSARY TO INSTALL PIPELINES. PROVIDE SHORING AS NECESSARY TO MAINTAIN
TRENCH DURING PIPELINE INSTALLATION ACTIVITIES.
CORROSIVE TO CONCRETE/STEEL
PROVIDE CONCRETE MIXES DESIGNED TO BE RESISTANT TO CORROSION AT SITES WITH CORROSIVE POTENTIAL SOILS. STEEL CASINGS AND PIPELINES SHALL BE PROTECTED WITH COATINGS TO RESIST CORROSION.
EASILY ERODIBLE
IF NECESSARY, PROVIDE EROSION PROTECTION BLANKETS TO PREVENT ACCELERATED EROSION. SEED AND MULCH DISTURBED AREAS AS SOON AS POSSIBLE AFTER ESTABLISHING FINAL CONTOURS. INSPECT AND MAINTAIN DISTURBED AREAS BY RE-SEEDING AS NEEDED UNTIL A STABLE VEGETATIVE COVER IS ESTABLISHED.
DEPTH TO SATURATED…