2-McConnellsburg - Bid Drawings - 2026-10-15-Sealed.pdf
PDF 13 MB Posted
- Attached to
- Maple Street Water Main Replacement
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
This is a bid drawings document for the Maple Street Water Main Replacement project, prepared for the McConnellsburg Borough Municipal Authority in Fulton County, Pennsylvania. The project involves the construction of an 8-inch ductile iron pipe (DIP) water main spanning approximately 877 linear feet, with associated appurtenances including gate valves, tapping sleeves, insertion valves, hydrants, and water service connections. The work includes abandonment of existing 4-inch and 6-inch water mains, installation of new water services to residential properties, trench excavation and backfill in both paved and unpaved areas, pavement and driveway restoration, and erosion and sedimentation control measures. The drawings establish the site plan and profile for the water main installation with specific station locations, valve placements, and service connection points along Maple Street in Mechanicsburg. Sealed bids are due November 18, 2026 at noon through the PennBid program, with construction specifications and wage determinations included in the project manual.
The contract requires a bid bond or certified check equal to 10 percent of the total bid amount, with the successful bidder obligated to provide performance and payment bonds at 100 percent of the bid amount. The project is subject to Pennsylvania's Steel Products Procurement Act (Act No. 3 of 1978) and the Pennsylvania Prevailing Wage Act, requiring all bids to reflect applicable prevailing wage rates. No pre-bid meeting has been scheduled, though contractors are required to verify all site conditions and utility locations before submitting proposals. The contractor must coordinate with multiple utility owners including Metropolitan Edison Company/FirstEnergy, UGI Utilities, and the McConnellsburg Sewerage Authority, and provide notice to facility owners at least three working days in advance of excavation operations in accordance with Pennsylvania Act 287. All work must comply with Pennsylvania's Erosion and Sedimentation Pollution Control Manual and AWWA standards for pipe encasement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-McConnellsburg-Bid Documents-10-15-26-Sealed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2025 Microsoft Corporation © 2025 TomTom
SITE
MECHANICSBURG, PENNSYLVANIA
OCTOBER 2026
PROJECT NUMBER: 77443.202501
MAPLE STREET
WATERMAIN REPLACEMENT
McCONNELLSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA
BID DRAWINGS
DRAWING INDEX
DRAWING
NO.
SHEET
NUMBER SHEET NAME
GENERAL
G-01 COVER
CIVIL
C-01 GENERAL NOTES, LEGENDS AND ABBREVIATIONS
C-02
VICINITY MAP
D ra w in g:
C
:\U se rs \k zi eg le r\D
C \A
C C
D oc s\ G
AN
N
ET
T
FL
EM
IN
G
IN
C
\0
3-
M cC on ne lls bu rg \P ro je ct F ile s\
M ap le _S tre et
_W M
\S he et s\
-C ov er
_S he et .d w g
Pl ot te d:
O ct
5,
- 1
2:
pm
SITE PLAN AND PROFILE
C-04 DETAILS
C-05 DETAILS
C-03 INSERTION VALVES - SITE PLAN AND DETAILS
C-06 C-07
C-08 EROSION AND SEDIMENTATION CONTROL NOTES
SITE
EROSION AND SEDIMENTATION CONTROL DETAILS
EROSION AND SEDIMENTATION CONTROL NOTES
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \k zi eg le r\D
C \A
C C
D oc s\ G
AN
N
ET
T
FL
EM
IN
G
IN
C
\0
3-
M cC on ne lls bu rg \P ro je ct F ile s\
M ap le _S tre et
_W M
\S he et s\
-L eg en d.
dw g Pl ot te d:
O ct
5,
- 1 :0
2p m
MECHANICSBURG, PENNSYLVANIA
MAPLE ST.
WATERMAIN REPLACEMENT
MCCONNELSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA 77443.202501
OCTOBER 2026
© GFT INFRASTRUCTURE, INC. 2026
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT INFRASTRUCTURE, INC. AND ANY MISUSE, REUSE, ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT INFRASTRUCTURE INC. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
GENERAL NOTES, LEGENDS
AND ABBREVIATIONS C-1
AS NOTEDNHH
AG JRSBCS
KDJ
STA STATION
TYP TYPICAL
SHT
NTS
PC
OD
MC
MIN
NA
FT
ID
OUTSIDE DIAMETER
SHEET
PLATE
PLUMBING CONTRACT
NOT TO SCALE
NOT APPLICABLE
MINIMUM
MECHANICAL CONTRACT
INSIDE DIAMETER
FOOT OR FEET
CMU
EC
EL or ELEV
CLR
ELEVATION
CONCRETE MASONRY UNIT
ELECTRICAL CONTRACT
CENTERLINE
CLEARANCE
EX EXISTING
SQ SQUARE
GENERAL ABBREVIATIONS
SS
STL
PCCP
PVC
RCCP
FRP
GI
STEEL
STAINLESS STEEL
REINFORCED CEMENT CONCRETE PIPE
POLYVINYL CHLORIDE PIPE
PRESTRESSED CONCRETE CYLINDER PIPE
GALVANIZED IRON
FIBERGLASS REINFORCED PLASTIC
CMP
CPVC
CU
AL
CI
COPPER
CORRUGATED METAL PIPE
CHLORINATED POLYVINYL CHLORIDE PIPE
CAST IRON
ALUMINUM
DI DUCTILE IRON
MATERIAL
DIP DUCTILE IRON PIPE
GLDIP GLASS LINED DUCTILE IRON PIPE
CIP CAST IRON PIPE
CISP CAST IRON SOIL PIPE
HDPE HIGH DENSITY POLYETHYLENE
PEX CROSS-LINKED POLYETHYLENE
ACP ASBESTOS CEMENT PIPE
INV INVERT
MAX MAXIMUM
DIA DIAMETER
W WATER
WW WASTEWATER
GC GENERAL CONTRACT
WCB
WV
WS
UGT
W
ST
UGE
SWS
S
SD
WATER CURB BOX
UNDERGROUND TELEPHONE
WATER SERVICE
WATER VALVE
WATER
SHORT WATER SERVICE
UNDERGROUND ELECTRIC
SANITARY SEWER
STREET
STORM DRAIN
REINFORCED CONCRETE (USED ON SECTIONS)
FILL CONCRETE (USED ON SECTIONS)
MASONRY WALL (PLANS AND SECTIONS)
LA LANE
OE
PM
RTE
RD
OT
MH
NC
MAC
LWS
OVERHEAD ELECTRICAL
PIPELINE MARKER
OVERHEAD TELEPHONE
PROPERTY LINE
ROAD
ROUTE
LONG WATER SERVICE
NETWORK CABLE
MANHOLE
MACADAM
HWY
HYD
G
GV
GCB
D
DR
FH
CIR
CT
GAS CURB BOX
HYDRANT
HIGHWAY
GAS VALVE
GAS
FIRE HYDRANT
DRIVE
DRAIN
COURT
CIRCLE
BLVD
CB
CC
AVE
BIT
CHEMICAL CONDUIT
BOULEVARD
CATCH BASIN
BITUMINOUS
AVENUE
CM CONCRETE MONUMENT
IP IRON PIN
PC POINT OF CURVE
PI POINT OF INTERSECTION
POB POINT OF BEGINNING
POE POINT OF ENDING
POL POINT ON LINE
PT POINT OF TANGENT
PVC POINT OF VERTICAL CURVE
POINT OF VERTICAL TANGENTPVT
SS STORM SEWER
CIVIL/SITE ABBREVIATIONS
CIVIL/SITE SYMBOLS
SHADED FACILITIES EXISTING LINE WORK
PROPOSED PIPE (4" DIA. AND LARGER)
STORM SEWER AND INLET
PROPOSED LINE WORK
PROPERTY LINE
TEMP. CONSTRUCTION EASEMENT LINE
GRADING SLOPE2:1
SLOPE DIRECTION
REINFORCED SILT FENCE - HEIGHT
STANDARD SILT FENCE - HEIGHT
SFR-30
PROTECTIVE FENCE
E&S LINE WORK
SUPER SILT FENCE - HEIGHT
SF-18
SSF-30
PF PF
REINFORCED PROTECTIVE FENCEPFR
LIMIT OF DISTURBANCELOD
RCE
IP
DC
ST
ROCK CONSTRUCTION ENTRANCE
INLET PROTECTION
SEDIMENT TRAP
TEMPORARY DIVERSION CHANNEL
ROCK FILTER
ANY BORINGS, SOUNDINGS, TEST PILES,
SUBSURFACE CONDITIONS AND LOCATIONS
OF AND NATURE OF EXISTING
UNDERGROUND STRUCTURES SHOWN OR
INDICATED ON THIS DRAWING ARE FOR THE
INFORMATION OF THE OWNER AND IN NO
EVENT IS THIS INFORMATION TO BE
CONSIDERED AS PART OF THE CONTRACT.
SEE PROJECT MANUAL.
UTILITY POLE
WATER CURB BOX
EXISTING WATER VALVE
VENT
SIGNAL
SIGN
MANHOLE
LIGHT
EXISTING GAS CURB BOX
EXISTING GAS VALVE
CHECK VALVE
CATCH BASIN/INLET
BUTTERFLY VALVE AND VALVE BOX
HYDRANT
BORING
GATE VALVE AND VALVE BOX
CONTROL POINT
TREES, BUSHES AND SHRUBS
BENCH MARKBM NO.1
AIR RELEASE MANHOLE
WV
WATER MAIN AND VALVE
SANITARY SEWER AND MANHOLES S
W W
STORM SEWER AND INLETSS SS
GAS MAIN AND VALVEG G
GV
OVERHEAD ELECTRIC LINEOHE
UNDERGROUND ELECTRIC CABLEUGE UGE
T T
UNDERGROUND TELEPHONE CABLEUGT UGT
OVERHEAD TELEPHONE LINE
MH
AIR LINEA A
MISCELLANEOUS UTILITYC C
FENCEX X
DITCH, STREAM OR SWALE
ONE FOOT CONTOUR INTERVAL
FIVE FOOT CONTOUR INTERVAL
BITUMINOUS ROAD SURFACE AND DRIVES
GRAVEL OR EARTH DRIVES
CONCRETE SIDEWALK OR RETAINING WALL
WOOD OR VEGETATION LINE
PROPERTY LINE
SOIL BOUNDARY LINE
SANITARY FORCE MAINFM FM
WASTEWATER MAINWW WW
WETLANDS
CENTER LINE
RJ RESTRAINED JOINT
MJ MECHANICAL JOINT
TEST PIT
PROPOSED PIPE (3" DIA. AND SMALLER)
RIGHT-OF-WAY LINE
RIGHT-OF-WAY LINECIVIL SHEET REFERENCE LEGEND
C-8
RW RAW WATER
WARG WEDGE ACTION RETAINING GLAND
SECTION No. WHERE SHOWN
SECTION No.
LINE COMPOSITION
NEW FACILITIES SHOWN WITH HEAVIER AND BOLDER LINE
WORK AND CALLOUTS IN VERTICAL TEXT.
EXISTING FACILITIES SHOWN WITH LIGHT LINE WORK WITH
CALLOUTS IN ITALICIZED TEXT.
PROPOSED WORK SHOWN ON ADJOINING SHEET
LIST OF KNOWN UTILITY OWNERS
METROPOLITAN EDISON CO/FIRSTENERGY
341 WHITE POND DR.
AKRON, OH. 44320
CONTACT: MELLYSSA ADAMS
MADAMS@FIRSTENERGYCORP.COM
330-252-4013
MCCONNELLSBURG BOROUGH MUNICIPAL AUTH
965 LIONS PARK DRIVE
PO BOX 218
MCCONNELLSBURG, PA. 172330218
CONTACT: OFFICE PERSONNEL
717-485-5001
McCONNELLSBURG BOROUGH
112 LINCOLN WAY EAST
McCONNELLSBURG, PA 17233
CONTACT: RYAN EARLEY
MCCONNELLSBURGBOROUGH@GMAIL.COM
(717) 485-3690
MCCONNELLSBURG SEWERAGE AUTHORITY
20789 GREAT COVE RD
PO BOX 681
MCCONNELLSBURG, PA. 17233
CONTACT: CRAIG STRAIT
MCCSEWERAUTHORITY@HOTMAIL.COM
717-485-4728
UGI UTILITIES INC
1 UGI DRIVE
DENVER, PA. 17517
CONTACT: DANIEL BARNHART
DBARNHART@UGI.COM
610-736-5314
GENERAL NOTES:
1. ALL ELEVATIONS REFER TO U.S.G.S. NAVD 88 DATUM UNLESS NOTED
OTHERWISE.
2. HORIZONTAL CONTROL IS BASED UPON STATE PLANE COORDINATE SYSTEM.
3. INFORMATION SHOWN HEREIN IS BASED ON SURVEY PERFORMED BY GFT
INFRASTRUCTURE, AUGUST 2026 AND AUGUST 2026.
4. IT IS ASSUMED THAT LOCATIONS OF PHYSICAL FEATURES, UTILITIES, ETC.,
FROM INVESTIGATIONS AND FIELD SURVEYS, ARE APPROXIMATE AND THE
NATURE OF MATERIALS IS NOT GUARANTEED.
5. THE CONTRACTOR SHALL BE REQUIRED TO VERIFY ALL CONDITIONS AND
DIMENSIONS OF THE JOB SITE BEFORE PROCEEDING WITH THE WORK AND
SHALL MAKE MINOR ADJUSTMENTS AS REQUIRED ON THE JOB. SUCH
ADJUSTMENTS ARE TO BE APPROVED BY THE ENGINEER AND THE OWNER.
6. LOCATION AND DEPTH OF EXISTING UTILITY LINES INCLUDING SERVICES
SHALL BE VERIFIED BY THE CONTRACTOR IN ADVANCE OF THE WATER MAIN
CONSTRUCTION. EXTREME CARE SHALL BE EXERCISED WHEN EXCAVATING
EXISTING UTILITY LINES, HAND EXCAVATION ONLY WILL BE PERMITTED IN THE
VICINITY OF EXISTING PIPES AND/OR CONDUITS. ANY DAMAGE TO UTILITIES
SHALL BE REPAIRED BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
7. THE CONTRACTOR SHALL SUSTAIN IN THEIR PLACES AND PROTECT FROM
DIRECT OR INDIRECT INJURY ALL PIPES, CONDUITS, TRACKS, UTILITY POLES,
GUIDE RAILS, GUARD POSTS, WALLS, FOUNDATIONS, BUILDINGS, AND OTHER
STRUCTURES OR PROPERTY IN THE VICINITY OF HIS WORK, WHETHER ABOVE
OR BELOW GROUND, OR THAT MAY APPEAR IN THE TRENCH. PIPES AND
UNDERGROUND CONDUITS EXPOSED AS A RESULT OF THE CONTRACTOR'S
OPERATIONS SHALL BE ADEQUATELY SUPPORTED ALONG THEIR ENTIRE
EXPOSED LENGTHS.
8. THE CONTRACTOR SHALL VERIFY LOCATIONS OF PIPELINE, VALVES AND AIR
VALVES WITH ENGINEER PRIOR TO THEIR INSTALLATION.
9. IN ACCORDANCE WITH PROVISIONS OF ACT NO. 287/187 (AMENDMENT 1996),
THE CONTRACTOR SHALL NOTIFY EACH USER (AS DEFINED IN THE ACT) A
MINIMUM OF THREE WORKING DAYS IN ADVANCE OF THE TIME HE INTENDS TO
BEGIN EXCAVATION OPERATIONS IN VICINITY OF THE USER'S LINES.
10. THE CONTRACTOR SHALL EXERCISE SPECIAL CARE WHEN WORKING IN RIGHT
OF WAYS SO AS NOT TO DAMAGE TREES AND SHRUBS THAT ARE TO BE
MAINTAINED. ALL SIGNS, MAILBOXES, FENCES, LAWNS, SHRUBS, HEDGES,
TREES, OTHER LANDSCAPING, DRIVEWAYS, ETC., DISTURBED DURING
CONSTRUCTION SHALL BE REPLACED IN KIND.
11. MAINTAIN MINIMUM 18" VERTICAL SEPARATION BETWEEN TRANSVERSE
CROSSING OF WATER MAIN AND SEWER LINE.
12. ALL EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE
CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE PENNSYLVANIA
"EROSION AND SEDIMENTATION POLLUTION CONTROL MANUAL" AND THE
EROSION AND SEDIMENTATION CONTROL PLAN(S) PREPARED FOR THIS
PROJECT.
13. AT POINTS OF CONNECTION, CONTRACTOR SHALL EXPOSE EXISTING WATER
MAINS TO VERIFY LOCATION, GEOMETRY, AND MATERIAL REQUIREMENTS
PRIOR TO ORDERING MATERIALS OR STARTING CONSTRUCTION OF ANY MAIN
CONNECTING THERETO.
14. FIRE HYDRANT INSTALLATIONS INDICATED ON THE DRAWINGS ARE
APPROXIMATE. OWNER WILL PROVIDE EXACT LOCATION DURING
CONSTRUCTION.
15. ENCASE ALL PIPE AND APPURTENANCES IN POLYETHYLENE PER AWWA C105.
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE052836E
AutoCAD SHX Text
BRIAN C. SWIFT
AutoCAD SHX Text
TP
CP1
CP2
O H
E O
H E
O H
E OHE
W
SSSSSSSSSSSSSSS
S
S S
S S
S S
S S
S S
W
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
OHE
O H
E O
H E
O H
E
XO
H
E O
H E
O H
E
O H
E
OHE
OHE
OHE
W W
W W
W W
W W
W W W W W W W W W W W W W W W W W
O H
E
S
936 937 938 939
942 943 944 946
947 94
944 945 945 946
W W
W
PAVED
DRIVEWAY
0+00
1+00
2+00
3+00 4+00 5+00 6+00 7+00 8+00 8+77
8" 11.25° BEND
8" DIP
8" DIP
8" TAPPING SLEEVE
AND VALVE
PROPOSED 8" DIP
WATER
8" CAP
8" GATE VALVE
8"x8" TEE
8" GATE VALVE
8"x6" TEE
6" GATE VALVE
8"x6" TEE
6" GATE VALVE
8"-45° BEND
8"x4" REDUCER
4" GATE VALVE
4" SOLID SLEEVE
4"-45° BEND
8" GATE VALVE
626C
610 612
625 631 637 647 649 651 655 657
626A
655B
650 652 654
-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
ST
A.
+6
8"
1.
° B
EN
D
MIN 4' COVER
8" DIP
8" DIP
8" DIP
ST
A.
+7
8"
T
AP
PI
N
G S
LE
VE
V
AL
VE
EXIST. GRADE
PROPOSED 8" DIP
WATER
ST
A.
+0
8"
G
AT
E
VA
LV
E
ST
A.
+0
8"
X8 " T
EE
ST
A.
+1
8"
X6 " T
EE
ST
A.
+1
8"
G
AT
E
VA
LV
E
ST
A.
+9
8" x6 " T
EE
ST
A.
+0
8"
G
AT
E
VA
LV
E
ST
A.
+0
8"
C
AP
ST
A.
+2
6"
G V
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \k zi eg le r\D
C \A
C C
D oc s\ G
AN
N
ET
T
FL
EM
IN
G
IN
C
\0
3-
M cC on ne lls bu rg \P ro je ct F ile s\
M ap le _S tre et
_W M
\S he et s\
-P la n_
Sh ee t.d w g Pl ot te d:
O ct
5,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
MAPLE ST.
WATERMAIN REPLACEMENT
MCCONNELSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA 77443.202501
OCTOBER 2026
© GFT INFRASTRUCTURE, INC. 2026
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT INFRASTRUCTURE, INC. AND ANY MISUSE, REUSE, ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT INFRASTRUCTURE INC. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
040' 40' 80'
1" = 40'-0" HORIZONTAL
02.5' 10'5'5'
1" = 5'-0" VERTICAL
SITE PLAN
SCALE: 1"=40'
8-INCH WATERMAIN PROFILE
SITE PLAN AND PROFILE C-2
SCALE: HORZ. 1" = 40'
VERT. 1" = 5'
AS NOTEDNHH
AG JRSBCS
KDJ
NEW HYDRANT
SEE DETAIL, SHEET C-4
NEW HYDRANT
SEE DETAIL, SHEET C-4
NEW SERVICE
NEW SERVICE
NEW SERVICE
NEW SERVICE NEW SERVICE
08/2026 SHANE AMSLER
NOTICE
GFT INFRASTRUCTURE, INC. ADVISES THAT IT HAS COMPLIED
WITH THE PROVISIONS OF THE UNDERGROUND UTILITY LINE
PROTECTION LAW, ACT 287 OF 1974 AS AMENDED, IN PREPARING
THESE DRAWINGS REQUIRING EXCAVATION OR DEMOLITION
WORK AT SITES WITHIN THE COMMONWEALTH OF PENNSYLVANIA.
GFT INFRASTRUCTURE, INC. DOES NOT MAKE ANY
REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTY THAT
THE INFORMATION RECEIVED PURSUANT TO SAID ACT AND
REFLECTED ON THESE DRAWINGS IS CORRECT OR ACCURATE,
BUT IS REFLECTING SAID INFORMATION ON THESE DRAWINGS IN
ACCORDANCE WITH THE REQUIREMENT OF SUCH ACT.
CONTRACTORS ARE REMINDED OF THEIR OBLIGATION TO NOTIFY
FACILITY OWNER(S) VIA ONE CALL(S) AT 1-800-242-1776 OR
412-464-7100 (PITTSBURGH AREA) NOT LESS THAN 3 OR MORE
THAN 10 WORKING DAYS PRIOR TO BEGINNING EXCAVATION.
DATE BY
GFT INFRASTRUCTURE, INC.
ONE CALL SYSTEM TELEPHONE NUMBER: 1-800-242-1776
PROJECT ONE CALL SERIAL NUMBER: 20262151912
CUT AND PLUG EX.
4" WATER MAIN
NEW SERVICE
NEW SERVICE
NEW SERVICE
NEW SERVICE
CUT AND CAP EX.
4" WATER MAINNEW WATER SERVICE TO
EXISTING METER VAULT.
CONTRACTOR TO FIELD VERIFY
EXISTING VAULT CONDITIONS
AND MAKE CONNECTION TO
EXISTING METER SETTING.
NEW WATER SERVICE TO
EXISTING METER VAULT.
CONTRACTOR TO FIELD VERIFY
EXISTING VAULT CONDITIONS
AND MAKE CONNECTION TO
EXISTING METER SETTING.
EX. 8" DI WATER MAIN
(CONTRACTOR TO FIELD
VERIFY DIAMETER)
REMOVE EX. HYDRANT
CLOSE VALVE
AND REMOVE
VALVE BOX
DEFLECT
JOINTS AS
REQ'DNEW SERVICE
CLOSE VALVE AND
REMOVE VALVE
BOX
NEW SERVICE
(R O
TA
TE
A S
R
EQ
'D
NEW SERVICE
8" INSERTION VALVE
MH-4P
TOP 934.5
INV 928.1
NEW SERVICE
MH-1C
TOP 939.7
INV 933.3
INV 933.3
EX. 4" AC WATER MAIN
(CONTRACTOR TO FIELD VERIFY
TYPE AND DIAMETER)
MH-2C
TOP 942.3
INV 936.1
INV 936.1
MH-3C
TOP 944.8
INV 938.2
INV 938.2
2" NEW SERVICE
EX. 4" AC WATER MAIN
(CONTRACTOR TO FIELD VERIFY
TYPE AND DIAMETER)
MH-1R
TOP 948.3
INV 941.6
INV 938.9
INV 938.7
NEW SERVICE
CLOSE VALVE
AND REMOVE
VALVE BOX
NOTE:
SANITARY MANHOLE RIM ELEVATIONS ARE BASED
ON CURRENT SURVEY DATA. PIPE INVERT
ELEVATIONS WERE DERIVED BY APPLYING THE
ORIGINAL RIM-TO-INVERT VERTICAL DIFFERENCES
TO THE UPDATED SURVEYED RIM ELEVATIONS.
AutoCAD SHX Text
E MAPLE ST
AutoCAD SHX Text
S 7TH ST
AutoCAD SHX Text
WASHINGTON AVE
AutoCAD SHX Text
SOUTH JEFFERSON DR
AutoCAD SHX Text
SOUTH MONROE AVE
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE052836E
BRIAN C. SWIFT
S S
S S
S S
S S
S S S
OHE OHE OHE OHE OHE OHE OHE OHE OHE
T T
T
T
T
T
OHE OHE OHE OHE OHE OHE OHE OHE
T T
T
O H E
O H E
O H E
O H E
O H E
O H E
O H E
O H E
W W
W
W
W W
W W
W
W W W
W W
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \ty ba ss
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
3- M cC on ne lls bu rg
\P ro je ct
F ile s\ M ap le
_S tre et _W
M \S he et s\
-P la n_ Sh ee t.d w g
Pl ot te d:
O ct
5,
- 1
2:
pm
MECHANICSBURG, PENNSYLVANIA
MAPLE ST.
WATERMAIN REPLACEMENT
MCCONNELSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA 77443.202501
OCTOBER 2026
© GFT INFRASTRUCTURE, INC. 2026
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT INFRASTRUCTURE, INC. AND ANY MISUSE, REUSE, ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT INFRASTRUCTURE INC. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
040' 40' 80'
1" = 40'-0" HORIZONTAL
02.5' 10'5'5'
1" = 5'-0" VERTICAL
SITE PLAN
SCALE: 1"=20'
INSERTION VALVE INSTALLATION NOTES:
1. CONTRACTOR SHALL VERIFY EXISTING WATER MAIN SIZE, MATERIAL, OUTSIDE DIAMETER, WALL
THICKNESS, AND OPERATING CONDITIONS PRIOR TO ORDERING INSERTION VALVES.
2. INSERTION VALVES SHALL BE SPECIFICALLY DESIGNED FOR THE EXISTING PIPE MATERIAL, SIZE, AND PRESSURE CONDITIONS ON WHICH THEY ARE INSTALLED.
3. INSERTION VALVES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN
RECOMMENDATIONS AND REQUIREMENTS.
4. SUBMIT SHOP DRAWINGS, PRODUCT DATA, AND INSTALLATION PROCEDURES FOR REVIEW PRIOR
TO PROCUREMENT AND INSTALLATION.
5. CONTRACTOR SHALL COORDINATE INSERTION VALVE INSTALLATION WITH THE WATER AUTHORITY
AND PROVIDE ADVANCE NOTICE OF ALL OPERATIONS.
6. INSTALLATION SHALL BE PERFORMED BY PERSONNEL TRAINED AND EXPERIENCED IN INSERTION
VALVE INSTALLATION.
7. CONTRACTOR SHALL MAINTAIN WATER SERVICE DURING INSERTION VALVE INSTALLATION UNLESS
OTHERWISE APPROVED BY THE WATER AUTHORITY.
8. AFTER INSTALLATION, OPERATE EACH INSERTION VALVE THROUGH ITS FULL RANGE OF MOTION
AND VERIFY PROPER OPERATION.
9. ANY DAMAGE TO THE EXISTING WATER MAIN RESULTING FROM INSERTION VALVE INSTALLATION
SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER.
10. ALL EXCAVATION, BEDDING, BACKFILL, COMPACTION, AND SURFACE RESTORATION SHALL
CONFORM TO PROJECT SPECIFICATIONS.
11. CONTRACTOR SHALL FIELD VERIFY ALL HORIZONTAL AND VERTICAL CLEARANCES PRIOR TO
INSTALLATION.
INSERTION VALVES
SITE PLAN AND DETAILS C-3
AS NOTEDNHH
AG JRSBCS
KDJ
4" INSERTION VALVE
08/2026 SHANE AMSLER
NOTICE
GFT INFRASTRUCTURE, INC. ADVISES THAT IT HAS COMPLIED
WITH THE PROVISIONS OF THE UNDERGROUND UTILITY LINE
PROTECTION LAW, ACT 287 OF 1974 AS AMENDED, IN PREPARING
THESE DRAWINGS REQUIRING EXCAVATION OR DEMOLITION
WORK AT SITES WITHIN THE COMMONWEALTH OF PENNSYLVANIA.
GFT INFRASTRUCTURE, INC. DOES NOT MAKE ANY
REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTY THAT
THE INFORMATION RECEIVED PURSUANT TO SAID ACT AND
REFLECTED ON THESE DRAWINGS IS CORRECT OR ACCURATE,
BUT IS REFLECTING SAID INFORMATION ON THESE DRAWINGS IN
ACCORDANCE WITH THE REQUIREMENT OF SUCH ACT.
CONTRACTORS ARE REMINDED OF THEIR OBLIGATION TO NOTIFY
FACILITY OWNER(S) VIA ONE CALL(S) AT 1-800-242-1776 OR
412-464-7100 (PITTSBURGH AREA) NOT LESS THAN 3 OR MORE
THAN 10 WORKING DAYS PRIOR TO BEGINNING EXCAVATION.
DATE BY
GFT INFRASTRUCTURE, INC.
ONE CALL SYSTEM TELEPHONE NUMBER: 1-800-242-1776
PROJECT ONE CALL SERIAL NUMBER: 20262023761
4" INSERTION VALVE
6" INSERTION VALVE
INSERTION VALVE DETAIL
NO SCALE
NOTES:
1. ONLY 10" & 12" FEED SCREWS
ARE STAINLESS STEEL.
2. CITY VALVES ARE TO BE
OPEN RIGHT.
3. INSERTION VALVE IS TO BE
HYDRA STOP INSTA-VALVE
PLUS RS WEDGE VALVE AS
SHOWN.
FITTING SIZE A B C D
4" 16" 12" 4.80 9" 6" 16" 13" 6.90 11" 8" 20" 15" 9.05 13.5" 10" 24" 18.5" 11.10 16" 12" 24" 20" 13.20 19"
REMOVE VALVE BOX
EX. 4" AC WATER MAIN
(CONTRACTOR TO FIELD VERIFY
TYPE AND DIAMETER)
MH-1AA
TOP 906.5
INV 901.3
INV 901.3
EX. 6" CI WATER MAIN
(CONTRACTOR TO FIELD VERIFY
TYPE AND DIAMETER)
6" INSERTION VALVE
EX. 6" CI WATER MAIN
(CONTRACTOR TO FIELD VERIFY
TYPE AND DIAMETER)
AutoCAD SHX Text
S 2ND ST
AutoCAD SHX Text
E MAPLE ST
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE052836E
* PROVIDE A MINIMUM OF 3 SQ.FT. BEARING AREA.
1.
2.
HYDRANT DETAIL
NO SCALE
TYPICAL CONNECTION DETAIL
NO SCALE
TYPICAL NEW/REPLACEMENT
SERVICE DETAIL
NO SCALE
HYDRANT w/ BREAK AWAY FLANGE
GROUND LINE
VALVE BOX
6" MJ GATE VALVE
HYDRANT TEE
(MJxMJxSWIVEL)
IN WATER MAIN
CONCRETE
REACTION
BACKING
1/2 CU. YD.
AGGREGATE
BACKFILL
UNDISTURBED EARTH
*CONCRETE
REACTION
BACKING
HYDRANT BASE W/
WEDGE-ACTION
RETAINER GLAND
6" MJ HYDRANT PIPING
w/ WEDGE- ACTION
RETAINER GLAND
NOTES:
FIELD-LOCK GASKETS REQUIRED IF PUSH-ON JOINTS
ARE USED (USE OF PUSH-ON JOINTS REQUIRES AUTHORITY APPROVAL).
IF BENDS USED IN HYDRANT LATERAL, TIE RODS ARE REQUIRED.
NEW PIPE-BEGIN w/ BELL
END INSTALLED OVER PREPARED
END OF EXISTING PIPE
EXISTING WATER MAIN
CUT EXISTING MAIN
SQUARE AND BEVEL END
NEW CURB BOX
EXISTING SERVICE LINE
(IF REPLACEMENT) SERVICE
LINE BY OTHERS (IF NEW)
NEW CURB STOP
22 1/2°
3/4" TYPE K CU.
SERVICE PIPECORPORATION STOP,
FORD FB-1000-3Q OR
EQUAL
3' -6
" M
IN
2%
4'-0"
NO SCALE
SIDEWALK SECTION AT CURB
NOTES:
1. ALL SERVICES ARE SHOWN IN PLAN AS NEW/
REPLACEMENT DUE TO UNKNOWN SERVICE LINE
MATERIAL. EXISTING COPPER SERVICE LINES WILL BE
RECONNECTED AT THE DISCRETION OF THE OWNER.
2. SERVICES LARGER THAN 1" REQUIRE THE USE OF A
SERVICE SADDLE.
5"
4"
2" 7"
7" 1'
-5
9"
CONCRETE CURB SECTION
NO SCALE
BITUMINOUS
SURFACE OR
CONCRETE
3/4" RADIUS
1/4" RADIUS
FINISHED
GRADE
FORMING
NOT
REQUIRED
CURB TO BE CONSTRUCTED WITH CLASS 'A' CONCRETE WITH
CONTRACTION JOINTS SPACED AT 16'-0" MAXIMUM.
NOTE:
9"
1/2" JOINT
FILLER
CONCRETE
CURB
6"x6" - W2.9 x W2.9
WELDED WIRE MESH
UNDISTURBED OR
COMPACTED EARTH
STRUCTURAL
AGGREGATE BACKFILL
FINISHED
GRADE
CLASS A
CONCRETE2" MIN. CLR.
2' -0
1'-6"
VALVE BOX
2A COURSE AGGREGATE
M
IN
REMOVAL OF EXISTING VALVE BOX
ON VALVES TO BE ABANDONED
NO SCALE
NOTES:
1. SAW CUT PAVING 1'-6" SQUARE.
2. REMOVE PAVING AND EARTH TO 18" MIN.
3. BREAK OFF VALVE BOX AT BOTTOM OF
EXCAVATION & FILL BOX WITH COMPACTED
2A COARSE AGGREGATE.
4. REPAVE.
ADJUSTABLE CAST
IRON VALVE BOX
WITH COVER
PIPE BEDDING
MATERIAL
NEW PIPE
VALVE
(TO OPEN LEFT/
COUNTERCLOCKWISE)
℄ VALVE AND VALVE BOX
FINISH GRADE (FLUSH WITH TOP
OF COVER ON ADJUSTABLE CAST
IRON VALE BOX)
3' -6
" M
IN
6" MIN
(TYP)
6"
VALVE AND VALVE BOX
NO SCALE
** 4" IN EARTH, SEE NOTE 1
8" IN ROCK
1' -0
" 1'-0"1'-0" PIPE O.D.
** 4" IN EARTH, SEE NOTE 1
8" IN ROCK
1'-0"PIPE O.D.1'-0"
BITUMINOUS DRIVEWAY
PAVEMENT REPLACEMENT
1'-0"1'-0" PIPE TRENCH
GRAVEL DRIVEWAY
REPLACEMENT
MIN. 5" COARSE
AGGREGATE
EXISTING GRAVEL
DRIVEWAY
1'-0" 1'-0"
TYPICAL TRENCH PAVED AREAS
EXISTING
GRADE
TOPSOIL, WHERE
REQ'D. 4" MIN. SEE
NOTE 4
4' -0
" M
IN
. C O
VE
R
UNDISTURBED
EARTH OR ROCK
SUBGRADE
APPROVED
BACKFILLTA
M P
IN
8"
L
AY
ER
S
TA
M
P
IN
4" L
AY
ER
S
SE
E N
O
TE
TYPICAL TRENCH UNPAVED AREAS
SEE PAVEMENT
REPLACEMENT
DETAILS
EXISTING
PAVEMENT
AASHTO #8
PIPE BEDDING
UNDISTURBED
EARTH OR ROCK
SUBGRADE
PA.NO.2A
COARSE
AGGREGATE
TA
M
P
IN
" L
AY
ER
S
SE
E N
O
TE
NO SCALE NO SCALE
4' -0
" M
IN
. C O
VE
R
TRENCH NOTES:
1. IF UNSUITABLE SUBSOIL IS ENCOUNTERED AT THE NORMAL TRENCH
SUBGRADE, THE CONTRACTOR SHALL REMOVE IT TO THE DEPTH DIRECTED
BY THE ENGINEER IN THE FIELD, AND BACKFILL w/ SELECT BACKFILL
MATERIAL IN 4" LAYERS.
2. BOTTOM OF TRENCH SHALL BE FREE OF WATER PRIOR TO PLACING
BEDDING.
3. IF VIBRATORY COMPACTION EQUIPMENT IS USED BACKFILL MAY BE IN 8"
LAYERS.
4. PROVIDE 4" OF TOPSOIL WHERE SEEDING IS REQUIRED, SEE NOTE 6 AT
GRAVEL DRIVEWAYS.
5. CONTRACTOR SHALL SHORE THE TRENCH IN ACCORDANCE WITH SECTION
314100 OF THE SPECIFICATIONS.
6. GRAVEL AND PAVED DRIVEWAYS TO BE RESTORED IN KIND WITH MINIMUM
REQUIREMENTS AS INDICATED ON THIS SHEET.
PAINT EDGE OF
EXISTING PAVING
w/ AE-T
BITUMINOUS
TACK COAT
BEFORE PAVING.
AFTER PAVING
SEAL JOINT
BETWEEN NEW
AND EXISTING
PAVEMENT w/
PG-64S-22
ASPHALT
CEMENT.
SAW CUT
(TYP.)
SEE TYPICAL
TRENCH DETAIL
EXISTING
BITUMINOUS
PAVEMENT
PIPE TRENCH
BOROUGH STREET
PAVEMENT REPLACEMENT
NO SCALE
EXISTING
PAVEMENT
2" OF WMA HOT BITUMINOUS
PATCHING MATERIAL*
SEE TYPICAL
TRENCH DETAIL
PIPE TRENCH
TEMPORARY PAVEMENT
REPLACEMENT
NO SCALE
PAINT EDGE OF EXISTING PAVING w/ AE-T
BITUMINOUS TACK COAT BEFORE PAVING. AFTER
PAVING SEAL JOINT BETWEEN NEW AND EXISTING
PAVEMENT w/ PG-64-22 ASPHALT CEMENT.
1" WMA
WEARING
COURSE
SAW CUT
(TYP.)
2" WMA
BASE
COURSE
SEE TYPICAL
TRENCH DETAILEXISTING
BITUMINOUS
DRIVEWAY
NO SCALE NO SCALE
SEE TYPICAL
TRENCH DETAIL
PIPE TRENCH
(NOT FOR USE IN PENNDOT ROADWAYS)
(NOT FOR USE IN PENNDOT ROADWAYS)
*4" REQUIRED IN WINTER MONTHS
5" SUPER PAVE BASE COURSE,
PG 64S-22, 0.3 TO <3 MILLION
ESALS, 25MM MIX
AASHTO #8
PIPE BEDDING
SELECT
BACKFILL
1' -0
SELECT
BACKFILL
TYPICAL SERVICE RECONNECTION
DETAIL
NO SCALE
EXISTING CURB BOX
EXISTING SERVICE LINE
EXISTING CURB STOP
22 1/2°
EXISTING WATER MAIN
TO BE ABANDONED
CORPORATION STOP,
FORD FB-1000-3Q OR
EQUAL
3' -6
" M
IN
1'-0"1'-0"
5" SUPER PAVE BASE COURSE,
PG 58S-28, 3 TO <30 MILLION
ESALS, 25MM MIX
PAINT EDGE OF
EXISTING PAVING
w/ AE-T
BITUMINOUS
TACK COAT
BEFORE PAVING.
AFTER PAVING
SEAL JOINT
BETWEEN NEW
AND EXISTING
PAVEMENT w/
CLASS PG 64S-22
ASPHALT
CEMENT.
PENNDOT SR 522
PAVEMENT REPLACEMENT
NO SCALE
SAW CUT
(TYP.)
EXISTING
BITUMINOUS
PAVEMENT
SEE TYPICAL
TRENCH DETAIL
PIPE TRENCH
1.5" SUPER PAVE WEARING
COURSE, PG-64S-22, 3 TO <30
MILLION ESALS, 9.5 MM MIX
1'-0"1'-0"
7" SUPER PAVE BASE COURSE,
PG 58S-28, 3 TO <30 MILLION
ESALS, 25MM MIX. INSTALLED IN
EQUAL LIFTS
PAINT EDGE OF
EXISTING PAVING
w/ AE-T
BITUMINOUS
TACK COAT
BEFORE PAVING.
AFTER PAVING
SEAL JOINT
BETWEEN NEW
AND EXISTING
PAVEMENT w/
CLASS PG 64S-22
ASPHALT
CEMENT.
PENNDOT SR 1001
PAVEMENT REPLACEMENT
NO SCALE
SAW CUT
(TYP.)
EXISTING
BITUMINOUS
PAVEMENT
SEE TYPICAL
TRENCH DETAIL
PIPE TRENCH
1.5" SUPER PAVE WEARING
COURSE, PG-64S-22, 3 TO <30
MILLION ESALS, 9.5 MM MIX
** 4" IN EARTH, SEE NOTE 1
8" IN ROCK
1'-0"PIPE O.D.1'-0"
TYPICAL TRENCH INSIDE
PENNDOT ROW
SEE PAVEMENT
REPLACEMENT
DETAILS
EXISTING
PAVEMENT
AASHTO #8
PIPE BEDDING
UNDISTURBED
EARTH OR ROCK
SUBGRADE
PA.NO.2A
COARSE
AGGREGATE
TA
M
P
IN
" L
AY
ER
S
SE
E N
O
TE
NO SCALE
4' -0
" M
IN
. C O
VE
R
1' -0
PENNDOT DETAILS
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \k zi eg le r\D
C \A
C C
D oc s\ G
AN
N
ET
T
FL
EM
IN
G
IN
C
\0
3-
M cC on ne lls bu rg \P ro je ct F ile s\
M ap le _S tre et
_W M
\S he et s\
-C iv il_
D et ai ls
.d w g Pl ot te d:
O ct
5,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
MAPLE ST.
WATERMAIN REPLACEMENT
MCCONNELSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA 77443.202501
OCTOBER 2026
© GFT INFRASTRUCTURE, INC. 2026
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT INFRASTRUCTURE, INC. AND ANY MISUSE, REUSE, ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT INFRASTRUCTURE INC. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
DETAILS C-4
AS NOTEDNHH
AG JRSBCS
KDJ
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE052836E
E
E x
F
D
F/
F/
F
NO SCALE
H G
I
J
KK
NO SCALE
1' -6
1'
-6
PI
PE
O .D
PI
PE
O
.D
1'-0"
1-6"
3"
2 O.D. O.D.+2'-0"
2' -0
1'
-0
NO SCALE
1.
2.
REDUCERE F G I K L M
1'-4"
J
1'-0"
1'-6"
2'-0"
2'-6"
4'-0" 5'-6" 2'-6" 0'-10"
1'-0" 0'-3"
12'-6" 6'-6" 3'-3" 1'-8" 2'-8" 1'-8"
7'-0" 3'-6" 2'-0" 1'-5" 2'-5" 1'-5"
5'-0" 2'-6" 2'-0" 2'-4" 1'-4"
3'-0" 2'-0" 2'-0" 1'-3" 2'-3" 1'-3"
2'-0" 2'-0" 2'-0" 2'-2" 1'-2"
3'-9"
1'-10" 0'-6" 0'-4"
1'-0" 0'-6" 0'-4"
0'-4" 0'-4" 0'-4" 1'-3"
H
3'-4"
2'-8"
2'-6"
2'-4"
1'-0"
4'-3" 2'-2" 1'-2"
2'-2" 1'-2" 1'-0"
1'-0"
1'-0"
1'-0"1'-0"1'-0"
1'-0"
1'-0"1'-6"
122 2 1411 2221 41 2221 4111 11 A B C D
1'-0"
1'-0"
1'-0"
TEST
PRESSURE
(PSI)
PIPE
DIA.
16"
10"
8"
6"
4"
6'-2"
4'-3"
3'-6"
2'-8"
2'-0"
3'-6"
2'-6"
2'-0"
1'-6"
1'-0"
2'-0"
1'-6"
1'-0"
1'-0"
1'-0" 1'-0"
1'-0"
TABLE OF REACTION BACKING DIMENSIONS
1'-0"
2'-0"
2'-6"
3'-0"
4'-3"
3'-0" 1'-8" 0'-9" 8'-9" 4'-6" 2'-3" 1'-6" 2'-6" 1'-6"3'-6"3'-0" 2'-8" 1'-4" 1'-0"15012" 5'-0" 2'-8" 1'-3" 1'-0" 3'-6"
2'-10"
HIGH EARLY STRENGTH
CONCRETE BLOCK
6"
PI
PE
D
IA
6"
6" 6"
PLUG OR COVER
END OF PIPE
CUT AND PLUG DETAIL
NO SCALE
CUT AND CAP DETAIL
NO SCALE
3' -0
1'-0"
MIN.
3'-0"
MIN.
1. UNCOVER EXISTING PIPE.
2. CUT 2'-0" SECTION FROM MAIN IN CENTER OF EXCAVATION.
3. CAP EXISTING MAIN.
4. PLACE NOMINAL 6x6 SOLID CONCRETE BRICKS AS SHOWN.
WEDGE TIGHTLY BETWEEN ENDS OF PIPES.
5. ENCASE IN CONCRETE TO AT LEAST LIMITS SHOWN.
CONCRETE ENCASEMENT OPPOSITE CAP MUST BEAR ON
UNDISTURBED EARTH.
PLAN
UNDISTURBED
EARTH
6"x6"
SOLID
CONCRETE
BRICKS
MECHANICAL
JOINT CAP (TYP.)
HIGH EARLY STRENGTH
CONCRETE BLOCK
EXISTING WATER
MAIN (TYP.)
8'-0"1'-8"3'-0"6'-0"11'-0"24" 150 2'-0"3'-9"7'-6"4'-0" 2'-0"3'-0"2'-0"5'-0"10'-0"20'-0"1'-6"4'-0"9'-0"5'-0"
3/4"Ø TIE ROD
SEE NOTE 3
NOTES:
45° BEND 22 1/2° BEND 11 1/4° BEND
ELEVATION
SECTION
SECTIONELEVATION
VERTICAL REACTION BACKINGS
ELEVATION
REDUCER
PLAN
HORIZONTAL REACTION BACKINGS
SECTION
PLUG AND TEE
PLAN
SECTION
NOTES:
ANCHOR BLOCK CONNECTION DETAIL
CONCRETE ANCHOR BLOCK SHALL BE INSTALLED A MIN.
OF 7 DAYS PRIOR TO INSTALLATION OF CONNECTION.
COR-TEN STEEL TIE RODS AND SOCKET CLAMPS SHALL
BE COATED w/ 2 COATS BITUMASTIC PAINT, AND
WRAPPED WITH 8 MIL THICK POLYETHYLENE. (TYP.)
NO. OF 3/4"Ø TIE RODS FOR 150 PSI TEST PRESSURE
4"-12" = 1 PAIR
14"-16" = 2 PAIR
18"-20" = 3 PAIR
24" = 4 PAIR
3.
A
90° BEND
B C
L
M
MECHANICAL
JOINT CAP (TYP.)
1' -0
3' -0
" M
IN
ELEVATION
HIGH EARLY
STRENGTH
CONCRETE
EXISTING WATER
MAIN (TYP.)
6"x6"
SOLID
CONCRETE
BRICKS
1. REACTION BACKING DIMENSIONS HAVE BEEN CALCULATED USING A SOIL BEARING
CAPACITY OF 2000 POUNDS PER SQUARE FOOT AND TEST PRESSURES AS INDICATED.
2. ALL FITTINGS SHALL BE MECHANICAL JOINT AND SHALL HAVE WEDGE ACTION
RETAINER GLANDS INSTALLED TO MANUFACTURERS SPECIFICATIONS, EXCEPT IN
RESTRAINED JOINT AREAS.
3. ALL CONCRETE SHALL BE HIGH EARLY STRENGTH.
NOTES:
CONCRETE ANCHOR
BLOCK, SEE NOTE 1
UNDISTURBED EARTH
OR ROCK SUBGRADE
SPOOL
PIECE
SOCKET CLAMP AND SOCKET
CLAMP WASHERS, FIG. 595 &
594 BY GRINNELL (TYP.)
EXISTING WATER
MAIN TO BE
REMOVED
FITTING
COUPLING
#6 @ 12
EXISTING
MAIN
10'-0"
MIN. ±
UNDISTURBED EARTH
OR ROCK SUBGRADE
CONCRETE ANCHOR
BLOCK
SUBGRADE
3 LAYERS OF
ASPHALT BUILDING
PAPER
GATE VALVE OR
BUTTERFLY VALVE
(TYP.)
SEE NOTE
CONCRETE
BLOCK
FOSTER ADAPTOR
(TYP.)RESTRAINED PLUGUNDISTURBED EARTH
OR ROCK SUBGRADE
CONCRETE
BLOCK 1 FULL
LENGTH
PIPE
O.D.+6"
CONCRETE
BLOCK
UNDISTURBED
EARTH90° BEND
CONCRETE
BLOCK
45° BEND
UNDISTURBED
EARTH
CONCRETE
BLOCK
22 1/2° BEND UNDISTURBED
EARTH
CONCRETE
BLOCK
11 1/4° BEND
UNDISTURBED
EARTH
FITTING
TRENCH WIDTH
2 + 6"
CONCRETE
BLOCK
UNDISTURBED EARTH
#5@12
REDUCER
CONCRETE
BLOCK
UNDISTURBED EARTH
CONCRETE
BLOCK
#5@12
REDUCER
UNDISTURBED EARTH
UNDISTURBED
EARTH
MJ FITTING
CONCRETE
BLOCK
BEDDING
DEPTH
+1'-0"
CONCRETE
BLOCK
#6@12 M.J. FITTING
#4 (TYP.)
#6@12
#4 (TYP.)
UNDISTURBED EARTH
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \k zi eg le r\D
C \A
C C
D oc s\ G
AN
N
ET
T
FL
EM
IN
G
IN
C
\0
3-
M cC on ne lls bu rg \P ro je ct F ile s\
M ap le _S tre et
_W M
\S he et s\
-C iv il_
D et ai ls
.d w g Pl ot te d:
O ct
5,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
MAPLE ST.
WATERMAIN REPLACEMENT
MCCONNELSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA 77443.202501
OCTOBER 2026
© GFT INFRASTRUCTURE, INC. 2026
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT INFRASTRUCTURE, INC. AND ANY MISUSE, REUSE, ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT INFRASTRUCTURE INC. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
DETAILS C-5
AS NOTEDNHH
AG JRSBCS
KDJ
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE052836E
HEIGHT OF ROCK
FILTER = 5/6 HEIGHT
OF FABRIC FENCE OR
STRAW BALES
ROCK FILTER OUTLET
MAINTENANCE:
ROCK FILTER OUTLET SHALL BE CHECKED REGULARLY.
MAINTAIN BY REPLACING ROCK WHEN ACCUMULATIONS
REACH 1/3 THE HEIGHT OF THE OUTLET AND DRESSING IT
SHOULD IT BECOME DISPLACED. A STOCKPILE OF AGGREGATE
WILL BE MAINTAINED ON SITE FOR THIS PURPOSE.
WOOD POST
NO SCALE
SECTION
FILTER FABRIC
ELEVATION
1 MIN.
1 MIN.
1 MIN.
1' 1'
NO SCALE
FILTER BAG INLET
PROTECTION - TYPE 1
1. MAXIMUM DRAINAGE AREA = 1/2 ACRE.
2. INLET PROTECTION IS NOT REQUIRED FOR INLET TRIBUTARY TO
SEDIMENT BASIN OR TRAP. BERMS
3. REQUIRED FOR ALL INSTALLATIONS.
4. EARTHEN BERM SHALL BE MAINTAINED UNTIL ROADWAY IS STONED.
ROAD SUBBASE BERM SHALL
5. BE MAINTAINED UNTIL ROADWAY IS PAVED.
6. SIX INCH MINIMUM HEIGHT ASPHALT BERM SHALL BE MAINTAINED UNTIL
ROADWAY SURFACE RECEIVES
7. FINAL COAT.
8. DO NOT USE ON MAJOR PAVED ROADWAYS WHERE PONDING MAY CAUSE
TRAFFIC HAZARDS.
NOTES:
ELEVATION VIEW
BAG DETAIL
2"x2"x3/4"
RUBBER BLOCK
(TYP.)
1/4" NYLON ROPE
EXPANSION RESTRAINT
SANDBAG
PLAN VIEW
ISOMETRIC VIEW
INSTALLATION DETAIL
4'-0"
2'-0"
3' -0
1" REBAR FOR BAG
REMOVAL FROM INLET
INLET GRATE
2 MIN.
2 MIN.
BERM
1' MIN.
BERM
CURB
3' MIN.
AASHTO
#57 6" MIN.R-3 ROCK
SINKHOLE REPAIR DETAIL
NO SCALE
EXISTING GROUND
LIMIT OF SELECT EMBANKMENT
IMPERVIOUS
FILL
SOIL
LIMIT OF CLASS
"C" CONCRETE
ROCK
LIMIT OF SOIL/VOID
GEOGRID
ROCK
3' (M
IN
EXCAVATION
LIMIT
SOIL
CURBED ROADWAY
MAINTENANCE:
INLET FILTER BAGS SHALL BE CHECKED WEEKLY
AND AFTER EACH RUNOFF EVENT. FILTER BAGS
SHALL BE CLEANED AND/OR REPLACED WHEN HALF
FULL. DAMAGED FILTER BAGS SHALL BE REPLACED
IMMEDIATELY.
NO SCALE
STANDARD CONSTRUCTION DETAIL #3-16
PUMPED WATER FILTER BAG
FILTER BAG
WELL VEGETATED, GRASSY AREA
WELL VEGETATED, GRASSY AREA
FILTER BAG
INTAKE HOSE
PUMP
DISCHARGE HOSE
CLAMPS
CLAMPS
DISCHARGE HOSE
PUMP
INTAKE HOSE
HEAVY DUTY LIFTING STRAPS
(RECOMMENDED)PLAN VIEW
ELEVATION VIEWNOTES:
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE
FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS
ALREADY ATTACHED.
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY
AREA IS NOT AVAILABLE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY
CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS.
PUMP INTAKES SHALL BE FLOATING AND SCREENED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL
THE PROBLEM IS CORRECTED.
PLAN
NO SCALE
SECTION
NOTES:
1. INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE.
2. 18" DIAMETER FILTER SOCK MAY BE STACKED ONTO
DOUBLE 24" DIAMETER SOCKS IN PYRAMIDAL
CONFIGURATION FOR ADDED HEIGHT.
A SUITABLE IMPERVIOUS GEOMEMBRANE SHALL BE PLACED AT THE LOCATION OF
THE WASHOUT PRIOR TO INSTALLING THE SOCKS.
ADAPTED FROM FILTREXX.
FIGURE 3.18
TYPICAL COMPOST SOCK WASHOUT
INSTALLATION
2"X2"X36" WOODEN
STAKES PLACED 5' O.C.
DIRECT CONCRETE WASHOUT
WATER INTO FILTER RING
24" DIAMETER COMPOST
FILTER SOCK. 4' MIN.
OVERLAP ON UPSLOPE
SIDE OF FILTER RING
2" x 2" x 36" WOODEN
STAKES PLACED 5' O.C.
MAXIMUM DEPTH OF CONCRETE
WASHOUT WATER IS 50% OF FILTER
RING HEIGHT
24" DIAMETER COMPOST
FILTER SOCK
M
IN
NO SCALE
STANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
FL
OW
FLO
W
DISTURBED AREA
UNDISTURBED AREA
SECTION
PLAN VIEW
EXISTING
CONTOURS
COMPOST FILTER SOCK
2 IN. x 2 IN. WOODEN STAKES
PLACED 10 FT ON CENTER
2 IN. x 2 IN. WOODEN STAKES
PLACED 10 FT ON CENTER
COMPOST FILTER SOCK
BLOWN/PLACED
FILTER MEDIA
DISTURBED AREA
UNDISTURBED AREA
NOTES:
SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL.
COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.
COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT.
MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE
OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.
TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.
ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT
OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT.
DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR
REPLACED WITHIN 24 HOURS OF INSPECTION.
BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS;
PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED
ACCORDING TO MANUFACTURER’S RECOMMENDATIONS.
UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL
BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
IN
M
IN
TABLE 4.2
COMPOST STANDARDS
ORGANIC MATTER CONTENT 25%-100% (DRY WEIGHT BASIS)
ORGANIC PORTION FIBROUS AND ELONGATED
pH 5.5-8.5
MOISTURE CONTENT 30%-60%
PARTICLE SIZE 30%-50% PASS THROUGH 3/8" SIEVE
SOLUBLE SALT CONCENTRATION 5.0 dS/m (MMHOS/CM) MAXIMUM
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \k zi eg le r\D
C \A
C C
D oc s\ G
AN
N
ET
T
FL
EM
IN
G
IN
C
\0
3-
M cC on ne lls bu rg \P ro je ct F ile s\
M ap le _S tre et
_W M
\S he et s\
-C iv il_
D et ai ls
.d w g Pl ot te d:
O ct
5,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
MAPLE ST.
WATERMAIN REPLACEMENT
MCCONNELSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA 77443.202501
OCTOBER 2026
© GFT INFRASTRUCTURE, INC. 2026
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT INFRASTRUCTURE, INC. AND ANY MISUSE, REUSE, ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT INFRASTRUCTURE INC. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
C-6
AS NOTEDNHH
AG JRSBCS
KDJ EROSION AND
SEDIMENTATION CONTROL
DETAILS
AutoCAD SHX Text
PROPERTY
AutoCAD SHX Text
TEST METHOD
AutoCAD SHX Text
MINIMUM STANDARD
AutoCAD SHX Text
AVG. WIDE WIDTH STRENGTH
AutoCAD SHX Text
ASTM D-4884
AutoCAD SHX Text
60 LB/IN
AutoCAD SHX Text
GRAB TENSILE
AutoCAD SHX Text
ASTM D-4632
AutoCAD SHX Text
205 LB
AutoCAD SHX Text
PUNCTURE
AutoCAD SHX Text
ASTM D-4833
AutoCAD SHX Text
110 LB
AutoCAD SHX Text
MULLEN BURST
AutoCAD SHX Text
ASTM D-3786
AutoCAD SHX Text
350 PSI
AutoCAD SHX Text
UV RESISTANCE
AutoCAD SHX Text
ASTM D-4355
AutoCAD SHX Text 70%
AutoCAD SHX Text
AOS % RETAINED
AutoCAD SHX Text
ASTM D-4751
AutoCAD SHX Text
80 SIEVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE052836E
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \ty ba ss
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
3- M cC on ne lls bu rg
\P ro je ct
F ile s\ M ap le
_S tre et _W
M \S he et s\
-C iv il_ D et ai ls .d w g
Pl ot te d:
O ct
5,
- 1
2:
pm
MECHANICSBURG, PENNSYLVANIA
MAPLE ST.
WATERMAIN REPLACEMENT
MCCONNELSBURG BOROUGH MUNICIPAL AUTHORITY
FULTON COUNTY, PENNSYLVANIA 77443.202501
OCTOBER 2026
© GFT INFRASTRUCTURE, INC. 2026
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT INFRASTRUCTURE, INC. AND ANY MISUSE, REUSE, ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT INFRASTRUCTURE INC. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
EROSION AND
SEDIMENTATION CONTROL
NOTES
C-7
AS NOTEDNHH
AG JRSBCS
KDJ
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE052836E
1. EROSION AND SEDIMENTATION CONTROL MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE WITHIN
THE TRIBUTARY AREAS OF THESE CONTROLS.
2. ALL EXCAVATION FOR UTILITY LINE INSTALLATION SHALL BE LIMITED TO THE AMOUNT THAT CAN BE EXCAVATED, INSTALLED, BACKFILLED AND STABILIZED WITHIN ONE WORKING DAY. ALL EXCAVATED MATERIAL SHALL BE DEPOSITED ON THE UPSLOPE SIDE OF THE TRENCH.
3. ANY DISTURBED AREAS NOT SUBJECT TO CONSTRUCTION TRAFFIC, WILL IMMEDIATELY RECEIVE A TEMPORARY SEEDING AND MULCHING.
IF THE SEASON PREVENTS THE ESTABLISHMENT OF A TEMPORARY COVER, THE DISTURBED AREAS WILL BE MULCHED WITH STRAW OR
EQUIVALENT MATERIAL, AT A RATE OF 3 TONS PER ACRE.
4. IMMEDIATELY FOLLOWING INITIAL DISTURBANCE OR ROUGH GRADING, ALL CRITICAL AREAS SUBJECT TO EROSION (I.E. STEEP SLOPES AND ROADWAY EMBANKMENTS) WILL RECEIVE A TEMPORARY SEEDING IN COMBINATION WITH STRAW MULCH OR SUITABLE EQUIVALENT, AT A RATE OF 3 TONS PER ACRE. ON SLOPES 3:1 OR STEEPER, TEMPORARY SEEDING SHALL BE STABILIZED WITH WOOD EXCELSIOR
MATTING.
5. PERMANENT VEGETATION TO BE SEEDED OR SODDED ON ALL EXPOSED AREAS IMMEDIATELY AFTER FINAL GRADING. MULCH TO BE USED AT RATE OF 3 TONS PER ACRE FOR PROTECTION UNTIL SEEDING IS ESTABLISHED. EXCELSIOR MATTING WILL BE USED ON ALL SLOPES 3:1
OR STEEPER AND WITHIN DRAIN CHANNEL.
6. UPON COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, THE OPERATOR SHALL STABILIZE IMMEDIATELY THE DISTURBED AREAS TO PROTECT FROM ACCELERATED EROSION. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH TEMPORARY SEEDING SPECIFICATIONS. DISTURBED AREAS, WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE REDISTURBED WITHIN ONE YEAR, MUST BE STABILIZED IN ACCORDANCE WITH PERMANENT
SEEDING SPECIFICATIONS.
7. TEMPORARY AND PERMANENT SEEDING RATES WILL BE AS FOLLOWS:
TEMPORARY -SPECIES: ANNUAL RYEGRASS
APPLICATION RATE: 10 LBS/1,000 SY
FERTILIZER TYPE: 10-20-20
FERTILIZER APPL. RATE: 140 LBS/1,000 SY
LIMING RATE: 1 TON PER ACRE
SEEDING DATES: MARCH 15 TO OCTOBER 15
NOTE:
TEMPORARY SOIL STABILIZATION BEYOND THE SEEDING DATES WILL BE WITH STRAW MULCH OR SUITABLE EQUIVALENT AS REFERENCED
IN NOTES 3 AND 4.
PERMANENT -SPECIES: (SEEDING DATES, MARCH 1 TO JUNE 1 & AUGUST 1 TO OCTOBER 1)
LAWN AREA (MIXTURE NO. 1)
SPECIES IN MIX MIX % BY WEIGHT MIN. % PURITY GERMINATION MAX. % WEED SEED
RED FESCUE CHEWINGS 30 95 85 0.50
KENTUCKY BLUEGRASS 50 85 80 0.40
RED TOP 3 90 90 0.75
PERENNIAL RYE GRASS 17 90 90 0.50
STEEP SLOPES (MIXTURE NO. 2) (3:1 OR STEEPER)
ANNUAL RYE 100 95 90 0.15
MULCH:
ANY THRESHED GRAIN OR TALL HAY GRASS STALKS FREE OF SEED BEARING STALKS, WEEDS OR ROOTS HARMFUL
TO LAWN GROWTH.
EXCELSIOR MATTING - SOIL RETENTION BLANKET:
MAT OF WOOD EXCELSIOR WITH 80% OF THE FIBERS 8" OR LONGER. AVERAGE WEIGHT 0.95 LBS. PER SQ. YD.
REINFORCING MESH ON TOP SIDE AND SMOLDER RESISTANT.
HYDROSEEDING:
SEEDING AND SOIL SUPPLEMENT MAY BE PERFORMED BY HYDROSEEDING (SLURRY) APPLICATIONS. ALL APPLICATIONS MUST HAVE A MULCH BINDER. HYDROSEEDING SHALL BE PERFORMED BETWEEN MARCH 1 TO JUNE 1 & AUGUST 1
TO OCTOBER 1.
APPLICATION RATE:
LAWN AREA - 45 LBS. PER 1000 SQ. YD. AREA; STEEP SLOPES - 9 LBS. PER 1000 SQ. YD. AREA.
FERTILIZER TYPE:
FERTILIZER APPL. RATE: 140LBS/1000 SY
FERTILIZER TYPE: 10-20-20
LIMING RATE:
4 TONS PER ACRE
8. A ROCK CONSTRUCTION ENTRANCE OF AASHTO #1 CLEAN STONE WILL BE PLACED AT CONSTRUCTION ENTRANCES. ENTRANCES SHALL BE 50 FT. MINIMUM IN LENGTH AND 20 FT. IN WIDTH. FILTER CLOTH IS REQUIRED PRIOR TO STONE PLACEMENT.
9. ANY CHANGES TO THE EROSION AND SEDIMENT CONTROL PLAN WILL REQUIRE THE SUBMISSION OF REVISED EROSION AND SEDIMENT CONTROL PLANS TO THE DISTRICT FOR RE-REVIEW. THE REVISED PLANS MUST MEET ALL CURRENT STATE EROSION AND SEDIMENT
POLLUTION CONTROL REQUIREMENTS AS WELL AS DISTRICT REQUIREMENTS.
10. ALL WORK WILL BE DONE IN ACCORDANCE WITH CHAPTER 102, EROSION CONTROL REGULATIONS.
11. THE COUNTY CONSERVATION DISTRICT SHALL BE NOTIFIED 72 HOURS IN ADVANCE OF BEGINNING LAND DISTURBANCE ACTIVITIES.
12. THE OWNER WILL BE RESPONSIBLE FOR THE MAINTENANCE OF PERMANENT EROSION AND SEDIMENT POLLUTION CONTROL MEASURES.
13. PUMPED WATER SEDIMENT REMOVAL POND OR FILTER BAG SEDIMENT TRAP WILL BE USED AS REQUIRED FOR THE DEWATERING OF
EXCAVATIONS. THE LOCATION OF THE POND WILL BE AS INDICATED ON THE PLANS.
14. INSTALL FILTER SOCK BARRIERS ON THE DOWNSLOPE SIDE OF ALL STOCK PILES.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ANY EXCESS MATERIAL AND MAKE SURE SITE(S) RECEIVING THE EXCESS MATERIAL HAS AN APPROVED EROSION CONTROL PLAN THAT MEETS THE CONDITION OF
CHAPTER 102 AND/OR OTHER STATE AND FEDERAL REGULATIONS.
16. UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION THE CONTRACTOR SHALL PROPERLY IMPLEMENT, OPERATE AND MAINTAIN ALL THE BEST MANAGEMENT PRACTICES. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION CONTROL AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING, MUST BE PERFORMED IMMEDIATELY.
17. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED IMMEDIATELY.
18. AT THE END OF EACH WORKING DAY, ANY SEDIMENT TRACKED OR CONVEYED ONTO A PUBLIC ROADWAY WILL BE REMOVED AND REDEPOSITED ONTO THE CONSTRUCTION SITE. REMOVAL CAN BE COMPLETED THROUGH USE OF
MECHANICAL OR HAND TOOLS, BUT MUST NEVER BE WASHED OFF THE ROAD BY USE OF WATER.
19. SEDIMENT REMOVED FROM E&SPC CONTROLS AND FACILITIES SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOOD PLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED OR
PLACED IN TOPSOIL STOCKPILES.
20. SHOULD UNFORESEEN EROSION CONDITIONS DEVELOP DURING CONSTRUCTION, THE CONTRACTOR SHALL TAKE ACTION TO REMEDY SUCH CONDITIONS AND TO PREVENT DAMAGE TO ADJACENT PROPERTIES AS A RESULT OF INCREASED RUNOFF AND/OR SEDIMENT DISPLACEMENT. STOCKPILES OF WOOD CHIPS, HAY BALES, CRUSHED STONE AND OTHER MULCHES SHALL BE HELD IN READINESS TO DEAL IMMEDIATELY WITH EMERGENCY PROBLEMS OF
EROSION.
21. THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX 64, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE , WATER RESOURCES, CHAPTER 103, EROSION
CONTROL.
22. A COPY OF THIS EROSION AND SEDIMENTATION CONTROL REPORT AND PLANS MUST BE POSTED AT THE
CONSTRUCTION SITE.
23. STORMWATER INLETS, WHICH DO NOT DISCHARGE TO SEDIMENT TRAPS OR BASINS, MUST BE PROTECTED UNTIL THE
TRIBUTARY AREAS ARE STABILIZED.
24. SEDIMENT MUST BE REMOVED FROM INLET PROTECTION AFTER EACH STORM EVENT.
25. STOCKPILE HEIGHTS MUST NOT EXCEED 35'. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER.
26. DIVERSION CHANNELS, SEDIMENTATION BASINS, SEDIMENT TRAPS, AND STOCKPILES MUST BE STABILIZED
IMMEDIATELY.
27. HAY AND STRAW MULCH MUST BE APPLIED AT RATES OF AT LEAST 3.0 TONS PER ACRE.
28. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM OF 70% UNIFORM PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING OR
OTHER MOVEMENTS.
29. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. EACH STAGE SHALL BE COMPLETED IN COMPLIANCE WITH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING SHALL BE LIMITED ONLY TO THOSE AREAS DESCRIBED IN EACH STAGE.
30. AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE OPERATOR SHALL INVITE ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES, THE LANDOWNER, ALL APPROPRIATE MUNICIPAL OFFICIALS, THE EROSION AND SEDIMENTATION CONTROL PLAN PREPARER, AND A REPRESENTATIVE OF THE COUNTY CONSERVATION DISTRICT TO SCHEDULE AN ON-SITE PRE-CONSTRUCTION MEETING. ALSO, AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR BURIED UTILITIES LOCATION.
31. BEFORE IMPLEMENTING ANY REVISIONS TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN OR REVISIONS TO OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN, THE OPERATOR
MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE COUNTY CONSERVATION DISTRICT.
32. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ.
271.1 E. SEQ. AND 287.1 ET SEQ.
33. BEFORE DISPOSING OF SOIL OR RECEIVING BORROW FOR THE SITE, THE OPERATOR MUST ASSURE THAT EACH SPOIL OR BORROW AREA HAS AN EROSION AND SEDIMENT CONTROL PLAN APPROVED BY THE COUNTY CONSERVATION DISTRICT, AND WHICH IS BEING IMPLEMENTED AND MAINTAINED ACCORDING TO CHAPTER 102 REGULATIONS. THE OPERATOR SHALL ALSO NOTIFY THE COUNTY CONSERVATION DISTRICT IN WRITING OF ALL
RECEIVING SPOIL AND BORROW AREAS WHEN THEY HAVE BEEN IDENTIFIED.
34. THE CONTRACTOR SHALL PROVIDE INLET PROTECTION DOWN SIDE STREETS WHERE THE POTENTIAL OF RUNOFF
FROM THE WORK AREA EXISTS.
35. ALL INLETS AS SHOWN WITH TYPE 1 OR TYPE 2 INLET PROTECTION ARE WITHIN THE HALF ACRE DRAINAGE
REQUIREMENT.
EROSION AND SEDIMENT POLLUTION CONTROL GENERAL NOTES SEQUENCE OF CONSTRUCTION
MATERIAL MANAGEMENT AND EROSION & SEDIMENT CONTROL GENERAL APPROACH
UTILITY CONSTRUCTION WILL OCCUR PRIMARILY WITHIN THE EXISTING ROADWAY CORRIDOR. TO MINIMIZE THE EXTENT AND DURATION OF EXPOSED SOIL, EXCAVATED MATERIAL WILL BE LOADED DIRECTLY INTO TRUCKS OR CONTAINERS
AND REMOVED FROM THE WORK AREA TO THE MAXIMUM EXTENT PRACTICABLE.
CONSTRUCTION WILL BE PERFORMED IN A PHASED MANNER WITH OPEN TRENCH LENGTHS MINIMIZED AND DISTURBED
AREAS STABILIZED AS WORK PROGRESSES.
TEMPORARY STOCKPILES, WHEN NECESSARY, SHALL BE LIMITED IN SIZE AND DURATION AND PROTECTED WITH APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES. STORM DRAINAGE INLETS WITHIN OR ADJACENT TO ACTIVE WORK AREAS SHALL BE PROTECTED, AND ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED
UNTIL FINAL STABILIZATION IS ACHIEVED.
SEQUENCE OF CONSTRUCTION
1. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN, INCLUDING ALL APPROVED REVISIONS, ON-SITE AND AVAILABLE FOR REVIEW AT ALL TIMES DURING EARTH
DISTURBANCE AND CONSTRUCTION ACTIVITIES.
2. INSTALL ALL INITIAL TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES SHOWN ON THE DRAWINGS, INCLUDING REQUIRED INLET PROTECTION DEVICES, PRIOR TO COMMENCING EARTH DISTURBANCE ACTIVITIES.
ADDITIONAL BMPS, INCLUDING FILTER SOCKS, FILTER BERMS, OR OTHER APPROVED CONTROLS, SHALL BE INSTALLED AS NECESSARY TO ADDRESS FIELD CONDITIONS. MAINTAIN ALL BMPS THROUGHOUT CONSTRUCTION
UNTIL FINAL STABILIZATION IS ACHIEVED.
3. CONSTRUCTION SHALL BE PERFORMED IN A PHASED MANNER TO MINIMIZE THE EXTENT AND DURATION OF
DISTURBED AREAS.
4. SAW CUT PAVEMENT AS NECESSARY TO CONSTRUCT THE MAIN, BUT NO DISTURBANCE IS TO EXCEED RIGHT-OF-WAY
LIMITS AND NO MORE THAN 5 DAYS IN ADVANCE OF CONSTRUCTION.
5. MINIMIZE OPEN TRENCH LENGTH. EXCAVATION SHALL BE LIMITED TO THE AMOUNT OF PIPE THAT CAN BE INSTALLED
AND STABILIZED WITHIN THE SAME WORK DAY.
6. INSTALL THE PROPOSED UTILITY PIPELINE AND ASSOCIATED APPURTENANCES. COMPLETE ALL REQUIRED BEDDING, JOINTING, AND RELATED WORK AS SPECIFIED.
7. EXCAVATED MATERIAL SHALL BE LOADED DIRECTLY INTO TRUCKS OR CONTAINERS TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE STOCKPILING, REDUCE MATERIAL HANDLING, AND LIMIT THE CONSTRUCTION FOOTPRINT.
8. TEMPORARY SOIL AND OTHER STOCKPILES, WHEN NECESSARY, SHALL BE LIMITED IN SIZE AND DURATION AND PROTECTED WITH COMPOST FILTER SOCK, SILT SOCK, FILTER BERMS, OR APPROVED EQUIVALENT CONTROLS.
9. STOCKPILES REMAINING FOR EXTENDED PERIODS OR DURING ADVERSE WEATHER CONDITIONS SHALL BE COVERED
OR OTHERWISE STABILIZED PER REQUIREMENTS.
10. BACKFILL, PLATE, INSTALL…