2_Paint_Vault_Toilets_306435-Specs.pdf
PDF 8 MB Posted
- Attached to
- LAKE21-1539-PAINT VAULT TOILETS PARKWIDE
- Solicitation number
- 140P8121Q0095
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PPQ.pdf | ||
| WD_NV_Clark_County.pdf | ||
| 306435_Paint_Vault_Toilets_-_Schedule_of_Values.docx | DOCX document | |
| Release_of_Claims.pdf | ||
| WD_AZ_Clark_County.pdf | ||
| SF25A_Payment_Bond.pdf | ||
| Sol_140P8121Q0095.pdf | ||
| B08_RFQ_Final140P8121Q0095_Section_A_-_M.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE MEAD NATIONAL RECREATION AREA
BOULDER CITY, NEVADA
REPAIR FLOORING AND PAINT PARKWIDE VAULT TOILETS
LAKE – 306435A
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
May 26, 2021
LAKE 306435 Page 2 of 57
Table of Contents
DIVISION 1 - GENERAL REQUIREMENTS
SECTION PAGE No.
01110 SUMMARY OF WORK 3
01270 DEFINITIONS OF BID ITEMS 13
01310 PROJECT MANAGEMENT AND COORDINATION 15
01330 SUBMITTALS 17
01360 ACCIDENT PREVENTION 21
01400 QUALITY REQUIREMENTS 24
01510 TEMPORARY SERVICES 27
01570 TEMPORARY CONTROLS 29
01600 PRODUCT REQUIREMENTS 31
01770 CLOSEOUT PROCEDURES 33
25 00 00 SITE CONSTRUCTION 35
LAKE 306435 Page 3 of 57
DIVISION 1 GENERAL REQUIREMENTS
SECTION 01110 SUMMARY OF WORK
1.1 EXISTING CONDITIONS
The Project location is the Lake Mead National Recreation Area. The sites are located throughout the park.
These restrooms are used throughout the park were no other public utilities exist. The vault toilets are located near high traffic areas throughout Lake Mead and Mohave that serves eight to nine million visitors annually. Due to the high use and extreme climate conditions, the restroom must be regularly maintained and are serviced almost on a daily basis.
1.2 GENERAL PROJECT STATEMENT
A. This project requires the construction services to clean, prepare the surface and paint the inside, floor and outside of existing vault toilets parkwide.
B. Some of the vent stacks are missing bird screens on them. Install new bird screens where missing.
C. A site visit will be scheduled for a pre-bid visit with the interested respondents to a small representative selection of the sites. Mainly in the Boulder Beach area.
1.3 SCOPE OF WORK
The scope of work for this contract consists of:
A. See the locations in the grid and on the attached maps.
B. See pictures at the end of these specifications for existing site conditions and visual site conditions.
C. Forty two (42) vault toilets are to be painted and maintained.
1. Paint the exterior walls. All four (4) sides. From the groundline attaching to the tank to the roof line. Color shall be Sherwin Williams SW 6114 Bagel. Or approved equal to match the existing. Exterior coat shall be followed by a clear acrylic anti-graffiti sealer coat. All sites to painted the same color.
2. Interior walls and ceiling shall be modified acrylic, water repellent with the color white to match the existing. Interior coat shall be followed by a clear acrylic anti-graffiti sealer coat.
3. Floors shall be chemical resistant urethane paint in grey.
4. Metal doors, door frames, window frames and hatch covers shall be surfaced prepped and painted. Paint to be used is a DTM ALKYD type paint. Color shall be Sherwin Williams SW 6083 Sable (Brown) to match existing or approved equal.
LAKE 306435 Page 4 of 57
5. Contractor shall meet with the COR with a sample of the colors and paint to be used for agreement of the color selection before application.
6. Clean and prep the surfaces for painting.
7. Do not paint the exterior roof.
8. Do not paint the items like signs, toilet, grab bars, etc.
9. The plastic vent pipe does not get painted.
10. Most sites are the CXT type as shown in the plans and pictures. The sites listed as
Yosemite Style (YOSE) has an exposed rock rubble finish, do not paint the textured rock surface.
D. Incidental plant and dirt removal near the vault toilets shall be included. Contractor shall remove enough to give clearance to the painted surfaces and the ability to properly complete the task of painting.
E. Missing vent covers to prevent animals from flying or falling down the vent stacks shall be installed. Estimate that 30 of the vent covers are missing.
1. Vent covers shall be stainless steel, rigid, and will not collapse under weight loads from animals, wind and rain. The covers shall allow space for ventilation of the vault tank to occur. The covers shall be firmly attached to the top of the vent pipe using stainless steel screws.
2. These are the source of vent covers that the park currently is using.
3. https://tetonraptorcenter.org/our-work/poo-poo-project/
4. Other options and installation methods shall be submitted to the NPS for review and approval.
5. Extra covers purchased for the project shall be given to the NP
F. When working on a site:
1. If the site contains a single toilet, close the toilet and perform the work.
2. If a site location contains multiple toilets in the same vicinity, stagger the work sites to keep at least one toilet open and accessible to the public in that location.
List # Location Size Type GPS coordinates Park Developed
Area Map
1 KA Grapevine Canyon Vault Toilet 182 single CXT 35.225807 -114.681173 Katherine Landing 2
2 CB Summit Trail Vault Toilet 561 single CXT 36.22724 -114.62126 Callville Bay 12
3 BB 33 Hole Vault Toilet 469 single CXT 36.11134 -114.84222 Boulder Beach 8 https://tetonraptorcenter.org/our-work/poo-poo-project/
LAKE 306435 Page 5 of 57
4 BB Rocky Point Vault Toilet 451 single CXT 36.11098 -114.84072 Boulder Beach 8
5 LV Wetlands Vault Toilet 525 single CXT 36.12494 -114.90269 Las Vegas Wash 9
6 BB Historic Railroad Trail Vault Toilet 452 double CXT 36.0116 -114.79347 Boulder Beach 6
7 EB Roger's Spring Vault Toilet 628 double CXT 36.377551 -114.442883 Echo Bay 10
8 EB Redstone Vault Toilet 627 double CXT 36.242312 -114.516233 Echo Bay 12
9 OB St Thomas Vault Toilet 655 single CXT 36.470631 -114.385345 Overton Beach 11
10 CC Cottonwood East Vault Toilet 260 single CXT 35.464557 -114.639243 Cottonwood Cove 1
11 MV South Cove Picnic Area Vault Toilet 854 single CXT 36.09254 -114.101829 Meadview 13
12 MV Pearce Ferry Vault Toilet 861 single CXT 36.116722 -114.004151 Meadview 14
13 MV Pearce Ferry Vault Toilet 862 single CXT 36.114703 -114.002952 Meadview 14
14 MV South Cove Picnic Area Parking Vault Toilet 869 single CXT 36.092541 -114.101893 Meadview 13
15 KA Cabinsite Point Vault Toilet 183 single YOSE 35.239768 -114.576376 Katherine Landing 4
16 KA Cabinsite Point Vault Toilet 179 single YOSE 35.239578 -114.576435 Katherine Landing 4
17 KA South Telephone Cove Vault Toilet 180 single YOSE 35.229944 -114.569776 Katherine Landing 4
18 KA South Telephone Cove Vault Toilet 178 single YOSE 35.23001 -114.569805 Katherine Landing 4
19 KA North Telephone Cove Vault Toilet 177 single YOSE 35.232921 -114.570044 Katherine Landing 4
20 KA North Telephone Cove Vault Toilet 176 single YOSE 35.232864 -114.570366 Katherine Landing 4
21 KA North Telephone Cove Vault Toilet 175 single YOSE 35.23373 -114.570079 Katherine Landing 4
22 KA North Telephone Cove Vault Toilet 174 single YOSE 35.233653 -114.569559 Katherine Landing 4
23 KA Princess Cove Picnic Area Vault Toilet 160 single CXT 35.264604 -114.583284 Katherine Landing 5
24 KA Princess Cove Ramp Vault Toilet 159 single CXT 35.265148 -114.580743 Katherine Landing 5
25 KA Princess Cove Ramp Vault Toilet 158 single CXT 35.264972 -114.580334 Katherine Landing 5
26 KA Nevada Telephone Cove Vault Toilet 184 single CXT 35.23008 -114.594014 Katherine Landing 3
27 WB Kingman Wash Vault Toilet 331 single CXT 36.033152 -114.705318 Willow Beach 6
28 EB Stewarts Point Cove Vault Toilet 630 double CXT 36.378437 -114.399146 Echo Bay 10
29 KA Nevada Telephone Cove Vault Toilet 171 single CXT 35.230646 -114.594125 Katherine Landing 3
30 KA Nevada Telephone Cove Vault Toilet 172 single CXT 35.232358 -114.594602 Katherine Landing 3
31 KA Grapevine Canyon Vault Toilet 181 single CXT 35.225788 -114.681127 Katherine Landing 2
32 CC Six Mile Cove Vault Toilet 254 single CXT 35.452535 -114.679633 Cottonwood Cove 1
33 CC Six Mile Cove Vault Toilet 255 single CXT 35.453279 -114.679606 Cottonwood Cove 1
34 CC Six Mile Cove Vault Toilet 256 single CXT 35.454066 -114.678906 Cottonwood Cove 1
35 CC Nine Mile Cove Vault Toilet 257 single CXT 35.413773 -114.673492 Cottonwood Cove 1
LAKE 306435 Page 6 of 57
36 BB Sunset View Overlook Vault Toilet 485 single CXT 36.096939 -114.824371 Boulder Beach 7
37 BB Longview Overlook Vault Toilet 486 single CXT 36.098397 -114.843247 Boulder Beach 7
38 BB 3 Island Vault Toilet 487 single CXT 36.110715 -114.843855 Boulder Beach 8
39 MV South Cove Picnic Area Vault Toilet 853 single CXT 36.090011 -114.100818 Meadview 13
40 MV South Cove Launch Ramp Vault Toilet 855 single CXT 36.090051 -114.100795 Meadview 13
41 MV South Cove Launch Ramp Vault Toilet 856 single CXT 36.090089 -114.100784 Meadview 13
42 LV Overlook Vault Toilet 539 single CXT 36.117055 -114.864418 Las Vegas Wash 9
1.4 LOCATION
A. Project Location: Parkwide, Clark County, Nevada and Mohave County, Arizona; within Lake Mead National Recreation Area (LAKE NRA). See identified locations.
1.5 PERFORMANCE PERIOD: The project schedule is based on calendar days from the "Notice to Proceed" (NTP) date.
The total performance period for this project is 150 calendar days.
1.6 FIELD VERIFICATION
A. The Contractor shall field verify all new and existing dimensions affecting the work in this contract before ordering any materials, supplies or parts.
1.7 CONTRACTOR'S USE OF PREMISES
A. The sites are located in public areas.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the recreation area visitors and employees.
C. The contractor shall at all times make the job site safe to the public.
1. Barriers, cones or tape shall be used around the active job site.
2. Safe storage of materials shall be done.
D. Preservation of Natural Features: Confine all operations to work limits of the project.
Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
F. Work Limits: The Contractor shall be confined to conduct his work to job site area and work limits as shown on drawings or approved by the Contracting Officer. Contractor shall be responsible to pay for rehabilitation work for any resource damage outside authorized work limits.
G. Care shall be taken to ensure that fuel, oil and other spills do not occur. If spills occur, cleanup will be completed at no additional expense to the Government.
LAKE 306435 Page 7 of 57
1.8 HOURS OF OPERATION
A. Hours of operation shall be Monday through Friday between the hours of 7:00 AM and 5:00 PM unless alternate hours are approved by the Contracting Officer and the Contracting Officers Representative (COR). Requests for changes shall be submitted to the COR.
B. Requests for alternate work hours will need to be submitted to the CO and the COR, the COR will review and make a recommendation to the CO to approve the alternate work hours. Alternate work hours may not be used as a way to accelerate the schedule.
Contractors that voluntarily schedule an acceleration are responsible for the costs of those accelerations. Government acceptance of Contractor's voluntary schedule acceleration does not commit the Government to additional costs that result in Contractor's acceleration of the schedule. Voluntary acceleration of work needs to be identified and writing and request shall be reviewed by the COR and is only subject to CO approval.
1.9 SPECIAL PROVISIONS
A. Time Constraints:
1. Quiet Hours in the park are from 10:00 PM until 6:00 AM. The Contractor shall not operate equipment or make loud noise between these hours.
2. No work will be performed on weekends or on federal holidays without the advanced, written authorization of the CO.
3. Any request to work outside of normal working days and hours shall be submitted to the CO and COR at least 3 business days before the requested event for authorization.
B. Park Entry:
1. The contractor shall furnish a list of personnel with phone contact information.
Vehicles associated with the contractor shall be waived entrance fee upon entering in a marked company vehicle or by providing the names of employees entering in personal vehicles. The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
C. Park Regulations:
1. Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
D. Emergency Medical and Accident Reporting:
1. All accidents and incidents shall be reported to the CO and COR.
a. The Contractor or subcontractor shall contact Park Dispatch for any medical emergency or traffic accident occurring within the Park.
Emergency number: Dial 911 as needed.
LAKE 306435 Page 8 of 57
Park Dispatch: 702-293-8932 EMERGENCY Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles (e.g. ambulance) need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.
b. The Contractor or subcontractor is required to report ANY personal injury and / or property damage incident occurring within the park. This report must be made to a Law Enforcement Ranger at the first available opportunity before leaving the park:
Park Dispatch: 702-293-8998 NON-EMERGENCY
E. Environmental Compliance Requirements:
1. The Contractor and all employees working on the Project will be required to take “Desert Tortoise Awareness Training” which will be provided by the Government at no cost to the Contractor. This training will take approximately 30 minutes or less.
2. The Contractor’s employees shall never handle a desert tortoise.
3. The Contractor and employees shall immediately report the presence of any desert tortoise to the COR.
4. Herbicides shall not be used in or around the Project site.
5. The environmental compliance contact for this project is Toshi Yoshida. For questions or additional information, contact Toshi at: 702-293-8849.
F. Equipment Washing:
1. Equipment washing is required to preclude the introduction and spread of non-native species into the Park. Therefore, all equipment shall be cleaned outside of the Park before entering the Park. Equipment leaving the park for any reason must be re-washed before returning to the job site. Equipment that is moved from the job site, but remains within the original developed area, need not be re-washed prior to returning to the job site. It is also known that there are areas inside the Park that have non-native plants and weed species infestation. Therefore, before equipment can be moved from one developed area to another, it must be washed at the location identified on the Site Plan (see attached site plan and mileage table) to ensure weeds are not spread from one developed area to another.
2. The Contractor shall clean all equipment prior to the equipment entering Lake Mead National Recreation Area. It is recommended that cleaning be accomplished by hot water, pressure washing, using water only. All equipment surfaces shall be cleaned, with special emphasis given to the undercarriage. This includes, but is not limited to:
wheel wells, bumpers, radiator grills, springs, shock absorbers, wire harnesses, skid plates, oil pans, axles, frame ledges, buckets, tracks, belly pans, etc. Cleaning shall also include all dirt and debris inside the cab, or operator area. A Shop-Vac or commercial car wash vacuum system may be used for operator compartments, provided the method used effectively removes all visible debris. Equipment cleaning is
LAKE 306435 Page 9 of 57 for the purpose of removing any seed and soil accumulations to prevent the potential spread of non-native plant and weed species from outside the park to locations inside the park. Cleaning shall be performed in a manner that will reasonably remove all visible soil, plant and other foreign material. All equipment that requires washing shall be inspected by government personnel, or contractors/partners assigned to this duty, to ensure compliance.
3. Equipment that requires washing is generally defined as track or rubber-tired machinery intended for use primarily off-road. Examples include backhoes, loaders, earthmovers, graders, rollers, bulldozers, water trucks, etc; or four wheel drive or passenger vehicles that are driven in off road areas. Equipment may also be stationary, such as a material screening plant, conex storage containers, or a mobile office (mobile offices may be cleaned in the same manner as operator compartments as outlined in paragraph 2). The equipment is generally under the direct control of the contractor or sub-contractors, is likely to remain on the construction site for an extended period of time, and may contain adhered soil and seed from other project sites.
4. Equipment/Vehicles that do not require washing are defined as those normally used for highway driving only, and travel primarily on paved surfaces and well maintained service roads and parking areas (this includes approved staging areas). Examples include semi-tractor trailers, dump trucks, concrete trucks, pickup trucks, fuel trucks, service trucks, etc. These delivery and passenger vehicles are generally not under the direct control of the contractor, have no earth-moving function, and do not remain on the project site. These vehicles have a low probability of carrying adhered soil and seed from other projects. However, every vehicle and piece of equipment is subject to rejection from entering the park if there are obvious signs (covered in mud, plant material adhered to it, etc.) that it could be transporting non-native species into the Park.
G. Post Equipment Washing Inspections:
1. All equipment subject to inspection will be inspected by government, or other authorized personnel prior to leaving the paved surface or designated washing area identified on the Site Plan. Equipment determined to be free of soil or mud based on visual examination by government personnel will be cleared to enter the project area, or proceed to other areas of the park as appropriate. The Contractor shall arrange for needed inspections by contacting the NPS inspection office no less than 5 working days prior to the inspection. Such contact shall provide sufficient time to accommodate scheduling and travel to the site. Equipment not passing initial inspection must be rewashed outside the park at no additional expense to the government.
2. A list of government Inspectors for this project will be provided by:
Kelly Wallace Cell Phone: 702-371-9673
LAKE 306435 Page 10 of 57
Toshi Yoshida Office Phone: 702-293-8849 Cell Phone: 702-279-9262
1.10 DESIGNATED OFFICIALS
A. The NPS Project Manager (PM) and Contracting Officer's Representative (COR) will be:
Carl Bush PE, Lake Mead NRA Telephone: 702-293-8735 (w) 702-859-0194 (cell) E-mail: carl_bush@nps.gov
B. The Contracting Officer (CO) will be:
TBD
END OF SECTION 01010
LAKE 306435 Page 11 of 57
LAKE MEAD NATIONAL RECREATION AREA
FIGURE 1
LAKE 306435 Page 12 of 57
LAKE MEAD NRA DISTANCE CHART
FIGURE 2
LAKE 306435 Page 13 of 57
SECTION 01270 DEFINITION OF BID ITEMS
1.1 DESCRIPTION
A. The intent of this section is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends and another begins.
B. If no bid item exists for a portion of the work, include the costs in a related bid item.
1.2 LIST OF ANTICIPATED BID ITEMS
A. BID ITEM No. 01 – Paint Vault Toilets, as specified.
1. UNIT – lump sum
2. DEFINITION – Unit price includes all necessary labor, materials, and equipment to paint the vault toilets. Work also includes but is not limited to: mobilization, purchase of paint, prepare surfaces and installation of vent covers. All removed/demolished equipment and materials shall be transported and legally disposed of off-site.
Schedule of Values do not need to be filled out for the Bid Proposal.
Schedule of Values Contract Line Item Number
(CLIN)
Contract Line Item Title Quantity Unit of Measure
Unit Price Total Price
10 Mobilization/Project kickoff 1 LS
20 KA Grapevine Canyon Vault Toilet 182 1 LS 30 CB Summit Trail Vault Toilet 561 1 LS 40 BB 33 Hole Vault Toilet 469 1 LS 50 BB Rocky Point Vault Toilet 451 1 LS 60 LV Wetlands Vault Toilet 525 1 LS 70 BB Historic Railroad Trail Vault Toilet 452 1 LS 80 EB Roger's Spring Vault Toilet 628 1 LS 90 EB Redstone Vault Toilet 627 1 LS
100 OB St Thomas Vault Toilet 655 1 LS 110 CC Cottonwood East Vault Toilet 260 1 LS 120 MV South Cove Picnic Area Vault Toilet 854 1 LS 130 MV Pearce Ferry Vault Toilet 861 1 LS 140 MV Pearce Ferry Vault Toilet 862 1 LS 150 MV South Cove Picnic Area Parking Vault Toilet 869 1 LS 160 KA Cabinsite Point Vault Toilet 183 1 LS 170 KA Cabinsite Point Vault Toilet 179 1 LS
LAKE 306435 Page 14 of 57
180 KA South Telephone Cove Vault Toilet 180 1 LS 190 KA South Telephone Cove Vault Toilet 178 1 LS 200 KA North Telephone Cove Vault Toilet 177 1 LS 210 KA North Telephone Cove Vault Toilet 176 1 LS 220 KA North Telephone Cove Vault Toilet 175 1 LS 230 KA North Telephone Cove Vault Toilet 174 1 LS 240 KA Princess Cove Picnic Area Vault Toilet 160 1 LS 250 KA Princess Cove Ramp Vault Toilet 159 1 LS 260 KA Princess Cove Ramp Vault Toilet 158 1 LS 270 KA Nevada Telephone Cove Vault Toilet 184 1 LS 280 WB Kingman Wash Vault Toilet 331 1 LS 290 EB Stewarts Point Cove Vault Toilet 630 1 LS 300 KA Nevada Telephone Cove Vault Toilet 171 1 LS 310 KA Nevada Telephone Cove Vault Toilet 172 1 LS 320 KA Grapevine Canyon Vault Toilet 181 1 LS 330 CC Six Mile Cove Vault Toilet 254 1 LS 340 CC Six Mile Cove Vault Toilet 255 1 LS 350 CC Six Mile Cove Vault Toilet 256 1 LS 360 CC Nine Mile Cove Vault Toilet 257 1 LS 370 BB Sunset View Overlook Vault Toilet 485 1 LS 380 BB Longview Overlook Vault Toilet 486 1 LS 390 BB 3 Island Vault Toilet 487 1 LS 400 MV South Cove Picnic Area Vault Toilet 853 1 LS 410 MV South Cove Launch Ramp Vault Toilet 855 1 LS 420 MV South Cove Launch Ramp Vault Toilet 856 1 LS 430 LV Overlook Vault Toilet 539 1 LS 440 Demobilization/Project cleanup 1 LS 450 Bonds 1 LS
Total Price for Bid
END OF SECTION 01270
LAKE 306435 Page 15 of 57
SECTION 01310 PROJECT MANAGEMENT AND COORDINATION
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on this project including, but not limited to the following:
1. Supervisory and administrative personnel.
2. Project meetings.
3. Coordination procedures.
1.2 SUPERVISORY AND ADMINISTRATIVE PERSONNEL
A. General: In addition to the project superintendent, the Contractor shall provide other supervisory and administrative personnel as required for proper work performance. This may include special personnel required for coordination of operations with subcontractors and material suppliers.
B. Staff roster:
1. Within 14 days after the NTP, the Contractor shall submit a list of staff assignments, including subcontractor personnel (if applicable), working at the job site. Identify each individual and their duties and responsibilities.
1.3 PROJECT MEETINGS
A. Submittals required prior to the Preconstruction Conference.
1. Letter designating the Project Superintendent.
2. Proposed construction schedule.
3. Schedule of values.
4. Accident prevention plan.
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.
B. Preconstruction Conference: Once the contract is awarded, an initial orientation meeting will be scheduled for a time and date that is agreeable to the Government and Contractor and will be conducted in the Lake Mead Maintenance Building. Lake Mead personnel will be present to go over park specific requirements of the project with the Contractor and the Contractor’s supervisory and administrative team. The Notice to Proceed date will also be established at the Preconstruction Conference.
LAKE 306435 Page 16 of 57
1. Agenda: Items to be discussed will include but not be limited to:
1. Park Rules and Regulations.
2. General correspondence procedures.
3. Labor standards provisions.
4. Payroll reports.
5. Payments to the Contractor.
6. Acceptance/rejection of work.
7. Progress Meetings.
8. Subcontractors.
9. Documents required under contract.
10. Local emergency phone number.
11. Specifications and drawings.
2. Once the Notice to Proceed date has been established, the Contractor shall submit the proposed work schedule to the Government for approval.
1.4 COORDINATION PROCEDURES
A. Coordination: Coordinate the construction operations identified in the various Sections of this Specification to ensure the efficient installation of all materials and equipment.
1. Schedule construction operations in the proper sequence required to obtain the best results where installation of one part of the Work depends on installation of other components before or after its own installation.
2. Coordinate installation of different components with subcontractors and Government personnel to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
END OF SECTION 01310
LAKE 306435 Page 17 of 57
SECTION 01330 SUBMITTALS
A. The intent of this section is to explain submittal requirements before and during construction.
B. This section also includes the requirements for properly handling "Substitutions" and
"Comparable Products" the Contractor submits as being "equal" to the product that has been specified.
1.2 SUBMITTAL AND APPROVAL PROCEEDURES
A. All submittals shall be transmitted to the COR, as original and three (3) copies, using National Park Service form CM-16, dated 4/00.
1. A copy of the form is included at the end of this Section.
2. No action will be taken on a submittal unless it is accompanied by a transmittal form.
3. All submittals shall be carefully reviewed by the Contractor prior to submission to the
Government to eliminate errors.
B. Content of the RFI or Submittal: Include a detailed, legible description of item needing information or interpretation and the following:
1. RFI/Submittal number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Contractor's suggested resolution. If Contractor's suggested resolution impacts the
Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
7. Contractor’s signature.
8. Requested date for response.
9. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, and details of affected materials, assemblies, and attachments on attached sketches.
C. Manufactures' Catalog Sheets: Submit only pertinent pages and mark each copy of standard printed data to identify products proposed for use. Submittal forms with attached Manufactures' Catalog Sheets that are not marked to identify products proposed for use will be disapproved by the COR and shall be resubmitted by the Contractor.
D. Manufactures' Installation Instructions: Provide one (1) complete set of instructions to the
COR and keep another complete set of instructions at the job site until substantial completion.
E. The Contractor shall forward submittals to the COR in accordance with the milestones.
LAKE 306435 Page 18 of 57
F. Lake Mead personnel will review and approve or disapprove and provide comment to submittals in as short a timeframe as possible, but not to exceed 7 calendar days.
G. Contracting Officer will not respond to RFIs submitted by other entities controlled by
Contractor.
H. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
1.3 REQUIREMENTS FOR APPROVED EQUALS
A. For each "Substitution" or "Comparable Product" the Contractor submits as being "equal" to the product that has been specified, the Contractor shall submit supporting documentation that includes:
1. Statement indicating why specified material or product cannot be provided.
2. Detailed comparison of the characteristics of the proposed item with that specified.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendors.
5. Product data, including drawings, descriptions, fabrication, and samples as appropriate.
6. Manufacturer's literature regarding installation, operation and maintenance, schematics for electrical systems, and parts lists.
a. Describe availability of maintenance service and state a source of replacement parts and materials.
B. A request for approval constitutes a representation that the Contractor:
1. Has investigated the proposed item and determined that it is equal to or superior in all respects to that specified.
2. Shall provide the same warranties for the proposed item as for the item specified.
3. Has determined the proposed item is compatible with interfacing items.
4. Shall coordinate the installation of the alternate item and make all changes required in other elements of the work because of the substitution.
5. Wavier all claims for additional expenses the may be incurred as a result of the substitution.
C. If all of the requirements listed above are not met by the Contractor, the COR will disapprove the "Substitution" or "Comparable Product" request.
END OF SECTION 01330
LAKE 306435 Page 19 of 57
TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
It em N o
Specification Section No. P ar ag ra p h N
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature
Recommended By
Title
Date
Title
I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments
Action By
Contracting Officer's Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From Contractor [__________], To Reviewer [__________], From Reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim
CM-16Rev. 4/00 (Formerly DSC-1)
LAKE 306435 Page 20 of 57
TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 2 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
It em N
Specification Section No. P ar ag ra p h N
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16Rev. 4/00 (Formerly DSC-1)
LAKE 306435 Page 21 of 57
SECTION 01360 ACCIDENT PREVENTION
A. After contract award and before the Pre-Construction conference, submit for review an
Accident Prevention Plan. The Contracting Officer will review the proposed Plan. If the plan requires any revisions or corrections, the Contractor shall resubmit the Plan within ten
(10) days. No progress payments will be made until the Plan is accepted.
1.2 SUBMITTALS
A. Accident Prevention Plan - The Plan shall be written to comply with OSHA and project requirements including but not limited to the following information/topics:
1. The name of the responsible supervisor who shall carry out the program.
2. Documentation of the personnel training program; both initial and continuing.
3. Weekly and monthly safety meetings.
4. First aid procedures.
5. Outline the work, associated hazards, protective measures, and the methods proposed to ensure property protection, safety of the public, National Park Service personnel, and Contractor's employees.
6. Planning and checklists for possible emergency situations.
7. A fire protection plan.
8. And a fall protection plan.
B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.
C. Tests: Submit triplicate copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
D. Off Site Inspection Reports: Submit prior to shipment.
E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.
1.3 QUALIFICATION OF EMPLOYEES
A. Ensure that employees are physically qualified to perform assigned duties in a safe manner.
LAKE 306435 Page 22 of 57
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.
1.4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100. Notify Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage Report (Form CM-22). Form may be obtained from the Contracting Officer.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
1.5 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of National Institute for Occupational Safety and Health (NIOSH) and
OSHA.
B. Inspect personal protective equipment daily and maintain in a serviceable condition.
Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
D. It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
1.6 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
1.7 FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the hazards associated with the types of ongoing construction work at the site.
1.7 SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
LAKE 306435 Page 23 of 57
B. Conduct monthly safety meetings for all levels of supervision. Notify the COR of meeting dates and times. These meetings shall be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program.
END OF SECTION 01360
LAKE 306435 Page 24 of 57
SECTION 01400 QUALITY REQUIREMENTS
A. The intent of this section is to explain the requirements for preparing and executing a Quality Control Program.
1.2 SUBMITTALS
A. Quality Control Plan: At the time of the Pre-Construction Conference the Contractor shall submit for approval a written Contractor Quality Control (CQC) plan to the Government. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days. The Government reserves the right to require changes to the plan during the contract period as necessary to obtain the quality specified. No change in the approved plan may be made without written concurrence by the Contracting Officer. The plan shall include:
1. A list of personnel responsible for quality control. Include each person's qualifications.
2. A copy of a letter of direction to the Contractor's quality control supervisor outlining assigned duties.
3. Names and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
4. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.
5. Methods of performing, documenting, and enforcing quality control of all work.
B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.
C. Tests: Submit triplicate copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
D. Off Site Inspection Reports: Submit prior to shipment.
E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.
1.3 QUALITY ASSURANCE
A. General: Except for tests or other items of work specified to be performed by the Government, the quality of all work shall be the responsibility of the Contractor. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
LAKE 306435 Page 25 of 57
B. Quality Control Staff: The Contractor's job supervisory staff may be used for quality control, supplemented as necessary by additional technicians. The Contractor's designated Quality Control Supervisor shall be employed full time at the project site whenever contract work is in progress.
C. Testing Laboratory and Equipment: Employ certified independent laboratory to perform sampling and testing.
1. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with NBS/NIST requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.
2. The testing laboratory organization shall be experienced in the type of testing work to be done.
1.4 OFF-SITE CONTROL
A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.
1.5 ON-SITE CONTROL
A. Notify the COR at least 24 hours in advance of the initial and follow-up phases.
B. Preparatory: Perform before beginning each feature of work.
1. Review control submittal requirements with personnel directly responsible for the quality control work.
2. Ensure that provisions have been made for field control testing.
3. Examine the work area to ensure that all preliminary work has been completed.
4. Verify all field dimensions and advise the COR of discrepancies.
5. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.
C. Initial: As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship. Review control testing procedures to ensure compliance with contract requirements.
D. Follow-Up: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
1.6 DOCUMENTATION
A. Maintain Daily Quality Control Reports (sample attached) of quality control activities and tests. Daily Quality Control Reports may not be substituted for other written reports required under the General Provisions, such as Disputes, Differing Site Conditions, or Changes.
LAKE 306435 Page 26 of 57
1.7 ENFORCEMENT
A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the COR. Construction shall not proceed on any feature of work containing uncorrected work.
END OF SECTION 01400
LAKE 306435 Page 27 of 57
SECTION 01510 TEMPORARY SERVICES
A. The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract.
1.2 GENERAL REQUIREMENTS
A. Temporary materials may be new or used but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
1.3 SANITARY FACILITES
A. Provide and maintain temporary toilet facilities in accordance with State Health Department and National Park Service requirements.
B. Sufficiently lighted and ventilated toilet facilities in weatherproof, sight-proof, handicap accessible, sturdy enclosures with privacy locks.
1.4 FIRE PROTECTION EQUIPMENT
A. Extinguisher shall have a minimum UL rating of 2-A: 10-B:C.
1.5 ELECTRICITY AND LIGHTING
A. Make arrangements with utility company for metered connection to existing utility and pay all costs.
B. Temporary Electrical: Temporary electrical work shall meet requirements of NFPA 70- 1996 (NEC), Article 305.
C. When temporary connections are removed, restore existing utility services to their original condition.
1.6 HEATING AND VENTILATING
A. Provide and maintain adequate approved facilities, as required for safety and construction requirements, during the progress of the work. Provide ample clearance around stoves and heaters, and all chimneys and vent connections to prevent ignition of combustible material.
1.7 TELEPHONE
A. No telephone service is available on site for Contractor's use. Make arrangements with Telephone Company and pay all costs.
LAKE 306435 Page 28 of 57
1.8 WATER
A. The Contractor shall furnish cool, potable water for construction personnel in locations convenient to work site.
1.9 FIRE PREVENTION AND PROTECTION
A. Responsible person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.
B. Hazard Control: Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing buildings. Provide adequate ventilation during use of volatile or noxious substances.
C. Spark Arresters:
1. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.
2. Equip all gasoline or diesel-powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the U. S. Forest Service.
D. Service and Refueling Areas: Locate areas a minimum of 50 feet from buildings. Shut down equipment before refueling.
E. Smoking: Smoking within buildings or temporary storage sheds is prohibited.
F. Welding: Cutting by torch or welding shall be performed only when adequate fire protection is provided.
1.11 PROTECTION EQUIPMENT REQUIRED
A. Buildings:
1. Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof.
2. Travel distance from any work station to the nearest extinguisher shall not exceed 75 feet.
B. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.
END OF SECTION 01510
LAKE 306435 Page 29 of 57
SECTION 01570 TEMPORARY CONTROLS
A. This Section includes administrative and procedural requirements for providing temporary controls.
1.2 HOUSEKEEPING
A. Keep project site neat, orderly, and in a safe condition at all times.
B. Provide enough containers for collecting construction debris and construction materials to be recycled.
C. Keep volatile wastes in covered containers.
1.3 DISPOSAL
A. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the park.
B. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the park. Do not burn or bury refuse inside the park.
1.4 FIRE PROTECTION EQUIPMENT
A. Extinguisher shall have a minimum UL rating of 2-A: 10-B: C.
1.5 AIR AND WATER POLLUTION CONTROL
A. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
B. Do not dispose of volatile wastes or oils in storm or sanitary drains.
C. Do not allow waste materials to be washed into streams or bodies of water.
1.6 WATER
A. Toilets: Use of existing park toilet facilities will be permitted.
1.8 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
LAKE 306435 Page 30 of 57
B. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
END OF SECTION 01570
LAKE 306435 Page 31 of 57
SECTION 01600 PRODUCT REQUIREMENTS
A. This Section includes administrative and procedural requirements for selection of products for use in this Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; product substitutions; and comparable products.
1.2 DEFINITIONS
A. Products: are items purchased for incorporating into the Work, whether purchased for this Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.
1. Named Products: are items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.
2. New Products: are items that have not previously been incorporated into another project or facility, except that products consisting of recycled-content materials are allowed, unless explicitly stated otherwise. Products salvaged or recycled from other projects are not considered new products.
3. Comparable Products: are a product that is demonstrated and approved through the submittal process outlined in Section 01330 and have been proven to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of the specified product.
B. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor that have been approved through the submittal process outlined in Section 01330.
C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and accompanied by the words "basis of design," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of other named manufacturers that have been approved through the submittal process outlined in Section 01330.
D. Manufacturer's Warranty: Preprinted written warranty published by individual manufacturer for a particular product and specifically endorsed by manufacturer to the Government.
E. Special Warranty: Written warranty required by or incorporated into the Contract Documents, either to extend time limit provided by manufacturer's warranty or to provide more rights for the Government.
1.3 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.
LAKE 306435 Page 32 of 57
B. Delivery and Handling:
1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.
2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.
3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.
4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.
C. Storage:
1. Store products to allow for inspection and measurement of quantity or counting of units.
2. Store materials in a manner that will not endanger Project structure.
3. Store products that are subject to damage by the elements, under cover in a weather-tight enclosure above ground, with ventilation adequate to prevent condensation.
4. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment.
5. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage.
6. Protect stored products from damage and liquids from freezing.
1.4 PRODUCT WARRANTIES
A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents.