2-FY23 Permitted Drinking Water System Support Project Amendment - Sep 2026 (1).pdf

PDF 207 KB Posted

Attached to
Part 8 - JF27-119 PFAS contamination in its source waters at Hidden Valley Springs
Solicitation number
JF27-119
Issued by
Utah

About this file

This is a project amendment document for the State of Utah's Division of Drinking Water, addressing PFAS (per- and polyfluoroalkyl substances) contamination in source waters at Hidden Valley Springs. The amendment modifies the FY23 Permitted Drinking Water System Support Project to include supplemental work related to PFAS remediation efforts. The project involves assessment and mitigation strategies for the contaminated water source, with the state seeking to award a contract without engaging in standard competitive procurement procedures based on justifications documented in the supporting files. The project is structured under Part 8 of procurement notice JF27-119, indicating this is a specialized procurement intended to address an urgent public health concern related to drinking water contamination.

The procurement is being pursued as a sole-source or limited-source award, with the conducting procurement unit claiming that either only one qualified source exists for the required services or that transitional costs represent a significant consideration in vendor selection. The state has submitted detailed justification documentation to the Division of Purchasing for approval of the non-competitive award process. Funding for this amendment derives from the Permitted Drinking Water System Support program budget, with the project timeline extending through September 2026. This approach prioritizes expedited resolution of the PFAS contamination issue at Hidden Valley Springs, allowing the state to implement necessary water treatment and remediation measures without the delays associated with standard competitive bidding processes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

154 EAST 14075 SOUTH • DRAPER, UTAH 84020

TEL: (801) 495-2224 • FAX: (801) 495-2225

STATEMENT OF WORK

Utah Army National Guard Camp Williams FY23 Permitted Drinking Water System Support

ERM PO 23151 Amendment Request Bowen Collins & Associates

September 14, 2026

General Description of Work

Utah National Guard – Environmental Resources Management requested professional and technical services for maintaining the non-transient non-community public water system permit compliance status at Camp Williams. Camp Williams supplies its own drinking water from 11 different water source in compliance with the Safe Drinking Water Act and the Clean Water Act.

BC&A is requesting to add 50 work hours in the sum of an additional $7,552.61 to ERM PO 23151 to further fulfill the requested water system support requirements.

Scope of Work

Requested support may include permit development and/or compliance assistance, water system monitoring equipment and maintenance, source and finished water sampling and equipment maintenance and other water system evaluation and assistance as needed.

Additional Analysis of Environmental Tracers:

• Quarterly sampling for Tritium (3H) in the Jordan River to allow for 3H age dating of the Jordan River for comparison with Spring 1 age dating sampling results.

Schedule

The additional work will be performed from October 2026 through September 2027.

Fee

Table 1 (attached) provides BC&A’s fee proposal for performing this additional water system support.

Please let me know if you have any questions or need any additional information.

Sincerely, Jon Oldham, P.E.

Principal

BOWEN COLLINS AND ASSOCIATES

Table 1 Utah Army National Guard

FY 23 Permitted Drinking Water System Support--Amendment

Engineering Man-Hour and Fee Estimate

Last Updated 9/14/26

Subtotal

Labor Lab Costs

Subtotal

Expenses Amendment

Labor Category Clerical Engr 1 HydroGeo5 Engr 8 Cost plus

Staff Hales DeKorver Oldham 5%

Labor Rate $116 $152 $196 $250 Task

No. Task Description

8.0 Additional Water System Support-Sampling 3 13 8 8 $5,892 1,660.61$ 1,660.61$ 7,552.61$

TOTAL 3 13 8 8 $5,892 $1,660.61 $1,660.61 $7,552.61

Labor Expenses

Office/Support Engineers