Building 1: Repair Building Exterior Envelope, Phase 2, 3, 4
Solicitation number
12505B23R0010
Issued by

About this file

This statement of work describes a federal contract opportunity to repair the exterior envelope of Building 1 at the National Center for Agricultural Utilization Research in Peoria, Illinois. The project involves removing and replacing brick, concrete, windows, curtainwalls and other building components in phases 2, 3 and 4 to address deteriorated materials. Bids are requested for a base scope in phase 4 along with optional additions in phases 2 and 3. Submission of daily reports, schedules, safety plans and other documents will be required along with EPA-compliant products. The selected contractor will furnish all labor, materials and equipment to complete repairs by the specified date while coordinating work to minimize disruption to ongoing research activities.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Building 1: Repair Building Exterior Envelope – Phase 2, 3, and 4

National Center for Agricultural Utilization Research (NCAUR)

USDA-ARS, Peoria, IL

DATE: February 8, 2023

National Center of Agricultural Utilization Research (NCAUR)

TOC-1

TABLE OF CONTENTS

Scope of Work Description

Attachments Material Approval Submittal form Schedule of Material Submittals Recently Replaced Component Form AD-107 form

General Notes and Standard Requirements

Listing of Bidding Quantities

Project Specifications See Table of Contents included in “Specifications” dated September 30, 2020

Project Drawings See Drawing Index included on Sheet G-001 of “Drawings” dated September 30, 2020

END OF TABLE OF CONTENTS

Scope of Work Description

Scope of Work Description:

1. Project Location: USDA-ARS-NCAUR

1815 North University Street Peoria, IL 61604

2. Point of Contact at Location: Craig Tiezzi craig.tiezzi@usda.gov

3. MWA EPM: Wayne Myers

(309)-681-6124 wayne.myers@usda.gov

4. Interested parties are strongly encouraged to visit the site of the proposed work and review the existing conditions there relating to construction and labor, and to be fully informed as to the facilities involved, and the difficulties and restrictions that may affect the performance of the Contract. Failure to visit the site will not disqualify those submitting a proposal. However, change order requests for items that could have been reasonably ascertainable from a site visit (and included in a proposal) will be reviewed by the CO and evaluated accordingly.

5. The project shall include a Base Bid and multiple Bid Options:

Base Bid shall be all work indicated for Phase 4 of the project.

Bid Option 01 shall be all work indicated for Phase 3 of the project.

Bid Option 02 shall be all work indicated for Phase 2 of the project.

6. The scope of the project shall be, generally, the repair of the building exterior envelope, replacement of windows and associated work components in accordance with this Statement of Work and FAR Solicitation and Contract clauses that are identified in the complete Solicitation package. This Statement of Work (SOW) shall consist of this “Scope of Work Description”, Attachments, General Notes and Requirements, Listing of Bidding Quantities, Project Specifications, and Project Drawings.

The scope of the project shall be performed in a neat, workmanlike manner and shall be sequenced for efficient workflow and to minimize interruption to the daily activities and ongoing research at the facility to the greatest extent possible.

The work components of the project shall include, but not limited to:

o Repair and replacement of brick masonry and corroded steel.

o Removal and replacement of windows along with associated flashing and counterflashing measures.

o Installation of weep holes.

o Repointing of mortar.

o Repair of cracks and spalls o Repair / replacement of selected limestone coping sections.

o Removal and replacement of sealant installations.

o Repair of metal coping installations.

o Restoration and painting of surfaces.

o Other associated repairs.

7. After project award, the Contractor shall inspect / confirm all existing conditions and dimensions prior to proceeding with any project activities and identify all existing conditions that may impact the work and alert the CO and EPM immediately if conditions are discovered that differ from the SOW. Contractor shall point out discrepancies between work identified in this SOW and actual field-verified conditions--if they exist, prior to performing work. Items not identified in SOW may be treated as unforeseen conditions and priced in accordance with standard FAR contract clauses. Coordinate with location for laydown and staging areas.

8. Period of performance shall be as indicated in the Contract Documents and begins after Notice to Proceed is issued by CO.

9. Basis-of-design products are indicated in this SOW to convey a specified standard of quality and salient characteristics desired but are not to be considered a single-source specification. Contractor-proposed equals will be considered.

The Contractor must compare and validate that quality and salient characteristics are equal and approve the proposed equal products prior to submission for Government review and approval. Additional work required to incorporate Contractor-proposed equals shall be at the Contractor’s expense.

Owner will review all Contractor-proposed equal equipment, materials, manufacturers, or installation. It shall be the Contractor’s burden to furnish all documentation and / or samples to show equality with specified items.

Owner’s decision on equality is final. Manufacturers / products that are submitted as “Approved Equal” are reviewed during the shop drawing process, not during bidding.

10. Submittals / product data / shop drawings shall be submitted as indicated in the

Project Specifications. Submittals shall be reviewed for general conformance with the Contract Documents. Markings for comments and approval of the submittals by USDA shall not be construed as releasing the Contractor from compliance with the specified requirements.

Use ARS submittal/transmittal form included with this SOW for each submittal.

All submittals shall be distributed to and reviewed by the Government prior to commencing work at the site. Purchase of materials prior to submittal approvals are at the Contractor’s risk.

Submittals are required for each product used, as well as for various testing requirements. See Project Specifications for additional information.

See Project Specifications for requirements on documenting Contractor’s effort in diverting waste to recycle.

11. See Project Specifications for requirements on construction progress documentation including, but not limited to: daily reports, construction schedule(s), etc.

Contractor shall prepare and submit to the Owner a combined construction schedule for the entire project. The schedule be comprehensive, integrated, and fully developed. Contractor shall secure time commitments for performing construction activities from his subcontractors and suppliers prior to submitting the construction schedule. Contractor shall revise the construction schedule based on actual progress. Contractor shall submit to the Owner an updated the construction schedule at least monthly and upon request by Owner.

Contractor shall prepare a daily construction report recording events at Project site. An electronic copy (pdf format) of the daily report shall be submitted daily to the Contracting Office Representative (COR) / Engineering Project Manager (EPM) / Location Monitor (LM). A copy of the daily shall be sent weekly to the Contracting Officer (CO) along with certified payrolls (coordinate submission requirements with CO). The daily construction report must be dated and signed and should include the following (see specification section 01 01 00 for additional information):

a. List of subcontractors.

b. High and low temperatures and general weather conditions.

c. Accidents

d. Stoppage, delays, and losses

e. Orders and requests of authorities having jurisdiction.

f. Services connected and disconnected.

g. Equipment or system tests and startups.

12. The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, supervision, *safety equipment, and incidentals for all elements of the work to provide a complete and properly functioning installation in accordance with this Statement of Work. The installation shall be ready for use by Final Completion date.

* Note: Contractor is solely responsible for safety measures and conformance to applicable requirements in accordance with FAR clauses referenced in Solicitation package.

Contractor shall provide all means and methods to protect the facility and its installations from all project activities, including protecting the facility from environmental elements as the improvements are completed.

The Contractor shall submit a detailed plan for dust mitigation and containment to the Government for review prior to starting any on-site project activities. See Project Specifications for additional information on requirements for submittals.

13. Contractor shall coordinate all work activities with the Owner prior to beginning any work. All work shall be scheduled in a manner such that ongoing research is not jeopardized, and facility’s ongoing day-to day operations are not affected negatively, including air quality.

Project shall be left clean at the end of each workday.

Contractor shall coordinate access to all areas with the designated USDA staff.

During pre-construction meeting, Contractor shall verify all parking, security, and health requirements with the USDA staff.

Coordinate with location for laydown and staging areas.

Attachments

National Center for Agricultural

Notes:

1. The following attachments follow:

a. Material Approval Submittal form

b. Schedule of Material Submittals

c. Recently Replaced Component form

d. AD-107 form

2. Regarding “Material Approval Submittal” form; Contractor shall complete and include this form on each material submittal provided in this project. See “Schedule of Material Submittals” for additional information.

3. Regarding “Schedule of Material Submittals”; schedule indicates a listing of material and information submittals required in the project.

4. Regarding “Recently Replaced Component Form”; Contractor shall complete (with Government assistance) this form and submit to the Government as part of project closeout.

5. Regarding “AD-107” form; Contractor shall complete (with Government assistance) this form and submit to the Government as part of project closeout.

MATERIAL APPROVAL SUBMITTAL

TO: USDA/ARS CO

CC: A&E, COR

FROM: (Contractor) PROJECT TITLE: CONTRACT NUMBER:

(To be completed by the Contractor) Government Use Only

SUBMITTAL

NUMBER:

PREVIOUS SUBMITTAL NUMBER

(only if items listed were submitted previously):

A&E

Recommendation

COR/EPM

Recommendation

Contracting Officer Approval/Disapproval

Line

No.

Specification Sect.

Para No., Draw No.

Description of Material

(Include type, model, mfg) APP

See

Comments on Reverse APP DISAP

See

Comments on Reverse APP DISAP

See

Comments on

Reverse

If an item is disapproved, a resubmittal is due within ________ calendar days of the Contracting Officer’s signature below.

Contractor A&E COR/EPM Contracting Officer TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

By completing this form, the above signed contractor certifies that the material complies with all specifications of the subject contract.

DATE RECEIVED FROM KTR: DATE RECEIVED FROM A&E: DATE RECEIVED FROM COR:

Material Approval Submittal Cover Sheet (11/2016)

Building 1: Repair Building Exterior Envelope - Phase 6 USDA-ARS-NCAUR, Peoria, IL

N-A

N-A

N-A

N-A

Wayne.Myers Cross-Out

CONTRACT #: SUBMITTAL #:

COMMENTS

Instructions: Enter the initials of the individual making the comment, the Line Number of the item for which the comment is being made, and the comment.

Material Approval Submittal Cover Sheet (11/2016) (Reverse)

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER:

PROJECT TITLE:

Building 1: Repair Building Exterior Envelope; USDA‐ARS‐NCAUR, Peoria, IL

SOLICITATION/CONRTACT NUMBER:

TO BE COMPLETED BY COR TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NO.

SOW /PWS/

SPECIFICATION NO: ITEM CE

RT

IF

IC

AT

E O F

CO

M

PL

IA

N

CE

SH

O P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

M

AN

U

FA

CT

U

RE

R' S

RE

CO

M M

EN

DA

TI

O N S

M

AN

U

FA

CT

U

RE

R' S W

AR

RE

N

TY

CA

TA

LO

G

PR

O

DU

CT

D

AT

A

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N S

TE

ST

R

EP

O

RT

S

O

TH

ER

(S

EE

S

PE

CI

FI

CA

TI

O N

REQUIRED

SUBMISSION

DATE

DATE TO

COR

DATE

CONTRACTING

OFFICER

RECEIVED

RETURN

SUSPENSE DATE

DATE

CONTRACTOR

NOTIFIED

APPROVED

(INSERT

SUBMITTAL

NUMBER)

DISAPPROVED

(INSERT

SUBMITTAL

NUMBER)

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

1 Scope of Work Description

Daily Reports

2 Scope of Work Description

Construction Schedule

Specification Section

01 01 00 Training Records X

Specification Section

01 01 00 Daily Reports

Specification Section

01 01 00 Meeting Minutes from Formal Meetings

Specification Section

01 01 00 Safety Plan X

Specification Section

01 01 00 Fire Safety Plan X

Specification Section

01 01 00 Construction Schedule X

Specification Section

01 01 00 Project Record Documents X

Specification Section

01 01 00 Waste Management Plan X

Specification Section

01 11 00 Salvage Plan X

Specification Section

01 35 26 Accident Preventation Plan X

Specification Section

01 35 26 Accident Reports X

Specification Section

01 35 26 Standard Lift Plan X

Specification Section

01 35 26 Critical Lift Plan X

Specification Section

01 45 00 Contractor Quality Control Plan X

Specification Section

01 61 16 VOC‐restricted product X

Specification Section

01 78 00 Operation and Maintenance Data X X X

Specification Section

01 78 00 As Built Drawings X

Specification Section

01 78 00 Certification of EPA Designated Items X

Specification Section

02 41 00 Site Plan X

Specification Section

03 01 00 Concrete Removal Equipment X

Specification Section

03 01 00 Concrete Mix Design X

Specification Section

03 01 00 Methods of Curing X

Specification Section

04 01 00 Cleaning compounds X

26 Section 04 05 11 Masonry Mortaring and Grouting X X X X X

Specification Section

04 20 00 General Masonry X X X X X

Specification Section

04 23 00 Glass Unit Masonry X X X X X

Specification Section

06 10 00 Rough Carpentry X X X

LINE NO.

SOW /PWS/

SPECIFICATION NO: ITEM CE

RT

IF

IC

AT

E O F

CO

M

PL

IA

N

CE

SH

O P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

M

AN

U

FA

CT

U

RE

R' S

RE

CO

M M

EN

DA

TI

O N S

M

AN

U

FA

CT

U

RE

R' S W

AR

RE

N

TY

CA

TA

LO

G

PR

O

DU

CT

D

AT

A

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N S

TE

ST

R

EP

O

RT

S

O

TH

ER

(S

EE

S

PE

CI

FI

CA

TI

O N

REQUIRED

SUBMISSION

DATE

DATE TO

COR

DATE

CONTRACTING

OFFICER

RECEIVED

RETURN

SUSPENSE DATE

DATE

CONTRACTOR

NOTIFIED

APPROVED

(INSERT

SUBMITTAL

NUMBER)

DISAPPROVED

(INSERT

SUBMITTAL

NUMBER)

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

Specification Section

07 13 00 Sheet Waterproofing X X X X X

31 Section 07 21 00 Thermal Insulation X X X

Specification Section

07 62 00 Sheet Metal Flashing and Trim X

Specification Section

07 84 13 Fire Stopping Penetrations, Fire Restitive Joints, Perimeter Fire Barrier Systems

X X X

Specification Section

07 92 00 Joint Sealants X X X X X

Specification Section

08 41 13 Aluminum‐Framed Entrances and Storefronts

X X X X X X

Specification Section

08 44 13 Glazed Aluminum Curtain Wall X X X X

Specification Section

08 51 13 Aluminum Windows X X X X X

Specification Section

08 71 00 Door Hardware X X X X

Specification Section

08 88 00 Glazing X X X X

Specification Section

09 22 16 Non‐structural Metal Framing X

Specification Section

09 23 00 Gypsum Plastering X

Specification Section

09 24 00 Cement Plastering X X

Specification Section

09 29 00 Gypsum Board X X

Specification Section

09 51 23 Acoustical Tile Ceilings X X

Specification Section

09 65 13 Resilient Base and Accessories X X X

Specification Section

09 91 23 Interior Painting X X X

Specification Section

09 91 23 High‐Performance Coatings X X X

BUILDER Facility Condition Assessments Recently Replaced Component Form (Not Repairs)

Location/Site name:

Building (CPAIS Asset ID):

Submitted by:

Contact information:

System Equipment Year Installed Location/Room Quantity/Area

Serial Number Model Manufacturer Comments Attachments

Old item

New item

Old item

New item

Old item

New item Notes: 1. If the equipment is not replacing another piece of equipment please use the new installation form

2. Please use this form for equipment replacements as well as building improvements (i.e. roofing, window, or facade replacement projects) greater then $75,000

3. Please provide a PDF of any documents associated with the new install

4. Some columns may not be applicable depending on what is being added

5. If you have suggestions on improvements/questions regarding this form email them to Joshua.Nye@USDA.GOV or call 301-504-1173

Date: ______________________ mailto:Joshua.Nye@ARS.USDA.GOV Joshua.Nye Stamp

Joshua.Nye Stamp

Joshua.Nye Stamp

Here is an example of an attached Word Doc converted into adobe where we can add details and additional information. PDF items can be attached, other formats will need to be converted to adobe.

Joshua.Nye File Attachment Example attachement.pdf

United States Department of Agriculture

Report of Transfer or Other Disposition or Construction of Property

Report No.

Date

3. Proceeds Received

1. Type of Transaction (Report each type separately)

Transfer Sale Trade In Donation

Construction Rehab As-Is

2. Authorization Reference

4. Reporting Agency 5. Receiving Agency (Or Name of Purchaser or Donee)

A. Organizational Unit

B. Location

C. Signature

D. Title

A. Organizational Unit (Or Address of Purchaser)

B. Location

C. Signature

D. Title E. Date

6. Property Items

Quantity (Or Prop. No.)

Item Description (Give Full Details Including Serial Numbers, If Any, and Condition Code)

Inventory Value

Certifications of Property and Fiscal Officers

7. Property Officer: This transaction is completed and the necessary entries have been made to adjust the property records proceeds, if any, are to be deposited to:

Signature Date

8. Fiscal Officer

The sum indicated below has been received in payment for the property disposed of.

A.

B. The necessary entries have been made to adjust the accounting records.

Amount Schedule No.

Signature Date

Form AD-107 (11/89)This form was electronically produced by USDA/ARS/OCIO/EASB.

E. Date

National Center of Agricultural Utilization Research

GN-1

General Notes and Standard Requirements

GN-2

General Notes and Standard Requirements

General Notes:

1. The furnishing and installation of all improvements indicated shall be complete in every respect and ready for use.

2. All work shall be coordinated and scheduled to avoid disrupting and jeopardizing ongoing research. Coordinate access to interior space(s) with COR or Location Monitor (designated by CO).

a. Contractor shall coordinate with COR or Location Monitor any orderly shutdown of scientific equipment, machines and computer equipment as needed for the performance of the contracted work.

b. Contractor shall coordinate with COR or Location Monitor any moving of scientific equipment, machines and computer equipment as needed for the performance of the contracted work.

3. When renovations and improvements are performed within an Owner-occupied space; adequate protection of sensitive equipment, machines and computers shall be implemented.

4. Contractor shall utilize appropriate personal protection equipment (PPE) during the performance of the Work.

5. Contractor shall provide final cleaning of project area, see specifications for additional information.

Standard Requirements – Diversion of Project Waste to Recycling:

1. Waste Disposal: Contractor shall divert project waste to recycle where practical.

The Contractor shall track and document the amount of project waste diverted to recycle.

2. Contractor shall submit documentation on the amount of project waste diverted to recycle as part of project closeout. Contractor shall submit the type and amount of waste that was diverted to recycle, present information in a clear, typewritten format.

If no project waste is diverted to recycle, the Contractor shall submit a letter stating this and why diversion was not practical.

Submit documentation in accordance with Section 01 33 00 of the Project Specifications.

BQ-1

Listing of Bidding Quantities

BQ-2

Notes - Listing of Bidding Quantities:

1. Contractor shall use the quantities indicated in attached “Listing of Bidding

Quantities” document in determining their pricing.

2. Regarding limestone coping stones; Contractor shall assume each limestone coping stone is 48” long x 2’-1/2” wide x 4-1/4” deep (i.e. dimensions from original construction drawings) for bidding purposes.

3. General Conditions shall include, but not limited to: projection management, supervision, safety program, quality control program, office support, mobilization, demobilization, project submittals, transportation / lodging, project closeout activities, project meetings, project reports, project scheduling, associated materials, associated labor, incidentals, etc. for a complete, properly functioning, code compliant project installation in accordance with the Statement of Work, Project Specifications, Project Drawings and contractual requirements of this project.

4. Where lump sum is indicated in the attached “Listing of Bidding Quantities” document; Contractor shall determine the quantities needed for the listed item.

5. Abbreviations:

ls = lump sum sf = square feet lf = lineal fee ea = each

8‐Feb‐23

Listing of Bidding Quantities ‐ Base Bid ‐ Phase 4

Building 1: Repair Building Exterior Envelope National Center for Agricultural Utilization Research (NCAUR) USDA‐ARS, Peoria, IL

Item Description Quantity Unit 1 General conditions 1 ls 2 Construction entrance 1 ls 3 Site Fencing @ staging area 1 ls 4 Site Safety Fencing 1 ls

5 Restore grassy areas disturbed / damaged by project activities 1 ls

Restore / replace landscaping (shrubs, trees, plantings beds, etc) disturbed / damaged by project activities

1 ls

Restore / repair asphalt areas disturbed / damaged by project activities

1 ls

8 Protect site landscaping from project activities 1 ls 9 Temporary overhead protection 1 ls 10 Temporary interior dust protection 1 ls 11 Temporary redirection signage 1 ls 12 Demolition ‐ material hauling 1 ls

13 Remove / reinstall exterior miscellaneous electrical devices / lights 1 ls

14 Final clean brick / concrete 1 ls 15 Scaffolding / equipment 1 ls 16 Temporary supports 1 ls 17 Remove brick fascia @ cracked brick 210 sf 18 Remove 3 courses of brick @ relieving angle 820 sf 19 Remove joint filler & sealant @ relieving angle 820 lf 20 New brick to match existing @ cracked area 210 sf 21 Reinstall salvaged brick @ relieving angle 820 sf 22 New flashing @ relieving angle 820 lf 23 Prep / clean / paint relieving angle 820 lf 24 Replacement of damaged relieving angle allow 25% 210 lf 25 Repoint deteriorated mortar to match existing 60 sf 26 Sandblast fascia to remove streaks & stains 90 sf 27 Remove 3 courses of brick to install new relieving angle 100 sf 28 New relieving angle 100 lf 29 New brick to match existing @ new relieving angle 100 sf 30 Remove / repair cracked concrete @ wall 40 sf 31 Prep / clean / coat steel reinforcement 40 sf 32 Forms for concrete repair 1 ls 33 Paint exteroir concrete wall 4330 sf 34 Remove and reinstall stone panels 450 sf

Listing of Bidding Quantities ‐ Base Bid ‐ Phase 4

Building 1: Repair Building Exterior Envelope National Center for Agricultural Utilization Research (NCAUR) USDA‐ARS, Peoria, IL

Item Description Quantity Unit 35 Sealant @ stone panel 1 ls 36 Stainless steel sill pan 300 lf 37 Non asphaltic membrane 300 lf 38 1/4" steel plate 330 lf 39 Modify gypsum board wall window head 330 lf 40 Sealant 1 ls 41 Bond breaker tape & sealant 280 lf 42 New backer rod & sealant 280 lf 43 Stainless steel flashing 280 lf 44 Stainless steel sill pan end dam in mortar 280 lf 45 Remove and reinstall steel plate 280 lf 46 Remove & replace window sills 330 lf 47 5x5 angle 40 lf 48 4x4 angle 40 lf 49 Replace metal flashing 60 lf 50 7/8" hat channel 110 lf 51 1/2" gypsum 200 lf 52 2"x2" aluminum angle 300 lf 53 1"x1‐1/2" aluminum angle 40 lf 54 Miscellaneous blocking & wood trim 850 sf 55 Repair crack / spall on interior basement wall; paint to match 20 lf 56 Remove existing glass block window installations 160 sf 57 Remove existing windows 57 ea 58 Remove existing curtainwall 500 sf 59 Remove double doors & hardware @ curtainwall 1 ea 60 New window Type B 10 ea 61 New window Type N 42 ea 62 New window Type S 2 ea 63 New window Type U 3 ea 64 New glass block window installations 160 sf 65 New curtain wall 500 sf 66 New double doors & hardware @ curtainwall 1 ea 67 Remove and reinstall window treatments 60 loc

Listing of Bidding Quantities ‐ Bid Option 01 ‐ Phase 3

Building 1: Repair Building Exterior Envelope National Center for Agricultural Utilization Research (NCAUR) USDA‐ARS, Peoria, IL

Item Description Quantity Unit 1 General conditions 1 ls 2 Construction entrance 1 ls 3 Site Fencing @ staging area 1 ls 4 Site Safety Fencing 1 ls 5 Restore grassy areas disturbed / damaged by project activities 1 ls

Restore / replace landscaping (shrubs, trees, plantings beds, etc) disturbed / damaged by project activities

1 ls

Restore / repair asphalt areas disturbed / damaged by project activities

1 ls

8 Protect site landscaping from project activities 1 ls 9 Temporary overhead protection 1 ls 10 Temporary interior dust protection 1 ls 11 Temporary redirection signage 1 ls 12 Demolition ‐ material hauling 1 ls

13 Remove / reinstall exterior miscellaneous electrical devices / lights 1 ls

14 Final clean brick / concrete 1 ls 15 Scaffolding / equipment 1 ls 16 Temporary supports 1 ls 17 Remove brick fascia @ cracked brick 40 sf 18 Remove 3 courses of brick @ relieving angle 1050 sf 19 Remove joint filler & sealant @ relieving angle 1050 lf 20 New brick to match existing @ cracked area 40 sf 21 Reinstall salvaged brick @ relieving angle 1050 sf 22 New flashing @ relieving angle 1050 lf 23 Prep / clean / paint relieving angle 1050 lf 24 Replacement of damaged relieving angle allow 25% 270 lf 25 Repoint deteriorated mortar to match existing 10 sf 26 Sandblast fascia to remove streaks & stains 20 sf 27 Remove / repair cracked concrete @ wall 200 lf 28 Prep / clean / coat steel reinforcement 200 sf 29 Forms for concrete repair 1 ls 30 Paint exteroir concrete wall 3800 sf 31 Remove and reinstall stone panels 660 sf 32 Sealant @ stone panel 1 ls 33 Stainless steel sill pan 1060 lf 34 Non asphaltic membrane 1060 lf 35 1/4" steel plate 1000 lf

Listing of Bidding Quantities ‐ Bid Option 01 ‐ Phase 3

Building 1: Repair Building Exterior Envelope National Center for Agricultural Utilization Research (NCAUR) USDA‐ARS, Peoria, IL

Item Description Quantity Unit 36 Modify gypsum board wall window head 1040 lf 37 Sealant 1 ls 38 Bond breaker tape & sealant 60 lf 39 New backer rod & sealant 990 lf 40 Stainless steel flashing 990 lf 41 Stainless steel sill pan end dam in mortar 990 lf 42 Remove and reinstall steel plate 990 lf 43 Remove & replace window sills 1100 lf 44 5x5 angle 50 lf 45 4x4 angle 50 lf 46 Replace metal flashing 90 lf 47 7/8" hat channel 140 lf 48 1/2" gypsum 280 lf 49 2"x2" aluminum angle 1060 lf 50 1"x1‐1/2" aluminum angle 80 lf 51 Miscellaneous blocking & wood trim 3000 sf 52 Repair crack / spall on interior basement wall; paint to match 40 lf 53 Remove damaged ceiling tile; replace with new 200 sf 54 Remove existing glass block window installations 220 sf 55 Remove existing windows 71 ea 56 Remove existing curtainwall 560 sf 57 Remove double doors & hardware @ curtainwall 1 ea 58 New window Type A 15 ea 59 New window Type B 9 ea 60 New window Type N 40 ea 61 New window Type Q 1 ea 62 New window Type S 6 ea 63 New glass block window installations 220 sf 64 New curtain wall 560 sf 65 New double doors & hardware @ curtainwall 1 ea 66 Remove and reinstall window treatments 75 loc

Listing of Bidding Quantities ‐ Bid Option 02 ‐ Phase 2

Building 1: Repair Building Exterior Envelope National Center for Agricultural Utilization Research (NCAUR) USDA‐ARS, Peoria, IL

Item Description Quantity Unit 1 General conditions 1 ls 2 Construction entrance 1 ls 3 Site Fencing @ staging area 1 ls 4 Site Safety Fencing 1 ls 5 Restore grassy areas disturbed / damaged by project activities 1 ls

Restore / replace landscaping (shrubs, trees, plantings beds, etc) disturbed / damaged by project activities

1 ls

Restore / repair asphalt areas disturbed / damaged by project activities

1 ls

8 Protect site landscaping from project activities 1 ls 9 Temporary overhead protection 1 ls 10 Temporary interior dust protection 1 ls 11 Temporary redirection signage 1 ls 12 Demolition ‐ material hauling 1 ls

13 Remove / reinstall exterior miscellaneous electrical devices / lights 1 ls

14 Final clean brick / concrete 1 ls 15 Scaffolding / equipment 1 ls 16 Temporary supports 1 ls 17 Remove brick fascia @ cracked brick 100 sf 18 Remove 3 courses of brick @ relieving angle 835 sf 19 Remove joint filler & sealant @ relieving angle 835 lf 20 New brick to match existing @ cracked area 90 sf 21 Reinstall salvaged brick @ relieving angle 835 sf 22 New flashing @ relieving angle 835 lf 23 Prep / clean / paint relieving angle 835 lf 24 Replacement of damaged relieving angle allow 25% 210 lf 25 Repoint deteriorated mortar to match existing 20 sf 26 Sandblast fascia to remove streaks & stains 40 sf 27 Remove 3 courses of brick to install new relieving angle 30 sf 28 New relieving angle 30 sf 29 New brick to match existing @ new relieving angle 30 sf 30 Remove sealant & clean @ existing horizontal joint 30 lf 31 Replace sealant or mortar @ existing horizontal joint 30 lf 32 Remove sealant & clean @ existing vertical joint 100 lf 33 New backer rod & sealant @ existing vertical joint 100 lf 34 Saw cut both sides of existing vertical joint 200 lf 35 Remove / repair cracked concrete @ wall 200 lf

Listing of Bidding Quantities ‐ Bid Option 02 ‐ Phase 2

Building 1: Repair Building Exterior Envelope National Center for Agricultural Utilization Research (NCAUR) USDA‐ARS, Peoria, IL

Item Description Quantity Unit 36 Remove cracked brick @ wall 20 sf 37 New brick to match existing @ cracked area 20 sf 38 Prep / clean / coat steel reinforcement 200 sf 39 Forms for concrete repair 1 ls 40 Paint exteroir concrete wall 3850 sf 41 Remove and reinstall stone panels 490 sf 42 Sealant @ stone panel 1 ls 43 Stainless steel sill pan 950 lf 44 Non asphaltic membrane 950 lf 45 1/4" steel plate 290 lf 46 Modify gypsum board wall window head 950 lf 47 Sealant 1 ls 48 2"x2" aluminum angle 950 lf 49 Remove & replace window sills 120 lf 50 New backer rod & sealant 180 lf 51 Stainless steel flashing 830 lf 52 New ACT ceiling 60 sf 53 Stainless steel sill end dam in mortar 830 lf 54 Remove and re‐install steel plate 830 lf 55 New painted plaster sill below windows 60 sf 56 Gypsum sill 600 lf 57 Remove & replace window sills 180 lf 58 Miscellaneous blocking & wood trim 830 sf 59 Repair damaged brick wall; paint to match 4050 sf 60 Remove damaged paint & mold; paint to match 2780 lf 61 Remove & salvage existing louver 20 sf 62 Re‐install salvaged louver 20 sf 63 Remove existing windows 68 ea 64 Remove existing curtainwall 300 sf 65 Remove double doors & hardware @ curtainwall 1 ea 66 New window Type B 3 ea 67 New window Type B‐R1 9 ea 68 New window Type N‐R1 45 ea 69 New window Type Q‐R1 2 ea 70 New window Type S‐R1 9 ea 71 New curtain wall 300 sf 72 New double doors & hardware @ curtainwall 1 ea 73 Remove and reinstall window treatments 75 loc

Peoria-Repair Bldg Exterior-Attachments.pdf
Recently Replaced Component Form-Peoria-Repair Bldg Ext-Ph 2-3-4.pdf
Location/Site name:
LocationSite name:
Building CPAIS Asset ID:
Submitted by:
Contact information:
EquipmentOld item:
Year InstalledOld item:
LocationRoomOld item:
QuantityAreaOld item:
Serial NumberOld item:
ModelOld item:
ManufacturerOld item:
CommentsOld item:
EquipmentNew item:
Year InstalledNew item:
LocationRoomNew item:
QuantityAreaNew item:
Serial NumberNew item:
ModelNew item:
ManufacturerNew item:
CommentsNew item:
EquipmentOld item_2:
Year InstalledOld item_2:
LocationRoomOld item_2:
QuantityAreaOld item_2:
Serial NumberOld item_2:
ModelOld item_2:
ManufacturerOld item_2:
CommentsOld item_2:
EquipmentNew item_2:
Year InstalledNew item_2:
LocationRoomNew item_2:
QuantityAreaNew item_2:
Serial NumberNew item_2:
ModelNew item_2:
ManufacturerNew item_2:
CommentsNew item_2:
EquipmentOld item_3:
Year InstalledOld item_3:
LocationRoomOld item_3:
QuantityAreaOld item_3:
Serial NumberOld item_3:
ModelOld item_3:
ManufacturerOld item_3:
CommentsOld item_3:
EquipmentNew item_3:
Year InstalledNew item_3:
LocationRoomNew item_3:
QuantityAreaNew item_3:
Serial NumberNew item_3:
ModelNew item_3:
ManufacturerNew item_3:
CommentsNew item_3:
Uniformat Dropdown1: [ ]
Uniformat Dropdown2: [ ]
Uniformat Dropdown3: [ ]
Button1:
Date:

File details come from the government source that posted it. Updated .