2-Livermore California Demolition - RFQ- Pricing Sheet CLINs Structure.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Demolition and Renovation Services Livermore, CA
- Solicitation number
- 273FCC24Q0039
- Issued by
-
Federal Communications Commission
About this file
This document is a Request for Quotations (RFQ) for demolition and renovation services at the Federal Communications Commission's (FCC) Livermore, California field office. The RFQ includes a pricing sheet with contract line items (CLINs) for various demolition and restoration tasks, including hazardous material survey, demolition of the generator, transmitter, and receiver buildings, and removal of a bridge. The estimated costs are based on a site assessment and known contractor pricing.
The solicitation provides details on the project location, period of performance, site visit, and submission requirements. Quotes must be submitted electronically by October 18, 2024 at 5:00 PM EST. Questions regarding the solicitation should be submitted by October 8, 2024. This is a commercial services procurement issued by the FCC with a place of performance at their Livermore, California field office.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE
| Quoter Company Name: | NAME | ||
| Date: | DATE | ||
| CLIN | Item | Year Built/Installed | Estimated Cost |
| 0001 | General Conditions | NA | 0.00 |
| 0001 | Hazardous Material Survey | NA | 0.00 |
| 0001 | Generator Building Demolition | 1963 | 0.00 |
| 0001 | Transmitter Building Demolition | 1963 | 0.00 |
| 0001 | Receiver Building Demolition | 1961 | 0.00 |
| 0001 | Bridge Removal | Unknown | 0.00 |
| RFQ-Pricing Sheet CLINs Structure Total | $0.00 |
| Livermore California Demolition - RFQ- Pricing Sheet CLINs Structure | ||||||||||
| The assessment of the Site was based on a assesment of the components of the property, the buildings and related structures. The estimated costs outlined in this document are based on the conditions observed during the site assessment. Estimated costs are based on a combination of past experience, known contractor pricing and estimating guides such as RS Means. | ||||||||||
| General Conditions (Mobilization) - CLIN 0001 Firm Fixed Price (FFP) | ||||||||||
| Item | Unit of Measure | Material Costs | Labor Costs | Other Direct Costs | Line Total | |||||
| Unit Price | Quantity | Material Price | Manhours | Rate | Labor Price | |||||
| General Conditions | Dumpster | Each | ||||||||
| Porta John | Each | |||||||||
| Utility Locator | Each | |||||||||
| Hydraulic Excavator | Hours | |||||||||
| Front Loader | Hours | |||||||||
| Compaction Equipment | Hours | |||||||||
| Permits/Insurance/Landfill/Other | Job | |||||||||
| Overhead | ||||||||||
| Profit | ||||||||||
| Bonding | ||||||||||
| Total | $0.00 | |||||||||
| Due to the age of buildings and structures (pre- 1990) at the FCC Field Site, a Hazardous Material Survey/Report is required. Removal and disposal of hazardous materials (PCBS, Asbestos, Lead, Oil-tank contaminated soil, and Freon) must be accomplished prior to starting demolition. | ||||||||||
| Hazardous Material Survey - CLIN 0001 Firm Fixed Price (FFP) | ||||||||||
| Item | Unit of Measure | Material Costs | Labor Costs (fully burdened) | Other Direct Costs | Line Total | |||||
| Unit Price | Quantity | Material Price | Manhours | Rate | Labor Price | |||||
| Hazardous Material Survey | Project Manager | Hours | ||||||||
| Superintendent | Hours | |||||||||
| Labor | Hours | |||||||||
| Industrial Hygienist | Hours | |||||||||
| LBP and ACM | Job | |||||||||
| Pipe Test | Job | |||||||||
| Test Sample Report | Each | |||||||||
| Overhead | ||||||||||
| Profit | ||||||||||
| Bonding | ||||||||||
| Total | $0.00 | |||||||||
| Demolition of the Generator building and restoration of grounds to preconstruction condition. | ||||||||||
| Generator Building Demolition | ||||||||||
| Item | Unit of Measure | Material Costs | Labor Costs (fully burdened) | Other Direct Costs | Line Total | |||||
| Unit Price | Quantity | Material Price | Manhours | Rate | Labor Price | |||||
| Demolition Managers and Labor | Project Manager (Job Foreman) | Hours | ||||||||
| Superintendent (Equipment Operators/Maintainers) | Hours | |||||||||
| Labor (Construction Workers) | Hours | |||||||||
| Building Demolition | Demo/Remove existing structure | Job | ||||||||
| Remove Slab | SF | |||||||||
| Remove Footing | LF | |||||||||
| Electrical Make Safe | Job | |||||||||
| Bring Areas to Pre-Construction Condition | Concrete Pad: Backfill with Clean Dirt | CY | ||||||||
| Test for Compaction | Each | |||||||||
| Seed and Straw all areas | SF | |||||||||
| Overhead | ||||||||||
| Profit | ||||||||||
| Bonding | ||||||||||
| Total | $0.00 | |||||||||
| Demolition of the Transmitter building and restoration of grounds to preconstruction condition. | ||||||||||
| Transmitter Building Demolition - CLIN 0001 Firm Fixed Price (FFP) | ||||||||||
| Item | Unit of Measure | Material Costs | Labor Costs (fully burdened) | Other Direct Costs | Line Total | |||||
| Unit Price | Quantity | Material Price | Manhours | Rate | Labor Price | |||||
| Demolition Managers and Labor | Project Manager (Job Foreman) | Hours | ||||||||
| Superintendent (Equipment Operators/Maintainers) | Hours | |||||||||
| Labor (Construction Workers) | Hours | |||||||||
| Building Demolition | Demo/Remove existing structure | Job | ||||||||
| Remove Slab | SF | |||||||||
| Remove Footing | LF | |||||||||
| Electrical Make Safe | Job | |||||||||
| Bring Areas to Pre-Construction Condition | Concrete Pad: Backfill with Clean Dirt | CY | ||||||||
| Test for Compaction | Each | |||||||||
| Seed and Straw all areas | SF | |||||||||
| Overhead | ||||||||||
| Profit | ||||||||||
| Bonding | ||||||||||
| Total | $0.00 | |||||||||
| Demolition of the Receiver building and restoration of grounds to preconstruction condition. | ||||||||||
| Receiver Building Demolition - CLIN 0001 Firm Fixed Price (FFP) | ||||||||||
| Item | Unit of Measure | Material Costs | Labor Costs (fully burdened) | Other Direct Costs | Line Total | |||||
| Unit Price | Quantity | Material Price | Manhours | Rate | Labor Price | |||||
| Demolition Managers and Labor | Project Manager (Job Foreman) | Hours | ||||||||
| Superintendent (Equipment Operators/Maintainers) | Hours | |||||||||
| Labor (Construction Workers) | Hours | |||||||||
| Building Demolition | Demo/Remove existing structure | Job | ||||||||
| Remove Slab | SF | |||||||||
| Remove Footing | LF | |||||||||
| Electrical Make Safe | Job | |||||||||
| Bring Areas to Pre-Construction Condition | Concrete Pad: Backfill with Clean Dirt | CY | ||||||||
| Test for Compaction | Each | |||||||||
| Seed and Straw all areas | SF | |||||||||
| Overhead | ||||||||||
| Profit | ||||||||||
| Bonding | ||||||||||
| Total | $0.00 | |||||||||
| Removal of the Bridge. | ||||||||||
| Bridge Removal - CLIN 0001 Firm Fixed Price (FFP) | ||||||||||
| Item | Unit of Measure | Material Costs | Labor Costs (fully burdened) | Other Direct Costs | Line Total | |||||
| Unit Price | Quantity | Material Price | Manhours | Rate | Labor Price | |||||
| Bridge Removal | Demo/Remove existing structure | Job | ||||||||
| Overhead | ||||||||||
| Profit | ||||||||||
| Bonding | ||||||||||
| Total | $0.00 |