2-IFB Drawings 2027 Area E Final Cover.pdf

PDF 10 MB Posted

Attached to
CCSWA Area E Stage 2 Capping Project
Solicitation number
US.262488
Issued by
Pennsylvania

About this file

CCSWA Area E Stage 2 Capping Project - Construction Drawings Summary

This document comprises construction drawings for the Area E Stage 2 Final Cover System at Lanchester Landfill, located in Salisbury and Caernarvon Townships across Lancaster and Chester Counties, Pennsylvania. The project is sponsored by Chester County Solid Waste Authority. The drawings set, prepared in November 2026, includes 15 sheets detailing the geosynthetic final cover system installation and associated infrastructure. The scope of work encompasses site preparation, erosion and sediment control, earthwork, geosynthetic final cover system installation, piping installation, exposure and preparation of existing tie-ins, stormwater management system installation, construction layout surveying, and construction as-built surveying. The drawing index identifies specifications for overall and detailed existing conditions plans, proposed grading plans for intermediate and final cover stages, geomembrane penetration plans, stormwater management system plans, final cover system details across five sheets, and erosion and sedimentation control plans with accompanying details.

The construction drawings were prepared by Civil & Environmental Consultants, Inc., located in Langhorne, Pennsylvania. The drawings include multiple plans at scales of 1" = 300' and 1" = 50', along with detail sheets at not-to-scale specifications. Key design elements depicted include temporary and final cover anchor trenches, closureturf final cover systems, landfill gas header crossings, force main and airline isolation valve penetration boots, rip rap terrace cross-sections, and comprehensive erosion and sediment control measures including compost filter sock details, silt fence installations, erosion control blanket specifications, and filter bag systems. The drawings establish design criteria for grading, soil stabilization, geomembrane installations, and stormwater management infrastructure necessary for the final closure of Area E.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH

REFERENCE

SITE

2027 AREA E FINAL COVER SYSTEM

LANCHESTER LANDFILL

SALISBURY AND CAERNARVON TOWNSHIPS

LANCASTER COUNTY AND

CHESTER COUNTY, PENNSYLVANIA

CONSTRUCTION DRAWINGS FOR

NOVEMBER 2026

PREPARED BY:

PREPARED FOR:

CHESTER COUNTY SOLID

WASTE AUTHORITY

7224 DIVISION HIGHWAY NARVON,

PENNSYLVANIA 17555

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

TI

TT

LE

S

H E

E T

A S

S H

O W

N

C S

D

C000

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e P A

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

DRAWING INDEX

SHEET

NUMBER

DRAWING

NUMBER SHEET TITLE

1 C000 TITLE SHEET

2 C100 OVERALL EXISTING CONDITIONS PLAN

3 C101 EXISTING CONDITIONS PLAN

4 C300 PROPOSED TOP OF INTERMEDIATE COVER GRADING PLAN

5 C301 PROPOSED TOP OF FINAL COVER GRADING PLAN

6 C302 PROPOSED GEOMEMBRANE PENETRATIONS PLAN

7 C303 PROPOSED STORMWATER MANAGEMENT SYSTEM PLAN

8 C800 FINAL COVER DETAILS (SHEET 1 OF 5)

9 C801 FINAL COVER DETAILS (SHEET 2 OF 5)

10 C802 FINAL COVER DETAILS (SHEET 3 OF 5)

11 C803 FINAL COVER DETAILS (SHEET 4 OF 5)

12 C804 FINAL COVER DETAILS (SHEET 5 OF 5)

13 C900 EROSION AND SEDIMENTATION CONTROL PLAN

14 C901 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 1 OF 2)

15 C902 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 2 OF 2)

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

LEGEND

NORTH

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

O V

E R

A

LL

E X

IS

TI

N G

C O

N D

IT

IO

N S

P

LA

N

1"

0'

C S

D

C100

NOTES

6'' G6'' G6'' G

6'' G

6'' G

6'' G

6'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G 18'' G

18'' G 18'' G

18'' G

12'' G

12'' G

12'' G

8'' G

8'' G 8'' G

8'' G

8'' G

6'' G

6'' G

6'' G 6'' G 6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

8'' G

6' ' G

6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

6'' G

8'' G

12'' G

18'' G

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

NORTH

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

E X

IS

TI

N G

C O

N D

IT

IO

N S

P

LA

N

1"

C S

D

C101

LEGEND

NOTES

6'' G

6'' G

6'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G 18'' G

18'' G 18'' G

18'' G

12'' G

12'' G

12'' G

8'' G

8'' G 8'' G

8'' G

8'' G

6'' G

6'' G

6'' G 6'' G 6'' G 6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

8'' G

6'' G

6'' G

6'' G

6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

6'' G

6' ' G

6' ' G

6'' G

6'' G

6'' G

'' G

24'' G 24'' G

24'' G

12'' G

12'' G

12'' G

24'' G

6' ' G

AREA E IDS FINAL COVER SYSTEM

N.T.S.

6'' G

8'' G

12'' G

18'' G

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

NORTH

LEGEND

NOTES:

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

P R

O P

O S

E D

T O

P O

F

IN

TE

R

M E

D

IA

TE

C O

V E

R G

R A

D

IN

G P

LA

N

1"

C S

D

C300

CONCRETE CANVAS REMOVAL NOTES:

6'' G

6'' G

6'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G 18'' G

18'' G 18'' G

18'' G

12'' G

12'' G

12'' G

8'' G

8'' G 8'' G

8'' G

8'' G

6'' G

6'' G

6'' G 6'' G 6'' G 6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

8'' G

6'' G

6'' G

6'' G

6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

6'' G

6' ' G

6' ' G

6'' G

6'' G

6'' G

'' G

24'' G 24'' G

24'' G

12'' G

12'' G

12'' G

24'' G

6' ' G

AREA E IDS FINAL COVER SYSTEM

N.T.S.

6'' G

8'' G

12'' G

18'' G

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

NORTH

NOTES:

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

P R

O P

O S

E D

T O

P O

F

FI

N A

L C

O V

E R

G R

A D

IN

G

P

LA

N

1"

C S

D

C301

AREA E IDS FINAL COVER SYSTEM

N.T.S.

6'' G6'' G6'' G

6'' G

6'' G

6'' G

6'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G 18'' G

18'' G 18'' G

18'' G

12'' G

12'' G

12'' G

8'' G

8'' G 8'' G

8'' G

8'' G

6'' G

6'' G

6'' G 6'' G 6'' G 6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

8'' G

6'' G

6'' G

6'' G

6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

6'' G

6' ' G

6' ' G

6'' G

6'' G

6'' G

'' G

24'' G 24'' G

24'' G

12'' G

12'' G

12'' G

24'' G

6' ' G

6'' G

8'' G

12'' G

18'' G

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

NORTH

NOTES:

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

P R

O P

O S

E D

G E

O M

E M

B R

A N

E

N E

TR

A

TI

O

N S

P

LA

N

1"

C S

D

C302

6'' G

6'' G

6'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G 18'' G

18'' G 18'' G

18'' G

12'' G

12'' G

12'' G

8'' G

8'' G 8'' G

8'' G

8'' G

6'' G

6'' G

6'' G 6'' G 6'' G 6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

8'' G

6'' G

6'' G

6'' G

6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

6'' G

6' ' G

6' ' G

6'' G

6'' G

6'' G

'' G

24'' G 24'' G

24'' G

12'' G

12'' G

12'' G

24'' G

6' ' G

AREA E IDS FINAL COVER SYSTEM

N.T.S.

6'' G

8'' G

12'' G

18'' G

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

NORTH

LEGEND

NOTES:

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

P R

O P

O S

E D

S

TO

R M

W A

TE

R

M

N

A G

E M

E N

T S

Y S

TE

M

P

LA

N

1"

C S

D

C303

AREA E TEMPORARY FINAL COVER ANCHOR TRENCH (TYP.)

AREA E IDS FINAL COVER SYSTEM CROSS SECTION

N.T.S.

AREA E FINAL COVER TIE-IN TO EXISTING CLOSURETURF

N.T.S.

TOP OF SLOPE ANCHOR TRENCH AND TIE-IN

1"=2'

CLOSURETURF FINAL COVER SYSTEM CROSS SECTION

N.T.S.

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

FI

N

A L

C O

V E

R D

E

TA

IL

S

(S H

E E

T

O F

5)

N .T

.S

R H

I

C800

FINAL COVER TIE-IN TO MSE BERM ANCHOR TRENCH

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

FI

N

A L

C O

V E

R D

E

TA

IL

S

(S H

E E

T

O F

5)

N .T

.S

R H

I

C801

CLOSURETURF FINAL COVER DOWNCHUTE

IDS FINAL COVER SYSTEM RIP RAP TERRACE CROSS SECTION

N.T.S.

A A

LFG HEADER CROSSING IN FINAL COVER AREA AT DRAINAGE TERRACE

N.T.S.

SECTION A-A

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

FI

N

A L

C O

V E

R D

E

TA

IL

S

(S H

E E

T

O F

5)

N .T

.S

R H

I

C802

CLOSURETURF TERRACE EXISTING CONDITIONS

CLOSURETURF TERRACE DETAIL

N.T.S.

CLOSURETURF TERRACE TRANSITION DETAIL

N.T.S.

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

FI

N

A L

C O

V E

R D

E

TA

IL

S

(S H

E E

T

O F

5)

N .T

.S

R H

I

C803

INSET 1: TYPICAL VERTICAL PIPE BOOT

TYPICAL FINAL COVER GEOEMBRANE VERTICAL PIPE PENETRATION BOOT DETAIL

N.T.S.

FORCE MAIN CLEANOUT DETAIL

TYPICAL FORCEMAIN CLEANOUT PENETRATION BOOT DETAIL

N.T.S.

FORCEMAIN ISOLATION VALVE DETAIL

FM

V

-E 1-

A V

-E 1-

AIRLNE ISOLATION AND BLOWOFF VALVE DETAIL

TYPICAL FORCEMAIN AND AIRLINE ISOLATION VALVE PENETRATION BOOT DETAIL

N.T.S.

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

FI

N

A L

C O

V E

R D

E

TA

IL

S

(S H

E E

T

O F

5)

N .T

.S

R H

I

C804

AREA E IDS FINAL COVER SYSTEM

6'' G6'' G6'' G

6'' G

6'' G

6'' G

6'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G

18'' G 18'' G

18'' G 18'' G

18'' G

12'' G

12'' G

12'' G

8'' G

8'' G 8'' G

8'' G

8'' G

6'' G

6'' G

6'' G 6'' G 6'' G 6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

8'' G

6'' G

6'' G

6'' G

6'' G

6'' G 6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

6'' G

8'' G

8'' G

8'' G

6'' G

6' ' G

6' ' G

6'' G

6'' G

6'' G

'' G

24'' G 24'' G

24'' G

12'' G

12'' G

12'' G

24'' G

6' ' G

6'' G

8'' G

12'' G

18'' G

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C R

W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

IL

E

NORTH

LEGEND

GENERAL NOTE:

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N

TR

O L

P

LA

N

1"

C S

D

C900

EROSION AND SEDIMENT CONTROL NOTES:

PHASED EROSION AND SEDIMENT CONTROL NOTES:

COMPOST FILTER SOCK DETAIL

ROCK FILTER DETAIL

SILTRON ADVANCED SILT FENCE

ANTI-PUSH

SPADE

TRENCH METHOD - 8 IN DEEP, 6 IN WIDE

TRENCH

-OR-

STATIC SLICING METHOD - SLIT CUT 8 IN

DEEP

BACKFILLED AND COMPACTED

(TRENCHED OR STATIC SLICED)

2 IN SPACE ON STAKE ABOVE TEXTILE

FABRIC WITH 16 GAUGE STAPLES EVERY 6 IN

1 12 X 1 12 WOOD STAKES WITH ANTI-PUSH SPADES

-OR- T- OR U-POSTS WITH ZIP-TIES

5' STAKE INTERVALS

SLOPE

WOOD STAKE WITH

ANTI-PUSH SPADE

BURY LINE

TRENCH BOTTOM

STAKE

STAPLES

JOINING FENCE SECTIONS

E&S CONTROL MAINTENANCE NOTES

SEEDING SPECIFICATIONS

EROSION CONTROL BLANKET INSTALLATION DETAIL

SOIL STOCKPILE E&S DETAIL

D

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

E R

O S

IO

N

A N

D S

E D

IM

E

N

TA

TI

O

N C

O N

TR

O

L D

E

TA

IL

S

(S

H E

E T

O

F 2)

N .T

.S

R H

I

C901

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C

R W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

PUMPED WATER FILTER BAG DETAIL

SIDESLOPE DIVERSION BERM

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

E R

O S

IO

N

A N

D S

E D

IM

E

N

TA

TI

O

N C

O N

TR

O

L D

E

TA

S

(S

H E

E T

O

F 2)

N .T

.S

R H

I

C902

A

B

34567 12

C

D

E

F

G

H

8 34567 12

A

B

C

D

E

F

G

H

D E

S C

R

IP

TI

O

N D

A

TE

N O

R E

V

IS

IO

N

R E

C O

R D

D A

TE

D W

G S

C A

LE

D R

A W

N B

Y

C H

E C

K E

D B

Y

A P

P R

O V

E D

B Y

P R

O

JE

C T

N O

SHEET OF

DRAWING NO.:

6-

N O

V E

M B

E R

C

R W

JR

H

A R

E A

E F

IN

A

L C

O V

E R

S Y

S

TE

M C

O N

S

TR

U C

TI

O

N D

R A

W

IN

G S

C H

ES

TE

R C

O U

N

TY

S O

LI

D

W A

S

TE

A U

TH

O

R

IT

Y

LA

N C

H

ES

TE

R

L A

N D

FI

LL

C iv il

E n vi ro n m e n ta l C o n su lt an ts In c.

w w w

.c e ci n c.

co m

E as t

M ap le A ve n u e

P h .5

.2

Su it e

L an gh o rn e

*H A

N D

S

IG

N A

TU

R

E O

N F

File details come from the government source that posted it. Updated .