This is a project manual and bid documents package for a public works construction project issued by School District U-46 in Elgin, Illinois, in collaboration with ARCON Associates, Inc. as the architectural firm. The project involves Stadium Improvements at Larkin High School, with a comprehensive scope including construction of new concessions/locker rooms building, synthetic turf field, track, grandstands/pressbox, lighting, and associated utilities and site work. The project is scheduled with key dates including a mandatory pre-bid meeting on November 4, 2025 at 4:00 PM, bid submission deadline on November 18, 2025 at 3:30 PM, and a projected contract start date of February 9, 2026. The project is expected to reach substantial completion by September 4, 2026, with final completion by November 6, 2026.

The project is funded through the school district and will be awarded as a single prime contract with a stipulated price. The total project includes a general allowance of $500,000 and potential unit price adjustments for various site and interior work scenarios. Bidders are required to submit comprehensive documentation including a Contractor's Qualification Statement, proof of insurance, performance and payment bonds, and compliance with prevailing wage laws. The estimated project budget is not explicitly stated, but the complexity and scope suggest a significant capital investment. Bidders must demonstrate financial stability, relevant experience, and compliance with local and state regulations, including specific requirements related to background checks, drug-free workplace policies, and human rights standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHOOL DISTRICT U-46

355 East Chicago Street Elgin, Illinois 60120

PROJECT MANUAL

STADIUM IMPROVEMENTS @ LARKIN HIGH SCHOOL

October 27, 2025

Owner: School District U-46 Plant Operations 1460 Sheldon Drive Elgin, Illinois 60120

SDU46 Project No. 275-25

Architect/Engineer: ARCON Associates, Inc.

2050 South Finley Road, Suite 40 Lombard, Illinois 60148 Project No. 24125

MANDATORY Pre-Bid Meeting: Tuesday, November 4, 2025 at 4:00PM Larkin High School 1475 Larkin Avenue Elgin, Illinois 60123

Virtual Bid Opening: Tuesday, November 18, 2025 at 3:30PM School District U-46 Link will be posted on the District’s Bid Portal (Bonfire)

ARCON 24125 00 01 01-1 TITLE PAGE

PROJECT MANUAL

FOR

STADIUM IMPROVEMENTS

AT

LARKIN HIGH SCHOOL

1475 LARKIN AVENUE

ELGIN, ILLINOIS 60123

DATE: OCTOBER 27, 2025

PROJECT NO. 24125

SD U46 PROJECT NO. 275-25

OWNER:

BOARD OF EDUCATION

SCHOOL DISTRICT U-46

355 EAST CHICAGO STREET

ELGIN, ILLINOIS 60120

ARCHITECT:

ARCON ASSOCIATES, INC.

2050 SOUTH FINLEY ROAD, SUITE 40

LOMBARD, ILLINOIS 60148

CONSULTANTS:

MECHANCIAL SERVICES ASSOCIATES

111 SOUTH VIRGINIA STREET

CRYSTAL LAKE, ILLINOIS 60014

CAGE CIVIL ENGINEERING

2200 CABOT DRIVE, SUITE 325

LISLE, ILLINOIS 60532

ML STRUCTURAL

334 EAST COLFAX STREET, UNIT D

PALATINE, ILLINOIS 60067

ARCON 24125 00 01 10-1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

Section 00 01 01 – Title Page 00 01 01-1 Section 00 01 10 – Table of Contents 00 01 10-1-4 Section 00 01 15 – List of Drawings 00 01 15-1-3 Section A1 – Advertisement for Bid A1-1 Section A2 – Instructions to Bidders A2-1-16 Section A3 – Form of Bid A3-1-8 Section A4 – Bidder Eligibility Certification and Non-Collusion Affidavit A4-1 Pursuant to Public Act 85-1295 Section A5 – Prevailing Wage Payment Certification A5-1 Section A6 – Certificate of Compliance with Illinois Human Rights Act A6-1 Section A7 – Certificate of Compliance with Illinois Drug-Free Workplace Act A7-1 Section A8 – Certificate Regarding Criminal Background Investigations A8-1 Section A9 – Authorization for Criminal Background Investigations A9-1 Section A10 – Asbestos and/or Lead-Free Construction Certification A10-1 Section A11 – Sexual Harassment Policy A11-1 Section A12 – Certification of Monthly Payroll (IDOL) A12-1 Section AIA A101-2017 – Standard Form of Agreement Between Owner and Contractor A101-2017-1-10 Section AIA A101-2017 Exhibit A – Insurance and Bonds A101-2017-1-10 Section AIA A201-2017 – General Conditions of the Contract for Construction A201-2017-1-106

DIVISION 01 – GENERAL REQUIREMENTS

Section 01 10 00 – Summary 01 10 00-1-5 Section 01 20 00 – Price and Payment Procedures 01 20 00-1-3 Section 01 21 00 – Allowances 01 21 00-1 Section 01 22 00 – Unit Prices 01 22 00-1-2 Section 01 23 00 – Alternates 01 23 00-1 Section 01 30 00 – Administrative Requirements 01 30 00-1-9 Section 01 40 00 – Quality Requirements 01 40 00-1-4 Section 01 45 33 – Code-Required Special Inspections and Procedures 01 45 33-1-7 Section 01 50 00 – Temporary Facilities and Controls 01 50 00-1-3 Section 01 61 16 – Volatile Organic Compound (VOC) Content Restrictions 01 61 16-1-3 Section 01 70 00 – Execution and Closeout Requirements 01 70 00-1-8 Section 01 78 00 – Closeout Submittals 01 78 00-1-5 Section 01 79 00 – Demonstration and Training 01 79 00-1-3

DIVISION 02 – EXISTING CONDITIONS

Section 02 41 00 – Demolition 02 41 00-1-4

DIVISION 03 – CONCRETE

Section 03 30 00 – Cast-in-Place Concrete 03 30 00-1-11

DIVISION 04 – MASONRY

Section 04 27 00 – Masonry Assemblies 04 27 00-1-16 Section 04 29 00 – Engineered Unit Masonry 04 29 00-1-7

DIVISION 05 – METALS

Section 05 12 00 – Structural Steel Framing 05 12 00-1-4 Section 05 21 00 – Steel Joist Framing 05 21 00-1-3 Section 05 31 00 – Steel Decking 05 31 00-1-3 Section 05 40 00 – Cold-Formed Metal Framing 05 40 00-1-7 Section 05 44 00 – Cold-Formed Metal Trusses 05 44 00-1-4 Section 05 50 00 – Metal Fabrications 05 50 00-1-3

ARCON 24125 00 01 10-2 TABLE OF CONTENTS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

Section 06 10 00 – Rough Carpentry 06 10 00-1-3 Section 06 10 01 – Roof Carpentry 06 10 01-1-5 Section 06 64 00 – Plastic Paneling 06 64 00-1-3

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 07 11 13 – Bituminous Dampproofing 07 11 13-1 Section 07 21 00 – Thermal Insulation 07 21 00-1-3 Section 07 25 00 – Fluid Applied Weather Barriers 07 25 00-1-3 Section 07 26 14 – Surface Applied Vapor Reduction System 07 26 14-1-4 Section 07 27 00 – Air Barriers 07 27 00-1-5 Section 07 31 13 – Asphalt Shingles 07 31 13-1-5 Section 07 62 00 – Sheet Metal Flashing and Trim 07 62 00-1-5 Section 07 84 00 – Firestopping 07 84 00-1-5 Section 07 92 00 – Joint Sealants 07 92 00-1-6

DIVISION 08 – OPENINGS

Section 08 11 13 – Hollow Metal Doors and Frames 08 11 13-1-6 Section 08 33 13 – Coiling Counter Doors 08 33 13-1-3 Section 08 36 13 – Sectional Doors 08 36 13-1-4 Section 08 71 00 – Door Hardware 08 71 00-1-23 Section 08 80 00 – Glazing 08 80 00-1-4

DIVISION 09 – FINISHES

Section 09 21 16 – Gypsum Board Assemblies 09 21 16-1-6 Section 09 51 00 – Acoustical Ceilings 09 51 00-1-4 Section 09 65 00 – Resilient Flooring 09 65 00-1-4 Section 09 67 00 – Fluid-Applied Flooring 09 67 00-1-6 Section 09 91 13 – Exterior Painting 09 91 13-1-4 Section 09 91 23 – Interior Painting 09 91 23-1-6

DIVISION 10 – SPECIALTIES

Section 10 11 00 – Visual Display Units 10 11 00-1-2 Section 10 14 00 – Signage 10 14 00-1-3 Section 10 44 00 – Fire Protection Specialties 10 44 00-1-2 Section 10 51 01 – Fully Welded Metal Lockers 10 51 01-1-3 Section 10 75 00 – Flagpoles 10 75 00-1-3

DIVISION 11 – EQUIPMENT

Section 11 40 00 – Food Service Equipment 11 40 00-1-21

DIVISION 12 – FURNISHINGS

Section 12 24 00 – Window Shades 12 24 00-1-5 Section 12 35 50 – Manufactured Casework 12 35 50-1-10

DIVISION 21 – FIRE SUPPRESSION

Section 21 05 00 – Common Work Results for Fire Suppression 21 05 00-1-6 Section 21 05 53 – Identification for Fire Suppression Piping and Equipment 21 05 53-1-6 Section 21 13 13 – Wet-Pipe Sprinkler Systems 21 13 13-1-10

DIVISION 22 – PLUMBING

Section 22 05 00 – Common Work Results for Plumbing 22 05 00-1-9 Section 22 05 23 – General-Duty Valves for Plumbing Piping 22 05 23-1-12 Section 22 05 29 – Hangers and Supports for Plumbing Piping and Equipment 22 05 29-1-9 Section 22 05 53 – Identification for Plumbing Piping and Equipment 22 05 53-1-5 Section 22 07 00 – Plumbing Insulation 22 07 00-1-16 Section 22 11 16 – Domestic Water Piping 22 11 16-1-10

ARCON 24125 00 01 10-3 TABLE OF CONTENTS

Section 22 11 19 – Domestic Water Piping Specialties 22 11 19-1-6 Section 22 11 23.21 – Inline, Domestic-Water Pumps 22 11 23.21-1-3 Section 22 13 16 – Sanitary Waste and Vent Piping 22 13 16-1-6 Section 22 13 19 – Sanitary Waste Piping Specialties 22 13 19-1-8 Section 22 34 00 – Fuel-Fired, Domestic-Water Heaters 22 34 00-1-4 Section 22 40 00 – Plumbing Fixtures 22 40 00-1-7 Section 22 45 00 – Emergency Plumbing Fixtures 22 45 00-1-3

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

Section 23 00 00 – General Requirements for Heating, Ventilating and Air Conditioning 23 00 00-1-6 Section 23 05 00 – Common Work Results for HVAC 23 05 00-1-4 Section 23 05 93 – Testing, Adjusting, and Balancing for HVAC 23 05 93-1-9 Section 23 07 13 – Duct Insulation 23 07 13-1-14 Section 23 09 23 – Direct Digital Control (DDC) System for HVAC 23 09 23-1-22 Section 23 09 93 – Sequence of Operations for HVAC Controls 23 09 93-1-4 Section 23 11 23 – Facility Natural-Gas Piping 23 11 23-1-8 Section 23 31 13 – Metal Ducts 23 31 13-1-10 Section 23 33 00 – Air Duct Accessories 23 33 00-1-8 Section 23 34 23 – HVAC Power Ventilators 23 34 23-1-4 Section 23 74 13 – Packaged, Outdoor, Central-Station Air-Handling Units 23 74 13-1-7 Section 23 74 17 – Rooftop Equipment Screens 23 74 17-1-3 Section 23 82 39 – Unit Heaters 23 82 39-1-4

DIVISION 26 – ELECTRICAL

Section 26 00 00 – Electrical, General 26 00 00-1-8 Section 26 05 00 – Common Work Results for Electrical 26 05 00-1-3 Section 26 05 19 – Low-Voltage Electrical Power Conductors and Cables 26 05 19-1-5 Section 26 05 23 – Control-Voltage Electrical Power Cables 26 05 23-1-5 Section 26 05 26 – Grounding and Bonding for Electrical Systems 26 05 26-1-7 Section 26 05 29 – Hangers and Supports for Electrical Systems 26 05-29-1-5 Section 26 05 33 – Raceway and Boxes for Electrical Systems 26 05 33-1-13 Section 26 05 53 – Identification for Electrical Systems 26 05 53-1-6 Section 23 05 73 – Overcurrent Protective Device Coordination Study 23 05 73-6 Section 26 09 23 – Lighting Control Devices 26 09 23-1-5 Section 26 09 43 – Network Lighting Controls 26 09 43-1-24 Section 26 22 00 – Low-Voltage Transformers 26 22 00-1-4 Section 26 24 16 – Panelboards 26 24 16-1-6 Section 26 27 26 – Wiring Devices 26 27 26-1-7 Section 26 28 13 – Fuses 26 28 13-1-2 Section 26 28 16 – Enclosed Switches and Circuit Breakers 26 28 16-1-5 Section 26 51 00 – Interior Lighting 26 51 00-1-6 Section 26 56 68 – Exterior Athletic Lighting 26 56 68-1-8

DIVISION 27 – COMMUNICATIONS

Section 27 05 00 – Common Work Results for Communications 27 05 00-1-2 Section 27 11 00 – Communications Equipment Room Fittings 27 11 00-1-5 Section 27 13 00 – Communications Backbone Cabling 27 13 00-1-11 Section 27 15 00 – Communications Horizontal Cabling 27 15 00-1-14 Section 27 21 33 – Data Communications Wi-Fi Access Points (WAP) 27 21 33-1-2 Section 27 51 16 – Public Address and Music Equipment 27 51 16-1-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

Section 28 05 00 – Common Work Results for Electronic Safety and Security 28 05 00-1-3 Section 28 05 13 – Conductors and Cables for Electronic Safety and Security 28 05 13-1-6 Section 28 16 00 – Intrusion Detection 28 16 00-1-13 Section 28 23 00 – Network Video Surveillance 28 23 00-1-39 Section 28 31 11 – Digital, Addressable Fire-Alarm System 28 31 11-1-23

ARCON 24125 00 01 10-4 TABLE OF CONTENTS

DIVISION 31 – EARTHWORK

Section 31 10 00 – Site Clearing 31 10 00-1 Section 31 23 00 – Earthwork 31 23 00-1-7

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 31 01 16 – Asphalt Pavement Repair 31 01 16-1-4 Section 32 12 16 – Asphalt Paving 32 12 16-1-4 Section 32 13 13 – Concrete Paving 32 13 13-1-6 Section 32 31 13 – Chain Link Fences and Gates 32 31 13-1-5 Section 32 31 19 – Decorative Metal Fences and Gates 32 31 19-1-4 Section 32 92 19 – Turf Seeding 32 92 19-1-5 Section 32 92 23 – Sodding 32 92 23-1-5 Section 32 93 00 – Plants 32 93 00-1-6

ARCON 24125 00 01 15 - 1 LIST OF DRAWINGS

SECTION 00 01 15

LIST OF DRAWINGS

G0.1 COVER SHEET

G1.1 LIFE SAFETY

G2.0 AERIAL VIEWS – FOR REFERENCE ONLY

C0.0 SITE LOCATION MAP & CIVIL LEGEND

C0.1 GENERAL NOTES & SPECIFICATIONS

C0.2 CITY OF ELGIN GENERAL NOTES

C1.0 EXISTING CONDITIONS & DEMOLITION PLAN

C2.0 SITE LAYOUT PLAN

C3.0 SITE GRADING PLAN

C3.1 SOIL EROSION & SEDIMENT CONTROL PLAN

C3.2 SOIL EROSION & SEDIMENT CONTROL DETAILS

C4.0 SITE UTILITY PLAN

C5.0 CONSTRUCTION DETAILS

C5.1 CONSTRUCTION DETAILS

C5.2 CONSTRUCTION DETAILS

C5.3 CONSTRUCTION DETAILS

C5.4 CONSTRUCTION DETAILS

C5.5 STORMTECH CHAMBER SYSTEM DETAILS

C5.6 STORMTECH CHAMBER SYSTEM DETAILS

C5.7 STORMTECH CHAMBER SYSTEM DETAILS

C5.8 STORMTECH CHAMBER SYSTEM DETAILS

C5.9 STORMTECH CHAMBER SYSTEM DETAILS

C5.10 LIFT STATION DETAILS

L.1 TREE PROTECTION & REMOVAL PLAN

L.2 LANDSCAPE PLAN

L.3 LANDSCAPE DETAILS & NOTES

L.4 FENCING DETAILS

AS1.1 ARCHITECTURAL SITE PLAN

AS1.2 SITE DETAILS

AS1.3 NORTH BLEACHER PLANS

AS1.4 NORTH BLEACHER ELEVATIONS

AS1.5 SOUTH BLEACHER PLANS

AS1.6 SOUTH BLEACHER ELEVATIONS

A0.1 PARTIAL FIRST FLOOR DEMOLITION PLAN

A1.1 CONCESSIONS/ LOCKER ROOM FLOOR PLAN

A1.2 TICKET BOOTHS AND PAVILION FLOOR PLAN

A2.1 DOOR & FRAME SCHEDULE

A3.1 EXTERIOR ELEVATIONS

A3.2 WALL SECTIONS

A4.1 OVERALL ROOF PLAN

A4.2 TYPICAL ROOF DETAILS

A5.1 INTERIOR ELEVATIONS

A6.1 PARTIAL REFLECTED CEILING PLAN

ARCON 24125 00 01 15 - 2 LIST OF DRAWINGS

A7.1 INTERIOR DETAILS

A7.2 TOILET PLANS, ELEVATIONS, & DETAILS

A7.3 TOILET PLANS, ELEVATIONS, & DETAILS

A9.1 PARTIAL FIRST FLOOR FINISH PLAN

S0.1 GENERAL NOTES

S0.2 SPECIAL INSPECTIONS

S1.0 FOUNDATION PLAN - CONCESSIONS/LOCKER ROOM

S1.1 FOUNDATION & FRAMING PLANS/DETAILS - TICKET BOOTHS & PAVILION

S1.2 FOUNDATION PLANS AND DETAILS @ BLEACHERS

S2.0 ROOF FRAMING PLAN - CONCESSIONS/LOCKER ROOM

S3.0 FOUNDATION DETAILS

S3.1 FOUNDATION DETAILS

S4.0 FRAMING DETAILS

S5.0 MASONRY DETAILS

S5.1 MASONRY DETAILS

S6.0 3D VIEW

M1.1 FIRST FLOOR MECHANICALPLAN

M1.2 MECHANICAL ROOF PLAN

M2.0 MECHANICAL EQUIPMENT SCHEDULES

M3.0 MECHANICAL DETAILS & SYMBOLS LIST

P1.0 FIRST FLOOR BELOW GROUND PLUMBING PLAN

P1.1 FIRST FLOOR ABOVE GROUND PLUMBING PLAN

P1.2 PLUMBING ROOF PLAN

P2.0 PLUMBING FIXTURES SCHEDULE, DETAILS & SYMBOLS LIST

P3.0 PLUMBING RISERS

FP1.1 FIRST FLOOR FIRE PROTECTION PLAN & RISER

E0.0 GENERAL ELECTRICAL DEMO NOTES

E0.1 PARTIAL SITE PLAN - ELEC DEMO

E0.2 PARTIAL SITE PLAN – ELECTRICAL DEMO

E1.1 CONCESSIONS-LOCKER ROOM ELECTRICAL PLAN

E1.2 CONCESSIONS-LOCKER ROOM MECHANICAL EQUIPMENT ELECTRICAL PLAN

E1.3 CONCESSIONS-LOCKER ROOM FIRE ALARM PLAN

E1.4 CONCESSIONS-LOCKER ROOM LOW VOLTAGE PLAN

E2.1 CONCESSIONS-LOCKER ROOM LIGHTING PLAN

E2.2 CONCESSIONS LTG DETAILS

E3.0 ELECTRICAL NEW WORK PLAN NOTES AND DETAILS

E3.1 SITE PLAN - ELEC NEW WORK

E3.2 SITE PLAN - LOW VOLTAGE NEW WORK

E3.3 PRESS BOX PLANS

E3.4 BLEACHERS PLANS

E3.5 PARTIAL SCHOOL BLDG PLANS

E3.6 ELECTRICAL DETAILS

E3.7 ELECTRICAL DETAILS

E3.8 ELECTRICAL DETAILS

E3.9 ELECTRICAL DETAILS

E4.0 ELECTRICAL NOTES AND DETAILS

E4.1 FIRE ALARM SYSTEM NOTES AND DETAILS

E4.2 FIRE ALARM SYSTEM NOTES AND DETAILS

E4.3 INTRUSION NOTES AND DETAILS

E4.4 SECURITY CAMERA SYSTEM

ARCON 24125 00 01 15 - 3 LIST OF DRAWINGS

E4.5 SECURITY CAMERA NOTES AND DETAILS

E4.6 SECURITY CAMERA PRESS BOX RISER

E5.0 TECHNOLOGY NOTES AND DETAILS A

E5.1 TECHNOLOGY NOTES AND DETAILS B

E5.2 TECHNOLOGY NOTES AND DETAILS C

E5.3 TECHNOLOGY RISER DIAGRAM

E5.4 STADIUM SOUND SYSTEM

E5.5 STADIUM SOUND SYSTEM

E5.6 STADIUM SOUND SYSTEM RISER

E6.0 ELECTRICAL RISER DIAGRAM

E6.1 ELECTRICAL PANEL SCHEDULES

END OF SECTION 00 01 15

ARCON 24125 A1 - 1 ADVERTISTEMENT FOR BID

BIDDING REQUIREMENTS

SECTION A1- ADVERTISEMENT FOR BIDS:

The Board of Education of School District U-46, Kane County, Illinois hereby gives notice that sealed lump sum bids will be received for the Stadium Improvements at Larkin High School; ARCON Project No. 24125.

SD U46 Project No. 275-25. In this project, the work includes but is not limited to: New concessions/locker rooms building, synthetic turf field, track, grandstands/pressbox, lighting, new utilities, and site work at Larkin High School located at 1475 Larkin Avenue, Elgin, Illinois 60123. All demolition, architectural, site, mechanical, electrical, fire protection, and plumbing work will be the responsibility of the general/prime contractor. Refer to Drawings and Project Manual for full extent of the work required.

CONSTRUCTION BONDS REQUIRED: Upon award of Contract, a Performance Bond and Material & Labor Payment Bond will be required from the General Contractor for 100% of the contract sum, per Contract Awarded, payable to the Owner.

PREVAILING WAGE LAW: This project is subject to the Illinois Prevailing Wage Act (820 ILCS 130).

PREQUALIFICATION PROCEDURE – All interested bidders are required to complete an AIA document A305, Contractor’s Qualification Statement, and submit it with all bidding documents at the time of bidding.

MANDATORY PRE-BID MEETING: A MANDATORY Pre-Bid meeting is scheduled for Tuesday, November 4, 2025 @ 4:00PM at Larkin High School located at 1475 Larkin Avenue, Elgin, Illinois 60123. Park in the parking lot at the main entrance.

BID GUARANTEE: Contractors shall guarantee their submitted Bid Proposal for a ninety (90) day period from the date of Bid Opening.

BID PACKAGE SUBMITTAL: Bids will be due on Tuesday, November 18, 2025, at 3:30PM local time via the School District’s RFP/Bid Portal (refer to BID DOCUMENTS paragraph below for information on portal). Contractors will upload all required bid forms and documentation individually to the bidding portal. Refer to bid form for all required bid documentation.

Receipt of a Bid Bond of ten percent (10%) of the amount of the base bid(s), (including all alternates and allowances) or a Cashier’s Check, made payable to School District U-46, is required prior to the time of the virtual bid opening.

Contractor shall send the original Bid Bond or Cashier’s Check to the Plant Operation’s Office (School District U-46 Procurement Office, 1474 Sheldon Drive, Elgin, Illinois 60120, Attn: Danise Smith) via Certified mail, UPS, or FedEx to ensure confirmed delivery prior to the Bid Opening. If Contractor has an electronic certification process, then they will be able to upload the Bid Bond into the bidding portal. Bids will not be accepted without a Bid Bond / Cashier’s Check at Bid Opening. These can be dropped off Monday through Friday, 7:00 AM CST to 4:00 PM

CST.

A Public Bid Opening will be conducted via a Zoom meeting on the bid’s established bid opening date and time. At that time, the bids will be unsealed, and all bid totals will be read aloud and will be able to be visually viewed on the screen.

Zoom credentials (sign-in) for attendance at this meeting, along with bid opening date and time, will be posted on the District’s Bid Portal (Bonfire) under “Public Files.” Invites will NOT be provided; therefore, it is the Bidders’ responsibility to obtain these Zoom credentials directly from the Portal prior to the Bid Opening.

BID DOCUMENTS: Bid Documents, including Drawings and Specifications, are available for download from the School District’s RFP/Bid Portal at https://u-46.bonfirehub.com/portal/?tab=login starting on Monday, October 27, 2025 at 8:00 AM CST. Registration is required to access the Bid Documents; however, registration is easy and free!

If needed, registration instructions are available at: https://vendorsupport.gobonfire.com/hc/en-us/articles/15646869029783-Vendor-Registration

END OF ADVERTISEMENT FOR BID

LHS – STADIUM IMPROVEMENTS @ LARKIN HIGH SCHOOL

https://u-46.bonfirehub.com/portal/?tab=login https://u-46.bonfirehub.com/portal/?tab=login https://u-46.bonfirehub.com/portal/?tab=login https://u-46.bonfirehub.com/portal/?tab=login https://vendorsupport.gobonfire.com/hc/en-us/articles/15646869029783-Vendor-Registration

ARCON 24125 A2-1 INSTRUCTIONS TO BIDDERS

SECTION A2

INSTRUCTIONS TO BIDDERS

1. NOTICE TO BIDDERS

Notice is hereby given by the Board of Education of School District U-46 in Kane County, Illinois that sealed lump sum bids will be received for the following:

Project: ARCON Project No. 24125 / SD U-46 Project No. 275-25 Stadium Improvements Larkin High School 1475 Larkin Avenue Elgin, Illinois 60123

Owner: Board of Education

School District U-46

Elgin, Illinois 60120-6543

2. PROJECT DESCRIPTION

Scope of Work includes, but is not limited to the following:

• New concessions/locker rooms building

• Stadium and Site Lighting

• New utilities work

• Concrete and Asphalt

• As shown on the drawings and described herein. All demolition, architectural, civil, mechanical, electrical, fire protection, and plumbing work will be the responsibility of the general/prime contractor.

• Coordination of Synthetic turf field and track installation. Synthetic Turf and Track Surface by Owner through Cooperative Purchasing. FieldTurf is the Synthetic Turf Contractor.

• Coordination of Grandstands/Pressbox installation. Grandstands and Pressbox by Owner through Cooperative Purchasing. GT Grandstands is the Grandstands and Pressbox Contractor.

1 All costs for overtime, weekend work, or additional manpower shall be included in the Base Bid, as required to meet the project schedule/timeline as outlined herein. Contractor is responsible for Winter Conditions till March 13, 2026. Additional Winter Conditions provisions after March 14, 2026 will be an allowance draw as approved by the owner/architect.

2 All work shall be under Prime Contractor. All demolition, architectural, mechanical, electrical, plumbing, and roofing work is a part of the Prime Contractor’s responsibility.

3 The Contractor shall field verify all existing electrical and mechanical piping and conduit runs and all other associated MEP & FP items, such as fire alarm, H.V.A.C. controls, security systems wiring, etc. not only within and adjacent to the project area, but also any electrical runs, controls, gas lines, sprinklers, etc. that feed other areas within the building. The field verification shall be conducted prior to the start of this project and coordinated with the schools’ daily schedule, which may include, but is not limited to, evening and weekend hours. (See Article 6.9)

4 The “Time Schedule” for this work is very critical. When submitting a bid the Prime Contractor agrees they can meet the completion requirements. The bidder agrees they have adequate staff and financial resources to complete the project on time. The bidder further agrees they have included any premium necessary to have workers on overtime, multiple working shifts, holidays, ARCON 24125 A2-2 INSTRUCTIONS TO BIDDERS weekends or any other arrangement to adequately man the project to meet the schedule. The Prime Contractor further agrees they will place a Project Superintendent from his staff full time on the project. In addition, the Project Superintendent must be on site any time any subcontractors are on site. Failure to maintain a full time Project Superintendent on the site from start to final acceptance will be reason for the Owner to deduct from the contract amount all costs of services if the Owner and/or Architect decide any other services are required to complete the project in an orderly and timely manner.

5 There are Liquidated Damages Provisions for the Substantial Completion of this project, due to the critical time schedule. (See Article 17)

6 The School District may elect to interview the Contractor after bids are received as part of the award process.

7 The Contractor is notified that Allowances are included in this project. See Specification

Section 01 21 02.

8 The Contractor must include in his bid a full-time Foreman to always be on-site when work is occurring. A Project Superintendent / Project Manager must also be available for weekly OAC meetings, and as requested by the Owner / Architect for additional scheduled meetings during the project.

9 The Contractor agrees by submitting a bid that he has included adequate safety precautions and protection to insure safe conditions for the building occupants during the entire project. The Prime Contractor shall cooperate with the Owner at all times and coordinate construction work to maintain the safety, health, and welfare of students, staff, workers and other contractors. The Prime Contractor alone is responsible for safety on this project.

10 The expectation is that the Contractor shall order all necessary project materials upon submittal(s) approval. Contractor is responsible for any/all cost incurred including but not limited storge fees, delivery fees, various material handling costs, etc. The Contractor is to include these costs in base bid. Reference the schedule for milestones.

11 Contractor shall protect the work area from all garbage/debris and clean-up site at the end of each day’s work so that area is clean in the morning. Contractor shall cooperate with the Owner at all times and coordinate construction work to maintain the safety, health, and welfare of students, staff, workers, and other contractors.

12 The following Shop Drawings to be submitted four weeks after the bid opening by the Apparent

Low Bidder:

a. Manufactured Casework

b. Mechanical Equipment

c. Sink, Faucets and fittings

d. Control System Components

e. Fume hoods/exhaust systems

f. Lights and lighting controls

g. Power Panels and Transformers

h. Cameras and Access Control

13 There will be other summer construction projects occurring at the school. Superintendent responsible to coordinate all access and construction staging areas with all the other construction projects.

ARCON 24125 A2-3 INSTRUCTIONS TO BIDDERS

14 Secured Construction fence with screening is required around any exterior site improvements, construction dumpsters, temporary toilet facilities, and construction material/equipment for the duration of the project.

15 Final construction cleaning and finish wax of the new resilient flooring (refer to resilient flooring spec) is the responsibility of the prime/general contractor. To be completed by Substantial Completion.

16 Radar Scan all floors before coring or saw cutting. Notify GC, Owner and Engineer of findings and if new work will conflict with any existing conduit or piping that may have been discovered in the floor system. If radar scans are not performed, the contractor will be responsible for all repair work needed to return the existing systems back to an operational condition.

17 Contact J.U.L.I.E. and hiring a Private Utility Locate company will be the responsibility of the

Contractor. If Private Utility Locate are not performed, the Contractor will be responsible for all repair work needed to return the existing systems back to an operational condition.

18 Tree clearing is allowed between November 1 and March 30 with the restricted tree clearing season April 1 to September 30 per the federal and state regulatory requirements for the NLEB.

19 All changes to the construction involving costs, either extra items or credit items, shall be in accordance with Article 7 of the General Conditions of the Contract for Construction and the following percentages will be added or deducted from the actual cost of the work for overhead and profit:

a. For work done by our own crew = 10% Overhead and Profit

b. For work done by Subcontractors = 5% Overhead and Profit

c. Maximum combined for Prime Roofing = 15% Overhead and Profit

20 ** CONSTRUCTION SCHEDULE IS CRITICAL** Contractor shall commence work on the dates shown in the table below and shall complete all work in a diligent and professional manner by the dates indicated in the schedule blow. Any and all possible overtime, first and second shift work, and weekend work in order to accomplish completion of project in accordance with the construction schedules shall be included in the Prime Contractor’s Bid. No extension of time or additional costs will be accepted after Contract Award.

Owner needs to be notified immediately of any known material delivery delays pertaining to this project which may affect substantial completion. Identify any known equipment delivery delays on Section A3, Form of Bid.

3. GENERAL

The Prime Contractor shall supply all labor, transportation, apparatus, scaffolding, and any tools necessary for the completion of the work, maintain and remove temporary equipment, and construct in excellent and workmanlike manner the complete work and everything properly incidental thereto as stated in the contract documents or reasonably implied therefrom. It is not the intent of the contract documents to set forth in detail every item necessary for the construction of this project. Prime Contractor must be qualified for this work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order ready for use without additional work. All parts must be coordinated, complete, ready to operate and delivered to the Owner in new condition.

Each Prime Contractor shall coordinate his work with any and all other trades and Contractors on the site.

His work shall be performed in a timely fashion to meet the project time schedule for all work.

4. BIDDING DOCUMENTS

Bidding documents consist of the following:

ARCON 24125 A2-4 INSTRUCTIONS TO BIDDERS

1. Advertisement for Bids

2. Bid Form (Proposal)

3. Bid Security

4. Instructions to Bidders

5. General Conditions

6. Supplementary General Conditions

7. Specifications

8. Drawings

9. Addenda

Bid Documents, including Drawings and Specifications, are available for download from the School District’s RFP/Bid Portal at https://u-46.bonfirehub.com/portal/?tab=login starting on Monday, October 27, 2025 at 8:00 AM. Registration is required to access the specifications; however, registration is easy and free!

If needed, registration instructions are available at https://vendorsupport.gobonfire.com/hc/en-us/articles/15646869029783-Vendor-Registration

Prime Contractor shall review all existing drawings for the building, especially electrical, structural, mechanical, architectural and fire alarm system drawings. These are on file at the Owner's office.

5. CONTRACTOR REQUIREMENTS

All interested Bidders shall meet the following requirements in order to bid this project:

A. Be a licensed Contractor in the State of Illinois and shall have five (5) years’ experience minimum in school building contracts.

B. As the Contractor, they shall provide evidence that they have a minimum bonding capacity of

$20,000,000. The Bonding Company must be licensed in the State of Illinois.

C. As the Contractor, they shall provide a letter from the specified manufacturer(s) with their Bid Form, stating that they can obtain the specified guarantees.

D. As the Contractor, they shall have their own place of business, equipment, staff, and manpower, etc., required for the type of work that they are licensed to perform. The business address, equipment storage as well as the staff and manpower should be located within a 100-mile radius of the project site location.

E. As the Contractor, they shall have successfully completed five (5) projects of the same size (or larger), scope, cost and guarantees in the last five (5) years. These projects shall be listed in the bid form for the system specified on this project. The foreman and manpower for this project should also have worked on five (5) projects of the same size (or larger) and scope in the last five (5) years, as represented on the Bid Form.

F. As the Contractor, they shall be able to meet the necessary insurance limits required by the Contract

Documents (see Supplementary General Conditions for insurance limits). The insurance company shall be acceptable to Owner.

G. As the Contractor, they shall provide financial information at the Owner’s request, including, but not limited to, financial statements for the three (3) previous years. The financial statements shall have been prepared and certified by a C.P.A.

H. As the Prime Contractor, they shall submit to the Owner for review a list of all subcontractors that are not listed on the Bid Form, within ten (10) days after being notified that their bid has been accepted.

http://u-46.bonfirehub.com/portal/?tab=login

ARCON 24125 A2-5 INSTRUCTIONS TO BIDDERS

I. As the Prime Contractor, they shall be pre-qualified with the Architect prior to the scheduled Pre-Bid

Meeting. Pre-Qualifications shall be presented on the Architect’s form “Pre-Qualification Form for Prime Contractors” and / or AIA Document A305-1986 (or current version thereof). Pre-Qualification must be current as of January 1 of the current year.

J. As the Contractor, they MUST attend the MANDATORY Pre-bid Meeting.

L. As the Prime Contractor, represents and warrants that they are not currently and within the past five

(5) years, have not been suspended, debarred, excluded, or otherwise limited as a contractor, construction manager or participant in any state, federal or Illinois Purchasing Act governed construction contract, grant or reimbursement program. In the event Prime Contractor is or has been suspended, debarred, excluded, or otherwise.

M. All Contracts for the construction of Public Works are subject to the Illinois Prevailing Wage Act (820

ILCS 130/1-12).

6. PROPOSAL (BID) INSTRUCTIONS

6.1 GENERAL

A Bid for this project, as listed below, shall be uploaded to the School District U46 bid portal bearing the name of the of the bidder, and the following inscription:

STADIUM IMPROVEMENTS

AT

LARKIN HIGH SCHOOL

SCHOOL DISTRICT U46

ARCON PROJECT NO. 24125

S.D. U46 PROJECT NO. 275-25

All bids will be firm for a period of ninety (90) days from the date of the Bid Opening.

Bids shall be opened at the time noted in the Advertisement for Bids. No bids will be accepted after this time.

All overtime or extra costs for working within the specified time limitations must be included in the proposal. The Owner will not pay for any premiums on wages.

Prices quoted shall include all charges for packing, transportation, and delivery to the school building.

The signing of these Bid Forms shall be construed as acceptance of all provisions contained herein.

All proposals shall be submitted with each space properly completed. The special attention of bidders is directed to the policy that no claim for relief because of errors or omissions in the bidding will be considered, and bidders will be held strictly to the proposals as submitted. Should a bidder find any discrepancies in, or omissions from, any of the documents, or be in doubt as to their meanings, he shall advise the Architect, who will issue the necessary clarifications to all prospective bidders by means of Addenda.

6.2 QUESTIONS & ANSWERS

No oral interpretations will be made to any Bidder as to the meaning of the Specifications or the Drawings. Every request for an interpretation shall be made through Bonfire “Opportunity Q&A”.

ARCON 24125 A2-6 INSTRUCTIONS TO BIDDERS

Deadline to submit questions in Bonfire will be Friday, November 7, 2025, at 1:00PM. All questions will be responded to by Wednesday, November 12, 2025, at 1:00PM and posted in the form of a “Public Notice”. No questions will be responded thru district email or by phone call.

Addenda will be issued via Bonfire. Prime Contractor will be required to sign and submit all Addenda as part of the Bid Package.

6.3 PERMITS AND FEES

All permits, licenses, tap-on fees, tie-in fees, and any other fees and permits shall be coordinated and obtained by the Prime Contractor and paid by the Owner.

6.4 EXCEPTIONS

Any deviation, clarification or exception to these bid documents could be cause for rejection of your bid.

Under the State Bidding Laws, exceptions to the bid could be cause for disqualification of the bidder.

6.5 PROPOSALS

Bids are invited from qualified Prime Contractors for the complete construction of this Project under one General Contract, including all trades as specified in the Project Manual.

Bids will be due on Tuesday, November 18, 2025, 3:30PM local time via the School District’s RFP/Bid Portal (as explained in the Advertisement for Bids). Prime Contractors will upload all required bid forms and documentation individually to the bidding portal. Refer to Form of Bid for all required bid documentation.

A Public Bid Opening will be conducted via a Zoom meeting on the bid’s established bid opening date and time. At that time, the bids will be unsealed and all bid totals will be read aloud and will be able to be visually viewed on the screen. Zoom credentials (sign-in) for attendance at this meeting, along with bid opening date and time, will be posted on the District’s Bid Portal (Bonfire) under “Public Files.” Invites will NOT be provided; therefore, it is the Bidders’ responsibility to obtain these Zoom credentials directly from the Portal prior to the Bid Opening.

6.6 BID GUARANTEE

Bid Guarantee via Bid Bond/Cashier’s Check shall be submitted with the understanding that it shall guarantee that:

1. The Bidder will not withdraw his Bid within 90 days after the date of the opening of Bids.

2. That the successful Bidder will enter into a formal Contract with the Owner and give such bonds as are required by the GENERAL CONDITIONS.

3. In the event the Bid is withdrawn within the 90-day period after the date of the Bid opening, the Bidder shall be liable to the Owner for the full amount of the Bid Bond, and the Owners shall have the right to retain the proceeds of said Bid Bond to apply on the account of damages and excess costs which they may incur because of such withdrawal.

4. In case the Bid Guarantee is in the form of a Certified Check or Bank Draft, the Owner may make such disposition of same as will accomplish the purpose for which submitted. Certified checks or Bank Drafts of all but the three lowest Bidders will be returned as soon as practicable after the opening of the Bids.

6.7 BID SECURITY

All Bids must be accompanied by a Bid Security as noted in the Advertisement for Bids as follows:

ARCON 24125 A2-7 INSTRUCTIONS TO BIDDERS

Receipt of a Bid Bond of ten percent (10%) of the amount of the base bid(s), (including all alternates and allowances) or a Cashier’s Check, made payable to School District U-46, is required prior to the time of the virtual bid opening. Prime Contractor shall send the original Bid Bond or

Cashier’s Check “MADE PAYABLE TO School District U-46” – to the Plant Operations

Office (School District U-46 Procurement Office, 1474 Sheldon Dr. Elgin, Illinois 60120 Attn:

Danise Smith) via Certified mail, UPS, or FedEx to ensure confirmed delivery prior to the Bid

Opening. If Prime Contractor has an electronic certification process, then they will be able to upload the Bid Bond into the bidding portal. Bids will not be accepted without a Bid Bond /

Cashier’s Check at Bid Opening. These can be dropped off Monday through Friday 7 AM to 4 PM

The bidder agrees that the proceeds of the Bid Security will become the property of the Owner if for any reason the bidder withdraws his bid prior to the time period noted in the Bid Form. The defaulting bidder shall pay the Owner all costs which exceed the amount of his bid for procuring the performance for the work required by the bidding documents. Such costs include, but are not limited to, additional advertising and architectural and engineering services.

6.8 CONFIRMATION OF ADDENDA

It is the responsibility of each Prime Contractor to determine if any Addenda have been issued by contacting the office of the Architect 630-495-1900.

6.9 BIDDER'S RESPONSIBILITY FOR CONDITIONS OF WORK AT SITE

Each bidder shall inform himself of the conditions under which the work is to be performed, the site of the work, the obstacles which may be encountered and all other relevant matters concerning the work to be performed; also, the bidder, if awarded the contract, shall not be allowed any extra compensation by reason of any matter or thing concerning which such bidder might have fully informed himself prior to the bidding.

Existing Conditions Review

After award of the contract, the Prime Contractor shall carefully review the existing conditions in and around the areas of work at the project site and provide to the Owner a list of any and all concerns regarding existing conditions. This must be presented at the beginning of the project.

Otherwise, it will be the Prime Contractors responsibility to resolve any and all unforeseen existing conditions that may arise during the project at no cost to School District U46, as follows:

All existing mechanical equipment not scheduled to be removed/replaced is to be tested and verified operational before the start of construction. This includes but is not limited to all existing rooftop equipment and exhaust fans, etc. All existing plumbing equipment that will not be replaced is to be tested and verified operational before the start of construction. This includes but is not limited to all roof drains and plumbing vents, etc. All existing rooftop electrical devices that will not be replaced are to be tested and verified operational before the start of construction.

This includes but is not limited to exterior lighting and all existing security and intrusion detection devices. Unless deficiencies in any of these systems or equipment are noted at the beginning of the project, the Prime Contractor will be responsible to repair and make operational any of these devices or systems as directed by the owner.

7. TIME SCHEDULE

A letter of intent is anticipated to be issued by the School District on Tuesday, January 13, 2026. The Construction Schedule is as follows:

• School District U-46 will meet on Monday, January 12, 2026, Performance Period shall begin pending “board action” on this date. This will allow the shop drawings to be processed prior to

ARCON 24125 A2-8 INSTRUCTIONS TO BIDDERS

formal project approval by the school board on Monday, January 26, 2026. If for some reason, the recommended Prime Contractor is not approved at the above noted Board of Education meeting, School District U-46 will notify you immediately to stop all related work on this project.

In that case, the District will be responsible for the reasonable and customary expenses incurred during the period. Such expenses shall be limited solely to those actual expenditures incurred by the Prime Contractor in undertaking actions pursuant to the notice to proceed, and shall in no event include lost profits, restocking charges, liquidated damages, termination charges or other claimed contract damages.

• Bid Documents available to Contractors October 27, 2025

• Pre-Bid Meeting (Mandatory) November 4, 2025, 4:00PM

• Bid Opening November 18, 2025, 3:30PM

• First Board Meeting (Review) January 12, 2026

• Letter of Intent/Notice to Proceed January 13, 2026 (Contractor shall begin Shop Drawings)

• Second Board Meeting (Anticipated Award) January 26, 2026

• Start Construction: February 9, 2026

Concessions/Locker Milestones:

• Concrete Foundation Complete: March 20, 2026

• Structural Masonry Walls Complete: April 17, 2026

• Structural Steel and Deck and Roofing Complete: May 15, 2026

• Ceiling Grid and Tile Complete: July 17, 2026

• HVAC Startup: July 20, 2026

Stadium Field Milestones:

• Grandstand Foundations Start (N.I.C): April 6, 2026; 4 week duration

• Grandstands and Pressbox Start (N.I.C): May 4, 2026; 8 week duration

• Grandstands Concrete Flatwork: June 15, 2026 to June 20, 2026

• Site + Storm Utilities Complete: May 1, 2026

• Site Lighting Complete: June 1, 2026

• Final Grading: June 6, 2026

• Asphalt and Concrete Flatwork Complete: June 20, 2026

• Field and Turf Start: June 23, 2026

• Grandstands and Pressbox Substantial Completion: July 11, 2026

• Track Surfacing and Striping: July 20, 2026 to August 7, 2026

• Chainlink and Ornamental Fencing: August 14, 2026

• Site Restoration: August 14, 2026

• Removal of Construction Fencing: August 21, 2026

• Entire Project Substantial Completion: September 4, 2026 @ 5:00PM

• Final Completion (Punch list and Close outs): November 6, 2026

The schedule of construction shall be closely coordinated with individual school’s ongoing activities, sporting events, concerts, etc. The Prime Contractor will be required to coordinate site access, and actual schedule of working dates.

Prime Contractors access to the work area, parking locations, and material delivery locations as well as the timing of same shall all be as determined by the School District such that any disturbance to the educational environment is minimized.

ARCON 24125 A2-9 INSTRUCTIONS TO BIDDERS

Any and all possible overtime/second shift premiums for this work in order to accomplish completion of project in accordance with the construction schedule shall be included in the Prime Contractor’s Bid.

Prime Contractor will be required to pay the School District for custodian straight time and overtime when working beyond normal school hours, or if working on Sundays or Holidays, at the following rates. A minimum of 3 hours custodian pay shall be required for each day working beyond the hours explained above.

All Schools Weekdays after 10:00 p.m.: $71.33 per hour

High Schools Saturdays after 3:00 p.m.: $71.33 per hour

Elementary and Middle Schools Saturdays: $71.33 per hour

All Schools Sundays and Holidays: $95.11 per hour

No extension of time or additional costs will be accepted after Contract Award.

8. PROJECT VISITATION SCHEDULE

Visitation to the site may be made during the pre-bid meeting.

9. PRE-BID MEETING

There shall be a Mandatory Pre-bid Meeting on Tuesday, November 4, 2025, 4:00PM, at:

Larkin High School 1475 Larkin Avenue Elgin, Illinois 60123

The purpose of the Pre-bid Meeting is to review the project and existing conditions. This is a MANDATORY Pre-bid Meeting. All Prime Contractors who are interested in submitting a bid MUST attend this meeting. Prime Contractors will have reviewed the bid documents prior to the meeting.

10. RESERVATION OF RIGHTS BY THE DISTRICT

The Owner reserves the right to reject any or all bids, to waive irregularities, and to accept that bid which is considered to be in the best interests of the Owner. Any such decision shall be considered final. The Owner reserves the right to set aside a bid from a Prime Contractor who, in the Owner's opinion, does not exhibit past experience equal to the size and scope of this project.

The Board reserves the right to award each item to different bidders or all items to a single bidder unless otherwise noted on bid request, and to determine whether in the opinion of the Board of Education: (1) an equal or alternate is a satisfactory substitute, (2) an early delivery date is entitled to more consideration than price, (3) an earlier delivery date is to be disregarded because of the reputation of the bidder for not meeting delivery dates, (4) a bidder is determined not to be a responsible bidder and should be disregarded and (5) what exceptions or deviations from written specifications will be accepted.

11. STATUTORY REQUIREMENTS

All applicable Federal and State laws, and the rules and regulations of all authorities having jurisdiction over construction of the project, shall apply to the contract throughout, and they will be deemed to be included in the contract the same as though written therein in full. This includes all current regulations with respect to paying the prevailing wage which shall be incorporated into this project.

ARCON 24125 A2-10 INSTRUCTIONS TO BIDDERS

Purchases of building materials for incorporation into this project are exempt from the Illinois Retailer's Occupation Tax and Use Tax (Sales Tax). The bidder shall exclude such taxes from consideration in preparing his bid.

12. NOTICE OF AWARD

The contract shall be deemed as having been awarded when formal notice of award shall have been duly served upon the intended awardee by some officer or agent of the Owner authorized to give such notice.

Such notice shall be in writing.

13. POST AWARD REQUIREMENTS

Within ten (10) days after receiving the contract for signature, the Prime Contractor must furnish the Architect:

Executed Owner-Contractor Agreement (AIA Document A101) Performance Bond Payment Bond Certificate of Insurance

A statement of costs for each major item of work or supplier. This statement shall note what work shall be performed by the Prime Contractor and what shall be performed by his subcontractors.

13.1 COMMENCEMENT OF THE WORK

The Prime Contractor shall purchase and accept delivery thereon of all materials needed to complete his work. The actual work shall be started as noted in the Project Schedule. This work shall be carried on continuously to completion at the earliest possible date thereafter within the limits of the schedule.

If weather does not permit the actual construction to commence, or during construction if weather interferes with the process, the Prime Contractor shall work on every day that conditions are reasonably acceptable to do so.

13.2 COORDINATION, PROJECT SUPERVISION, AND SAFETY

The Prime Contractor is solely responsible for supervising, monitoring and maintaining a safe working environment for all workers and visitors.

Each Prime Contractor and Subcontractor must coordinate his work with all trades. He must cooperate to permit interfacing of systems.

The project must be managed and supervised by a competent individual at all times from the contracting company. He must develop a schedule conforming to time limitations noted in these specifications.

It is understood that this is a complex construction project and the Prime Contractor is responsible for providing a superintendent who will verify, both existing and new, conditions to make sure that the work described in the drawings will fit. This superintendent shall review all the drawings and become familiar with them, so that work described on one drawing will be compatible with work shown on another. He shall review shop drawings and verify dimensions so that all new work will be compatible with the conditions, dimensions, and elevations.

The Prime Contractor shall provide all required investigators, survey, or inspections before demolition of any systems or sections of the building required by any regulatory agency.

13.3 PROGRESS PAYMENTS

ARCON 24125 A2-11 INSTRUCTIONS TO BIDDERS

Based upon Applications for Payment submitted to the Architect by the Prime Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Prime Contractor as provided in the contract documents as follows:

Provided an Application for Payment is received by the Architect not later than the last day of a month, the Owner shall make payment to the Prime Contractor not later than sixty days after receiving the Application for Payment. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than ninety days after the Architect receives the Application for Payment.

Ninety percent (90%) of the portion of the Contract Sum properly allocable to labor, materials, and equipment incorporated in the work and seventy-five (75%) of the portion of the Contract Sum properly allocable to materials and equipment properly stored at the site or at some other location agreed upon in writing for the period covered by the Application for Payment, less the aggregate of previous payments made by the Owner; less such amounts as the Architect shall determine for all incomplete work and unsettled claims as provided in the contract documents. All waivers from subcontractors shall accompany the payment request. Final waivers from the Prime Contractor, his subcontractors, and his suppliers must be submitted with the Final Payment Request. Final waivers must include and acknowledge on the form the total contracted amount (including change orders). The Owner, at his option, may exclude the payment of materials not stored on the construction site.

Payment request shall be submitted on AIA…