This document contains a schedule of items for a construction project and related federal contract opportunity. The schedule of items lists 14 construction items including mobilization, replacing a submersible well pump, installing a solar power system, fencing, and aggregate base work. Unit prices and a total proposed price are provided. The related federal contract opportunity is solicitation number 127EAW23R0057 for improvements to the GAOA Dru Barner Coordinated Resource Management group grounds issued by the U.S. Department of Agriculture Forest Service. The schedule of items provides a breakdown of work items and proposed pricing for a construction project to support the federal contracting opportunity listed.

View the file

Other files

File Type Posted
7. RFI Form.docx DOCX document
5. Davis-Bacon Act WD # CA20230007.pdf PDF
4. Supplemental Specifications.pdf PDF
1. Statement of Work.pdf PDF
127EAW23R0057 - GAOA Dru Barner CG Improvements.pdf PDF
3. Project Plans.pdf PDF
6. Fire Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

Item
Construction Items
Qty
UNIT
Unit Price
Total Price
1
Mobilization
1
LS
$
$
2
Clean Groundwater Well
1
LS
$
$
3
Replace Submersible Well Pump
1
LS
$
$
4
Check Valve, Booster Pump, Hydropneumatic Tank
1
LS
$
$
5
Install Solar Power System
1
LS
$
$
6
Install Power and Control Wiring
1
LS
$
$
7
Chain Link Fence Enclosure
1
LS
$
$
8
Water Meter
1
LS
$
$
9
Water Filter System
1
LS
$
$
10
Prefabricated Building
1
LS
$
$
11
20409 Excavation, Rolling Dip
1
EA
$
$
12
20410 Excavation, Rocked Swale
1
EA
$
$
13
30103 Aggregate base, grading D, compaction method 2
72.0
TON
$
$
14
30315 Roadway Reconditioning, gravel surface road, compaction method 2
0.7
MI
$
$
BASE COMBINED TOTAL:
$