2-MWJ2607-2.01-Bid Submittal Form-FINAL-11132026.xlsx
XLSX spreadsheet 54 KB Posted
- Attached to
- Electrical and Low Voltage - JOC
- Solicitation number
- RFB #MWJ2607
- Issued by
- Cook County, Illinois
About this file
This is a Bid Submittal Form for Request for Bids (RFB) #MWJ2607 issued by City Colleges of Chicago (CCC) for Electrical and Low Voltage Services under a Job Order Contract (JOC) Section 02000. The contract will encompass electrical work on CCC facilities including electrical renovations, replacement-in-kind, IT/AV systems, low voltage systems, and installation and maintenance of security products, access control, turnstiles, and CCTV. The scope of work will be defined through individual Job Orders issued post-award. Upon receipt of a Notice to Proceed for each Job Order, the Contractor shall provide all necessary management, labor, materials, supplies, parts, transportation, supervision, and equipment to perform the required improvements. The form does not specify response dates, due dates, site visits, bidder conferences, award dates, or contract term information.
Bidders must submit two Adjustment Factors as multipliers to the Construction Task Catalog base price of 1.0000: one for Normal Working Hours (Monday through Friday, 6:00 AM to 5:00 PM, excluding County Holidays) weighted at 70% for evaluation purposes, and one for Other Than Normal Working Hours (Monday through Friday, 5:01 PM to 5:59 AM, and all day Saturday, Sunday, and County Holidays) weighted at 30% for evaluation purposes. The Adjustment Factor for Other Than Normal Working Hours must be greater than or equal to the Normal Working Hours factor. Both Adjustment Factors must include a 1.00% JOC System License Fee. Bidders must certify that they have reviewed CCC's Cabling Standards (Volume V) and that their pricing is based on these standards. All bids must be signed by an authorized representative to be considered valid quotations. The form includes spaces for acknowledgment of any addenda issued.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Request for Bids (RFB) #MWJ2607 – Electrical and Low Voltage – JOC
| Section 02000 |
| 2.01 - BID SUBMITTAL FORM - SCHEDULE OF PRICES |
| Enter the Bidder's proposed Adjustment Factors in Part A, and in Part B, certify / agree to CCC's cabling standards. Make sure to read the "Notes to Bidder" contained in Part C |
BIDDER'S NAME:
| PART A: Having carefully examined the specifications and being familiar with all the conditions affecting this bid, the undersigned agrees to furnish all material, labor, equipment and such other apparatus, supervision, and construction project management as required to satisfactorily meet the specifications. (All blanks must be completed). |
| The Bidder shall set forth Adjustment Factors in the respective space provided. Failure to submit all Adjustment Factors will result in the bid being deemed non-responsive. The Contractor shall perform the Work required by each individual Job Order using the following Adjustment Factors: |
| Adjustment Factor Name | ADJUSTMENT FACTOR PROPOSED | |
| ADJUSTMENT FACTORS | Normal Working Hours (70% Weight) | |
| Other than Normal Working Hours (30% Weight) | ||
| Award Criteria Figure | 0.0000 | |
| Part B: Please certify that you have received/reviewed a copy of Volume V – City Colleges of Chicago (CCC) Cabling Standards and agree that all pricing proposed is based on following these standards? |
| The Bidder certifies that they have received and reviewed a Copy of Volume IV: CCC Cabling Standards and the proposed pricing is based on these standards: | ||
| Certified and Agreed? (Yes / No) | ||
| PART C: NOTES TO Bidder | ||
| 1. There are two Adjustment Factors for this Contract. When preparing a Price Proposal, the Contractor shall select the appropriate Adjustment Factor. The Adjustment Factors are as follows: | ||
| a. Normal Working Hours Adjustment Factor: Monday through Friday 6:00 am to 5:00 pm except County Holidays | ||
| b. Other Normal Working Hours Adjustment Factor: Monday through Friday 5:01 pm to 5:59 am, and all day Saturday, Sunday and County Holidays | ||
| 2. The Adjustment Factor for Other Than Normal Working Hours must be greater than or equal to the Adjustment Factor for Normal Working Hours. | ||
| 3. ADJUSTMENT FACTORS MUST INCLUDE THE 1.00% JOC SYSTEM LICENSE FEE | ||
| 4. The Construction Task Catalog® (CTC) is priced at a net value of 1.0000. The bid shall be an increase to" (e.g., 1.1000 or decrease e.g., 0.9500) to the Unit Prices listed in the Construction Task Catalog®. Bidders who submit separate Adjustment Factors for separate Unit Prices may be considered non-responsive and their Proposal may be rejected. | ||
| 6. For bid evaluation purposes only, the following work distributions shall be used to determine the Award Criteria Figure for Contract: | ||
| a. Normal Working Hours Adjustment Factor: | 70% | |
| b. Other Normal Working Hours Adjustment Factor: | 30% | |
| 7. The weighted multipliers above are for the purpose of calculating an Award Criteria Figure only. No assurances are made by the County that Work will be ordered under the Contract in a distribution consistent with the weighted percentages above. The Award Criteria Figure is only used for the purpose of determining the lowest proposed price. | ||
| 8. When submitting Job Order Proposals related to specific Job Orders, the Bidder shall utilize one or more of the Adjustment Factors applicable to the Work being performed. | ||
| Acknowledgment of Addendum(s) | ||
| Bidder acknowledges receipt fo the following addenda: | ||
| Addendum No. | Dated: | |
| Addendum No. | Dated: | |
| Addendum No. | Dated: |
| Note: All bids must be signed to be considered a valid quotation. | |
| Firm's Name: | |
| (Corporation, Partnership, Sole Proprietor) | |
| By: | |
| (Authorized Signature) | |
| By: | |
| (Authorized Signor's Printed Name and Title) | |
| Address: | |
| City, State Zip Code | |
| Contact Person: | |
| Title: | |
| Email and phone #: | |
| Date: |