2-IFB Drawings 2027 Area E Final Cover.pdf
PDF 10 MB Posted
- Attached to
- CCSWA Area E Stage 2 Capping Project
- Solicitation number
- US.262488
- Issued by
- Pennsylvania
About this file
CCSWA Area E Stage 2 Capping Project - Construction Drawings Summary
This document comprises construction drawings for the Area E Stage 2 Final Cover System at Lanchester Landfill, located in Salisbury and Caernarvon Townships across Lancaster and Chester Counties, Pennsylvania. The project is sponsored by Chester County Solid Waste Authority. The drawings set, prepared in November 2026, includes 15 sheets detailing the geosynthetic final cover system installation and associated infrastructure. The scope of work encompasses site preparation, erosion and sediment control, earthwork, geosynthetic final cover system installation, piping installation, exposure and preparation of existing tie-ins, stormwater management system installation, construction layout surveying, and construction as-built surveying. The drawing index identifies specifications for overall and detailed existing conditions plans, proposed grading plans for intermediate and final cover stages, geomembrane penetration plans, stormwater management system plans, final cover system details across five sheets, and erosion and sedimentation control plans with accompanying details.
The construction drawings were prepared by Civil & Environmental Consultants, Inc., located in Langhorne, Pennsylvania. The drawings include multiple plans at scales of 1" = 300' and 1" = 50', along with detail sheets at not-to-scale specifications. Key design elements depicted include temporary and final cover anchor trenches, closureturf final cover systems, landfill gas header crossings, force main and airline isolation valve penetration boots, rip rap terrace cross-sections, and comprehensive erosion and sediment control measures including compost filter sock details, silt fence installations, erosion control blanket specifications, and filter bag systems. The drawings establish design criteria for grading, soil stabilization, geomembrane installations, and stormwater management infrastructure necessary for the final closure of Area E.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-2027 Area E Final Cover Bid Document Compiled.pdf | ||
| 1-Invitation for Bid 2027 Area E Final Cover.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
REFERENCE
SITE
2027 AREA E FINAL COVER SYSTEM
LANCHESTER LANDFILL
SALISBURY AND CAERNARVON TOWNSHIPS
LANCASTER COUNTY AND
CHESTER COUNTY, PENNSYLVANIA
CONSTRUCTION DRAWINGS FOR
NOVEMBER 2026
PREPARED BY:
PREPARED FOR:
CHESTER COUNTY SOLID
WASTE AUTHORITY
7224 DIVISION HIGHWAY NARVON,
PENNSYLVANIA 17555
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
TI
TT
LE
S
H E
E T
A S
S H
O W
N
C S
D
C000
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e P A
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
DRAWING INDEX
SHEET
NUMBER
DRAWING
NUMBER SHEET TITLE
1 C000 TITLE SHEET
2 C100 OVERALL EXISTING CONDITIONS PLAN
3 C101 EXISTING CONDITIONS PLAN
4 C300 PROPOSED TOP OF INTERMEDIATE COVER GRADING PLAN
5 C301 PROPOSED TOP OF FINAL COVER GRADING PLAN
6 C302 PROPOSED GEOMEMBRANE PENETRATIONS PLAN
7 C303 PROPOSED STORMWATER MANAGEMENT SYSTEM PLAN
8 C800 FINAL COVER DETAILS (SHEET 1 OF 5)
9 C801 FINAL COVER DETAILS (SHEET 2 OF 5)
10 C802 FINAL COVER DETAILS (SHEET 3 OF 5)
11 C803 FINAL COVER DETAILS (SHEET 4 OF 5)
12 C804 FINAL COVER DETAILS (SHEET 5 OF 5)
13 C900 EROSION AND SEDIMENTATION CONTROL PLAN
14 C901 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 1 OF 2)
15 C902 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 2 OF 2)
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
LEGEND
NORTH
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
O V
E R
A
LL
E X
IS
TI
N G
C O
N D
IT
IO
N S
P
LA
N
1"
0'
C S
D
C100
NOTES
6'' G6'' G6'' G
6'' G
6'' G
6'' G
6'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G 18'' G
18'' G 18'' G
18'' G
12'' G
12'' G
12'' G
8'' G
8'' G 8'' G
8'' G
8'' G
6'' G
6'' G
6'' G 6'' G 6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
8'' G
6' ' G
6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
6'' G
8'' G
12'' G
18'' G
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
NORTH
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
E X
IS
TI
N G
C O
N D
IT
IO
N S
P
LA
N
1"
C S
D
C101
LEGEND
NOTES
6'' G
6'' G
6'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G 18'' G
18'' G 18'' G
18'' G
12'' G
12'' G
12'' G
8'' G
8'' G 8'' G
8'' G
8'' G
6'' G
6'' G
6'' G 6'' G 6'' G 6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
8'' G
6'' G
6'' G
6'' G
6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
6'' G
6' ' G
6' ' G
6'' G
6'' G
6'' G
'' G
24'' G 24'' G
24'' G
12'' G
12'' G
12'' G
24'' G
6' ' G
AREA E IDS FINAL COVER SYSTEM
N.T.S.
6'' G
8'' G
12'' G
18'' G
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
NORTH
LEGEND
NOTES:
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
P R
O P
O S
E D
T O
P O
F
IN
TE
R
M E
D
IA
TE
C O
V E
R G
R A
D
IN
G P
LA
N
1"
C S
D
C300
CONCRETE CANVAS REMOVAL NOTES:
6'' G
6'' G
6'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G 18'' G
18'' G 18'' G
18'' G
12'' G
12'' G
12'' G
8'' G
8'' G 8'' G
8'' G
8'' G
6'' G
6'' G
6'' G 6'' G 6'' G 6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
8'' G
6'' G
6'' G
6'' G
6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
6'' G
6' ' G
6' ' G
6'' G
6'' G
6'' G
'' G
24'' G 24'' G
24'' G
12'' G
12'' G
12'' G
24'' G
6' ' G
AREA E IDS FINAL COVER SYSTEM
N.T.S.
6'' G
8'' G
12'' G
18'' G
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
NORTH
NOTES:
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
P R
O P
O S
E D
T O
P O
F
FI
N A
L C
O V
E R
G R
A D
IN
G
P
LA
N
1"
C S
D
C301
AREA E IDS FINAL COVER SYSTEM
N.T.S.
6'' G6'' G6'' G
6'' G
6'' G
6'' G
6'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G 18'' G
18'' G 18'' G
18'' G
12'' G
12'' G
12'' G
8'' G
8'' G 8'' G
8'' G
8'' G
6'' G
6'' G
6'' G 6'' G 6'' G 6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
8'' G
6'' G
6'' G
6'' G
6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
6'' G
6' ' G
6' ' G
6'' G
6'' G
6'' G
'' G
24'' G 24'' G
24'' G
12'' G
12'' G
12'' G
24'' G
6' ' G
6'' G
8'' G
12'' G
18'' G
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
NORTH
NOTES:
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
P R
O P
O S
E D
G E
O M
E M
B R
A N
E
N E
TR
A
TI
O
N S
P
LA
N
1"
C S
D
C302
6'' G
6'' G
6'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G 18'' G
18'' G 18'' G
18'' G
12'' G
12'' G
12'' G
8'' G
8'' G 8'' G
8'' G
8'' G
6'' G
6'' G
6'' G 6'' G 6'' G 6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
8'' G
6'' G
6'' G
6'' G
6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
6'' G
6' ' G
6' ' G
6'' G
6'' G
6'' G
'' G
24'' G 24'' G
24'' G
12'' G
12'' G
12'' G
24'' G
6' ' G
AREA E IDS FINAL COVER SYSTEM
N.T.S.
6'' G
8'' G
12'' G
18'' G
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
NORTH
LEGEND
NOTES:
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
P R
O P
O S
E D
S
TO
R M
W A
TE
R
M
N
A G
E M
E N
T S
Y S
TE
M
P
LA
N
1"
C S
D
C303
AREA E TEMPORARY FINAL COVER ANCHOR TRENCH (TYP.)
AREA E IDS FINAL COVER SYSTEM CROSS SECTION
N.T.S.
AREA E FINAL COVER TIE-IN TO EXISTING CLOSURETURF
N.T.S.
TOP OF SLOPE ANCHOR TRENCH AND TIE-IN
1"=2'
CLOSURETURF FINAL COVER SYSTEM CROSS SECTION
N.T.S.
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
FI
N
A L
C O
V E
R D
E
TA
IL
S
(S H
E E
T
O F
5)
N .T
.S
R H
I
C800
FINAL COVER TIE-IN TO MSE BERM ANCHOR TRENCH
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
FI
N
A L
C O
V E
R D
E
TA
IL
S
(S H
E E
T
O F
5)
N .T
.S
R H
I
C801
CLOSURETURF FINAL COVER DOWNCHUTE
IDS FINAL COVER SYSTEM RIP RAP TERRACE CROSS SECTION
N.T.S.
A A
LFG HEADER CROSSING IN FINAL COVER AREA AT DRAINAGE TERRACE
N.T.S.
SECTION A-A
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
FI
N
A L
C O
V E
R D
E
TA
IL
S
(S H
E E
T
O F
5)
N .T
.S
R H
I
C802
CLOSURETURF TERRACE EXISTING CONDITIONS
CLOSURETURF TERRACE DETAIL
N.T.S.
CLOSURETURF TERRACE TRANSITION DETAIL
N.T.S.
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
FI
N
A L
C O
V E
R D
E
TA
IL
S
(S H
E E
T
O F
5)
N .T
.S
R H
I
C803
INSET 1: TYPICAL VERTICAL PIPE BOOT
TYPICAL FINAL COVER GEOEMBRANE VERTICAL PIPE PENETRATION BOOT DETAIL
N.T.S.
FORCE MAIN CLEANOUT DETAIL
TYPICAL FORCEMAIN CLEANOUT PENETRATION BOOT DETAIL
N.T.S.
FORCEMAIN ISOLATION VALVE DETAIL
FM
V
-E 1-
A V
-E 1-
AIRLNE ISOLATION AND BLOWOFF VALVE DETAIL
TYPICAL FORCEMAIN AND AIRLINE ISOLATION VALVE PENETRATION BOOT DETAIL
N.T.S.
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
FI
N
A L
C O
V E
R D
E
TA
IL
S
(S H
E E
T
O F
5)
N .T
.S
R H
I
C804
AREA E IDS FINAL COVER SYSTEM
6'' G6'' G6'' G
6'' G
6'' G
6'' G
6'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G
18'' G 18'' G
18'' G 18'' G
18'' G
12'' G
12'' G
12'' G
8'' G
8'' G 8'' G
8'' G
8'' G
6'' G
6'' G
6'' G 6'' G 6'' G 6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
8'' G
6'' G
6'' G
6'' G
6'' G
6'' G 6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
6'' G
8'' G
8'' G
8'' G
6'' G
6' ' G
6' ' G
6'' G
6'' G
6'' G
'' G
24'' G 24'' G
24'' G
12'' G
12'' G
12'' G
24'' G
6' ' G
6'' G
8'' G
12'' G
18'' G
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C R
W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
IL
E
NORTH
LEGEND
GENERAL NOTE:
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
E R
O S
IO
N
A N
D S
E D
IM
E
N T
C O
N
TR
O L
P
LA
N
1"
C S
D
C900
EROSION AND SEDIMENT CONTROL NOTES:
PHASED EROSION AND SEDIMENT CONTROL NOTES:
COMPOST FILTER SOCK DETAIL
ROCK FILTER DETAIL
SILTRON ADVANCED SILT FENCE
ANTI-PUSH
SPADE
TRENCH METHOD - 8 IN DEEP, 6 IN WIDE
TRENCH
-OR-
STATIC SLICING METHOD - SLIT CUT 8 IN
DEEP
BACKFILLED AND COMPACTED
(TRENCHED OR STATIC SLICED)
2 IN SPACE ON STAKE ABOVE TEXTILE
FABRIC WITH 16 GAUGE STAPLES EVERY 6 IN
1 12 X 1 12 WOOD STAKES WITH ANTI-PUSH SPADES
-OR- T- OR U-POSTS WITH ZIP-TIES
5' STAKE INTERVALS
SLOPE
WOOD STAKE WITH
ANTI-PUSH SPADE
BURY LINE
TRENCH BOTTOM
STAKE
STAPLES
JOINING FENCE SECTIONS
E&S CONTROL MAINTENANCE NOTES
SEEDING SPECIFICATIONS
EROSION CONTROL BLANKET INSTALLATION DETAIL
SOIL STOCKPILE E&S DETAIL
D
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
E R
O S
IO
N
A N
D S
E D
IM
E
N
TA
TI
O
N C
O N
TR
O
L D
E
TA
IL
S
(S
H E
E T
O
F 2)
N .T
.S
R H
I
C901
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C
R W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
PUMPED WATER FILTER BAG DETAIL
SIDESLOPE DIVERSION BERM
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
E R
O S
IO
N
A N
D S
E D
IM
E
N
TA
TI
O
N C
O N
TR
O
L D
E
TA
S
(S
H E
E T
O
F 2)
N .T
.S
R H
I
C902
A
B
34567 12
C
D
E
F
G
H
8 34567 12
A
B
C
D
E
F
G
H
D E
S C
R
IP
TI
O
N D
A
TE
N O
R E
V
IS
IO
N
R E
C O
R D
D A
TE
D W
G S
C A
LE
D R
A W
N B
Y
C H
E C
K E
D B
Y
A P
P R
O V
E D
B Y
P R
O
JE
C T
N O
SHEET OF
DRAWING NO.:
6-
N O
V E
M B
E R
C
R W
JR
H
A R
E A
E F
IN
A
L C
O V
E R
S Y
S
TE
M C
O N
S
TR
U C
TI
O
N D
R A
W
IN
G S
C H
ES
TE
R C
O U
N
TY
S O
LI
D
W A
S
TE
A U
TH
O
R
IT
Y
LA
N C
H
ES
TE
R
L A
N D
FI
LL
C iv il
E n vi ro n m e n ta l C o n su lt an ts In c.
w w w
.c e ci n c.
co m
E as t
M ap le A ve n u e
P h .5
.2
Su it e
L an gh o rn e
*H A
N D
S
IG
N A
TU
R
E O
N F
File details come from the government source that posted it. Updated .