2-Drawings-PEMB Maintenance Building.pdf

PDF 32 MB Posted

Attached to
Mount Pocono Maintenance Building Expansion
Solicitation number
US.229779
Issued by
Monroe County, Pennsylvania

About this file

This is a preliminary/final land development plan prepared by Barry Isett & Associates, Inc. for the Mount Pocono Borough in Monroe County, Pennsylvania for the Mount Pocono Maintenance Building Expansion project. The project involves the replacement of an existing maintenance building with a new 5,883 square foot facility that adds vehicle bays and updates ADA-compliant facilities. The work includes demolition of the existing structure, construction of the new maintenance building, installation of pavement, underground storm system, service utilities, and a reinforced concrete apron at 57 Knox Street, Mount Pocono, PA 18344 on a 1.16-acre site in the R1 zoning district. The plan set consists of ten sheets including site development plans, grading and utility plans, lighting plans, erosion and sediment control plans, construction details, and post-construction stormwater management details. A pre-bid meeting is scheduled for 10:00 AM on Tuesday, April 7, 2026 at the project site, with sealed bids due online via the PennBid Program by 10:00 AM on Wednesday, April 22, 2026. Notice of award will be given on Wednesday, April 29, 2026, with notice to proceed for PEMB shop drawings also issued on that date.

The project requires a bid bond equal to 10% of the total bid amount and a performance and payment bond equal to 100% of the contract value. Prevailing wage rates apply to all work. The site currently contains five existing parking spaces and provides six parking spaces, exceeding the required four spaces. Water service will be provided by Pennsylvania American Water, and sewer service will be provided by the Mount Pocono Municipal Authority. Utility coordination includes contacts with multiple service providers including Windstream, Verizon Pennsylvania, PPL Electric Utilities, UGI Utilities, and Pennsylvania American Water. The development is located in Flood Zone X (minimal flood hazard) with no wetlands on the property. As-built drawings and construction completion certification must be provided by the contractor upon project completion in PDF format certified by the engineer.

View the file

Other files

File Type Posted
1-Contract Documents and Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .