2-Notice of Intended Sole Source- X Factor Sole Source - extending for funding.doc

DOC document 114 KB Posted

Attached to
Sole Source - Additional Time to finish up project with Review AAM Community Outreach and Toolkit
Solicitation number
UDOT260083MH - Additional Time to finish up project with Review
Issued by
Utah

About this file

This is a Notice of Intent to Award a Contract Without Engaging in a Standard Procurement Process submitted by the State of Utah Department of Transportation (UDOT) Procurement. The notice addresses a sole source procurement for Air Mobility Community Engagement and Toolkit services from vendor X-Factor. The procurement involves continuing installation and upgrade of e-screening systems at Ports of Entry, identifying out-of-service carriers through vehicle management sign integration, completing the Tire Anomaly Classification Systems (TACS) installation, and installing Commercial Vehicle sorting systems. The scope further includes installation of weigh-in-motion sensors, USDOT readers, license plate readers, cameras, masts, poles, signs, technical wiring, and related equipment at ten additional locations throughout Utah. The Port Operations Enhancement project encompasses sensor installation and technical infrastructure necessary for tire anomaly system technology implementation, while the Operations and Maintenance project covers maintenance, replacement, and repairs of currently installed equipment vital to e-screening operations. The contract term expires December 31, 2026, with no renewal options. No specific response deadline or bidder conference is identified in the notice.

The estimated total additional funding for this contract extension is $44,258.45. UDOT Procurement justified the sole source award based on compatibility of equipment, technology, software, accessories, and replacement parts being the paramount consideration, as this represents a continuation and completion of an existing contract with X-Factor. The justification indicates that there is an existing contract and no additional market research was deemed necessary due to the ongoing nature of the project. No personal, financial, or fiduciary relationships with the vendor were disclosed. The document explicitly states that an existing contract forms the basis for this sole source determination, eliminating the need to contact other similar vendors. UDOT Procurement reserves the right to reject the sole source justification if other qualified providers submit valid challenges during the public notice period demonstrating the availability of competing sources.

View the file

Other files

File Type Posted
1-01. General Information- Notice of Sole Source (1).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF UTAH - DEPARTMENT OF TRANSPORTATION

UDOT Procurement NOTICE OF INTENT TO AWARD A CONTRACT WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS UDOT Procurement is publishing this notice pursuant to the Utah Procurement Code. The Requesting Unit submitted this form to UDOT Procurement claiming that it intends to award a contract without competition if it is determined by UDOT Procurement, in writing, that:

· there is only one source for the procurement item.

· transitional costs are a significant consideration in selecting a procurement item; or

· the award of a contract is under circumstances, described in rules adopted by the applicable rulemaking authority, that make awarding the contract through a standard procurement process impractical and not in the best interest of the procurement unit.

In the subsequent pages the Requesting Unit has identified its justification for pursuing this process.

Determination of Other Interested Providers The intent of this notice is to determine if there are any other interested and qualified providers that meet the specifications of this notice. Any such providers must submit the following information:

· The name of the provider; and

· A detailed explanation of the challenge, including documentation showing that there are other competing sources for the procurement item.

In addition, a provider should include:

· Documentation that the provider can provide a comparable or better procurement item that meets or exceeds the specifications.

· Documentation that the provider can also provide the same proprietary procurement item or an equivalent procurement item; and

· If transitional costs are identified as the justification for this notice, submit a cost comparison of the identified transitional costs with the provider’s anticipated transitional costs.

Regardless of any prior communications with UDOT Procurement or the State, all providers interested in responding to this notice must submit a response to this posting containing complete responses to all of the information requested above.

DO NOT CONTACT THE REQUESTING UNIT. Any questions regarding this notice, including obtaining additional information, must be obtained through UDOT Procurement during the publication period. No action is required if you agree with this Notice.

If, after the public notice period has passed, UDOT Procurement determines that there are other interested and qualified providers that meet the specifications of this notice; UDOT Procurement will not award a contract pursuant to this notice.

If, after the public notice period has passed, no valid challenges have been received, then the UDOT Division of Procurement may award a contract to the identified vendor without competition.

Please read the entire form very carefully before responding to this notice.

It is anticipated that this procurement will result in a:

RESULT
ACTION

X

Contract

MOU

1. The term of this contract will be: expires 12/31/2026 and renewal options: none.

Purchase Order
1. Insert the Accounting Coding: Example: 8301 XDA B87E12

Coding for this Purchase Order: Unit FORMTEXT

Appr FORMTEXT

Obj FORMTEXT

Activity FORMTEXT

Function FORMTEXT

Other

___ GAX

___ P Card

1. NOTICE: The GAX option is for EXTENUATING circumstances only. Requesting Unit may not make the procurement until after the solicitation process is completed and the method of payment has been approved by UDOT Procurement.

NOTICE: The Requesting Unit may not make the procurement until after the solicitation process is completed and the purchase order or contract is fully signed by and delivered to all required parties.

Description of procurement item to be purchased:
Air Mobility Community Engagement and Toolkit
Estimated Total Term Cost/Cost per quote:
Additional Funding $44,258.45
Freight Cost (F.O.B. Destination, Freight Prepaid):
NA
Vendor Name:
X-Factor

Explain in detail the service or product to be procured (additional information is found on any attached Scope of Work):

Continuing the install and upgrade e-screening systems out of Port of Entry’s, including identifying Out of Service Carriers through integration with our VMS signs. Finishing ongoing project on installing Tire anomaly classification systems(TACS). Installing Commercial Vehicle sorting systems.

Installation of weigh-in-motion sensors, USDOT readers, license plate readers, cameras, masts, poles, signs, technical wiring, and other equipment typical to the other e-screening systems already in place at Ports of Entry in the State of Utah.

The Port Operations Enhancement project includes installation of sensors, technical wiring, conduit, and other equipment necessary for implementation of tire anomaly system technology at ten additional locations throughout the State of Utah.

The Operations and Maintenance project includes maintenance and possible replacement (as determined by the Division) and/or repairs of currently installed equipment, systems, sensors, and other equipment vital to our e-screening operations.

CHECK THE THAT BOX IDENTIFIES WHY A CONTRACT SHOULD BE AWARDED WITHOUT ENGAGING IN A STANDARD PROCUREMENT PROCESS:

X
There is only one source for the procurement item, or Compatibility of equipment, technology, software, accessories, replacement parts, or service, including professional services, is the paramount consideration.
Complete section A
Transitional costs are a significant consideration in selecting a procurement item and the results of a cost-benefit analysis demonstrate that transitional costs are unreasonable or cost-prohibitive.
Complete section B
The award of a contract is under circumstances, described in rules adopted by the applicable rulemaking authority, that make awarding the contract through a standard procurement process impractical and not in the best interest of the procurement unit.
Complete section C
Procurement item is needed for Trial use or testing to determine whether the item will benefit the agency.
Complete section D

SECTION A: ONLY ONE SOURCE

1.
What is unique about this procurement item to justify an award of contract without engaging in a standard procurement process? (Explain in detail why the service or product is only available from a single supplier.)

Project Meetings and Wrapping up the Project

2.
Could the procurement item be reasonably modified to allow for competition?

No there is an existing contract

3.
Explain the market research performed.

Existing contract

4.
What research have you conducted to ensure the requested item is not available on an existing state cooperative contract?

Existing contracts

5.
List the names of other similar vendors contacted, contact person, and a summary of their response,

NA

6.
Disclose in space below if the requestor has any personal, financial, or fiduciary relationship with the recommended vendor.

No

SECTION B: TRANSITIONAL COSTS

1.
Describe the existing equipment, technology, software, accessories, replacement parts, or service, hereafter referred to as equipment; include the original purchase price and date of purchase for the existing equipment.
2.
Supply the following:
a.
Procurement method that was used to purchase the existing equipment (IFB, RFP, Sole Source):
b.
Solicitation number, RQS number, or sole source number for the existing equipment:
c.
Contract number for the existing equipment:
3.
Attach the cost-benefit analysis, as required by Utah Code Section 63G-6a-802 that demonstrates that transitional costs are unreasonable or cost-prohibitive.

SECTION C: STANDARD PROCUREMENT PROCESS IMPRACTICABLE

1.
Review R33-8-101c

and provide the supporting justification that awarding through a standard procurement process is impractical and not in the best interest of the procurement unit under the circumstances; including any supporting documentation.

2.
Supply the following, if applicable:
a.
Procurement method that was used to purchase the existing equipment. (IFB, RFP, Sole Source):
b.
Solicitation number, RQS number, or sole source number for the existing equipment:
c.
Contract number for the existing equipment

SECTION D: PROCUREMENT ITEM IS NEEDED FOR TRIAL USE OR TESTING

1.
Describe why is the trial use or testing necessary? (Explain the purpose of the trial use or testing of the procurement item.)
2.
What is the anticipated end result of the trial or test?
3.
Do any other similar vendors provide this product or service?
a.
If yes, list the company names, and whether their products will be tested:
4.
What criteria were used to choose this vendor?
5.
What is the scope, size, and location of test or trial?
6.
Contracts for trial and testing must follow the criteria listed in UCA 63G-6a-802.3, and the period for a trial use or testing of a procurement item under a trial use contract may not exceed 24 months, unless the procurement officer provides a written exception documenting the reason for a longer period. Exception attached yes: no:

LEASING PERSONAL PROPERTY (Not Real Property)

Lease requests must include an approved FI 9 State of Utah Lease Obligation Record form from the Division of Finance. The FI 9 State of Utah Lease Obligation Record form can be found on the Division of Finance website finance.utah.gov under Forms. The Finance policy FIACCT 09-21.00 Fixed Assets – Leases can be found on the Division of Finance website under Accounting Policies and Procedures. Approved FI 9 attached.

�(1) In accordance with Subsection 63G-6a-802(1)(c), the procurement official may consider, as applicable, the following circumstances when making a determination as to whether awarding a contract through a standard procurement process is impractical and not in the best interest of the procurement unit:

(a) a contract award to a specific supplier, service provider, or contractor is a condition of a donation or grant that will fund the full cost of the supply, service, or construction item;

(b) public utility services, when only one public utility service is available in an area;

(c) an item where compatibility is the overriding consideration; or

(d) a used procurement item that presents a unique, specialized, or time-limited buying opportunity.

revision date: 08-03-2023