2-For Bidding Drawings 2008-050 Skutumpah Road 2511-034 Johnson Canyon Road.pdf
PDF 37 MB Posted
- Solicitation number
- NS26-122
- Issued by
- Kane County, Utah
About this file
Summary
This document comprises bidding drawings for Kane County's Skutumpah Road Improvements (Project #2008-050) and Johnson Canyon Road Reconstruction (Project #2511-034) in Utah. The Skutumpah Road project extends from Station 10+10.29 to Station 136+90.00, spanning approximately 12.7 miles, while the Johnson Canyon Road project runs from Station 10+00.00 to Station 380+68.00, covering approximately 3.8 miles. The work includes roadway excavation, cement-treated base course installation, hot mix asphalt (HMA) surfacing at 3/8-inch thickness, drainage infrastructure including multiple corrugated metal pipe culverts ranging from 18 to 60 inches in diameter, gravel driveways, pavement markings, sign installation and removal, and mailbox relocation. Key quantities include 1,710 cubic yards of roadway excavation, 23,256 square yards of cement-treated base course, 6,200 tons of HMA for Skutumpah Road, 11,400 tons of HMA for Johnson Canyon Road, 250 feet of 18-inch HDPE pipe (owner-furnished), and 65 to 56 gallons of pavement marking paint across respective schedules. Bids are due at Kane County Offices (76 North Main Street, Kanab, Utah) on Tuesday, April 21, 2026 at 11:30 a.m. local time, with written questions due to Kaden Finlinson at kaden.f@jonesanddemille.com by Thursday, April 16, 2026 at 5:00 p.m. No pre-bid conference is scheduled, and bidding documents are available only in electronic format from Jones & DeMille Engineering, Inc.
The drawings are prepared for bidding purposes and include plan and profile sheets, typical sections, construction details, and summaries organized into multiple schedules. Schedule 2 covers Skutumpah Road and the initial portion of Johnson Canyon Road (Stations 10+00.00 to 90+50.00), while Schedule 3 addresses the remaining Johnson Canyon Road work (Stations 90+50.00 to 380+68.00). The typical section for Schedule 2 shows a 26-foot pavement width with 11-foot lanes and 2-foot shoulders, while Schedule 3 specifies a 24-foot pavement width with similar lane and shoulder configurations. Design speed is 40 miles per hour for Skutumpah Road with a maximum superelevation of 6 percent, and superelevation transitions are detailed throughout Johnson Canyon Road. Asphalt shoulder repairs are required on Johnson Canyon Road from Station 253+20.00 to Station 274+70.00, with specific lane-level and overlay asphalt specifications. The project includes utility coordination requirements through Blue Stakes of Utah (1-800-662-4111) and compliance with pavement marking standards per the Manual on Uniform Traffic Control Devices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-For Bidding Specs 2008-050 Skutumpah Road 2511-034 Johnson Canyon Road.pdf.pdf | ||
| 1-advertisement (2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KANE COUNTY
SKUTUMPAH ROAD IMPROVEMENTS
AND
JOHNSON CANYON ROAD RECONSTRUCTION
DRAWINGS
APRIL 7, 2026
FOR BIDDING ONLY
Project #: 2008-050 & 2511-034 h:
\2
8-
0\ dw g\ tit le
8-
2008-050 1
SHEET NO.PROJECT NO.
APPROVAL
RECOMMENDED FOR APPROVAL:
DATE
APPROVED:
DATE
IDAHO
C O
LO
R
AD
O
ARIZONA
N
EV
AD
A
WASHINGTON KANE
SAN JUAN
GARFIELDIRON
BEAVER PIUTE WAYNE
GRANDEMERY
SEVIER
MILLARD
SANPETE
CARBON
UINTAH
DUCHESNE
UTAH
WASATCH
SALT LAKE
JUAB
TOOELE
BOX ELDER
DAVIS
SUMMIT
MORGAN
WEBER
DAGGETT
RICH
CACHE
WYOMING
Jones & DeMille Engineering, Inc.
1.800.748.5275 www.jonesanddemille.com
GIS - ENVIRONMENTAL - MATERIALS TESTING
CIVIL & STRUCTURAL ENGINEERING - SURVEYING
- shaping the quality of life -
SUBMITTAL: FOR BIDDING ONLY
VICINITY MAP
PROJECT LOCATION
GLENDALE
SKUTUMPAH ROAD
GLENDALE BENCH ROAD
KANE COUNTY
SKUTUMPAH ROAD IMPROVEMENTS
KANE COUNTY, UTAH
GLENDALE
KANAB
CANNONVILL
E
H W
Y
JOHNSON CANYON ROAD
HIGHWAY 89
4-7-2026
Apr 07 2026
PP
-0
PP
-0
PP
-0
PP
-0
PP-05
PP-06
PP-07
PP-08
PP-09
PP-10
7+
10+00
PCL Skutumpah
BEGIN PROJECT
STA 10+10.29
N: 1062517.1104 E: 384974.9364
PCL Skutumpah
END PROJECT
STA 136+90.00
N: 1069273.8217 E: 393865.8634
4/ 6/
1A
SK
UT
UM
PA
H
RO
AD
IN
DE
X
-0
4/ 7/
H :\2
8-
0\ dw g\
Ti tle
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
FO
R
B
ID
D
IN
G O
N
LY
INDEX
INDEX TO SHEETS
SHEET NO. SHEET TITLE
1 TITLE
1A INDEX
1B LEGEND
PP-01 TO PP-10 PLAN AND PROFILE
TS-01 TYPICAL SECTIONS
SM-01 TO SM-05 SUMMARIES
DT-01 TO DT-03 DETAILS
JOHNSON CANYON ROAD
TO
G
LE
N
D
AL
E
TO
C
AN
N
O N
VI
LL
E
EN 1 TO TC 16 UDOT STANDARD DRAWINGS (22 SHEETS)
LEGEND
EDGE OF ASPHALT
EDGE OF CONCRETE
EDGE OF GRAVEL SURFACING
EDGE OF DIRT SURFACING
EDGE OF ASPHALT SURFACING
TOP BACK OF CURB
LIP OF CURB
TOP OF SIDEWALK
TOP OF CONCRETE
TOP OF GRATE
EDGE OF ASPHALT
FLOW LINE OF GUTTER
FLOW LINE OF CULVERT
SIDEWALK
FINISHED GROUND
TOP OF ASPHALT
CONCRETE SURFACING
ASPHALT SURFACING
STREET SIGN
TBC
LOC
TSW
TOC
TOG
EOA
FLG
FLC
SW
FG
TOA
SANITARY SEWER LINE
CULINARY WATER LINE
BURIED POWER LINE
FENCE LINE (BARBED OR STOCKTIGHT)
DRAINAGE CULVERT
FLOW LINE OF DITCH
BURIED TELEPHONE LINE
NATURAL GAS LINE
BURIED CABLE TV LINE
CULINARY WATER VALVE
SANITARY SEWER MANHOLE
TREE
CONCRETE SURFACING
DELINEATOR POST
PROPERTY LINE
IRRIGATION LINE
REQUESTED RIGHT OF WAY LINE
SANITARY SEWER MANHOLE
CULINARY WATER VALVE
DRAINAGE CULVERT
CULINARY WATER LINE
SANITARY SEWER LINE
SECTION LINE
PROPOSED RIGHT-OF-WAY LINE
SUBDIVISION BOUNDARY LINE
LOT LINES
QUARTER SECTION LINE
(P.U.E.) PUBLIC UTILITY EASEMENT
DEED LINE
FIRE HYDRANT
FIRE HYDRANT
STRUCTURE
DELINEATOR POST
STREET SIGN
TOP OF CUT LIMITS
TOE OF FILL LIMITS
CULINARY WATER METER
WATER METER
POWER POLE & GUY WIRE
G.W.
STORM DRAIN
SANITARY SEWER SERVICE
POWER POLE
EXISTING FEATURES PROPOSED FEATURESMISC. FEATURES
(SIDEWALK, CURB, GUTTER, ETC.)
FENCE LINE (CHAIN LINK)
M
M
TELEPHONE PEDESTAL
OVERHEAD CABLE TV LINE
OVERHEAD POWER LINE
OVERHEAD TELEPHONE LINE
BURIED POWER LINE
OVERHEAD POWER LINE
BURIED TELEPHONE LINE
OVERHEAD TELEPHONE LINE
BURIED CABLE TV LINE
OVERHEAD CABLE TV LINE
NATURAL GAS LINE
IRRIGATION LINE
STORM DRAIN
FENCE LINE (BARBED OR STOCKTIGHT)
FENCE LINE (CHAIN LINK)
FIBER OPTIC LINE
FIBER OPTIC LINE
MAILBOX
MAILBOX
ABBREVIATIONS
POWER POLE
COMMUNICATION MANHOLE
RIGHT-OF-WAY
SEWER MANHOLE
LEFT
RIGHT
EPP
CMH
R/W
SMH
L / LT
R / RT
TEMPORARY T.C.E.
PUBLIC UTILITY EASEMENTP.U.E.
CONSTRUCTION EASEMENT
STATIONSTA
EXISTING CITY BLOCK LINES
BLOCK LINE
EXISTING N/A LINE
EPP
SMH SMH
EPP
4/ 6/
1B
SK
UT
UM
PA
H
RO
AD
LE
G
EN
D
-0
4/
7/
H
:\2
8-
0\ dw g\ Ti tle
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
WMH WATER MANHOLE
LIGHT POLE
LIGHT POLE
SCO
FO
R
B
ID
D
IN
G O
N
LY
4/ 6/
SM-01
SK
UT
UM
PA
H
RO
AD
SU
M M
AR
IE
S
-0
4/
7/
H
:\2
8-
0\ dw g\ Ti tle
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
FO
R
B
ID
D
IN
G O
SM-02
SK
UT
UM
PA
H
RO
AD
SU
M M
AR
IE
S
-0
4/
7/
H
:\2
8-
0\ dw g\ Ti tle
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
FO
R
B
ID
D
IN
G O
SM-03
SK
UT
UM
PA
H
RO
AD
SU
M M
AR
IE
S
-0
4/
7/
H
:\2
8-
0\ dw g\ Ti tle
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
FO
R
B
ID
D
IN
G O
SM-04
SK
UT
UM
PA
H
RO
AD
SU
M M
AR
IE
S
-0
4/
7/
H
:\2
8-
0\ dw g\ Ti tle
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
FO
R
B
ID
D
IN
G O
SM-05
SK
UT
UM
PA
H
RO
AD
SU
M M
AR
IE
S
-0
4/
7/
H
:\2
8-
0\ dw g\ Ti tle
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
FO
R
B
ID
D
IN
G O
-4.00:1 -4.00:1 -4.00:1-4.00:1
-4.00:1
2.00:1 2.00:1
11.00' 2.00'
7.00'
CLEAR ZONE
11.00'2.00'5.00'
NOTE:
1. HOLD SHOULDER WIDTH, SLOPE VARIES
-4.00:1
-4.00:1
-4.00:1-4.00:1 -4.00:1
2.00:1 2.00:1
TYPICAL SECTION 1
5.00'
7.00'
CLEAR ZONE
STATION 10+10.29 TO STATION 136+90.00
DESIGN SPEED = 40 MPH
eMAX = 6%
←2% 2%→
ROADWAY EXCAVATION
(PLAN QUANTITY) REQ'D
EMBANKMENT
HOT MIX ASPHALT - 1/2" REQ'D
(4 INCHES THICK)UNTREATED BASE COURSE
(PLAN QUANTITY) REQ'D
(6 INCHES THICK)
33.00' 33.00'
66.00' REQUESTED RIGHT-OF-WAY
R/W R/W
4/ 6/
TS-01
SK
UT
UM
PA
H
RO
AD
TY
PI
CA
L
SE
CT
IO
NS
-0
4/
7/
H
:\2
8-
0\ dw g\ Ty pi ca ls
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
N O
N E
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
VA
R
IE
S
PIPE CULVERT (SEE PLAN
AND PROFILE SHEETS) EDGE OF ROAD
FL
O
W
NOTES:
1. SEE PLAN AND PROFILE SHEETS FOR LOCATIONS & PIPE SIZES.
2. SLOPE DRAINAGE DITCH TO DRAIN TO PIPE CULVERT INLET.
A
A
PIPE CULVERT (SEE PLAN
AND PROFILE SHEETS)
ROAD CENTERLINE
PLAN VIEW
VA
R
IE
S
EDGE OF ROAD
ROAD CENTERLINE
DITCH
DITCH
NOTES:
1. MINIMUM OUTLET DITCH SLOPE OF 0.5%
INLET BASIN
EXISTING
GROUND
FINISHED GRADE
END SECTION (TYP.)
SECTION A-A
GRADE TO DRAIN
PIPE CULVERT (SEE PLAN
AND PROFILE SHEETS)
SCALE
A1
VARIES
PIPE CULVERT INLET DETAIL
4/ 6/
DT-01
SK
UT
UM
PA
H
RO
AD
DE
TA
IL
S
-0
4/
7/
H
:\2
8-
0\ dw g\ D et ai ls
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
SU
BM
IT
TA
L:
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
TE
ST
IN
G
N U
M
BE
R
PR
O
JE
C
T
KANE
KA
NE
C O
UN
TY
VA
R
IE
S
FO
R
B
ID
D
IN
G O
N
LY
SE
E
SH
EE
T
PP
NATURAL GROUND
NATURAL GROUND
PIPE CULVERT
CULVERT END SECTION
FIBER ROLL CHECK DAM
PIPE CULVERT PLAN
TOP OF CUT
DITCH FLOWLINE
FLOW
SECTION A-A
PIPE CULVERT
CULVERT END SECTION
DITCH FLOWLINE
TOP OF CUT
FIBER ROLL CHECK DAM
SEE SECTION B-B
10' 20'
5' 10'
2 3PIPE SIZE
18" TO 54" DIA. PIPES
60" TO 72" DIA. PIPES
A
A
NOTES FOR CHECK DAM:
1. DO NOT PLACE CHECK DAMS ACROSS NATURAL STREAM BEDS.
2. CONSTRUCT CHECK DAMS SO THAT WATER DOES NOT FLOW AROUND ENDS
OF DAM.
3. REMOVE SEDIMENT AS IT ACCUMULATES AND PLACE IT IN STABLE AREA.
4. AFTER SURROUNDING AREAS HAVE BEEN SEEDED AND MULCHED. BREAK
APART FIBER ROLLS AND SPREAD THE STRAW OVER SEEDED AREAS.
B
B
12" FIBER ROLL REQ'D
SECTION B-B
KEY-IN FIBER ROLL 2 INCHES DEEPDITCH FLOW
INSTALL 2 WOOD STAKES IN "X" PATTERN 1
FOOT FROM ENDS OF ROLL AND AT MAXIMUM
SPACING OF 5 FEET ALONG LENGTH OF ROLL.
DRIVE WOOD STAKE INTO GROUND MINIMUM
OF 4 INCHES.
SCALE
A1
4/ 6/
DT-02
SK
UT
UM
PA
H
RO
AD
DE
TA
IL
S 4/
7/
H
:\2
8-
0\ dw g\ D et ai ls
8-
0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
SU
BM
IT
TA
L:
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
TE
ST
IN
G
N U
M
BE
R
PR
O
JE
C
T
KANE
KA
NE
C O
UN
TY
VA
R
IE
S
VARIES
FIBER ROLL CHECK DAM AT PIPE CULVERT DETAIL
WOOD STAKE
MINIMUM DIMENSIONS
3/4 INCHES BY 1-1/2
INCHES BY 18 INCHES
-0
FO
R
B
ID
D
IN
G O
8'
" O U
T
TO
O U
T
30' TO 32' OUT TO OUT
SEE NOTE 1
12" 12"UNTREATED
BASE COURSE
SCALE
A1
3/
/2
4/
7/
H
:\2
8-
0\ dw g\ C at tle
G ua rd .d w g
VA
R
IE
S
VARIES
OWNER FURNISHED CATTLE GUARD DETAIL
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
SU
BM
IT
TA
L:
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
TE
ST
IN
G
N U
M
BE
R
PR
O
JE
C
T
DT-03
SK
UT
UM
PA
H
RO
AD
DE
TA
IL
S
-0
KANE
KA
NE
C O
UN
TY
FO
R
B
ID
D
IN
G O
N
LY
NOTES:
1. CATTLE GUARD SHALL EXTEND AT LEAST TWO FEET PAST
SHOULDER ON EACH SIDE OF ROAD. VERIFY THAT WIDTH OF
OWNER FURNISHED CATTLE GUARD WILL BE SUFFICIENT
BEFORE INSTALLATION.
+1
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
0 23 +0
0 24 +0
PC: 10+18.36
PC: 19+03.98
PC
: 2
3+
.5
PT: 10+47.81
PT: 21+93.31
PCL Skutumpah
BEGIN PROJECT
STA 10+10.29
N: 1062517.1104
E: 384974.9364 BE
G
IN
T
YP
IC
AL
S
EC
TI
O
N
ST
A
+1
0.
, 0 .0
AS
PH
AL
T
DR
IV
EW
AY
R
EQ
'D
W =4
ST
A
+0 0.
, 1
3.
R
IN
ST
AL
L
O W
NE
R
FU
RN
IS
HE
D
CA
TT
LE
G
UA
RD
R
EQ
'D
ST
A
+9
5.
, 0 .0
SI
G
N
TY
PE
A
-2
X
(B
Y O
W N
ER
ST
A
+1
5.
, 6 9.
L
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
+9
5.
, 1 6.
L
SI
G
N
TY
PE
A
-1
X
RE
Q 'D
ST
A
+0
0.
, 1 5.
L
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
+5
0.
, 1 5.
R
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
+9
5.
, 1 6.
R
RE
M
O
VE
S
IG
N
RE
Q 'D
ST
A
+5
4.
, 2 7.
L
RE
M
O
VE
C
AT
TL
E
G
UA
RD
R
EQ
'D
ST
A
+9
5.
, 0 .0
RE
M
O
VE
C
UL
VE
RT
R
EQ
'D
ST
A
+7 6.
, 1
9.
R T
O
ST
A
+7 8.
, 1
7.
L
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
IN
CH
M
ET
AL
E
ND
S
EC
TI
O
N
RE
Q 'D
(2 ) R
EQ
'D
ST
A
+7
7.
8.
R
IN
V.
7.
ST
A
+8 2.
7.
L
IN
V.
9.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+1
9.
8.
L
IN
V.
9.
ST
A
+4 5.
2.
R
IN
V.
9.
N50°23'29"E
N33°30'53"E
N16°56'14"E
R=100.000' L=29.46'
R=1000.000' L=289.33'
R=1000.000' L=202.90'
R65.00'
R80.00'
10+00
.4
.3
.9
.2
11+00
.3
.2
.8
.4
12+00
.4
.8
.9
.4
13+00
.3
.4
.6
.7
14+00
.3
.4
.2
.5
15+00
.9
.9
.5
.7
16+00
.2
.9
.8
.4
17+00
.0
.9
.9
.4
18+00
.7
.9
.6
.4
19+00
.4
.7
.7
.9
20+00
.5
.1
.8
.1
21+00
.1
.0
.2
.8
22+00
.8
.4
.1
.0
23+00
.4
.6
.9
.3
24+00
.2
.9
3.04%
1.22%
-4.43%
PVI 10+00.00
Elev 5951.39
L 200.00 FT
K 120.28
PV
C
0+
.0
El ev
0.
PV
T
+2
5.
El ev
3.
PV
I 1
1+
.0
El ev
5.
L 400.00 FT
K 68.98
PV
C
2+
.0
El ev
3.
PV
T
+2
5.
El ev
3.
LO
4+
.6
El ev
0.
PV
I 1
4+
.0
El ev
7.
L 400.00 FT
K 220.63
PV
C
8+
.0
El ev
8.
PV
T
+0
0.
El ev
7.
PV
I 2
0+
.0
El ev
5.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
4/ 6/
PP-01
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 1.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SKUTUMPAH ROAD
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY
2'
2'
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" SOLID DOUBLE
YELLOW LINE
JO
HN
SO
N
CA
NY
O N
RO
AD
60 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
60 INCH METAL END
SECTION REQ'D (2) REQ'D
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
PC
: 2
3+
.5
PC
: 2
6+
.8
PT
: 2
5+
.4
PT
: 3
0+
.3
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+5
0.
9.
L
IN
V.
9.
ST
A
+0 5.
1.
R
IN
V.
8.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+0
3.
9.
L
IN
V.
2.
ST
A
+6 1.
1.
R
IN
V.
2.
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
+0
0.
, 1 5.
L
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
+0
0.
, 1 5.
R
N28°33'45"E
N15°37'39"E
R=1000.000' L=202.90'
R=2000.000' L=451.52'
24+00
.2
.9
.7
.5
25+00
.4
.3
.3
.2
26+00
.3
.2
.6
.4
27+00
.9
.6
.4
.0
28+00
.0
.5
.5
.1
29+00
.8
.6
.1
.9
30+00
.4
.2
.8
.3
31+00
.8
.4
.8
.3
32+00
.8
.1
.6
.1
33+00
.5
.4
.1
.9
34+00
.1
.8
.9
.8
35+00
.0
.2
.6
.4
36+00
.2
.1
.7
.2
37+00
.7
.8
.0
.8
38+00
.4
.5
3.10%
1.72%
-0.54%
L 400.00 FT
K 213.00
PV
T
+0
0.
El ev
8.
PV
I 2
6+
.0
El ev
2.
L 300.00 FT
K 91.60
PV
C
2+
.0
El ev
8.
PV
T
+0
0.
El ev
8.
PV
I 3
3+
.0
El ev
0.
L 300.00 FT
K 216.56
PV
C
8+
.0
El ev
0.
PV
T
+5
0.
El ev
7.
PV
I 3
0+
.0
El ev
4.
L 250.00 FT
K 45.19
PV
C
5+
.0
El ev
8.
PV
T
+5
0.
El ev
3.
H I 3
7+
.5
El ev
3.
PV
I 3
6+
.0
El ev
4.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
3/
/2
PP-02
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 2.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY
2'
2'
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" SOLID DOUBLE
YELLOW LINE
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
PC
: 4
4+
.8
PT
: 4
9+
.2
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
4'
ST
A
+6 8.
, 1
3.
R
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
4'
ST
A
+2 5.
, 1
3.
L
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
4'
ST
A
+1 0.
, 1
3.
L
RE
M
O
VE
C
UL
VE
RT
R
EQ
'D
ST
A
+4 0.
, 2
1.
R T
O
ST
A
+4 1.
, 1
9.
L
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+0
0.
9.
L
IN
V.
0.
ST
A
+0 0.
2.
R
IN
V.
9.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+2
7.
7.
L
IN
V.
1.
ST
A
+1 1.
1.
R
IN
V.
0.
N15°37'39"E
N24°16'04"E
R=3000.000' L=452.41'
38+00
.4
.5
.0
.3
39+00
.3
.2
.6
.2
40+00
.1
.3
.5
.5
41+00
.9
.7
.2
.2
42+00
.7
.2
.4
.5
43+00
.0
.2
.5
.4
44+00
.7
.8
.9
.7
45+00
.6
.4
.5
.8
46+00
.3
.9
.9
.7
47+00
.4
.3
.0
.9
48+00
.7
.2
.2
.4
49+00
.2
.4
.0
.2
50+00
.5
.8
.8
.4
51+00
.3
.1
.3
.2
52+00
.0
.8
0.34%
5.77%
1.08%
3.26%
L 200.00 FT
K 226.39
PV
T
+0
0.
El ev
3.
LO
9+
.6
El ev
3.
PV
I 3
9+
.0
El ev
2.
L 350.00 FT
K 64.48
PV
C
0+
.0
El ev
3.
PV
T
+2
5.
El ev
4.
PV
I 4
2+
.0
El ev
4.
L 300.00 FT
K 64.00
PV
C
0+
.0
El ev
3.
PV
I 5
2+
.0
El ev
5.
L 200.00 FT
K 79.52
PV
C
4+
.0
El ev
5.
PV
T
+5
0.
El ev
4.
PV
I 4
5+
.0
El ev
1.
L 300.00 FT
K 138.06
PV
C
7+
.0
El ev
6.
PV
T
+0
0.
El ev
2.
PV
I 4
8+
.0
El ev
1.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
3/
/2
PP-03
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 3.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY
2'
2'
ST
A
+8
0.
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" SOLID DOUBLE
YELLOW LINE
4" SOLID & BROKEN
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
PC
: 6
1+
.0
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+0
1.
4.
L
IN
V.
1.
ST
A
+1 7.
0.
R
IN
V.
2.
N24°16'04"E
R=1750.000' L=922.37'
52+00
.0
.8
.0
.7
53+00
.5
.0
.3
.7
54+00
.2
.5
.2
.4
55+00
.3
.3
.6
.2
56+00
.4
.1
.3
.0
57+00
.1
.9
.6
.7
58+00
.1
.6
.3
.5
59+00
.9
.4
.8
.3
60+00
.9
.2
.3
.0
61+00
.9
.4
.0
.4
62+00
.6
.0
.8
.2
63+00
.1
.3
.3
.5
64+00
.0
.0
.7
.9
65+00
.3
.2
.6
.8
66+00
.2
.5
2.25%
5.37%
5.77%
L 300.00 FT
K 64.00
PV
T
+5
0.
El ev
3.
L 200.00 FT
K 64.19
PV
C
3+
.8
El ev
2.
PV
T
+2
4.
El ev
0.
PV
I 6
4+
.8
El ev
5.
L 200.00 FT
K 56.82
PV
C
0+
.0
El ev
2.
PV
T
+2
5.
El ev
0.
PV
I 6
1+
.0
El ev
8.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
3/
/2
PP-04
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 4.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY
2'
2'
ST
A
+6
0.
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" SOLID DOUBLE
YELLOW LINE
4" SOLID & BROKEN
YELLOW LINE
ST
A
+0
0.
4" BROKEN
YELLOW LINE
ST
A
+7
0.
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
PT
: 7
0+
.3
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
=2 4'
ST
A
+7
5.
, 1 3.
L
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+5
0.
1.
L
IN
V.
3.
ST
A
+5 0.
8.
R
IN
V.
3.
N54°27'59"E
R=1750.000' L=922.37'
66+00
.2
.5
.3
.2
67+00
.3
.8
.3
.1
68+00
.2
.0
.7
.5
69+00
.8
.5
.0
.2
70+00
.3
.5
.6
.8
71+00
.1
.1
.6
.6
72+00
.3
.3
.1
.3
73+00
.2
.5
.6
.9
74+00
.3
.6
.5
.5
75+00
.8
.6
.0
.6
76+00
.8
.3
.9
.7
77+00
.7
.7
.0
.5
78+00
.1
.0
.3
.3
79+00
.5
.6
.8
.0
80+00
.3
.4
4.24%
0.61%
0.54%
L 400.00 FT
K 107.91
PV
C
0+
.2
El ev
7.
PV
T
+7
4.
El ev
7.
PV
I 7
2+
.2
El ev
9.
L 300.00 FT
K 272.94
PV
C
9+
.0
El ev
6.
L 300.00 FT
K 62.12
PV
C
6+
.9
El ev
8.
PV
T
+7
4.
El ev
7.
PV
I 6
8+
.9
El ev
6.
L 300.00 FT
K 82.63
PV
C
5+
.2
El ev
8.
PV
T
+0
4.
El ev
6.
PV
I 7
6+
.2
El ev
5.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
3/
/2
PP-05
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 5.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY 2'
2'
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
80+00
81+00
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
PC: 80+27.13
PC
: 9
0+
.0
PT
: 8
4+
.0
PT: 91+87.81
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
4'
ST
A
+9 7.
, 1
3.
L
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
4'
ST
A
+7 7.
, 1
3.
L
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
4'
ST
A
+0 2.
, 1
3.
R
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+9
0.
2.
L
IN
V.
0.
ST
A
+3 4.
0.
R
IN
V.
1.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+7
9.
7.
L
IN
V.
5.
ST
A
+1 9.
7.
L
IN
V.
5.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+8
2.
8.
R
IN
V.
4.
ST
A
+2 2.
8.
R
IN
V.
3.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+5
9.
7.
L
IN
V.
4.
ST
A
+9 9.
8.
L
IN
V.
3.
SI
G
N
TY
PE
A
-2
X
(B
Y O
W N
ER
ST
A
+0
0.
, 1 5.
R
SI
G
N
TY
PE
A
-2
X
(B
Y O
W N
ER
ST
A
+0
0.
, 1 5.
L
N54°27'59"E
N83°43'21"E N85°20'07"E
R=750.000' L=382.96' R=5000.000' L=140.75'
80+00
.3
.4
.8
.0
81+00
.8
.6
.6
.3
82+00
.7
.1
.7
.0
83+00
.8
.8
.0
.5
84+00
.2
.1
.6
.6
85+00
.9
.0
.9
.4
86+00
.0
.6
.8
.8
87+00
.7
.0
.4
.3
88+00
.9
.5
.3
.7
89+00
.6
.0
.8
.1
90+00
.2
.1
.6
.9
91+00
.6
.5
.7
.9
92+00
.5
.2
.4
.4
93+00
.6
.6
.9
.9
94+00
.2
.1
1.71%
0.46%
-1.59%
L 300.00 FT
K 272.94
PV
T
+0
0.
El ev
0.
PV
I 8
0+
.0
El ev
7.
L 300.00 FT
K 239.61
PV
C
2+
.2
El ev
1.
PV
T
+6
0.
El ev
4.
PV
I 8
4+
.2
El ev
3.
L 300.00 FT
K 146.41
PV
C
8+
.3
El ev
6.
PV
T
+9
8.
El ev
4.
H I 8
9+
.6
El ev
6.
PV
I 9
0+
.3
El ev
6.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
3/
/2
PP-06
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 6.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY
2'
2'
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
2+
.8
.0
L
IN
V.
3.
ST
A
2+
.8
.0
L
IN
V.
2.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
+9
6.
4.
R
IN
V.
1.
ST
A
+0 8.
4.
L
IN
V.
0.
+0
+0
+0
+0
+0
+0
0+
1+
2+
3+
4+
5+
6+
7+
8+
PC
: 9
7+
.5
PC: 104+97.36
PT: 98+84.74
PT
: 1
+7
6.
AS
PH
AL
T
DR
IV
EW
AY
RE
Q
'D W
4'
ST
A
2+
.3 7, 3.
L
RI
PR
AP
(D
=6
R
EQ
'D
ST
A
0+
.0
0, 9.
R T
O
ST
A
0+
.0 0, 9.
R
N85°20'07"E
N75°41'58"E N77°45'26"E
R=1000.000' L=168.18' R=5000.000' L=179.56'
G
EO
TE
XT
IL
E-
SE
PA
RA
TI
O N
RE
Q
'D
ST
A
0+
.0 0, 9.
R
T O
ST
A
0+
.0
0, 9.
R
94+00
.2
.1
.5
.3
95+00
.9
.5
.3
.7
96+00
.6
.9
.7
.1
97+00
.5
.2
.3
.3
98+00
.1
.4
.2
.4
99+00
.4
.4
.6
.4
100+00
.6
.3
.7
.2
101+00
.7
.1
.6
.0
102+00
.0
.9
.3
.8
103+00
.2
.7
.1
.4
104+00
.5
.7
.8
.6
105+00
.9
.1
.4
.2
106+00
.6
.0
.6
.5
107+00
.7
.1
.9
.6
108+00
.1
.1
-6.93%
-2.20%
L 300.00 FT
K 63.51
PV
C
+0 0.
El ev
3.
PV
T
6+
.0
El ev
0.
PV
I 1
+5
0.
El ev
0.
L 400.00 FT
K 651.64
PV
C
5+
.0
El ev
7.
PV
T
+9
9.
El ev
0.
PV
I 9
7+
.0
El ev
4.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
3/
/2
PP-07
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 7.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY2'
2'
ST
A
4+
.0
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" SOLID DOUBLE
YELLOW LINE
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
9+
.2
.7
L
IN
V.
2.
ST
A
9+
.6
.7
R
IN
V.
2.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
4+
.8
.3
L
IN
V.
3.
ST
A
4+
.2
.6
R
IN
V.
3.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
9+
.0
.5
L
IN
V.
3.
ST
A
9+
.1
.9
R
IN
V.
1.
8+
9+
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
2+
RE
M
O
VE
C
UL
VE
RT
R
EQ
'D
ST
A
9+
.9 3, 5.
L
T O
ST
A
9+
.5
7, .1
R
N77°45'26"E
SCHEDULE 1 ADDITIVE 1
108+00
.1
.1
.0
.7
109+00
.9
.3
.3
.1
110+00
.6
.1
.0
.2
111+00
.0
.5
.9
.8
112+00
.9
.0
.0
.3
113+00
.1
.5
.3
.8
114+00
.3
.0
.3
.3
115+00
.5
.5
.9
.8
116+00
.5
.1
.2
.3
117+00
.9
.7
.7
.5
118+00
.8
.6
.9
.1
119+00
.4
.7
.1
.3
120+00
.8
.9
.5
.6
121+00
.2
.2
.8
.8
122+00
.3
.4
-2.76%
-5.49%
L 200.00 FT
K 139.17
PV
C
+5 0.
El ev
2.
PV
T
0+
.0
El ev
0.
PV
I 1
+5
0.
El ev
5.
L 200.00 FT
K 73.15
PV
C
+5 0.
El ev
7.
PV
T
8+
.0
El ev
9.
PV
I 1
+5
0.
El ev
1.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
REQ'D
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
4/ 7/
PP-08
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 8.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY2'
2'
ST
A
0+
.0
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" BROKEN
YELLOW LINE
2+
3+
4+
5+
6+
7+
8+
9+
0+
1+
2+
3+
4+
5+
6+
PC
: 1
+5
1.
PC
: 1
+4
4.
PT
: 1
+1
8.
RE
M
O
VE
C
UL
VE
RT
R
EQ
'D
ST
A
2+
.5 7, 9.
L
T O
ST
A
2+
.1
5, 0.
R
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
6+
.7
.2
L
IN
V.
5.
ST
A
6+
.8
.1
R
IN
V.
4.
IN
CH
C
O
RR
UG
AT
ED
M
ET
AL
P
IP
E, C
LA
SS
A R
EQ
'D
ST
A
2+
.2
.6
L
IN
V.
8.
ST
A
2+
.8
.2
R
IN
V.
4.
N77°45'26"E
S75°28'41"ER=1000.000' L=467.13'
R=1000.000' L=756.35'
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
3+
.0
0, 5.
R
SCHEDULE 1 ADDITIVE 1
122+00
.3
.4
.1
.0
123+00
.0
.7
.8
.3
124+00
.6
.9
.3
.5
125+00
.8
.3
.2
.1
126+00
.7
.0
.4
.0
127+00
.3
.0
.4
.0
128+00
.5
.0
.7
.0
129+00
.0
.0
.4
.2
130+00
.0
.6
.5
.2
131+00
.2
.0
.1
.9
132+00
.2
.0
.7
.3
133+00
.6
.8
.7
.4
134+00
.1
.2
.8
.0
135+00
.3
.8
.2
.6
136+00
.7
.4
-2.00% 1.60%
L 200.00 FT
K 264.71
PV
C
+2 5.
El ev
3.
PV
T
6+
.0
El ev
8.
PV
I 1
+2
5.
El ev
0.
L 500.00 FT
K 139.01
PV
C
+6 4.
El ev
3.
PV
T
3+
.3
El ev
2.
PV
I 1
+1
4.
El ev
8.
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
4/ 7/
PP-09
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-0 9.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
-1
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY
2'
2'
ST
A
7+
.0
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" DOUBLE SOLID
YELLOW LINE
ST
A
8+
.0
4" SOLID & BROKEN
YELLOW LINE
4" BROKEN
YELLOW LINE
24 INCH CORRUGATED
METAL PIPE, CLASS A REQ'D
6+
7+
PC: 1
+4 4.9
RE
M
O
VE
C
AT
TL
E
G
UA
RD
R
EQ
'D
ST
A
6+
.2
1, .0
R
IN
ST
AL
L O
W
NE
R
FU
RN
IS
HE
D
CA
TT
LE
G
UA
RD
R
EQ
'D
ST
A
6+
.2 1, .0
R
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
6+
.2
1, 5.
R
SI
G
N
TY
PE
A
-1
X
(B
Y O
W N
ER
ST
A
6+
.2
1, 5.
L
PCL Skutumpah
END PROJECT
STA 136+90.00
N: 1069273.8217 E: 393865.8634
R=1000.000' L=756.35'
EN
D
TY
PI
CA
L
SE
CT
IO
N
ST
A
6+
.0 0, .0
136+00
.7
.4
.7
.2
137+00
.4
.0
.8
.8
138+00
.2
.3
.6
.4
139+00
.4
.2
.0
.5
140+00
.1
.4
.1
.0
141+00
.7
.2
4/ 6/
PP-10
SK
UT
UM
PA
H
RO
AD
PL
AN
A
ND
P
RO
FI
LE
-0
4/
7/
H
:\2
8-
0\ dw g\
PP
-1 0.
dw g
R
EV
IS
IO
N S
N O
D
AT
E
R
EM
AR
KS
SC
AL
E:
U
PD
AT
ED
N U
M
BE
R
PR
O
JE
C
T
COUNTY
SHEET NO.
R
EC
O M
M
AP
PR
O
VA
L
D
AT
E
PR
O
JE
C T
D
ES
IG
N
E N
G
IN
EE
R
D W
G N
AM
E:
PL
O
TT
ED
AP
PR
O
VE
D
Q U
AL
IT
Y M
AN
AG
EM
EN
T R
EV
IE
W D
AT
E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F
E
D
C
B
A
G
IS
EN
VI
R
O N
M
EN
TA
L
- M
AT
ER
IA
LS
T
ES
TI
N G
1.
0.
8.
w .jo ne sa nd de m ille
.c om
Jo ne s
D eM ille E ng in ee rin g, In c.
C
IV
IL
S
TR
U
C
TU
R
AL
E N
G
IN
EE
R
IN
G
SU
R
VE
YI
N
G
SU
BM
IT
AL
KANE
KA
NE
C O
UN
TY
1"
BLUE STAKES OF UTAH
Utility Notification Center, Inc.
1-800-662-4111 www.bluestakes.org
Dig Safely. Know what'sbelow.
Callbefore you dig.
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
FO
R
B
ID
D
IN
G O
N
LY
SKUTUMPAH ROAD
SCALE:
HORZ. 1" = 100'
VERT. 1" = 20'
SE
E
SH
EE
T
PP
-0
FINISH GRADE
EXISTING GROUND
REQUESTED
RIGHT-OF-WAY
REQUESTED
RIGHT-OF-WAY
2'
2'
ST
A
6+
.0
EDGE OF ASPHALT
4" SOLID WHITE LINE
4" SOLID WHITE LINE
EDGE OF ASPHALT
4" DOUBLE SOLID
YELLOW LINE
TIE INTO EXISTING
ROADWAY
TIE INTO EXISTING
ROADWAY
136+90.00
2511-034
VICINITY MAP
SHEET NO.PROJECT No.
APPROVAL
RECOMMENDED FOR APPROVAL:
DATE
APPROVED:
DATE
SCALE: 1" = 15,000'
PROJECT LOCATION
SUBMITTAL: FOR BIDDING ONLY
KANE COUNTY, UTAH
KANE COUNTY
SAN JUAN
KANEWASHINGTON
IRON GARFIELD
WAYNEPIUTEBEAVER
MILLARD
SEVIER
EMERY GRAND
SANPETE
CARBON
JUAB
UTAH
WASATCH
DUCHESNE
UINTAH
DAGGETTSUMMIT
SALT LAKE
TOOELE
DAVIS
MORGAN
WEBER
RICH
CACHE
BOX ELDER
IDAHO
WYOMING
C O
LO
R
AD
O
N
EV
AD
A
ARIZONA
KANE COUNTY
JOHNSON CANYON ROAD RECONSTRUCTION
KANE COUNTY
N O
R T
H
Pr in t D at e:
4/
7/
2:
P M
F ile
P at h:
H :\2
1-
4\ dw g\
C D s\
TI
TL
E.
dw g
LOCATION MAP US 89
US 89
U
S 89A
JO
HNSO
N CANYO
N RO
AD
KANAB
INDEX TO SHEETS
SHEET NO. SHEET TITLE
1 TITLE
1A TO 1B INDEX
2 LEGEND
SM-01 TO SM-05 SUMMARIES
TS-01 TYPICAL SECTIONS
DT-01 DETAILS
PP-01 TO PP-08 PLAN & PROFILE
EN-01 TO TC-16 SELECTED UDOT DRAWINGS (22 SHEETS)
4-7-2026
Apr 07 2026
1 Inch =
300' 600'
600 Feet
2026 M icrosoft Corporation © 2026 M axar ©
CN
ES (2026) Distribution Airbus DS ©
2026 TM
AP M
O
BILITY Earthstar Geographics SIO
NORTH
PP-01
PP-02
PP-03
PP-04
PP-05
PP-06
PP-07
CL - Johnson Canyon Road
BEGIN PROJECT
STA 10+00.00
N: 9996043.3620 E: 1387069.6170
PP-08
INDEX
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
PL
AN
_P
R O
FI
LE
.d w g
1A
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
TO US-89
1 Inch =
300' 600'
600 Feet
2026 M icrosoft Corporation © 2026 M axar ©
CN
ES (2026) Distribution Airbus DS ©
2026 TM
AP M
CL - Johnson Canyon Road
BEGIN PROJECT
STA 10+00.00
N: 9996043.3620 E: 1387069.6170
CL - Johnson Canyon Road
END PROJECT
STA 380+68.00
N: 10030894.7817
E: 1382759.4412
0000000
1 Inch = 3,000 Feet
000000000 1,500'00000000000000000000000000000000 3,000'
NORTH
INDEX
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
PL
AN
_P
R O
FI
LE
.d w g
1B
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
PP-01
PP-02
PP-03
PP-04
PP-05
PP-06
PP-07
PP-08
TO US-89
SCO
WMH
LEGEND
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
TI
TL
E.
dw g
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
LEGEND AND ABBREVIATIONS
EDGE OF ASPHALT
EDGE OF GRAVEL SURFACING
EDGE OF DIRT SURFACING
EDGE OF ASPHALT SURFACING
TOP BACK OF CURB
LIP OF CURB
TOP OF SIDEWALK
TOP OF CONCRETE
TOP OF GRATE
EDGE OF ASPHALT
FLOW LINE OF GUTTER
FLOW LINE OF CULVERT
SIDEWALK
TOP OF ASPHALT
CONCRETE SURFACING
ASPHALT SURFACING
STREET SIGN
TBC
LOC
TSW
TOC
TOG
EOA
FLG
FLC
SW
TOA
SANITARY SEWER LINE
CULINARY WATER LINE
BURIED POWER LINE
FENCE LINE (BARBED OR STOCKTIGHT)
DRAINAGE CULVERT
FLOW LINE OF DITCH
BURIED TELEPHONE LINE
NATURAL GAS LINE
BURIED CABLE TV LINE
TREE
CONCRETE SURFACING
DELINEATOR POST
PROPERTY LINE
IRRIGATION LINE
EXISTING RIGHT OF WAY LINE
DRAINAGE CULVERT
CULINARY WATER LINE
SANITARY SEWER LINE
SECTION LINE
PROPOSED RIGHT-OF-WAY LINE
SUBDIVISION BOUNDARY LINE
LOT LINES
QUARTER SECTION LINE
(P.U.E.) PUBLIC UTILITY EASEMENT
DEED LINE
FIRE HYDRANT
FIRE HYDRANT
STRUCTURE
DELINEATOR POST
STREET SIGN
TOP OF CUT LIMITS
TOE OF FILL LIMITS
CULINARY WATER METER
WATER METER
POWER POLE & GUY WIRE
STORM DRAIN
SANITARY SEWER SERVICE
POWER POLE
EXISTING FEATURES PROPOSED FEATURESMISC. FEATURES
(SIDEWALK, CURB, GUTTER, ETC.)
FENCE LINE (CHAIN LINK)
TELEPHONE PEDESTAL
OVERHEAD CABLE TV LINE
OVERHEAD POWER LINE
OVERHEAD TELEPHONE LINE
BURIED POWER LINE
OVERHEAD POWER LINE
BURIED TELEPHONE LINE
OVERHEAD TELEPHONE LINE
BURIED CABLE TV LINE
OVERHEAD CABLE TV LINE
NATURAL GAS LINE
IRRIGATION LINE
STORM DRAIN
FENCE LINE (BARBED OR STOCKTIGHT)
FENCE LINE (CHAIN LINK)
FIBER OPTIC LINE
FIBER OPTIC LINE
MAILBOX
MAILBOX
ABBREVIATIONS & HATCHING
RIGHT-OF-WAY
LEFT
RIGHT
R/W
L / LT
R / RT
TEMPORARY T.C.E.
LIMITS OF DISTURBANCELOD
CONSTRUCTION EASEMENT
STATIONSTA
EXISTING CITY BLOCK LINES
BLOCK LINE
EXISTING N/A LINE
WATER MANHOLE
LIGHT POLE
LIGHT POLE
GAS METER
GAS METER
CABLE TV PEDESTAL
SANITARY SEWER CLEAN OUT
IRRIGATION MANHOLE
IRRIGATION METER
STORM DRAIN MANHOLE
EXISTING GROUNDEG
FINISHED GRADEFG
CAST-IN-PLACECIP
or or epp
T
SCO
EPP
SCO
wmh sdm imh
G .W
CONCRETE SURFACING
(SIDEWALK, CURB, GUTTER, ETC.)
W G
GAS METERI
w g i
COMMUNICATION MANHOLEcmm
PUBLIC UTILITY EASEMENTP.U.E.
SEWER MANHOLESMH
STORM DRAIN MANHOLESDM
WATER MANHOLEWMH
IRRIGATION MANHOLEIMH
COMMUNICATION MANHOLECMM
STRUCTURE
SUMMARIES
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
SU
M M
AR
IE
S.
dw g
SM-01
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
SUMMARY OF ITEMS
ITEM NO. ITEM DESCRIPTION UNIT ESTIMATED QUANTITY
BID SCHEDULE 2
2-1 MOBILIZATION LUMP 1
2-2 TRAFFIC CONTROL LUMP 1
2-3 CLEARING & GRUBBING LUMP 1
2-4 ROADWAY EXCAVATION (PLAN QUANTITY) CU YD 1,710
2-5 CEMENT TREATED BASE (CTB) COURSE (PLAN QTY) SQ YD 23,256
2-6 CEMENT POWDER TON 519
2-7 HMA - 3/8 INCH TON 6,200
2-8 GRAVEL DRIVEWAY EACH 5
2-9 UNTREATED BASE COURSE CU YD 85
2-10 SOFT SPOT REPAIR (CONTINGENCY) CU YD 100
2-11 REMOVE SIGN EACH 8
2-12 RELOCATE MAILBOX EACH 2
2-13 PAVEMENT MARKING PAINT GALLON 65
2-14 18 INCH HDPE PIPE CULVERT (OWNER FURNISHED) FEET 250
BID SCHEDULE 3
3-1 TRAFFIC CONTROL LUMP 1
3-2 HMA - 3/8 INCH TON 11,400
3-3 UNTREATED BASE COURSE CU YD 100
3-4 ASPHALT SHOULDER REPAIR FEET 2,150
3-5 PAVEMENT MARKING PAINT GALLON 56
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
SU
M M
AR
IE
S.
dw g
SM-02
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
MISCELLANEOUS SUMMARY
LINE
FROM TO MOBILIZATION TRAFFIC
CONTROL
SOFT SPOT
REPAIR
(CONTINGENCY)
CLEARING &
GRUBBING
RELOCATE
MAILBOX REMARKS
STATION OFFSET STATION OFFSET LUMP LUMP CU YD LUMP EACH
BID SCHEDULE 2
JOHNSON CANYON ROAD 10+00.00 0.00 RT 90+50.00 0.00 RT 1 1 100 1
JOHNSON CANYON ROAD 11+54.40 19.69 LT 1
JOHNSON CANYON ROAD 19+93.81 19.88 RT 1
BID SCHEDULE 2 - TOTAL / USE 1 1 100 1 2
BID SCHEDULE 3
JOHNSON CANYON ROAD 90+50.00 0.00 RT 380+68.00 0.00 RT 1
BID SCHEDULE 3 - TOTAL / USE 0 1 0 0 0
EARTHWORK SUMMARY
LINE
STATION LENGTH
ROADWAY
EXCAVATION
(PLAN QUANTITY)
EMBANKMENT* NET EXPORT*
REMARKS
FROM TO FEET CU YD CU YD CU YD
BID SCHEDULE 2
JOHNSON CANYON ROAD 10+00.00 90+50.00 8,050 1,710 1,455 255
BID SCHEDULE 2 - TOTAL / USE 1,710
*FOR INFORMATION ONLY
CULVERT SUMMARY
LINE
STATION OFFSET STATION OFFSET INVERT IN
(ELEV.)
INVERT
OUT
(ELEV.)
HDPE PIPE CULVERT
(OWNER FURNISHED)
REMARKS18 INCH
FROM TO FROM TO FROM TO FEET
BID SCHEDULE 2
JOHNSON CANYON ROAD 34+02.44 22.55 RT 34+01.58 27.43 LT 5281.92 5280.96 50
JOHNSON CANYON ROAD 39+00.00 22.32 RT 39+00.00 37.68 LT 5283.70 5283.10 60
JOHNSON CANYON ROAD 44+00.00 18.48 RT 44+00.00 21.52 LT 5285.50 5285.09 40
JOHNSON CANYON ROAD 49+10.09 20.06 RT 49+12.64 29.86 LT 5288.83 5287.71 50
JOHNSON CANYON ROAD 55+08.14 22.69 RT 55+11.03 27.19 LT 5293.21 5291.44 50
BID SCHEDULE 2 - TOTAL / USE 250
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
SU
M M
AR
IE
S.
dw g
SM-03
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
DRIVEWAY SUMMARY
LINE
STATION
GRAVEL
DRIVEWAY*
UNTREATED BASE COURSE**
REMARKS
FROM OFFSET TO OFFSET
LENGTH AVE
WIDTH
AVE
DEPTH VOL VOL
EACH FT FT IN CU FT CU YD
BID SCHEDULE 2
JOHNSON CANYON ROAD 12+14.00 13.00 LT 12+56.00 13.00 LT 1 42 38 6 1,232 46
JOHNSON CANYON ROAD 19+64.00 13.00 RT 19+82.00 13.00 RT 1 18 20 6 276 11
JOHNSON CANYON ROAD 31+85.00 13.00 RT 32+01.00 13.00 RT 1 16 14 6 140 6
JOHNSON CANYON ROAD 66+17.00 13.00 RT 66+49.00 13.00 RT 1 32 12 6 224 9
JOHNSON CANYON ROAD 89+45.00 13.00 RT 89+55.00 13.00 RT 1 10 40 6 335 13
BID SCHEDULE 2 - TOTAL / USE 5 85
* UNTREATED BASE COURSE PAID OUT SEPARATELY.
** VOLUMES ON DRIVEWAYS INCLUDE RADII.
SURFACING SUMMARY
LINE
STATION
CEMENT TREATED BASE (CTB) COURSE (PLAN QTY) HMA - 3/8 INCH
REMARKS
(138 LB/FT³) (155 LB/FT³)
FROM TO
LENGTH AVE
WIDTH
AVE
DEPTH AREA AREA CEMENT
POWDER* LENGTH AVE
WIDTH DEPTH VOL
TON
FT FT IN SQ FT SQ YD TON FT FT IN CU FT
BID SCHEDULE 2
JOHNSON CANYON ROAD 10+00.00 90+50.00 8,050 26 6 209,300 23,256 519 8,050 26 4 75,743 5,871
BID SCHEDULE 2 - TOTAL 23,256 519 5,871
BID SCHEDULE 2 - USE 23,256 519 6,200
LINE
STATION UNTREATED BASE COURSE
ASPHALT
SHOULDER
REPAIR**
HMA - 3/8 INCH
REMARKS
(155 LB/FT³)
FROM TO
LENGTH AVE
WIDTH
AVE
DEPTH VOL VOL LENGTH LENGTH AVE
WIDTH DEPTH VOL
TON
FT FT IN CU FT CU YD FT FT FT IN CU FT
BID SCHEDULE 3
JOHNSON CANYON ROAD 90+50.00 380+68.00 29,018 24 2 137,615 10,666 LANE LEVEL &
OVERLAY
JOHNSON CANYON ROAD 253+20.00 274+70.00 2150 2.5 6 2,688 100 2,150 2,150 2 4 2,231 173 SHOULDER
REPAIR
BID SCHEDULE 3 - TOTAL 100 2,150 10,839
BID SCHEDULE 3 - USE 100 2,150 11,400
* CEMENT POWDER PERCENTAGE SHALL EQUAL 8% OF TOTAL MIXTURE WEIGHT.
**UNTREATED BASE COURSE AND HOT MIX ASPHALT PAID OUT SEPARATELY.
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
SU
M M
AR
IE
S.
dw g
SM-04
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
PAINT SUMMARY
LINE
FROM TO
PAVEMENT MARKING PAINT
REMARKS
4" YELLOW
95 FT/GAL 190 FT/GAL 760 FT/GAL
DOUBLE SOLID SOLID BROKEN
STATION OFFSET STATION OFFSET FEET GALLON FEET GALLON FEET GALLON
BID SCHEDULE 2
JOHNSON CANYON ROAD 10+00.00 0.00 35+00.00 0.00 2500 26.32
JOHNSON CANYON ROAD 35+00.00 0.00 41+50.00 0.00 650 3.42 650 0.86 NORTHBOUND PASSING
JOHNSON CANYON ROAD 41+50.00 0.00 51+50.00 0.00 1000 5.26 1000 1.32 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 51+50.00 0.00 61+50.00 0.00 1000 10.53
JOHNSON CANYON ROAD 61+50.00 0.00 65+50.00 0.00 400 2.11 400 0.53 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 65+50.00 0.00 67+75.00 0.00 225 2.37
JOHNSON CANYON ROAD 67+75.00 0.00 71+25.00 0.00 350 1.84 350 0.46 NORTHBOUND PASSING
JOHNSON CANYON ROAD 71+25.00 0.00 73+50.00 0.00 225 0.30
JOHNSON CANYON ROAD 73+50.00 0.00 80+00.00 0.00 650 3.42 650 0.86 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 80+00.00 0.00 81+75.00 0.00 175 1.84
JOHNSON CANYON ROAD 81+75.00 0.00 86+25.00 0.00 450 2.37 450 0.59 NORTHBOUND PASSING
JOHNSON CANYON ROAD 86+25.00 0.00 90+50.00 0.00 425 0.56
BID SCHEDULE 2 - TOTAL 41.05 18.42 5.46
BID SCHEDULE 2 - USE 65
BID SCHEDULE 3
JOHNSON CANYON ROAD 90+50.00 0.00 111+00.00 0.00 2050 2.70
JOHNSON CANYON ROAD 111+00.00 0.00 118+00.00 0.00 700 3.68 700 0.92 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 118+00.00 0.00 132+25.00 0.00 1425 15.00
JOHNSON CANYON ROAD 132+25.00 0.00 140+25.00 0.00 800 4.21 800 1.05 NORTHBOUND PASSING
JOHNSON CANYON ROAD 140+25.00 0.00 200+00.00 0.00 5975 7.86
JOHNSON CANYON ROAD 200+00.00 0.00 205+00.00 0.00 500 2.63 500 0.66 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 205+00.00 0.00 209+50.00 0.00 450 4.74
JOHNSON CANYON ROAD 209+50.00 0.00 216+50.00 0.00 700 3.68 700 0.92 NORTHBOUND PASSING
JOHNSON CANYON ROAD 216+50.00 0.00 270+25.00 0.00 5375 7.07
JOHNSON CANYON ROAD 270+25.00 0.00 278+25.00 0.00 800 4.21 800 1.05 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 278+25.00 0.00 283+00.00 0.00 475 5.00
JOHNSON CANYON ROAD 283+00.00 0.00 287+50.00 0.00 450 2.37 450 0.59 NORTHBOUND PASSING
JOHNSON CANYON ROAD 287+50.00 0.00 296+50.00 0.00 900 1.18
JOHNSON CANYON ROAD 296+50.00 0.00 304+00.00 0.00 750 3.95 750 0.99 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 304+00.00 0.00 309+25.00 0.00 525 0.69
JOHNSON CANYON ROAD 309+25.00 0.00 317+25.00 0.00 800 4.21 800 1.05 NORTHBOUND PASSING
JOHNSON CANYON ROAD 317+25.00 0.00 325+00.00 0.00 775 1.02
JOHNSON CANYON ROAD 325+00.00 0.00 334+75.00 0.00 975 5.13 975 1.28 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 334+75.00 0.00 342+75.00 0.00 800 8.42
JOHNSON CANYON ROAD 342+75.00 0.00 348+00.00 0.00 525 2.76 525 0.69 NORTHBOUND PASSING
JOHNSON CANYON ROAD 348+00.00 0.00 359+50.00 0.00 1150 1.51
JOHNSON CANYON ROAD 359+50.00 0.00 365+50.00 0.00 600 3.16 600 0.79 SOUTHBOUND PASSING
JOHNSON CANYON ROAD 365+50.00 0.00 380+68.00 0.00 1518 15.98
BID SCHEDULE 3 - TOTAL 24.40 21.58 9.80
BID SCHEDULE 3 - USE 56
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
SU
M M
AR
IE
S.
dw g
SM-05
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
SIGNING KEY
SIGN COLOR SIGN CODE
W = WHITE R = RELOCATION
G = GREEN N = NEW SIGN
BL = BLUE AUX = AUXILIARY SIGN
BR = BROWN X = REMOVE
BK = BLACK
Y = YELLOW
R = RED
SIGN SUMMARY
LINE STATION OFFSET MUTCD SIGN
CODE
SIGN
COLOR
SIGN
CODE
SIGN
DESCRIPTION
SIGN, TYPE
A-1, 36 X 36
(BY OTHERS)
SIGN, TYPE
A-1, 18 X 24
(BY OTHERS)
SIGN, TYPE
A-1, 18 X 18
(BY OTHERS)
SIGN, TYPE
A-1, 10 X 30
(BY OTHERS)
REMOVE
SIGN REMARKS
EACH EACH EACH EACH EACH
BID SCHEDULE 2
JOHNSON
CANYON
ROAD
12+39.92 15.47 RT OM-3L Y R OBJECT MARKER (L) 1 1
JOHNSON
CANYON
ROAD
12+81.54 17.96 LT OM-3R Y R OBJECT MARKER (R) 1 1
JOHNSON
CANYON
ROAD
13+36.77 16.15 RT OM-3R Y R OBJECT MARKER (R) 1 1
JOHNSON
CANYON
ROAD
13+91.31 16.15 LT OM-3L Y R OBJECT MARKER (L) 1 1
JOHNSON
CANYON
ROAD
14+45.98 21.22 RT W1-8R Y R CHEVRON (R) 1 1
JOHNSON
CANYON
ROAD
14+78.91 22.73 RT W1-8R Y R CHEVRON (R) 1 1
JOHNSON
CANYON
ROAD
19+04.43 18.62 LT W1-4R, W13-1 Y N REVERSE CURVE (R),
35 M.P.H. ADVISORY 1 1 2
BID SCHEDULE 2 - TOTAL / USE 1 (BY
OTHERS)
2 (BY
OTHERS)
1 (BY
OTHERS)
4 (BY
OTHERS) 8
TYPICAL SECTION NO.1
STA. 10+00.00 TO STA. 90+50.00
(SCHEDULE 2)
26.00'
11.00'2.00'3.61' 11.00' 2.00'
4:1
4:1
4:1
4:1
CEMENT TREATED BASE
COURSE REQ'D (6" THICK)
HMA - 3/8 INCH
REQ'D (4" THICK)
PAVEMENT WIDTH
LANE WIDTH LANE WIDTH
2% 2%
SH
O
U
LD
ER
EM
BA
N K.
SH
O
U
LD
ER
NOTES:
1. CROSS SLOPES VARY AT
SUPERELEVATIONS AND TRANSITIONS.
SEE SUPERELEVATION TRANSITION
TABLE.
2. DAYLIGHT VARIES AT BRIDGE
CROSSING STA, 12+19.33 TO STA.
14+13.45.
4:1
2.00' 3.61'
EM
BA
N K.
4:1
TYPICAL SECTION NO.2
STA. 90+50.00 TO STA. 380+68.00
(SCHEDULE 3)
24.00'
11.00' 11.00'
HMA - 3/8 INCH REQ'D (1/2" LANE LEVEL)
HMA - 3/8 INCH REQ'D (1-1/2" OVERLAY)
PAVEMENT WIDTH
LANE WIDTH LANE WIDTH
2% 2%
SHOULDERING BY OTHERS
ASPHALT SHOULDER REPAIR REQ'D
STA. 253+20.00 TO STA. 274+70.00 (SEE DT-01)
TYPICAL SECTIONS
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
TY
PI
C
AL
_S
EC
TI
O N
.d w g
TS-01
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
TRANSITION - START STATION TRANSITION - END STATION CROSS SLOPE % -
START STATION
LT - CROSS SLOPE TRANSITION
RATE (LENGTH / 1% CHANGE)
STA. 12+35.08 STA. 13+55.44 6.00% LT 10.03'
-6.00% LT
-2.00% LT
-4.00% LT
4.00% LT
-2.00% LT
2.80% LT
-2.00% LT
-3.20% LT
-6.00% RT
6.00% RT
-2.00% RT
4.00% RT
-4.00% RT
-2.00% RT
-2.80% RT
-2.00% RT
3.20% RT
CROSS SLOPE % -
END STATION
-6.00% LT
-2.00% LT
-4.00% LT
4.00% LT
-2.00% LT
2.80% LT
-2.00% LT
-3.20% LT
-2.00% LT
6.00% RT
-2.00% RT
4.00% RT
-4.00% RT
-2.00% RT
-2.80% RT
-2.00% RT
3.20% RT
2.00% RT
STA. 15+63.40 STA. 17+00.00
STA. 17+00.00 STA. 18+51.27
STA. 21+83.83 STA. 23+58.68
STA. 25+92.84 STA. 27+50.00
STA. 29+50.00 STA. 31+17.97
STA. 37+01.08 STA. 40+75.00
STA. 45+00.00 STA. 46+61.84
STA. 50+10.15 STA. 51+25.00
-2.00% LT 2.00% RT -3.40% LT 3.40% RTSTA. 53+25.00 STA. 54+26.35
-3.40% LT 3.40% RT 5.20% LT -5.20% RTSTA. 58+17.69 STA. 61+35.60
5.20% LT -5.20% RT -2.00% LT -2.00% RTSTA. 67+72.88 STA. 70+50.00
-2.00% LT -2.00% RT -3.40% LT 3.40% RTSTA. 73+50.00 STA. 75+67.76
-3.40% LT 3.40% RT -2.00% LT -2.00% RTSTA. 81+73.65 STA. 83+75.00
34.15'
75.64'
21.86'
26.19'
34.99'
77.90'
134.87'
95.71'
36.97'
72.39'
38.49'
155.54'
143.82'
10.03'
17.08'
25.21'
21.86'
78.58'
209.96'
467.40'
31.12'
95.71'
36.97'
72.39'
86.60'
40.33'
37.29'
LT - CROSS SLOPE TRANSITION
RATE (LENGTH / 1% CHANGE)
SUPERELEVATION TRANSITION TABLE
STANDARD SIGN & POST DETAIL
TYPICAL RURAL
INSTALLATION
TRAFFIC SIGN
(TYP.)
2" SQ.
GALV. STEEL
POST
ANCHOR POST
GROUND
LEVEL
M
IN
1" -2
"6' M
IN
6' MIN
ROAD SURFACE NOTE:
1. SIGNS SHALL BE IN
ACCORDANCE WITH MANUAL ON
UNIFORM TRAFFIC CONTROL
DEVICES.
2. SIGNS WILL BE FURNISHED
AND INSTALLED BY OTHERS.
11.00' LANE WIDTH1.00'
HMA - 3/8 INCH REQ'D
(4" THICK)
UNTREATED BASE
COURSE REQ'D (6" THICK)
-4.00:1
HMA - 3/8 INCH REQ'D
(1/2" LANE LEVEL AND
2" OVERLAY)
-4.00:1
-4.00:1
CUT ASPHALT 2' INSIDE
EXISTING EDGE OF ASPHALT.
USE GRADER/ROLLER SAW
DISC CUTTING ATTACHMENT.
NOTES:
1. IF ALLIGATOR CRACKING EXTENDS BEYOND 2'
MARK, REMOVE EXISTING ALLIGATOR
CRACKING BEYOND 2' MARK TO ENSURE THAT
CLEAN EDGE IS CREATED FOR SHOULDER
REPAIR.
SHOULDER
TRAVEL LANE
EDGE OF ROADWAY
WIDTH VARIES
WIDTH VARIES
PLAN
5.
6" MINIMUM UNTREATED
BASE COURSE REQ'D
VA
R
IE
S
M
IN
2%
M
AX
. 1 0%
SECTION A - A
RIGHT-OF-WAY LINE
GRAVEL DRIVEWAY DETAIL
R=10' MIN.
R=1 0'
MIN
A A
UNTREATED BASE COURSE REQ'D
12:1 SLOPE REQ'D
WITHIN 3' OF SHOULDER
4:1 SLOPE REQ'D OUT-
SIDE 3' OF SHOULDER
DETAILS
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\ D
ET
AI
LS
.d w g
DT-01
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
A1
D1 STANDARD SIGN & POST DETAIL D5
SCALE NTS
ASPHALT SHOULDER REPAIR
SCALE NTS
GRAVEL DRIVEWAY DETAIL
SCALE NTS
icrosoft Corporation © 2026 M axar ©
CN
ES (2026) Distribution Airbus DS ©
2026 TM
AP M
RE
O
VE
S
IG
N
RE
Q 'D
(O
BJ
EC
T
M
AR
KE
R
(R
ST
A
+3
6.
, 1 6.
R
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
0 20 +0
+0
+0
+0
+0
BP
: 1
0+
.0
PC
: 1
0+
.8
M id
: 1 1+
.9
PT
: 1
2+
.0
PC
: 1
3+
.4
M id
: 1 4+
.4
PT
: 1
5+
.4
PC
: 1
8+
.2
M id
: 2 0+
.5
PT
: 2
1+
.8
PC
: 2
3+
.6
CL - Johnson Canyon Road
BEGIN PROJECT
STA 10+00.00
N: 9996043.3620 E: 1387069.6170
N05°13′16″E
N21°15′29″W
N31°01′46″W
R = 450.00' L = 207.97'
CB = N08°01'06"W
CD = 206.12'
PC = STA. 13+55.44
PT = STA. 15+63.40
PI = STA. 14+59.42, 12.29 RT
R = 1950.00' L = 332.56'
CB = N29°50'20"W
CD = 341.00'
PC = STA. 18+51.27
PT = STA. 23+58.68
PI = STA. 20+17.55, 7.11 RT
R = 450.00' L = 198.28'
CB = N07°24'07"W
CD = 196.68'
PC = STA. 10+36.80
PT = STA. 12+35.08
PI = STA. 11+35.94, 11.15 LT
NORTH
100'0 50'
1 Inch = 100 Feet
RE
M
O
VE
S
IG
N
RE
Q 'D
(O
BJ
EC
T
M
AR
KE
R
(L
ST
A
+3
9.
, 1 5.
R
RE
M
O
VE
S
IG
N
RE
Q 'D
(C
HE
VR
O
N (R
ST
A
+4 5.
, 2
1.
R
RE
M
O
VE
S
IG
N
RE
Q 'D
(O
BJ
EC
T
M
AR
KE
R
(R
ST
A
+8
1.
, 1 7.
L
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(R
EV
ER
SE
C
UR
VE
(R
ST
A
+0 4.
, 1
8.
L
RE
M
O
VE
S
IG
N
RE
Q 'D
(O
BJ
EC
T
M
AR
KE
R
(L
ST
A
+9
1.
, 1 6.
L
RE
LO
CA
TE
M
AI
LB
O
X
RE
Q 'D
ST
A
+5
4.
, 1 9.
L
T O
RE
LO
CA
TE
M
AI
LB
O
X
RE
Q 'D
ST
A
+9
3.
, 1 9.
R
G
RA
VE
L
DR
IV
EW
AY
R
EQ
'D (4
2' W
ID
TH
ST
A
+1 4.
, 1
3.
L T
O
ST
A
+5 6.
, 1
3.
L
G
RA
VE
L
DR
IV
EW
AY
R
EQ
'D (1
8' W
ID
TH
ST
A
+6 4.
, 1
3.
R T
O
ST
A
+8 2.
, 1
3.
R
13.00' 13.00'
STA. 10+00.00
STA. 23+00.00
M
ATC
H
LIN
E
4" DOUBLE SOLID
YELLOW LINE
JOHNSON CANYON
ROAD CENTERLINE
JOHNSON CREEK BRIDGE
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(O
BJ
EC
T
M
AR
KE
R
(L
ST
A
+3
9.
, 1 5.
R
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(O
BJ
EC
T
M
AR
KE
R
(R
ST
A
+3
6.
, 1 6.
R
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(O
BJ
EC
T
M
AR
KE
R
(R
ST
A
+8
1.
, 1 7.
L
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(O
BJ
EC
T
M
AR
KE
R
(L
ST
A
+9
1.
, 1 6.
L
RE
M
O
VE
S
IG
N
RE
Q 'D
(2
(R
EV
ER
SE
C
UR
VE
(R
M .P
.H . A
DV
IS
O
RY
ST
A
+0 4.
, 1
8.
L
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(3
M .P
.H . A
DV
IS
O
RY
ST
A
+0 4.
, 1
8.
L
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(C
HE
VR
O
N (R
ST
A
+4 5.
, 2
1.
R
RE
M
O
VE
S
IG
N
RE
Q 'D
(C
HE
VR
O
N (R
ST
A
+7 8.
, 2
2.
R
SI
G
N, T
YP
E
A- 1, X
(B Y
O
TH
ER
S)
(C
HE
VR
O
N (R
ST
A
+7 8.
, 2
2.
R
BE
G
IN
T
YP
IC
AL
S
EC
TI
O N
NO
.1
ST
A
+0
0.
, 0 .0
1.17%
1.61%
1.12%
0.42%PV
I 1 0+
.0
El ev
2.
PV
I 1
2+
.0
El ev
5.
PV
I 1
8+
.2
El ev
2.
L 250.00 FT
K 210.64
PV
C
3+
.4
El ev
5.
PV
T
+0
5.
El ev
8.
PV
I 1
4+
.4
El ev
6.
10+00
.8
.8
.6
.3
11+00
.3
.9
.9
.4
12+00
.2
.0
.5
.5
13+00
.8
.7
.0
.9
14+00
.4
.1
.7
.5
15+00
.3
.0
.8
.6
16+00
.6
.4
.4
.2
17+00
.1
.0
.9
.8
18+00
.7
.6
.4
.4
19+00
.0
.0
.6
.5
20+00
.1
.1
.7
.7
21+00
.2
.3
.8
.9
22+00
.4
.5
.9
.0
23+00
.6
.6
FINISHED GRADE
Existing Ground
PLAN & PROFILE
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
PL
AN
_P
R O
FI
LE
.d w g
PP-01
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
JOHNSON CANYON ROAD
SCALE:
HOR. 1" = 100'
VERT. 1" = 10'
SE
E
SH
EE
T
PP
icrosoft Corporation © 2026 M axar ©
CN
ES (2026) Distribution Airbus DS ©
2026 TM
AP M
t Corporation © axar ©
CN
ES (2026) Distribution Airbus DS ©
2026 TM
AP M
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
PC
: 2
3+
.6
M id
: 2 4+
.7
PT
: 2
5+
.8
PC
: 3
1+
.9
M id
: 3 4+
.5
N31°01′46″W
N24°55′51″W
R = 2200.00' L = 234.16'
CB = N27°58'47"W
CD = 234.02'
PC = STA. 23+58.68
PT = STA. 25+92.84
PI = STA. 24+75.76, 3.12 LT
R = 3200.00' L = 583.11'
CB = N19°42'39"W
CD = 582.30'
PC = STA. 31+17.97
PT = STA. 37+01.08
PI = STA. 34+09.53, 13.33 LT
NORTH
100'0 50'
1 Inch = 100 Feet
G
RA
VE
L
DR
IV
EW
AY
R
EQ
'D (1
6' W
ID
TH
ST
A
+8 5.
, 1
3.
R
ST
A
+0 1.
, 1
3.
R
STA. 23+00.00
M
ATC
H
LIN
E
STA. 35+00.00
4" DOUBLE SOLID
YELLOW LINE
JOHNSON CANYON
ROAD CENTERLINE
STA. 36+00.00
M
ATC
H
LIN
E
4" SOLID YELLOW LINE AND
4" DASHED YELLOW LINE
13.00' 13.00'
IN
CH
H
DP
E
PI
PE
(O W
NE
R
FU
RN
IS
HE
D) R
EQ
'D
ST
A
+0
2.
, 2 2.
R
IN
V.
IN
1.
T
O
ST
A
+0 1.
, 2
7.
L
IN
V.
O
U T
.9
L
.0
0' S
-1
.9 2%
1.28%
1.62%
PV
I 2
3+
.7
El ev
7.
PV
I 3
1+
.9
El ev
0.
L 300.00 FT
K 279.40
PV
C
3+
.2
El ev
3.
PV
T
+4
3.
El ev
5.
PV
I 3
4+
.2
El ev
5.
23+00
.6
.6
.3
.3
24+00
.1
.1
.9
.0
25+00
.8
.8
.7
.6
26+00
.5
.4
.3
.2
27+00
.1
.0
.9
.8
28+00
.7
.6
.4
.4
29+00
.2
.3
.0
.1
30+00
.8
.9
.6
.7
31+00
.5
.5
.3
.2
32+00
.9
.8
.5
.5
33+00
.1
.1
.7
.8
34+00
.3
.4
.8
.8
35+00
.3
.3
.5
.6
36+00
.8
.8
FINISHED GRADE
Existing Ground
50.00' OF 18" HDPE PIPE (OWNER FURNISHED) REQ'D @ -1.92%
PLAN & PROFILE
A
SUBMITTAL
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B
C
D
E
F
JDE No.
STAMP
NO. DATE DESCRIPTION
REVISIONS
Pr in t D at e:
4/
7/
2:
P at h:
H :\2
1-
4\ dw g\
C D s\
PL
AN
_P
R O
FI
LE
.d w g
PP-02
FOR BIDDING ONLY
JOHNSON CANYON
ROAD
RECONSTRUCTION
KANE COUNTY
2511-034
Blue Stakes of
Bluestakes.org 1-800-662-4111
CALL BEFORE YOU DIG.
IT'S FREE AND IT'S THE LAW.
JOHNSON CANYON ROAD
SCALE:
HOR. 1" = 100'
VERT. 1" = 10'
SE
E
SH
EE
T
PP
-0
SE
E
SH
EE
T
PP
n © axar ©
CN
ES (2026) Distribution Airbus DS ©
2026 TM
AP M
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
PT
: 3
7+
.0
PC
: 4
6+
.8
M id
: 4 8+
.0
N14°29′26″W
R = 3200.00' L = 583.11'
CB = N19°42'39"W
CD = 582.30'
PC = STA. 31+17.97
PT = STA. 37+01.08
PI = STA. 34+09.53, 13.33 LT
R = 2600.00' L = 348.31'
CB = N18°19'42"W
CD = 348.05'
PC = STA. 46+61.84
PT = STA. 37+01.08
PI = STA. 50+10.15, 5.84 RT
NORTH
100'0 50'
1 Inch = 100 Feet
STA. 36+00.00
M
ATC
H
LIN
E
STA. 41+50.00
4" SOLID YELLOW LINE AND
4" DASHED YELLOW LINE
JOHNSON CANYON
ROAD CENTERLINE
STA. 49+00.00
M
ATC
H
LIN
E
4" DASHED YELLOW LINE AND
4" SOLID YELLOW LINE
13.00' 13.00'
IN
CH
H
DP
E
PI
PE
(O W
NE
R
FU
RN
IS
HE
D) R
EQ
'D
ST
A
+0
0.
, 2 2.
R
IN
V.
IN
3.
T
O
ST
A
+0 0.
, 3
7.
L
IN
V.
O
U T
.1
L
.0
0' S
-1
.0 0%
IN
CH
H
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .