This document is a Request for Quotations (RFQ) for demolition and renovation services at the Federal Communications Commission's (FCC) Livermore, California field office. The RFQ includes a pricing sheet with contract line items (CLINs) for various demolition and restoration tasks, including hazardous material survey, demolition of the generator, transmitter, and receiver buildings, and removal of a bridge. The estimated costs are based on a site assessment and known contractor pricing.

The solicitation provides details on the project location, period of performance, site visit, and submission requirements. Quotes must be submitted electronically by October 18, 2024 at 5:00 PM EST. Questions regarding the solicitation should be submitted by October 8, 2024. This is a commercial services procurement issued by the FCC with a place of performance at their Livermore, California field office.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE

Quoter Company Name:NAME
Date:DATE
CLINItemYear Built/InstalledEstimated Cost
0001General ConditionsNA0.00
0001Hazardous Material SurveyNA0.00
0001Generator Building Demolition19630.00
0001Transmitter Building Demolition19630.00
0001Receiver Building Demolition19610.00
0001Bridge RemovalUnknown0.00
RFQ-Pricing Sheet CLINs Structure Total$0.00
Livermore California Demolition - RFQ- Pricing Sheet CLINs Structure
The assessment of the Site was based on a assesment of the components of the property, the buildings and related structures. The estimated costs outlined in this document are based on the conditions observed during the site assessment. Estimated costs are based on a combination of past experience, known contractor pricing and estimating guides such as RS Means.
General Conditions (Mobilization) - CLIN 0001 Firm Fixed Price (FFP)
ItemUnit of MeasureMaterial CostsLabor CostsOther Direct CostsLine Total
Unit PriceQuantityMaterial PriceManhoursRateLabor Price
General ConditionsDumpsterEach
Porta JohnEach
Utility LocatorEach
Hydraulic ExcavatorHours
Front LoaderHours
Compaction EquipmentHours
Permits/Insurance/Landfill/OtherJob
Overhead
Profit
Bonding
Total$0.00
Due to the age of buildings and structures (pre- 1990) at the FCC Field Site, a Hazardous Material Survey/Report is required. Removal and disposal of hazardous materials (PCBS, Asbestos, Lead, Oil-tank contaminated soil, and Freon) must be accomplished prior to starting demolition.
Hazardous Material Survey - CLIN 0001 Firm Fixed Price (FFP)
ItemUnit of MeasureMaterial CostsLabor Costs (fully burdened)Other Direct CostsLine Total
Unit PriceQuantityMaterial PriceManhoursRateLabor Price
Hazardous Material SurveyProject ManagerHours
SuperintendentHours
LaborHours
Industrial HygienistHours
LBP and ACMJob
Pipe TestJob
Test Sample ReportEach
Overhead
Profit
Bonding
Total$0.00
Demolition of the Generator building and restoration of grounds to preconstruction condition.
Generator Building Demolition
ItemUnit of MeasureMaterial CostsLabor Costs (fully burdened)Other Direct CostsLine Total
Unit PriceQuantityMaterial PriceManhoursRateLabor Price
Demolition Managers and LaborProject Manager (Job Foreman)Hours
Superintendent (Equipment Operators/Maintainers)Hours
Labor (Construction Workers)Hours
Building DemolitionDemo/Remove existing structureJob
Remove SlabSF
Remove FootingLF
Electrical Make SafeJob
Bring Areas to Pre-Construction ConditionConcrete Pad: Backfill with Clean DirtCY
Test for CompactionEach
Seed and Straw all areasSF
Overhead
Profit
Bonding
Total$0.00
Demolition of the Transmitter building and restoration of grounds to preconstruction condition.
Transmitter Building Demolition - CLIN 0001 Firm Fixed Price (FFP)
ItemUnit of MeasureMaterial CostsLabor Costs (fully burdened)Other Direct CostsLine Total
Unit PriceQuantityMaterial PriceManhoursRateLabor Price
Demolition Managers and LaborProject Manager (Job Foreman)Hours
Superintendent (Equipment Operators/Maintainers)Hours
Labor (Construction Workers)Hours
Building DemolitionDemo/Remove existing structureJob
Remove SlabSF
Remove FootingLF
Electrical Make SafeJob
Bring Areas to Pre-Construction ConditionConcrete Pad: Backfill with Clean DirtCY
Test for CompactionEach
Seed and Straw all areasSF
Overhead
Profit
Bonding
Total$0.00
Demolition of the Receiver building and restoration of grounds to preconstruction condition.
Receiver Building Demolition - CLIN 0001 Firm Fixed Price (FFP)
ItemUnit of MeasureMaterial CostsLabor Costs (fully burdened)Other Direct CostsLine Total
Unit PriceQuantityMaterial PriceManhoursRateLabor Price
Demolition Managers and LaborProject Manager (Job Foreman)Hours
Superintendent (Equipment Operators/Maintainers)Hours
Labor (Construction Workers)Hours
Building DemolitionDemo/Remove existing structureJob
Remove SlabSF
Remove FootingLF
Electrical Make SafeJob
Bring Areas to Pre-Construction ConditionConcrete Pad: Backfill with Clean DirtCY
Test for CompactionEach
Seed and Straw all areasSF
Overhead
Profit
Bonding
Total$0.00
Removal of the Bridge.
Bridge Removal - CLIN 0001 Firm Fixed Price (FFP)
ItemUnit of MeasureMaterial CostsLabor Costs (fully burdened)Other Direct CostsLine Total
Unit PriceQuantityMaterial PriceManhoursRateLabor Price
Bridge RemovalDemo/Remove existing structureJob
Overhead
Profit
Bonding
Total$0.00