Solicitation No: 127EAW23R0024 Project Name: Chimney Beach Parking Lot
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| ITEM NUMBER |
| DESCRIPTION |
| UNIT |
| QTY |
| UNIT PRICE |
| TOTAL |
| 15101 |
| Mobilization |
| Lump Sum |
| 1 |
| $ |
| $ |
| 15201 |
| Construction Survey and Staking, method II, tolerance B |
| Lump Sum |
| 1 |
| $ |
| $ |
| 20102 |
| Clearing and grubbing, disposal method (a) |
| Acre |
| 2.17 |
| $ |
| $ |
| 20207 |
| Removal of Individual Trees, disposal method (FS Permit) |
| Each |
| 130 |
| $ |
| $ |
| 20401-A |
| Roadway excavation and embankment, compaction placement method 2, Tolarance E - Earth |
| Cubic Yard |
| 1,250 |
| $ |
| $ |
| 20401-B |
| Roadway excavation and embankment, compaction placement method 2, Tolerance E - Rock |
| Cubic Yard |
| 600 |
| $ |
| $ |
| 20415 |
| Embankment construction, compaction placement method 2, Tolerance E, Select Borrow |
| Cubic Yard |
| 4,850 |
| $ |
| $ |
| 20424 |
| Drainage Excavation, Rock Lined Channel |
| Linear Foot |
| 290 |
| $ |
| $ |
| 20425 |
| Drainage Excavation, Sediment Basin |
| Each |
| 1 |
| $ |
| $ |
| 25204 |
| Rockery Retaining Wall, Dry Stack |
| Square Yard |
| 253 |
| $ |
| $ |
| 30401 |
| Full Depth Asphalt Reclamation, 4" depth, 3" minus |
| Square Yard |
| 1450 |
| $ |
| $ |
| 60201 |
| 24" Class III Reinforced Concrete Pipe |
| Linear Foot |
| 300 |
| $ |
| $ |
| 60207 |
| 24" Reinforced Concrete Flared End Section |
| Each |
| 3 |
| $ |
| $ |
| 60402 |
| Installed Drainage Inlet, Rectangular w/ Grate FP=14 section 725.09 € |
| Each |
| 1 |
| $ |
| $ |
| 63606 |
| Utility Pole Adjustment |
| Lump Sum |
| 1 |
| $ |
| $ |
| BASE CONSTRUCTION TOTAL: |
| $ |
B.2 SCHEDULE OF ITEMS - OPTION 1
| ITEM NUMBER |
| DESCRIPTION |
| UNIT |
| QTY |
| UNIT PRICE |
| TOTAL |
| 30103 |
| Aggregate Base - CalTrans 3/4" Class 2 (or approved equal), Compaction D |
| Ton |
| 1150 |
| $ |
| $ |
B.3 SCHEDULE OF ITEMS - OPTION 2
| ITEM NUMBER |
| DESCRIPTION |
| UNIT |
| QTY |
| UNIT PRICE |
| TOTAL |
| 60902 |
| Concrete Curb and Gutter, 9.5 inch depth |
| Linear Foot |
| 1340 |
| $ |
| $ |
B.4 SCHEDULE OF ITEMS - OPTION 3
| ITEM NUMBER |
| DESCRIPTION |
| UNIT |
| QTY |
| UNIT PRICE |
| TOTAL |
| 61501 |
| Concrete Sidewalk, 4 inch depth |
| Square Yard |
| 350 |
| $ |
| $ |
| TOTAL PROPOSED AMOUNT (BASE + OPTION 1, 2, 3 COMBINED) |
| $ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |
| POC & Title: |