2-Exhibit B.pdf

PDF 240 KB Posted

Attached to
Design Services for Fire Station and Fire Administration Building
Solicitation number
RFSQ 25-2884
Issued by
Denton County, Texas

About this file

Exhibit B contains paper submission instructions for the Design Services for Fire Station and Fire Administration Building solicitation in Ponder, Texas. The opportunity seeks architectural design services from a qualified firm for a new Fire Station and Fire Administration Building on approximately 2.83 acres at Parcel #122594 George Owens Drive. Submissions must include two required tabs: Tab 1 for Firm Qualifications and Tab 2 for Technical Qualifications, with instructions detailed in the specifications Section I. The question period for this opportunity runs from November 21, 2025 at 2:00 PM CST through December 11, 2025 at 2:00 PM CST, after which no further messages may be submitted.

The document applies specifically to suppliers electing paper submission, as opposed to electronic submission which is addressed in Exhibit A. No pricing terms, set-asides, incumbents, funding sources, or contract term information is provided in this exhibit.

View the file

Other files

File Type Posted
3-Exhibit A.pdf PDF
4-Exhibit C - Architectural Services Agreement.pdf PDF
1-2884 Specs Final.pdf PDF
5-2884 Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B

Paper Submission Instructions

Paper Submission Instructions for Suppliers

The following instructions only pertain to those that intend to submit a paper submission. If you intent to submit electronically, refer to Exhibit A.

1. Prepare your submission materials:

Requested Information

Name Requirement

Tab 1 - Firm Qualifications Required

Tab 2 - Technical Qualifications Required

Follow the instructions in the specifications, Section I. Instructions for submission:

The Question period for this opportunity starts Nov 21, 2025 2:00 PM CST. The Question period for this opportunity ends Dec 11, 2025 2:00 PM CST. You will not be able to send messages after this time.

File details come from the government source that posted it. Updated .