2-PB24TF01- LHBR Redevelopment Final Landscape Improvements Plans Issued for Bid 10-29-2025.pdf
PDF 16 MB Posted
- Solicitation number
- CIZ25-PBW-3201
- Issued by
- Dallas County, Texas
About this file
This document is a comprehensive set of construction plans and specifications for the Longhorn Ballroom Redevelopment Project's Landscape Improvements on Corinth Street in Dallas, Texas, prepared by the City of Dallas Department of Transportation & Public Works. The project involves landscape improvements along Corinth Street from South Riverfront Boulevard to UPRR, with a total project length of 1,002 linear feet. The plans, dated October 27, 2025, include detailed landscape, planting, irrigation, and construction specifications, covering everything from tree and shrub placement to irrigation system design and installation.
The project encompasses multiple technical aspects, including specific landscape design with various plant species like American Sycamore, Cedar Elm, and Softleaf Yucca, an intricate irrigation system with subsurface drip lines and pop-up spray heads, and detailed construction requirements. The irrigation system includes a wall-mounted controller, rain sensor, and comprehensive piping and valve installations. The specifications provide extensive guidance on contractor qualifications, materials standards, installation methods, and quality control measures, with a focus on ensuring 100% landscape area coverage and adherence to local codes and regulations. The project appears to be a urban streetscape improvement initiative aimed at enhancing the public right-of-way with sustainable landscaping and modern irrigation technologies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O R
TH
DEPARTMENT OF TRANSPORTATION & PUBLIC WORKS
1. CORINTH STREET - PROJECT LENGTH 1002 LF
10/24/2025
A
S
E
S
A 2
O
ET
X
B
EW
10/27/2025
7-9 11-13
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D2/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
. T
TT
S
A
SA
M
ET
S
TA 2
OF
ET
X
U
S
BB
S
HEW
CITY OF DALLAS GENERAL NOTES
GENERAL
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS (NCTCOG) PUBLIC WORKS CONSTRUCTION STANDARDS, (FIFTH EDITION, NOVEMBER 2017), AS AMENDED BY THE CITY OF DALLAS 2021 ADDENDUM (OCTOBER 1, 2021) TO THE NCTCOG PUBLIC WORKS CONSTRUCTION
THE CITY OF DALLAS DEPARTMENT OF PUBLIC WORKS STANDARD CONSTRUCTION DETAILS (UPDATED
2. THE WORK ORDER FOR THIS PROJECT IS ESTIMATED TO BE ISSUED DURING THE MONTH OF
_____________________. THE CONTRACTOR SHALL BEGIN WORK WITHIN TEN (10) DAYS OF THE DATE SPECIFIED ON THE WORK ORDER. ANY REVISIONS/CHANGE ORDERS PROVIDED TO CONTRACTOR FOR ADDITIONAL WORK
OR REDUCTION IN WORK DOES NOT CONSTITUTE A NEW START DATE.
3. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS BEFORE ANY WORK MAY BEGIN. ALL PERMIT FEES SHALL BE CONSIDERED INCIDENTAL TO PAY ITEMS PROVIDED. STREET EXCAVATION PERMIT APPLICATIONS MUST BE SUBMITTED IN ROOM 321 OF THE OAK CLIFF MUNICIPAL CENTER, AT LEAST TWO (2) WORKING DAYS BEFORE THE START OF CONSTRUCTION. FOR MORE INFORMATION, CALL CITY OF DALLAS CONSTRUCTION
INSPECTION DIVISION (214) 948-4290.
4. THE CONTRACTOR SHALL PROVIDE A CONSTRUCTION SCHEDULE UPDATE TO THE ENGINEER AND THE CONSTRUCTION INSPECTOR WITH THE MONTHLY PAY ESTIMATE. CONTRACTOR SHALL PROVIDE A WEEKLY
UPDATE UPON REQUEST BY THE PROJECT MANAGER AT NO ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR WILL BE PAID ONLY FOR THE WORK WHICH IS COMPLETED IN STRICT CONFORMANCE TO THE FILE 251D-1; THE STANDARD SPECIFICATIONS; DALLAS WATER UTILITIES STANDARD DRAWINGS; AND ALL
ADDENDA AND APPLICABLE SPECIFICATIONS AS STATED IN THE SPECIAL PROVISIONS.
6. NO FINAL PAYMENT TO CONTRACTOR SHALL BE RELEASED PRIOR TO THE ACCEPTANCE OF THE FINAL INSPECTION FROM THE AUTHORIZED PERSONNEL OF THE CITY OF DALLAS DEPARTMENT OF PUBLIC WORKS
CONSTRUCTION INSPECTION DIVISION.
7. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING SHOULD ANY DISCREPANCIES BE FOUND IN THE CONSTRUCTION PLANS AND/OR THE SPECIAL PROVISIONS. THE CONTRACTOR WILL NOT BE COMPENSATED FOR
ANY WORK NOT AUTHORIZED BY THE ENGINEER.
8. THE CONTRACTOR SHALL NOTIFY THE CITY OF DALLAS CONSTRUCTION INSPECTOR OR DISTRICT SUPERVISOR TWO (2) WORKING DAYS BEFORE STARTING WORK, SO THAT PROPER JOB INSPECTION CAN BE SCHEDULED.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF DALLAS CONSTRUCTION INSPECTOR OR DISTRICT SUPERVISOR ONE (1) WORKING DAY IN ADVANCE OF ANY CONCRETE PLACING OR ASPHALT LAYING OPERATION.
10. THE CONTRACTOR MUST FURNISH AT LEAST TWO (2) PHONE NUMBERS WHERE RESPONSIBLE PERSONNEL CAN BE REACHED IN CASE OF EMERGENCY DURING WORKING AND NON-WORKING HOURS. IF THERE ARE ANY CHANGES, THE INFORMATION MUST BE UPDATED IMMEDIATELY FOR THE DURATION OF THE PROJECT.
11. IF CULTURAL RESOURCES (ARCHAEOLOGICAL FINDINGS UNEARTHED) ARE LOCATED DURING CONSTRUCTION, WORK SHALL STOP IMMEDIATELY IN THAT AREA.
12. WHILE THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS AND METHODS OF PROGRESSING THE WORK, THE ENGINEER/INSPECTOR IS RESPONSIBLE TO ASSURE THAT THE MEANS AND METHODS PROPOSED ARE IN ACCORDANCE WITH THE CITY STANDARDS AND GUIDELINES, AS WELL AS, THE DETAILS IN THE PROJECT SPECIFIC PLANS AND SPECIFICATIONS. THE ENGINEER/INSPECTOR WILL DIRECT THE CONTRACTOR TO STOP ANY ACTIVITIES THAT ENDANGERS VEHICULAR TRAFFIC, PEDESTRIANS, WORKERS OR PROPERTY AND TO ASSURE THAT THE NEEDED ADJUSTMENTS/MODIFICATIONS ARE IMPLEMENTED IN A TIMELY MANNER TO
MITIGATE ANY DANGEROUS CONDITIONS OR ACTIVITIES THAT EXIST.
13. THE CONTRACTOR AND THE CITY INSPECTOR SHALL MEASURE QUANTITIES FOR REMOVAL ITEMS 201, 202 & 203.
PAVING
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESETTING BENCHMARKS AFFECTED BY THE CONSTRUCTION
OR ESTABLISHING NEW ONES (NO SEPARATE PAY ITEM).
15. ALL CONCRETE SHALL BE PLACED IN COMPLIANCE WITH THE SPECIFIED CLASSES AND QUALITY OF CONCRETE
OTHERWISE MODIFIED BY THE PLANS AND SPECIAL PROVISIONS OF THE PROJECT. ALL OTHER CONCRETE NOT
16. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER THE COMPLETE CONCRETE MIX (BATCH) DESIGN AT THE PRE-CONSTRUCTION CONFERENCE AND/OR AT LEAST TEN (10) WORKING DAYS PRIOR TO THE START OF ANY CONCRETE PLACING OPERATIONS (FAX INFORMATION IS NOT ACCEPTABLE). IF VOLUMETRIC CONCRETE IS USED, THE SAME INFORMATION IS REQUIRED. (NOTE: VOLUMETRIC CONCRETE IS NOT APPROVED FOR PLACEMENT OF CONCRETE FOR STREET OR ALLEY PAVING, BUT MAY BE USED FOR SIDEWALK, CURB AND GUTTER, DRIVEWAY APPROACH, AND COMPOSITE GABION CONCRETE BEAMS. A SHEET OF TRUCK GATE SETTINGS FROM THE SUPPLIER MUST BE APPROVED BY THE ENGINEER, IN ADDITION TO THE COMPLETE
CONCRETE MIX DESIGN.)
17. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE
CORRECT CLEARANCES BY USING BAR CHAIRS OR OTHER APPROVED SUPPORT.
18. THE USE OF WOOD FORMS FOR PAVEMENT CONSTRUCTION WILL BE PERMITTED ONLY FOR LEAVEOUTS, ALLEYS, SIDEWALKS, DRIVEWAYS, BARRIER FREE RAMPS AND INTERSECTIONS, UNLESS OTHERWISE DIRECTED
BY THE ENGINEER.
19. DUMMY JOINTS (CONTROL JOINTS) SHALL BE SAWED IN THE PAVEMENT ON THIS PROJECT, AND SHALL BE SAWED NOT LATER THAN 12 HOURS AFTER THE PLACEMENT OF THE PAVEMENT. DUMMY JOINTS WILL BE SPACED 15 FEET ON CENTERS, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. SPACING VARIATIONS SHALL BE MADE AT BLOCKOUTS, CONSTRUCTION JOINTS AND STREET INTERSECTIONS TO LINE UP WITH EXISTING PAVING JOINTS, AS DIRECTED BY THE CITY OF DALLAS. THE SPACING BETWEEN ANY JOINT SHALL NOT BE LESS
THAN 10 FEET NOR MORE THAN 20 FEET. SEE FILE 251D-1, FOR ADDITIONAL INFORMATION.
20. DRIVE APPROACHES DAMAGED BY THE CONTRACTOR SHALL BE REMOVED AND REPLACED TO MATCH THE EXISTING CONDITIONS, AT THE CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE CITY OF DALLAS OR ITS REPRESENTATIVE. DRAINAGE PIPE UNDER DRIVE APPROACHES DAMAGED BY THE CONTRACTOR SHALL BE REPLACED OR REPAIRED TO EQUAL OR BETTER THAN EXISTING CONDITION, AT THE CONTRACTOR'S
EXPENSE.
21. PAY ITEM 503- GRAVEL SURFACE, IS FOR RESTORING UNPAVED DRIVES BEHIND THE PROPERTY LINE TO GRADE AND RESTORATION OF THE SURFACE TO EQUAL OR BETTER THAN THE ORIGINAL CONDITION. PAY LIMITS WILL BE MEASURED AS DIMENSIONED ON THE PLANS AND WILL NOT BE MEASURED IN THE FIELD FOR PAYMENT.
WHEN A PAY ITEM IS NOT INCLUDED IN THE PLANS, ADJUSTMENT WILL BE INCIDENTAL TO THE PROJECT.
22. BARRIER FREE RAMPS MAY BE BUILT WITH THIS PROJECT. PAY ITEMS WILL BE THOSE SHOWN ON THE PLANS.
LOCATIONS MAY BE ADJUSTED AS DIRECTED BY THE ENGINEER TO CLEAR OBSTRUCTIONS. ALL BARRIER FREE RAMPS SHALL MEET REQUIREMENTS FOR SLOPE, TEXTURE, SURFACE FINISH AND COLOR, AS SHOWN IN THE TEXAS ACCESSIBILITY STANDARDS, AS CURRENTLY AMENDED BY THE TEXAS DEPARTMENT OF LICENSING &
REGULATION.
23. WHEN BARRIER FREE RAMPS AND/OR SIDEWALKS ARE PLACED IMMEDIATELY ADJACENT TO CONCRETE CURB AND GUTTER, THE CONCRETE FOR THE CURB AND GUTTER SHALL BE PLACED FIRST AND ALLOWED TO CURE BEFORE CONCRETE FOR BARRIER FREE RAMPS AND/OR SIDEWALKS IS PLACED. THIS SEPARATION IS NECESSARY TO SATISFY THE REQUIREMENTS FOR KEYWAY OR KEYWAY REPLACEMENT AS SHOWN IN THE FILE 251D-1. THE CONCRETE FOR THE CURB AND GUTTER SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH
OF 4,500 PSI.
24. VARIABLE HEIGHT CURB AT INTERSECTIONS AND SLOPING CURBS AT DRIVES MAY BE CONSTRUCTED TO MATCH FUTURE BARRIER FREE RAMPS, AS DIRECTED BY THE ENGINEER. WHEN A PAY ITEM IS NOT INCLUDED IN THE
PLANS, WORK SHALL BE INCIDENTAL TO THE PROJECT.
25. DURING SIDEWALK REPLACEMENT, IF ADJACENT RETAINING WALLS ARE DAMAGED OR REMOVED BECAUSE OF
LIKE-KIND MATERIAL. WHEN A PAY ITEM IS NOT INCLUDED IN THE PLANS, WORK SHALL BE INCIDENTAL TO THE
PROJECT.
26. WHEN BARRIER FREE RAMP IS PAID AS EACH, ANY RETAINING WALL BUILT ADJACENT TO THE BARRIER FREE RAMP WILL BE MEASURED AND PAID FOR UPRIGHT PORTION ONLY. THE FOOTING PORTION OF THIS SECTION OF
RETAINING WALL SHALL BE INCIDENTAL TO THE BARRIER FREE RAMP.
27. THE PROPOSED SIDEWALK ALIGNMENT MAY BE REVISED AS DIRECTED BY THE ENGINEER TO PREVENT THE
REMOVAL OF TREES, ENSURING THAT ADEQUATE WIDTH IS RETAINED FOR HANDICAP ACCESS.
28. THE STANDARD RESIDENTIAL DRIVEWAY WIDTH IS 10-FEET. ALL DRIVEWAY TURNOUTS, EXCEPT THOSE IN THE CENTRAL BUSINESS DISTRICT OR CONSTRUCTED WITH SIDEWALK PROJECTS, SHALL BE CONSTRUCTED IN THE DUST-PAN STYLE SHOWN IN THE FILE 251D-1, SHEET 1004. WHERE DRIVEWAY TURNOUTS ARE CONSTRUCTED WITH A RADIUS, THE RADIUS SHALL BE 10 FEET TO THE FACE OF CURB. VARIATIONS FROM THE STANDARDS
ARE DIMENSIONED.
29. THE STANDARD WIDTH OF ALLEY TURNOUTS IS 12-FEET. ALL ALLEY TURNOUTS, EXCEPT THOSE CONSTRUCTED WITH SIDEWALK PROJECTS, SHALL BE CONSTRUCTED IN THE DUST-PAN STYLE SHOWN IN THE FILE 251D-1, SHEETS 1009, 1010. WHERE ALLEY TURNOUTS ARE CONSTRUCTED WITH A RADIUS, THE RADIUS SHALL BE
____________ TO THE FACE OF CURB. VARIATIONS FROM THE STANDARDS ARE DIMENSIONED.
30. THE CONTRACTOR SHALL PROTECT ALL EXISTING FENCES AND MAIL BOXES. ANY DAMAGES DUE TO
HAS BEEN PROVIDED, OR AS DIRECTED BY THE ENGINEER.
31. MAIL BOXES WILL BE RESET AS DIRECTED BY THE ENGINEER. ALL MAIL BOXES TO BE REMOVED SHALL BE STORED AND RESET AS SOON AS ALLOWED BY CONSTRUCTION ACTIVITIES. ALL MAIL BOXES DAMAGED BY CONSTRUCTION ACTIVITIES (OR WHILE BEING STORED) SHALL BE REPLACED WITH MAIL BOXES OF EQUAL OR BETTER QUALITY, AND OF A SIMILAR STYLE TO THOSE BEING REPLACED. SEE THE SPECIAL PROVISION.
32. WHEN ENCROACHING MASONRY WALLS AND LANDSCAPING PLANTS AND MATERIALS ARE TO BE REMOVED, SUITABLE MATERIAL AND PLANTS WILL BE SALVAGED FOR THE PROPERTY OWNER AS DIRECTED BY THE ENGINEER. PLANTS, SHRUBBERY, LANDSCAPING, OR ANY LIVING TREES SHALL BE PROTECTED AND SHALL NOT BE REMOVED FROM THE WORK SITE. DAMAGE TO THESE MATERIALS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHOULD CONTACT THE ENGINEER PRIOR TO ANY REMOVAL.
33. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL EXISTING FACILITIES IN AND AROUND THE PROJECT AREA. THESE INCLUDE TREES, PLANTINGS, CONCRETE PAVING, BENCHES, SIGNS AND OTHER FACILITIES FOUND ON SITE. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY FACILITIES DAMAGED DURING CONSTRUCTION, AT NO COST TO THE CITY, UNLESS A SEPARATE PAY ITEM HAS BEEN PROVIDED, OR AS
DIRECTED BY THE ENGINEER.
34. BEFORE THE START OF THE CONSTRUCTION, RESIDENTIAL SPRINKLER SYSTEMS MUST BE CHECKED IN THE PRESENCE OF THE PROPERTY OWNER. ANY DAMAGES TO EXISTING RESIDENTIAL SPRINKLER SYSTEMS DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE, UNLESS A SEPARATE PAY ITEM HAS
BEEN PROVIDED, OR AS DIRECTED BY THE ENGINEER.
35. THE LOCATIONS OF DRIVEWAYS, STEPS, ETC., AS SHOWN ON THESE PLANS ARE APPROXIMATE. ACCURATE LOCATIONS SHALL BE DETERMINED AT THE TIME OF CONSTRUCTION AFTER CONSULTATION WITH THE
ENGINEER.
ENVIRONMENTAL
36. THE CONTRACTOR MUST HAVE A WRITTEN AGREEMENT WITH THE PROPERTY OWNER ON FILE WITH THE CITY OF DALLAS BEFORE THE CONTRACTOR MAY USE OR PLACE ANY MATERIALS OR EQUIPMENT ON PRIVATE PROPERTY. IN ADDITION, THE CONTRACTOR SHALL PROVIDE A COPY OF THE TEMPORARY CERTIFICATE OF OCCUPANCY (C.O.) OR SPECIAL USE PERMIT (S.U.P.) AS REQUIRED OF THE PROPERTY OWNER, PER CITY OF DALLAS ORDINANCE NO. 22996, WHEN THE CONTRACTOR ELECTS TO PLACE EXCESS FILL ON PRIVATE PROPERTY ON A PERMANENT BASIS. LETTERS OF FINAL APPROVAL AND RELEASE FROM THE AFFECTED PROPERTY OWNER(S) MUST BE SUBMITTED TO THE CITY OF DALLAS BEFORE FINAL PAYMENT WILL BE AUTHORIZED ON THIS PROJECT. NO EXCESS EXCAVATED MATERIAL SHALL BE DEPOSITED IN LOW AREAS OR ALONG ANY NATURAL DRAINAGE WAY, WITHOUT WRITTEN PERMISSION FROM THE ENGINEER. IF THE CONTRACTOR PLACES EXCESS MATERIAL IN AREAS WITHOUT WRITTEN PERMISSION, DAMAGE RESULTING FROM SUCH FILL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. SUCH FILL MATERIAL SHALL BE REMOVED AT
BETTER THAN ORIGINAL CONDITION.
37. THE CITY OF DALLAS RESERVES THE RIGHT TO ISSUE THE WORK ORDER FOR PAY ITEM 101- CLEARING AND GRUBBING, SEPARATE AND APART FROM THE WORK ORDER FOR THE REMAINDER OF THE PROJECT. AFTER THE CLEARING AND GRUBBING, HAS BEEN COMPLETED TO THE SATISFACTION OF THE ENGINEER, THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR MAINTENANCE OF THE SITE, BARRICADES OR THE WARNING FACILITIES OF OTHERS UNTIL THE ISSUANCE OF THE WORK ORDER FOR THE REMAINDER OF THE PROJECT.
38. NO TREES SHALL BE CUT EXCEPT ON SPECIFIC AUTHORITY OF THE ENGINEER. TREES REMOVED WITH A DIAMETER OF LESS THAN 6 INCHES, LIMBS OVERHANGING THE BARRIER FREE RAMPS/SIDEWALK TRIMMED TO A HEIGHT OF 8 FEET FROM THE GROUND, AND SHAVING OF TREE ROOTS SHALL BE INCIDENTAL TO PAY ITEM 101- CLEARING & GRUBBING, OR INCIDENTAL TO THE PROJECT WHEN PAY ITEM 101 IS NOT PROVIDED.
39. PAY ITEM 102- UNCLASSIFIED STREET EXCAVATION, AND PAY ITEM 1405- UNCLASSIFIED CHANNEL EXCAVATION, WILL NOT INCLUDE CONCRETE WORK OR ANY OTHER MATERIAL REMOVED AS SEPARATE PAY ITEMS.
40. THE CONTRACTOR MAY EXCAVATE THE PROPOSED ROADWAY, FULL WIDTH, ONLY WITH THE PRIOR APPROVAL
41. THE QUANTITY OF UNCLASSIFIED EXCAVATION NECESSARY FOR THE CONSTRUCTION OF THIS PROJECT IS
ESTIMATED TO BE APPROXIMATELY 5,020 CUBIC YARDS.
42. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND SIDEWALKS ADJACENT TO THE PROJECT FREE
OF MUD AND DEBRIS FROM THE CONSTRUCTION AT ALL TIMES.
43. ALL STORM WATER POLLUTION PREVENTION MEASURES SHALL BE USED IN COMPLIANCE WITH THE STANDARD
SUCCESSFUL COMPLETION OF THE PROJECT.
44. ALL WASTE MATERIAL AND/OR EXCESS EXCAVATION NOT USED AS PART OF THE WORK SHALL BE REMOVED FROM THE JOB SITE AND DISPOSED OF IN A TIMELY MANNER AT ACCEPTABLE LOCATIONS IN ACCORDANCE WITH
ALL LOCAL, STATE AND FEDERAL REGULATIONS (NO SEPARATE PAY ITEM).
45. THE PAY LIMIT FOR GRASS SPOT OR BLOCK SODDING REPLACEMENT DUE TO STORM DRAINAGE SYSTEM INSTALLATION SHALL BE 2-FEET OUTSIDE THE EXCAVATED TRENCH. ALL OTHER GRASS DAMAGED OR DESTROYED DURING THIS INSTALLATION SHALL BE REPLACED AT THE SOLE EXPENSE OF THE CONTRACTOR.
46. THE CONTRACTOR SHALL HAVE AN ON-SITE SPILL RESPONSE KIT. CONSTRUCTION PERSONNEL SHALL BE TRAINED ON HOW TO USE THE SPILL RESPONSE KIT. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF THE CITY OF DALLAS ENVIRONMENTAL POLICY. NO SPILLS WILL BE ALLOWED TO ENTER THE STORM DRAINAGE
SYSTEM.
47.
DATED APRIL 10TH, 2024, FOR ANTICIPATED SUBSURFACE CONDITIONS AND DETAILS CONCERNING SUBGRADE PREPARATION. THIS REPORT SHALL BE MADE AVAILABLE TO THE CONTRACTOR DURING THE BIDDING PROCESS
48. ANY CLEARING AND GRUBBING NEEDED, AS DIRECTED BY THE ENGINEER, SHALL BE INCIDENTAL TO THE
PROJECT OR TO PAY ITEM 101- CLEARING & GRUBBING, WHEN PROVIDED.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D3/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
. T
TT
S
A
SA
M
ET
S
TA 2
OF
ET
X
U
S
BB
S
HEW
CITY OF DALLAS GENERAL NOTES
GENERAL NOTES SRTEET (CONT.):
TRAFFIC
49. THE CONTRACTOR SHALL MAINTAIN PROPER BARRICADES AND SAFETY MEASURES FOR THE PROTECTION OF THE TRAVELING PUBLIC DURING THE CONSTRUCTION OF THIS PROJECT AS COVERED IN THE STANDARD
50. ALL BARRICADES, WARNING SIGNS, LIGHTS, DEVICES, ETC., FOR THE GUIDANCE AND PROTECTION OF TRAFFIC AND PEDESTRIANS MUST CONFORM TO THE INSTALLATION SHOWN IN THE LATEST TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (TMUTCD), AS CURRENTLY AMENDED BY THE TEXAS DEPARTMENT OF TRANSPORTATION, AND THE CITY OF DALLAS TRAFFIC BARRICADE MANUAL (2011 EDITION, OR AS CURRENTLY AMENDED BY THE CITY OF DALLAS DEPARTMENT OF PUBLIC WORKS, RIGHT OF WAY MANAGEMENT SECTION).
51. THE CONTRACTOR SHALL DEVELOP A SEQUENCE OF CONSTRUCTION, PREPARE DETAILED TRAFFIC CONTROL
BARRICADE MANUAL, AND SUBMIT THEM TO THE CITY OF DALLAS FOR REVIEW AND APPROVAL PRIOR TO
SETTING UP FOR CONSTRUCTION.
52. PAY LIMITS FOR MEASUREMENT OF PAY ITEM 1601A- TRAFFIC CONTROL, SHALL INCLUDE REMOVAL, INSTALLATION AND MAINTENANCE OF ALL TEMPORARY TRAFFIC CONTROL DEVICES (WARNING SIGNS, BARRICADES, ELECTRICAL ARROW BOARD, FLAGMEN, TEMPORARY PAVEMENT MARKINGS FOR DETOUR [IF APPLICABLE] AND ANY OTHER TEMPORARY TRAFFIC CONTROL MEASURES) IMPLEMENTED, AS DIRECTED BY THE
ENGINEER TO MAINTAIN THE NECESSARY TRAFFIC THROUGH THE PROJECT.
53. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN REMOVING AND RESETTING TRAFFIC CONTROL SIGNS. WHEN A SEPARATE PAY ITEM HAS NOT BEEN PROVIDED, PAY ITEM 1601A SHALL ALSO INCLUDE REMOVING AND RESETTING/REPLACING EXISTING UNDAMAGED TRAFFIC CONTROL SIGNS. ANY TRAFFIC CONTROL SIGNS DAMAGED OR ALTERED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
54. THE CONTRACTOR SHALL REMOVE ALL EXISTING PAVEMENT MARKINGS IN DETOUR AREAS TO AVOID CONFLICTS WITH TEMPORARY PAVEMENT MARKINGS, AS DIRECTED BY THE ENGINEER. WHEN A PAY ITEM IS NOT INCLUDED IN THE PLANS, WORK SHALL BE INCIDENTAL TO THE PROJECT. DETOURS OUTSIDE THE PROJECT LIMITS THAT ROUTE TRAFFIC AROUND A CLOSED ROADWAY SHALL UTILIZE EXISTING PAVEMENT MARKINGS. ANY TRAFFIC
CONTROL STRIPING DAMAGED OR ALTERED DURING CONSTRUCTION SHALL BE REPLACED AT THE
CONTRACTOR'S EXPENSE.
55. TWO-WAY TRAFFIC SHALL BE MAINTAINED AT ALL TIMES ON THIS PROJECT UNLESS SPECIFIED OTHERWISE IN
THE PLANS AND SPECIFICATIONS.
56. ACCESS TO ABUTTING PROPERTY WILL BE MAINTAINED BY PAVING DOUBLE DRIVES ONE AT A TIME OR BY PAVING WIDE DRIVES ONE-HALF WIDTH AT A TIME, AS DIRECTED BY THE ENGINEER. ACCESS TO ABUTTING PROPERTY DURING THE CONSTRUCTION OF THIS PROJECT SHALL BE MAINTAINED FOR EMERGENCY AND LOCAL
TRAFFIC. PAYMENT FOR A LEAVEOUT WILL NOT BE MADE.
57. STREET INTERSECTIONS WILL BE KEPT OPEN TO TRAFFIC BY PAVING ONE-HALF WIDTH AT A TIME, AS DIRECTED BY THE ENGINEER. PAYMENT FOR A LEAVEOUT MAY BE PROVIDED IN SUCH CASES. WHEN A PAY ITEM IS NOT
INCLUDED IN THE PLANS, WORK SHALL BE INCIDENTAL TO THE PROJECT.
58. THE LOCATION OF TRAFFIC SIGNAL FOUNDATIONS, BASES, CONDUIT, DETECTORS, ETC., SHOWN ON THE PLANS IS APPROXIMATE. THE CONTRACTOR SHALL GIVE THE CITY OF DALLAS TRANSPORTATION DEPARTMENT TWO (2) WEEKDAYS NOTICE TO ESTABLISH THE FINAL LOCATION OF ANY FOUNDATION, BASE, CONDUIT, DETECTOR, ETC., AND HAVE THE LOCATION APPROVED ON THE GROUND BY THE CITY OF DALLAS TRAFFIC SIGNAL ENGINEER OR DULY AUTHORIZED REPRESENTATIVE. CONTACT CITY OF DALLAS TRAFFIC MANAGEMENT CENTER
AT (214) 670-3095 OR ALFRED.LEMON@DALLASCITYHALL.COM.
59. NO STOP OR YIELD SIGN IS TO BE RELOCATED OR REMOVED WITHOUT PRIOR APPROVAL BY THE CITY OF DALLAS DEPARTMENT OF TTRANSPORTATION (DDOT) TRAFFIC SIGNS AND PAVEMENT MARKING SECTION. THE CONTRACTOR MUST CONTACT DDOT ENGINEER OR DULY AUTHORIZED REPRESENTATIVE AND OBTAIN PERMISSION FROM DDOT TRAFFIC SIGN SHOP, 3204 CANTON STREET AT LEAST TWO (2) WEEKDAYS IN ADVANCE
FOR CHANGES IN THESE SIGNS. FOR MORE INFORMATION, CALL (469)-704-0614.
60. WHEN RIGID CONDUIT IS ENCOUNTERED, THE RIGID CONDUIT SHALL BE PUSHED UNDER EXISTING PAVEMENT
OR UNDER CONDUIT CONNECTING TO A POWER SOURCE. SEE SPECIAL PROVISION.
61. THE CONTRACTOR SHALL COORDINATE WITH DALLAS AREA RAPID TRANSIT (DART) FOR REMOVING AND RESETTING ANY DART BUS STOP AND/OR LIGHT RAIL SHELTERS, BENCHES, SIGNS OR OTHER AMENITIES.
UTILITIES
62. EXISTING UTILITIES ARE SHOWN AT APPROXIMATE LOCATIONS AND DEPTHS BASED ON BEST AVAILABLE RECORDS AND LIMITED FIELD DATA. NOT ALL UTILITIES MAY BE SHOWN. THE CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND DEPTHS OF ALL UTILITIES PRIOR TO BEGINNING CONSTRUCTION. ANY DAMAGES TO
63. LOCATION OF ALL UNDERGROUND UTILITIES AND STORM DRAINAGE FACILITIES IN THE AREA OF STORM DRAIN CONSTRUCTION AND OTHER AREAS OF POSSIBLE CONFLICT WILL BE UNCOVERED TO DETERMINE EXACT
BEFORE THE PAY ITEM CAN BE UTILIZED, WHEN A PAY ITEM IS PROVIDED. THE CONTRACTOR SHALL PROVIDE STATION AND ELEVATION INFORMATION FOR LOCATIONS THAT ARE UNCOVERED, IN ORDER TO BE PAID.
PAYMENT MAY BE MADE UNDER PAY ITEMS 1651, 1652, 1653, 1654 OR 2050.
64. THE CONTRACTOR SHALL NOTIFY THE DALLAS WATER UTILITIES DISTRIBUTION DIVISION AT 311 OR (214) 670-8963 AND THE WASTEWATER COLLECTION DIVISION AT (214) 670-8011, AT LEAST TWO (2) WORKING DAYS
PRIOR TO CONSTRUCTION THAT MIGHT AFFECT THEIR FACILITIES.
65. EQUIPMENT THAT IS OVE R H20 LOADING WILL NOT BE ALLOWED WITHIN THE R.O.W. OR EASEMENT OF DALLAS WATER UTILITIES. ONLY TRACKED EQUIPMENT SHALL BE USED OVER THE PIPELINES, UNLESS OTHERWISE
APPROVED BY DALLAS WATER UTILITIES.
AC ASPHALT CONCRETE
B-B BACK TO BACK
BM BENCHMARK
CATV CABLE TV
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CI CAST IRON
CL CENTERLINE
CLG CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONST CONSTRUCT
CONT CONTROL
CY CUBIC YARD
DI DUCTILE IRON
DTL DETAIL
E EAST / EASTING
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC
EL ELEVATION
ELEV ELEVATION
EX EXISTING
EXISTEXISTING
F-F FACE TO FACE
FH FIRE HYDRANT
FIR FOUND IRON ROD
FL FLOW LINE
FO FIBER OPTIC
STANDARD ABBREVIATIONS
FPK FOUND PK NAIL
FT FEET
GM GAS METER
HGL HYDRAULIC GRADE LINE
HP HIGH PRESSURE
INV INVERT
LBJ LONGITUDINAL BUTT JOINT
LF LINEAR FEET
LP LIGHT POLE
LT LEFT
MBC MULTIPLE BOX CULVERT
MH MANHOLE
N NORTH / NORTHING
NTS NOT TO SCALE
PC POINT OF CURVE
PED PEDESTRIAN
PI POINT OF INTERSECTION
PL PROPERTY LINE
PP POWER POLE
PT POINT OF TANGENT
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PGL PROFILE GRADE LINE
R RADIUS
RC REINFORCED CONCRETE
RCP REINFORCED CONCRETE PIPE
REBAR REINFORCED BAR
REINF REINFORCED
RFD ROCK FILTER DAM
ROW RIGHT-OF-WAY
RT RIGHT
S SOUTH
SECT SECTION
SCF SILT CONTROL FENCE
SD STORM DRAIN
SF SQUARE FEET
SIR SET IRON ROD
STA STATION
STD STANDARD
STM STORM
SW SIDEWALK
SY SQUARE YARD
T TANGENT
TC TOP OF CURB
TEL TELEPHONE
TOB TOP OF BERM
TOE TOE OF SLOPE
TP TOP OF PAVEMENT
TYP TYPICAL
TCP TRAFFIC CONTROL PLAN
VC VERTICAL CURVE
VERT VERTICAL
W WEST
WM WATER METER
WW WASTEWATER
66. NO PAVING WORK IS AUTHORIZED OVER OR IN CLOSE PROXIMITY TO DALLAS WATER UTILITIES INFRASTRUCTURE UNTIL A WRITTEN PAVING RELEASE IS ISSUED BY THE CITY OF DALLAS DEPARTMENT OF PUBLIC WORKS & CONSTRUCTION INSPECTION DIVISION. WATER LINES MUST BE SUCCESSFULLY PRESSURE TESTED AND CHLORINATED BEFORE RELEASE. WASTEWATER LINES MUST BE VIDEO INSPECTED TWICE BEFORE BEING RELEASED. NO COMPENSATION OR TIME EXTENSION WILL BE GIVEN TO THE CONTRACTOR FOR DELAY
ASSOCIATED WITH TESTING OR OBTAINING A PAVING RELEASE.
67. STORM DRAINAGE LINES MUST BE VIDEO INSPECTED ONCE AT THE END OF THE PROJECT.
68. THE STANDARD DEPTH OF STORM DRAINAGE INLETS IS 4.0' WITH THE EXCEPTION OF 14-FOOT INLETS WHICH HAVE A STANDARD DEPTH OF 4.5 FEET. IN SPECIAL SITUATIONS, INLET DEPTH MAY VARY FROM THE STANDARD, TO CLEAR UTILITIES OR SOME OTHER OBSTRUCTION, OR AS DIRECTED BY THE ENGINEER. SEPARATE PAY
ITEMS WILL BE PROVIDED FOR VARIABLE DEPTH INLETS.
69. PRIOR TO BEGINNING CONSTRUCTION IN CLOSE PROXIMITY TO SPECTRUM (TIME WARNER CABLE) / VERIZON / AT&T TEXAS / SBC / ONCOR (TXU ELECTRIC) / ATMOS ENERGY (LONE STAR GAS) FACILITIES, CALL 811 AT LEAST TWO (2) WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION, SO THAT THE LOCATION OF FACILITIES CAN BE MARKED. IF NECESSARY, TEST DITCHES SHALL BE DUG TO VERIFY/DETERMINE ACTUAL FIELD LOCATIONS AND
CONDITIONS.
70. THE CONTRACTOR SHALL PROVIDE A TRENCH SAFETY PLAN PER THE STANDARD SPECIFICATIONS, ITEM 107.20.3
AT THE PRECONSTRUCTION CONFERENCE OR PRIOR TO THE START OF CONSTRUCTION. FOR MORE INFORMATION, CONTACT THE CITY OF DALLAS CONSTRUCTION INSPECTOR OR DISTRICT SUPERVISOR AT (214) 948-4290.
71. TEXAS STATE LAW, ARTICLE 1436C, MAKES UNLAWFUL THE OPERATION OF EQUIPMENT OR MACHINES WITHIN 10 FEET OF ANY OVERHEAD ELECTRICAL LINE, UNLESS CONTACT WITH HIGH VOLTAGE LINES HAS BEEN EFFECTIVELY GUARDED AGAINST, PURSUANT TO THE PROVISIONS OF THE ARTICLE. WHEN CONSTRUCTION OPERATIONS REQUIRE WORKING NEAR AN OVERHEAD ELECTRICAL LINE, THE CONTRACTOR SHALL CONTACT THE OWNER/OPERATOR OF THE OVERHEAD ELECTRICAL LINE TO MAKE ADEQUATE ARRANGEMENTS AND TO TAKE NECESSARY SAFETY PRECAUTIONS TO ENSURE THAT ALL LAWS, ELECTRICAL LINE OWNER/OPERATOR
REQUIREMENTS, AND STANDARD INDUSTRY SAFETY PRECAUTIONS ARE MET.
SIGNS AND STRIPING GENERAL NOTES
72. SIGNING AND PAVEMENT MARKINGS PLANS SHALL BE DESIGNED AND PREPARED BY A QUALIFIED ENGINEER WITH EXPERIENCE IN SIGNING AND PAVEMENT MARKINGS PLANS AND FAMILIARITY WITH THE
REQUIRED STANDARDS. THE PLANS SHALL BE SUBMITTED AS EARLY AS THE 65% PLAN REVIEW
PHASE.
73. SIGNING AND PAVEMENT MARKINGS PLANS SHALL BE SIGNED AND SEALED BY A REGISTERED PROFESSIONAL CIVIL ENGINEER CURRENTLY LICENSED IN THE STATE OF TEXAS AND IN GOOD STANDING.
74. SIGNING SHALL BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE TMUTCD AVAILABLE AT
HTTPS://WWW.TXDOT.GOV/GOVERNMENT/ENFORCEMENT/SIGNAGE/TMUTCD.HTML AND THE DDOT
TRAFFIC SIGNS STANDARD; CURRENT EDITION.
75. PAVEMENT MARKING SHALL BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE TMUTCD AVAILABLE AT HTTPS://WWW.TXDOT.GOV/GOVERNMENT/ENFORCEMENT/SIGNAGE/TMUTCD.HTML AND
THE CITY OF DALLAS STANDARDS 251D, AS AMENDED.
76. SIGNING AND PAVEMENT MARKING SHALL BE SHOWN IN THE SAME PLAN VIEW UNLESS OTHERWISE
SPECIFIED BY THE CITY OF DALLAS.
77. SIGNING AND PAVEMENT MARKING PLANS SHALL INCLUDE ALL EXISTING SIGNING AND PAVEMENT MARKINGS AT A MINIMUM OF 200 FEET PAST THE LIMITS OF CONSTRUCTION, OR TO THE NEAREST LOGICAL INTERSECTION CONNECTION, OR TO THE LIMITS OF THE TRAFFIC CONTROL TRANSITION LENGTH OR AS REQUIRED BY THE CITY FOR ADEQUATE TRANSITIONS AND TAPERS TO MAINTAIN TRAFFIC AT THE DESIGN
SPEED.
78. THE ENGINEER OF RECORD SHALL FIELD VERIFY ALL EXISTING PAVEMENT MARKINGS IMPACTED BY THE PROJECT THAT MAY NEED TO BE REFRESHED DUE TO TRACKING DURING THE CONSTRUCTION PHASE.
OBLITERATION AND RE-PAVEMENT MARKINGS OUTSIDE OF THE PROJECT LIMITS MAY BE NECESSARY AS
NOTED IN ITEM 6 ABOVE.
79. THE ENGINEER OF RECORD SHALL FIELD VERIFY ALL EXISTING ADVANCE OR APPROACH SIGNING APPLICABLE TO THE PROJECT. REFERENCE SIGNS ON PLAN SHEETS INCLUDING LOCATION OR STATION AND
NOTE STATUS OF SIGN.
80. SIGN LOCATIONS SHALL BE COORDINATED WITH EXISTING OR PROPOSED LANDSCAPING TO ENSURE
LANDSCAPING WILL NOT OBSTRUCT SIGNS AND SHALL INCORPORATE ADA REQUIREMENTS.
81.
SEE APPENDIX A.
82. CLEARLY IDENTIFY IF SIDEWALK SECTIONS ARE IMPACTED AND IF ANY SIGNS ARE IMPACTED BY THE
TEMPORARY CONDITION.
GENERAL LAYOUT NOTES
1. ALL SITE FURNISHINGS AND LIGHTING SHALL AVOID DISTURBANCE OF PROPOSED
OR EXISTING UTILITIES. NOTIFY LANDSCAPE ARCHITECT IF CONFLICTS ARISE IN
FIELD.
2. REFER TO PLANS AND PLAN ENLARGEMENTS FOR EXPANSION AND CONTROL
JOINT LOCATIONS.
3. CONTRACTOR SHALL PROVIDE EXPANSION JOINTS PER APPROVED DETAIL
WHEREVER CONCRETE PAVEMENT (INCL. SUB-SLABS) MEETS BUILDINGS,
STRUCTURES, CURBING, WALLS, OTHER CONCRETE OR STONE SURFACES, ETC.
SEE ALSO HARDSCAPE DETAILS, CIVIL DRAWINGS AND SPECIFICATIONS.
4. DIMENSIONS ON PLAN REPRESENT LOCATIONS OF KEY FEATURES AND
ALIGNMENTS; REFER TO DETAILS FOR SPECIFIC DIMENSIONS AND MATERIALS.
5. ALL DIMENSIONS ORIGINATE FROM ROADWAY STATION POINT WHEN APPLICABLE.
6. ALL CONCRETE FORM WORK SHALL BE STRAIGHT AND FREE OF BULGES AND/OR
CHANGES IN ANGLE THAT ARE NOT SHOWN IN THE DRAWINGS.
7. SIDEWALK PAVING PATTERN, LANDSCAPING, AND STREET FURNITURE
SPECIFICATIONS MAY BE REVISED BASED ON CITY'S COMMENTS OR DESIGN PLANS.
LANDSCAPE NOTES
1. PLANT MATERIAL SHALL BE MEASURED AND SIZED ACCORDING TO THE LATEST
EDITION OF THE TEXAS NURSERY AND LANDSCAPE ASSOCIATION (TNLA)
SPECIFICATIONS, GRADES, AND STANDARDS OR APPLICABLE STATE THE PROJECT
IS LOCATED IN.
2. ALL PLANT SUBSTITUTIONS ARE SUBJECT TO APPROVAL BY LANDSCAPE
ARCHITECT AND MUST BE APPROVED IN ADVANCE OF SELECTION.
3. DEPTH OF PLANTING HOLE DETERMINED BY DEPTH AND FIRMNESS OF ROOT BALL
AND OTHER CHARACTERISTICS OF SITE (E.G., GRADE, SURROUND) UNLESS
OTHERWISE NOTED IN DETAILS.
4. TREES SHALL NOT BE PLANTED DEEPER THAN THE BASE OF THE "TRUNK FLARE";
BOTTOM OF FLARE SHALL BE AT OR ABOVE FINISHED GRADE, PREFERABLY TWO
TO THREE INCHES (2-3") ABOVE FINISHED GRADE UNLESS OTHERWISE NOTED IN
THE DETAILS.
5. TREES MUST BE PLANTED THREE FEET (3') MINIMUM FROM BACK OF CURBS,
SIDEWALKS, UTILITY LINES, SCREENING WALLS, AND/OR OTHER STRUCTURES
UNLESS OTHERWISE SPECIFICALLY NOTED.
6. TREES SHALL NOT BE WATERED TO EXCESS THAT RESULTS IN SOIL SATURATION.
IF SOIL BECOMES SATURATED, THE WATER SCHEDULE SHALL BE ADJUSTED TO
ALLOW FOR DRAINAGE AND ABSORPTION OF THE EXCESS WATER.
7. NO PERSON(S) OR ENTITY MAY USE IMPROPER OR MALICIOUS MAINTENANCE OR
PRUNING TECHNIQUES WHICH WOULD LIKELY LEAD TO DEATH OF THE TREE.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE,
ESTABLISHMENT, AND PERMANENCE OF PLANT MATERIAL. ALL LANDSCAPING
SHALL BE MAINTAINED IN A NEAT AND ORDERLY MANNER. THIS SHALL INCLUDE,
BUT NOT LIMITED TO, PRUNING, FERTILIZING, WATERING, AND OTHER ACTIVITIES
FOR THE MAINTENANCE OF LANDSCAPE AREAS.
9. ALL PLANT MATERIAL SHALL BE MAINTAINED IN A HEALTHY AND GROWING
CONDITION AS IS APPROPRIATE FOR THE SEASON OF THE YEAR. PLANT MATERIAL
THAT IS DAMAGED, DESTROYED, OR REMOVED, SHALL BE REPLACED WITH PLANT
MATERIAL OF SIMILAR SIZE AND VARIETY WITHIN 30 DAYS UNLESS OTHERWISE
APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. REPLACEMENT PLANT
MATERIAL SHALL BE NOTIFIED TO THE OWNER'S APPOINTED REPRESENTATIVE
BEFORE TIME OF REPLACEMENT.
10. IF AN AUTOMATIC IRRIGATION SYSTEM IS PROVIDED TO IRRIGATE LANDSCAPED
AREAS, OVERSPRAY ON STREETS AND WALKS IS PROHIBITED.
11. IF INFORMATION IN THE "GENERAL LANDSCAPE NOTES" CONFLICTS WITH THE
SPECIFICATIONS, THE SPECIFICATIONS WILL PREVAIL.
12. LANDSCAPE ARCHITECT SHALL REVIEW ALL SHOP DRAWINGS REQUESTED IN THE
LANDSCAPE DOCUMENTS, IN A TIMELY MANNER.
13. ALL PLANTS SHOULD BE HANDLED AND INSTALLED PER AMERICAN NURSERY
ASSOCIATION STANDARDS OF GOOD PRACTICE.
14. THE CONDITIONS OF THE LANDSCAPE GUARANTEE TO BE BETWEEN LANDSCAPE
CONTRACTOR AND OWNER. ONE YEAR MINIMUM SUGGESTED.
15. FOR THE GUARANTEE PERIOD, ALL PLANT MATERIAL SHALL BE MAINTAINED IN A
HEALTHY AND GROWING CONDITION IN ACCORDANCE WITH THE RESPECTIVE
GROWING SEASON.
16. THE LANDSCAPE SHOULD BE KEPT FREE OF WEEDS AND LITTER DURING THE
ESTABLISHED GUARANTEE AND MAINTENANCE PERIOD.
17. ALL LANDSCAPE AREAS SHALL BE 100% IRRIGATED, BY AN AUTOMATIC IRRIGATION
SYSTEM EQUIPPED WITH A RAIN/FREEZE SENSOR SET AT 38F.
18. PROVIDE SLEEVING TO ALL PLANTING AREAS
CONSTRUCTION TOLERANCES
1. CONSTRUCTION TOLERANCES ARE TO BE PROCURED BY THE LATEST VERSION
N.R.C.S. NATIONAL ENGINEERING HANDBOOK.
GENERAL NOTES
1. CONTRACTOR TO PROVIDE OWNER AND/OR OWNER'S REPRESENTATIVE
WITH PROJECT SCHEDULE.
2. CONTRACTOR IS RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL
CONTROL, REFERENCE POINTS AND CONSTRUCTION STAKING AS
REQUIRED FOR THE COMPLETION OF THE PROJECT.
3. CONTRACTOR TO VERIFY ALL BOUNDARY, TOPOGRAPHIC, AND
EASEMENT INFORMATION. CONTRACTOR IS RESPONSIBLE FOR
IDENTIFYING ANY AND ALL CONFLICTS WITH THESE OR ANY OTHER
LEGAL INSTRUMENT. CONFLICTS ARE TO BROUGHT TO THE OWNER'S
REPRESENTATIVE IMMEDIATELY.
4. EXISTING UTILITIES / CONDITIONS ARE SHOWN IN AN APPROXIMATION
AND ARE BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR TO
FIELD VERIFY LOCATION OF ANY AND ALL EXISTING UTILITIES AND OTHER
FACILITIES BEFORE COMMENCING WORK. CONTRACTOR AGREES TO BE
FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR
BY HIS FAILURE TO LOCATE AND PRESERVE ANY AND ALL EXISTING
FACILITIES.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY
BUILDING PERMITS AND FOR NOTIFICATION OF ALL AUTHORIZED
INSPECTORS, SUPERINTENDENTS AND/OR PERSONS IN CHARGE OF
PRIVATE OR PUBLIC UTILITIES AFFECTED BY HIS OPERATIONS PRIOR TO
COMMENCEMENT OF WORK. ALL FEES INCURRED IN OBTAINING THESE
SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS NOTED.
6. ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH APPLICABLE
LOCAL, STATE AND FEDERAL CODES. IN CASES WHERE CODES CONFLICT,
THE MORE STRINGENT INTERPRETATION SHALL GOVERN.
7. CONTRACTOR TO COMPLY WITH CONSTRUCTION PERMIT INCLUDING (IF
REQUIRED) PREPARATION OF A SWPPP AND TO PROVIDE A COPY OF THE
NOTICE OF INTENT (NOI) AND MAINTENANCE CHECKLIST TO THE CITY IN
THE CITY PROSCRIBED NECESSARY AMOUNT OF TIME PRIOR TO
COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY TO CITY ENGINEER
OR BUILDING OFFICIAL.
8. IT IS THE CONTRACTORS RESPONSIBILITY TO FAMILIARIZE THEMSELVES
WITH THE SITE AND DETERMINE THE EXTENT OF WORK TO BE DONE. NO
ADDITIONAL CLAIMS FOR PAYMENT SHALL BE ALLOWED FOR WORK THAT
SHOULD HAVE BEEN INCLUDED IN THE ORIGINAL INSPECTION.
9. IF ANY SCOPE OF WORK INDICATED ON THE DRAWINGS IS DETERMINED
TO CONFLICT WITH CONDITIONS IN FIELD, IT IS THE CONTRACTOR'S
RESPONSIBILITY TO INFORM THE ARCHITECT FOR INTERPRETATION AND
CLARIFICATION OF WORK PRIOR TO INITIATING THE WORK.
10. DO NOT SCALE DRAWINGS, DIMENSIONS SHALL GOVERN. LARGE SCALE
DRAWINGS GOVERN OVER SMALL SCALE.
11. ALL WASTE MATERIAL AND/OR EXCESS EXCAVATION NOT USED AS PART
OF THE WORK SHALL BE REMOVED FROM THE JOB SITE AND DISPOSED
OF AT ACCEPTABLE LOCATIONS IN ACCORDANCE WITH ALL LOCAL, STATE
AND FEDERAL REGULATIONS.
12. THE CONTRACTOR SHALL BE REQUIRED, AT ALL TIMES, DURING THE
CONSTRUCTION TO PROVIDE WARNING SIGNS, BARRICADES, AND OTHER
SAFETY DEVICES (INCLUDING TEMPORARY SAFETY FENCING AROUND
THE JOB SITE) IN ORDER TO PROTECT THE PUBLIC SAFETY AND HEALTH
UNTIL ALL OF THE WORK HAS BEEN COMPLETED AND ACCEPTED.
13. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL EXISTING
FACILITIES IN AND AROUND THE PROJECT AREA. THESE INCLUDE TREES,
PLANTINGS, CONCRETE PAVING, BENCHES, SIGNS AND OTHER FACILITIES
FOUND ON SITE. THE CONTRACTOR SHALL REPAIR OR REPLACE, ANY
FACILITIES DAMAGED DURING CONSTRUCTION OF THESE
IMPROVEMENTS.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CARE OF ALL WATER
DURING CONSTRUCTION. ALL PERMANENT WORK SHALL BE
CONSTRUCTED IN AREAS FREE FROM WATER. THE CONTRACTOR SHALL
CONSTRUCT AND MAINTAIN ALL DITCHES, LEVEES, COFFER DAMS,
DIVERSIONS, PUMPS, ETC. AS NECESSARY TO KEEP THE WORK AREAS
FREE FROM WATER.
15. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND OBTAINING
ALL PERMITS THAT ARE REQUIRED FOR SITE DEMOLITION.
SITE GRADING NOTES
1. ALL WALKWAYS SHALL MEET T.A.S. REQUIREMENTS.
2. NO WALK OR RAMP CROSS SLOPES SHALL EXCEED 2.0%.
3. NO WALK LONGITUDINAL SLOPE SHALL EXCEED 5.0%.
4. NO RAMP LONGITUDINAL SLOPE SHALL EXCEED 8.33%.
5. CURB RAMPS SHALL BE CONSTRUCTED AT A MAXIMUM LONGITUDINAL
SLOPE OF 8.33% AND A MAXIMUM CROSS SLOPES OF 2.0%. LENGTH TO
BE DETERMINED IN FIELD.
6. REFER TO CIVIL ENGINEER DRAWINGS FOR GRADING WHEN APPLICABLE.
7. THE OWNER HAS A CONTINUED OBLIGATION TO BRING ANY
NON-COMPLIANT ACCESSIBILITY ISSUES INTO FULL COMPLIANCE.
8. JOINTS BETWEEN MATERIALS SHALL NOT EXCEED 1
4" LEVEL CHANGE. A
MAXIMUM OF 12" LEVEL CHANGE ACCEPTABLE ONLY IF BEVELED UP TO A
MAXIMUM OF 1:2 SLOPE.
9. SPACE BETWEEN DECKING TO BE 1/8" MAX.
GENERAL MATERIALS NOTES
1. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL IMPROVEMENTS
UNTIL REVIEWED AND APPROVED BY THE ENGINEER, LANDSCAPE
ARCHITECT AND OWNER.
2. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID
ANY DISTURBANCE TO EXISTING CONDITIONS TO REMAIN AND/OR
COMPLETED `FINISH WORK' BY OTHERS. ANY DISTURBANCE AND/OR
DAMAGE SHALL BE RESTORED (REPAIRED) TO A CONDITION THAT
MEETS AND/OR EXCEEDS THE PREVIOUS NON-DISTURBED STATE
AT THE CONTRACTOR'S EXPENSE. ALL DISTURBANCES AND/OR
DAMAGES, AT THE VERY LEAST, WILL BE SUBJECT TO REVIEW AND
APPROVAL BY THE OWNER'S REPRESENTATIVE.
3. CONTRACTOR SHALL PROVIDE PAVING SURFACES THAT ARE FLUSH,
HAVE POSITIVE DRAINAGE (1% MINIMUM), PARTICULARLY AWAY
FROM ALL BUILDINGS/STRUCTURES, ARE SLIP-RESISTANT, AND
MEET SMOOTHLY AND EVENLY WITH ADJACENT SURFACES. SEE
ALSO CIVIL DRAWINGS.
4. CONTRACTOR SHALL SUBMIT SAMPLES, CUT SHEETS, AND/OR SHOP
DRAWINGS, AS REQUIRED, FOR ALL HARDSCAPE IMPROVEMENTS
AS INDICATED ON THE DRAWINGS, THE MATERIALS SCHEDULE, SITE
FURNISHINGS SCHEDULE AND/OR SPECIFICATIONS PRIOR TO
CONSTRUCTION FOR REVIEW AND APPROVAL BY THE OWNER'S
REPRESENTATIVE AND LANDSCAPE ARCHITECT.
5. CONTRACTOR SHALL CONSTRUCT MOCK-UPS, AS REQUIRED, IN THE
SIZE IDENTIFIED IN THE SPECIFICATIONS AND THE LOCATION
INDICATED BY THE OWNER'S REPRESENTATIVE, PRIOR TO
CONSTRUCTION FOR REVIEW AND APPROVAL BY THE OWNER'S
REPRESENTATIVE AND LANDSCAPE ARCHITECT. MOCK-UPS SHALL
SERVE AS THE 'FINISHES' QUALITY CONTROL FOR THE
INSTALLATION OF THE HARDSCAPE IMPROVEMENT.
6. CONTRACTOR SHALL REFER TO AND COORDINATE WITH CIVIL
ENGINEERING, STRUCTURAL ENGINEERING, MECHANICAL, LIGHTING
AND ELECTRICAL, LANDSCAPING AND IRRIGATION SYSTEM
DRAWINGS, WHICH MAY NOT BE INCLUDED WITHIN THIS SET OF
DOCUMENTS, AS REQUIRED.
7. REFER TO ELECTRICAL ENGINEER SERIES, WHEN APPLICABLE FOR
FIXTURE REQUIREMENTS, CONDUIT, WIRING AND ALL OTHER
ELECTRICAL DESIGN. FIXTURE DETAILS IN THIS SET ARE FOR
REFERENCE ONLY.
8. REFER TO DETAILS FOR DESIGN INTENT RELATED TO FIXTURE
PLACEMENT IN SPECIFIC FEATURES.
9. LOCATE PEDESTRIAN FIXTURES AS SHOWN IN PLANS; REFER TO
ALL APPLICABLE DETAILS BEFORE STARTING WORK.
10. ALL LIGHTS SHALL BE STAKED IN THE FIELD AND APPROVED BY THE
LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
MAINTENANCE NOTES
1. ALL PLANT MATERIAL SHALL BE MAINTAINED IN A HEALTHY AND
GROWING CONDITION AS IS APPROPRIATE FOR THE SEASON OF THE
YEAR. PLANT MATERIAL THAT IS DAMAGED, DESTROYED, OR
REMOVED, SHALL BE REPLACED WITH PLANT MATERIAL OF SIMILAR
SIZE AND VARIETY WITHIN 30 DAYS UNLESS OTHERWISE APPROVED
IN WRITING BY THE LANDSCAPE ARCHITECT. REPLACEMENT PLANT
MATERIAL SHALL BE NOTIFIED TO THE OWNER'S APPOINTED
REPRESENTATIVE BEFORE TIME OF REPLACEMENT.
2. REPLACE DEAD OR DYING PLANTS WITH PLANTS OF SAME SIZE AND
SPECIES AS SPECIFIED.
3. REMOVE TRASH, DEBRIS AND LITTER AS WELL AS WATER, PRUNE,
FERTILIZE, WEED AND APPLY HERBICIDE AND FUNGICIDES AS
REQUIRED.
4. REMOVE CLIPPINGS AND DEBRIS FROM SITE PROMPTLY.
5. COORDINATE WITH OPERATION OF IRRIGATION SYSTEM TO ENSURE
THAT PLANTS ARE ADEQUETLY WATERED. HAND WATER AREAS NOT
RECIEVING ADEQUATE WATER FROM AN IRRGAIATION SYSTEM.
6. RESET SETTLED PLANTS.
7. REAPPLY MULCH TO BARE AND THIN AREAS.
8. ALL WASTE MATERIAL AND/OR EXCESS EXCAVATION NOT USED AS
PART OF THE WORK SHALL BE REMOVED FROM THE JOB SITE AND
DISPOSED OF AT ACCEPTABLE LOCATIONS IN ACCORDANCE WITH
ALL LOCAL, STATE AND FEDERAL REGULATIONS.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CARE OF ALL
WATER DURING CONSTRUCTION. ALL PERMANENT WORK SHALL BE
CONSTRUCTED IN AREAS FREE FROM WATER. THE CONTRACTOR
SHALL CONSTRUCT AND MAINTAIN ALL DITCHES, LEVEES, COFFER
DAMS, DIVERSIONS, PUMPS, ETC. AS NECESSARY TO KEEP THE
WORK AREAS FREE FROM WATER.
IRRIGATION NOTES
1. IF AN AUTOMATIC IRRIGATION SYSTEM IS PROVIDED TO IRRIGATE
LANDSCAPED AREAS, OVERSPRAY ON STREETS AND WALKS IS
PROHIBITED.
2. ALL LANDSCAPE AREAS SHALL BE 100% IRRIGATED, BY AN AUTOMATIC
IRRIGATION SYSTEM EQUIPPED WITH A RAIN/FREEZE SENSOR SET AT
38 DEGREES FAHRENHEIT.
3. PROVIDE IRRIGATION SLEEVING TO ALL PLANTING AREAS.
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D4/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
. T
TT
S
A
SA
M
ET
S
TA 2
OF
ET
X
U
S
BB
S
HEW
LANDSCAPE GENERAL NOTES
HARDSCAPE & MISC.
REFERENCE SPECIFICATIONS FOR ADDITIONAL INFO.
REFERENCE MANUFACTURER FOR INSTALLATION
UNLESS OTHERWISE NOTED.
HARDSCAPE TYPE 1A:
INTEGRAL COLOR CONCRETE WALKWAY -
PEDESTRIAN THICKNESS
FINISH: MEDIUM ROCK SALT WITH SAWCUT JOINTS
COLOR: PEWTER, SIKA COLOR 100P ADMIXTURE
CONTRACTOR TO PROVIDE 6'x6' SAMPLE FOR
REVIEW BY LANDSCAPE ARCHITECT PRIOR TO SITE
POURS
HARDSCAPE TYPE 1B:
INTEGRAL COLOR CONCRETE WALKWAY -
PEDESTRIAN THICKNESS
FINISH: LIGHT SANDBLAST WITH SAWCUT JOINTS
COLOR: PEWTER, SIKA COLOR 100P ADMIXTURE
CONTRACTOR TO PROVIDE 6'x6' SAMPLE FOR
REVIEW BY LANDSCAPE ARCHITECT PRIOR TO SITE
POURS
HARDSCAPE TYPE 2A:
INTEGRAL COLOR CONCRETE WALKWAY -
VEHICULAR THICKNESS
FINISH: MEDIUM ROCK SALT WITH SAWCUT JOINTS
COLOR: PEWTER, SIKA COLOR 100P ADMIXTURE
CONTRACTOR TO PROVIDE 6'x6' SAMPLE FOR
REVIEW BY LANDSCAPE ARCHITECT PRIOR TO SITE
POURS
HARDSCAPE TYPE 2B:
INTEGRAL COLOR CONCRETE WALKWAY -
VEHICULAR THICKNESS
FINISH: LIGHT SANDBLAST WITH SAWCUT JOINTS
COLOR: PEWTER, SIKA COLOR 100P ADMIXTURE
CONTRACTOR TO PROVIDE 6'x6' SAMPLE FOR
REVIEW BY LANDSCAPE ARCHITECT PRIOR TO SITE
POURS
HARDSCAPE TYPE 2C:
INTEGRAL COLOR CONCRETE WALKWAY -
VEHICULAR THICKNESS
FINISH: MEDIUM ROCK SALT WITH SAWCUT JOINTS
COLOR: PEWTER, SIKA COLOR 100P ADMIXTURE
CONTRACTOR TO PROVIDE 6'x6' SAMPLE FOR
REVIEW BY LANDSCAPE ARCHITECT PRIOR TO SITE
POURS
HARDSCAPE TYPE 3:
CONCRETE PAVERS ON PEDESTRIAN CONCRETE
BASE
MANUFACTURER: KEYSTONE HARDSCAPES
VERONA SERIES - 4"x8"x80mm
FINISH: PLATINUM FINISH
COLOR: CHARCOAL
CONTRACTOR TO PROVIDE SAMPLE FOR
APPROVAL BY LANDSCAPE ARCHITECT PRIOR TO
BULK PURCHASE
HARDSCAPE TYPE 4:
CONCRETE PAVERS ON VEHICULAR CONCRETE
BASE
MANUFACTURER: KEYSTONE HARDSCAPES
VERONA SERIES - 4"x8"x80mm
FINISH: PLATINUM FINISH
COLOR: CHARCOAL
CONTRACTOR TO PROVIDE SAMPLE FOR
APPROVAL BY LANDSCAPE ARCHITECT PRIOR TO
BULK PURCHASE
HARDSCAPE TYPE 5:
STANDARD GRAY CONCRETE WALKWAY -
PEDESTRIAN THICKNESS
FINISH: LIGHT BROOM FINISH WITH SAWCUT JOINTS
COLOR: NATURAL
CONTRACTOR TO PROVIDE 6'x6' SAMPLE FOR
REVIEW BY LANDSCAPE ARCHITECT PRIOR TO SITE
POURS
ABBREVIATION GLOSSARY
ABV. - ABOVE
A.D. - AREA DRAIN
A.D.A. - AMERICANS WITH
DISABILITIES ACT
ALUM. - ALUMINUM
ANCH. - ANCHOR
ARCH. - ARCHITECT
ASPH. - ASPHALT
@ - AT
BC - BOTTOM OF CURB
BD. - BOARD
BLDG. - BUILDING
BLK. - BLOCK
BM. - BEAM
BO - BY OTHERS
BOT. - BOTTOM
BRKT. - BRACKET
B.S. - BOTTOM STEP
B.W. - BOTTOM OF WALL
CEM. - CEMENT
C.J. - CONSTRUCTION JOINT
C OR C.L. - CENTER LINE
CLG. - CEILING
CLKG. - CAULKING
CLOS. - CLOSET
C.M.U. - CONCRETE MASONRY UNIT
C.O. - CLEAN OUT
COL. - COLUMN
CONC. - CONCRETE
CONT. - CONTINUOUS
CONTR. - CONTRACTOR
CTR. - CENTER
DET. - DETAIL
D.F. - DRINKING FOUNTAIN
DIA. - DIAMETER
DIM. - DIMENSION
DN. - DOWN
DR. - DOOR
D.S. - DOWNSPOUT
DWG. - DRAWING
EA. - EACH
E.J. - EXPANSION JOINT
EL. - ELEVATION (HEIGHT)
ELEC. - ELECTRICAL
ELEV. - ELEVATION (DRAWING)
EQ. - EQUAL
EQUIP. - EQUIPMENT
E.W. - EACH WAY
EXIST. - EXISTING
EXT. - EXTERIOR
F.F. - FINISH FLOOR
F.G. - FINISHED GRADE
FIN. - FINISH
F.S. - FINISHED SURFACE
FWC - FABRIC WALL COVERING
GA. - GAUGE
GALV. - GALVANIZED
GEN. - GENERAL
HDW. - HARDWARE
HORIZ. - HORIZONTAL
H.P. - HIGH POINT
HT. - HEIGHT
I.D. - INSIDE DIAMETER
IN. - INCH
INSUL. - INSULATION
INT. - INTERIOR
JST. - JOIST
JT. - JOINT
LAM. - LAMINATE
LBL. - LABEL
L.F. - LINEAR FOOT
LNTL. - LINTEL
LOC. - LOCATION
L.P. - LOW POINT
LT. - LIGHT
MANUF. - MANUFACTURER
MAS. - MASONRY
MATL. - MATERIAL
MAX. - MAXIMUM
MECH. - MECHANICAL
M.H. - MANHOLE
MIN. - MINIMUM
MISC. - MISCELLANEOUS
N.I.C - NOT IN CONTRACT
NO. - NUMBER
NOM. - NOMINAL
N.T.S. - NOT TO SCALE
O.A. - OVER ALL
O.C. - ON CENTER
O.C.E.W. - ON CENTER EACH WAY
O.D. - OUTSIDE DIAMETER
OPP. - OPPOSITE
PIP - POURED IN PLACE
PL. - PLATE
P.L. - PROPERTY LINE
PNL. - PANEL
POB. - POINT OF BEGINNING
POL. - POLISHED
PROP. - PROPERTY
PT. - POINT
QTY. - QUANTITY
RAD. - RADIUS
RE - REFERENCE
REINF. - REINFORCE
REQD. - REQUIRED
REF. - REFERENCE
REV. - REVISED
R.O.W. - RIGHT OF WAY
SCH. - SCHEDULE
S.D. - STORM DRAIN
SECT. - SECTION
SHT. - SHEET
SIM. - SIMLAR
SPEC. - SPECIFIED
SQ. - SQUARE
S.S. - STAINLESS STEEL
STD. - STANDARD
STL. - STEEL
STRUCT. - STRUCTURAL
SURF. - SURFACE
TC - TOP OF CURB
TEL. - TELEPHONE
THK. - THICK
THRES. - THRESHOLD
T.O. - TOP OF
T.O.C. - TOP OF CURB
T.O.G. - TOP OF GUTTER
T.O.S. - TOP OF STEEL
TP - TOP OF CONCRETE CURB
T.PI. - TOP PLATE
TR. - TREAD
T.S. - TOP OF STEP
T.T.D. - TOILET TISSUE DISPENSER
T.W. - TOP OF WALL
TYP. - TYPICAL
U.N.O. - UNLESS OTHERWISE NOTED
VAR. - VARIES
VER. - VERIFY
VERT. - VERTICAL
V.I.F. - VERIFY IN FIELD
WD. - WOOD
WDW. - WINDOW
WT. - WEIGHT
YD. - YARD
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D5/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
. T
TT
S
A
S A
M
ET
S
TA 2
O F
ET
X
U
S
BB
S
HEW
LANDSCAPE DESIGN SELECTION SUMMARY
STREETSCAPE LANDSCAPE SUMMARY OF ITEMS
T
S
SHEET
LX-02
SHEET
LX-03
SHEET
LX-01
MATCH LINE LX-02
MATCH LINE LX-01
MATCH LINE LX-03
MATCH LINE LX-02
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D6/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
. T
TT
S
A
S A
M
ET
S
TA 2
O F
ET
X
U
S
BB
S
HEW
N
OVERALL SHEET LAYOUT PLAN
OVERALL SHEET LAYOUT PLAN
SCALE 22"x34": 1" = 60'-0"
SCALE 11"x17": 1" = 120'-0"
MATCH LINE L3-02
MATCH LINE L3-01
C O
R
IN
T H
S T
R E
E T
S. RIVERFRONT BLVD
S. RIVERFRONT BLVD
C O
R
IN
T H
S T
R E
E T
IMPROVEMENTS BY PROPERTY
OWNER, NIC
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D7/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
PLANTING LEGEND
LH
LOWERY'S LEGACY TEXAS SAGE
Leucophyllum langmanii 'Lowery's legacy'
GULF MUHLY
Muhlenbergia capillaris
WRIGHT'S PURPLE SKULLCAP
Scutellaria wrightii
TEXAS LANTANA
Lantana horrida
SOFTLEAF YUCCA
Yucca recurvifolia
SIDEOATS GRAMA
Bouteloua curtipendula
CEDAR ELM
Ulmus crassifolia
AMERICAN SYCAMORE
Planatus occidentalis
DWARF WAX MYRTLE
Myrica pusilla
BERMUDA GRASS HYDROMULCH
BERMUDA GRASS SOD
. T
TT
S
A
S A
M
ET
S
TA 2
O F
ET
X
U
S
BB
S
HEW
STEEL EDGING
N
PLANTING PLAN
PLANTING PLAN
SCALE 22"x34": 1" = 20'-0" SCALE 11"x17": 1" = 40'-0"
MATCH LINE L3-02
MATCH LINE L3-01
MATCH LINE L3-03
MATCH LINE L3-02
C O
R
IN
T H
S T
R E
E T
PLANTING PLAN
N
PLANTING PLAN
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D8/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
PLANTING LEGEND
LH
LOWERY'S LEGACY TEXAS SAGE
Leucophyllum langmanii 'Lowery's legacy'
GULF MUHLY
Muhlenbergia capillaris
WRIGHT'S PURPLE SKULLCAP
Scutellaria wrightii
TEXAS LANTANA
Lantana horrida
SOFTLEAF YUCCA
Yucca recurvifolia
SIDEOATS GRAMA
Bouteloua curtipendula
CEDAR ELM
Ulmus crassifolia
AMERICAN SYCAMORE
Planatus occidentalis
DWARF WAX MYRTLE
Myrica pusilla
BERMUDA GRASS HYDROMULCH
BERMUDA GRASS SOD
. T
TT
S
A
S A
M
ET
S
TA 2
O F
ET
X
U
S
BB
S
HEW
STEEL EDGING
MATCH LINE L3-03
MATCH LINE L3-02
C O
R
IN
T H
S T
R E
E T
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D9/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
PLANTING LEGEND
LH
LOWERY'S LEGACY TEXAS SAGE
Leucophyllum langmanii 'Lowery's legacy'
GULF MUHLY
Muhlenbergia capillaris
WRIGHT'S PURPLE SKULLCAP
Scutellaria wrightii
TEXAS LANTANA
Lantana horrida
SOFTLEAF YUCCA
Yucca recurvifolia
SIDEOATS GRAMA
Bouteloua curtipendula
CEDAR ELM
Ulmus crassifolia
AMERICAN SYCAMORE
Planatus occidentalis
DWARF WAX MYRTLE
Myrica pusilla
BERMUDA GRASS HYDROMULCH
BERMUDA GRASS SOD
. T
TT
S
A
S A
M
ET
S
TA 2
O F
ET
X
U
S
BB
S
HEW
STEEL EDGING
PLANTING PLAN
N
PLANTING PLAN
ROOTBALL. SET ON
UNDISTURBED
EXISTING SOIL
PEDESTAL.
BACKFILL WITH
PLANTING SOIL AS
PER
SPECIFICATIONS.
UNDISTURBED
SUBGRADE.
3" DARK BROWN
DYED MULCH AS
PER
SPECIFICATIONS.
SPREAD EVENLY
ACROSS BED.
SOIL RING AT EDGE
OF TREE PIT.
SCARIFY SIDES OF
TREE PIT FOR
DRAINAGE.
EXPOSE ROOT
FLARE PLANT TREE
AT 1"-2" ABOVE
FINISH GRADE.
PIT WIDTH IS 3 TIMES ROOTBALL
REFERENCE
BELOW GROUND
SAFETY STAKE
DETAIL FOR
STAKING
INFORMATION.
1. SET TREE IN PLANTING PIT, PLACE
ANCHOR WITH RING SIDE DOWN
AGAINST TOP OF ROOTBALL, CENTER
INNER RING(S) OF ROOT ANCHOR
AROUND TRUNK OF TREE, ALIGN DRIVE
ROD AS CLOSE AS POSSIBLE TO
OUTSIDE EDGE OF U-BRACKET
2. DRIVE ANCHOR STRAIGHT INTO
UNDISTURBED SUBBASE SOIL TO
RECOMMEND DEPTH AS PER TREE SIZING
CHART
3. REMOVE DRIVE ROD, REPEAT STEPS
1 AND 2 FOR ALL THREE (3) ANCHOR
LOCATIONS, PULL BACK ON STRAP
APPROXIMATELY 3" FOR THE V-68
ANCHOR OR 6" FOR THE V-88 ANCHOR
TO SET ANCHOR INTO A HORIZONTAL
OR LOCKED POSITION (FULCRUM MAY
BE REQUIRED TO ASSIST IN SETTING
ANCHOR), PLACE "S" HOOK OVER END
OF U-BRACKET PULL STRAP(S) UP
VERTICALLY UNTIL ROOT BALL AND
U-BRACKETS ARE FLUSH ON TOP OF
ROOT BALL, TIE EXCESS STRAPS OFF
U-BRACKET ALLOWING ENOUGH
REMAINING STRAP TO ADJUST TREE
IF NECESSARY
"S" HOOK
U-BRACKET
ROOT ANCHOR
TREE TRUNK
ROOTBALL
PLANTING HOLE
"S" HOOK
TIGHTENING STRAP
DRIVE ROD
ANCHOR
2"
S T
A K
E
12" #4 REBAR PINS PLACED AT 30" O.C.
DRIVE INTO SOLID GRADE AND TACK WELD
IN PLACE AT A MIN. OF TWO POINTS.
ALL ANGLES MAY BE EITHER
BUTT-JOINTED OR MITERED WITH A
CONTINUOUS WELD THAT IS GRINDED
SMOOTH.
ALL SEEMS TO BE CONTINUOUSLY
WELD AND GRINDED SMOOTH
STEEL EDGING TO BE MADE OF
UNFINISHED 1/4" STEEL PLATE
MATERIAL
1"
3" MULCH AS PER
SPECIFICATIONS. SPREAD
EVENLY ACROSS BED.
SCARIFY SIDES
OF SHRUB PIT
FOR DRAINAGE.
REMOVE 12" OF EXISTING
SOIL AND BACKFILL WITH
PLANTING SOIL AS PER
THE SPECIFIED BID ITEM
UNDISTURBED
SUBGRADE
X
X
X X
12" TYP.
NOTE:
A. REFER TO PLANTING PLAN FOR SPACING "X"
B. LANDSCAPE SOILS THAT HAVE COMPACTED DURING CONSTRUCTION
ACTIVITIES SHALL BE LOOSENED AND ALTERED TO A DEPTH OF AT
LEAST 6" BEFORE PLANTING.
SUPPLEMENT PLANTING SOIL
WITH COMPOST IN THE
AMOUNTS SPECIFIED
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D10/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas, Texas 75208 USA www.dsgn.com 214-748-7712
. T
TT
S
A
S A
M
ET
S
TA 2
O F
ET
X
U
S
BB
S
HEW
PLANTING DETAILS AND SCHEDULE
TREE PLANTING DETAIL NOT TO SCALE
TREE SAFETY STAKE DETAIL NOT TO SCALE STEEL EDGING DETAIL NOT TO SCALE SHRUB PLANTING DETAIL NOT TO SCALE
PLANTING SCHEDULE
DRIP
MATCH LINE L4-02
MATCH LINE L4-01
C O
R
IN
T H
S T
R E
E T
S. RIVERFRONT BLVD
S. RIVERFRONT BLVD
C O
R
IN
T H
S T
R E
E T
4" SCH. 40 SLEEVE
2" SCH. 40 SLEEVE
1" DOUBLE CHECK VALVE
ASSEMBLY
1" WATER METER / POC,
REF. CIVIL
1" ISOLATION VALVE
1" MASTER VALVE
IRRIGATION CONTROLLER,
REQUIRES 120 VOLT ELECTRICAL,
CONTRACTOR TO PROVIDE
RAIN / FREEZE SENSOR
4" SCH. 40 SLEEVE
4" SCH. 40 SLEEVE
IRRIGATION WIRE PULL
AND SPLICE BOX
MS
DESIGN DRAWN DATE SCALE NOTES FILE NO.
CITY OF DALLAS, TEXAS
MS 10/24/25
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
SOUTH RIVERFRONT BOULEVARD TO UPRR
CORINTH STREET
PB 24TF01 - Longhorn Ballroom Redevelopment Project
119311D11/15
DSGN Associates, Inc.
115 West Greenbriar Lane Dallas,…