2. PWS - KNMD260027 Repair Roll Up Doors B3424 and B3379.pdf

PDF 161 KB Posted

Attached to
Repair Roll-up Doors, JBPHH, Hawaii Air National Guard
Solicitation number
W50SLF26QA011
Issued by

About this file

Summary: Performance Work Statement for Roll Up Doors Repair Services

This Performance Work Statement (PWS) specifies repair and replacement services for roll-up door systems at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, Hawaii. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform the work. The scope encompasses three primary tasks: (1) converting Door #6 in Building 3424 from automatic to manual chain-hoist operation by removing the motor operator, control panel, sensors, and electrical components, then installing a new heavy-duty manual chain hoist with proper spring balance; (2) replacing the non-functional motor operator on Door #10 in Building 3424 with a new commercial-grade motor operator, including installation of controls, safety devices, and programming of open/close limits; and (3) completely demolishing and replacing the severely degraded 12' x 14' overhead coiling door on the Mauka side of Building 3379 with a new heavy-duty commercial-grade coiling door system featuring 22-gauge hot-dipped galvanized steel slats, structural steel guides, compression spring system, weatherproofing, manual chain hoist, and inside slide locks. All work must comply with applicable building codes, safety standards, and manufacturer recommendations, with contractor personnel required to maintain State of Hawaii licenses as qualified roll-up door systems technician contractors.

The contract has a 90-day period of performance, estimated from September 30, 2026, to December 28, 2026, with services performed Monday through Friday, 0700-1600 hours, excluding federal holidays. Deliverables include pre-work submittals (installation plan and schedule, material submittals) within 15-30 days of award, post-work submittals (preventive maintenance schedule, operations and maintenance manuals, as-built drawings, discrepancy cost estimate, and warranty documentation) within 30 days of final inspection, and comprehensive operational testing of all three doors with Government representative present. The contractor provides a one-year workmanship warranty on all work and must secure standard commercial warranties from manufacturers. Training and compliance requirements include Antiterrorism Level I training within 15 days, OPSEC training and plan submission within 15-30 days, ADLS registration, and PII protection in accordance with DFARS and DoD directives. All contractor employees require base identification, security clearance adjudication per NCIC-III and TSDB standards, and compliance with installation access and security policies.

View the file

Other files

File Type Posted
3. SCA Wage Determination 5.13.26.pdf PDF
1. Solicitation - W50SLF26QA011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

PERFORMANCE WORK STATEMENT (PWS)

FOR

Roll Up Doors Repair Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Roll Up Doors Repair Services, as defined in this

PWS.

1.1.1 Objectives: Repair and Replace Roll Up Door systems components in Building 3424 (AGE Motor Pool Shop) and Building 3379 at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, HI 96853.

1.2 Background: Perform complete repair of two (2) Roll Up Doors in B3424. The motor operator for Door #10 is non-functional and requires a full replacement.

Concurrently, the automatic roll-up Door #6 is to be converted to a manual chain-hoist operation to meet new operational needs. Additionally, perform a complete demolition and replacement of the severely degraded, inoperable 12' x 14' overhead coiling door on the Mauka side of Building 3379. All work shall comply with applicable building codes, safety standards, and manufacturer recommendations.

All work shall be completed as indicated on this PWS, the Contract drawings, and in accordance with specifications and codes. Contractor personnel shall comply with the State of Hawaii minimum required level of training to work as qualified Roll up Door systems technician contractors and provide a copy of the license/certification to the contracting officer (for each employee) at the time of contract start. The work shall be performed following all applicable Federal and State codes and regulations, including the requirements stated in this PWS. The Contractor must coordinate with the 154 Civil Engineering Squadron (CES) to access the work site as well as coordinate with the 154 CES environmental section for any hazardous materials storage/disposal.

1.3 Period of Performance (PoP): The Period of Performance shall 90 days.

Estimated: September 30, 2026, to December 28, 2026

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at:

This project is located at Building 3424 & 3379 at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, HI 96853.

The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.

3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

4. Reserved

5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6. Failure to comply with these requirements may result in withholding of final payment.

1.4.5.1. Reserved

1.4.5.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.

1.4.5.4 Reserved.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved

1.4.5.7 Advanced Distributed Learning Service (ADLS). All contractor employees and associated sub-contractor employees assigned to work on a Government site and/or requiring access to a DoD network will be required to register with ADLS at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD IAA CyberAwareness, Protecting Sensitive Information, Force Protection, etc.). ADLS website:

https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.

1.4.5.11 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSEC Awareness for Military Members, DoD Employees and Contactors) is located on the Security Training, Education, and Professionalization Portal (STEPP), https://cdse.usalearning.gov and the OPSEC Annual training – DAF OPSEC Awareness Training located on My Learning, https://lms-jets.cce.af.mil/moodle/course/view.php?id=11654#section-1.

The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training.

1.4.5.12 OPSEC Plan. The contractor shall develop an OPSEC Plan and provide it to the COR or KO within 15 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC officer, per AFI 10-701, Operations Security.

This Plan shall include the Government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. For the contractor to effectively comply with OPSEC provisions of the contract, the organization will provide the following guidance: (1) Organization’s Critical Information; (2) Adversaries’ collection threat information as it applies to the organization’s mission and the contract; (3) Operations Security guidance; and (4) Specific OPSEC measures the organization requires (as appropriate).

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Reserved

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses to work as Roll up Door systems technician contractors in the State of Hawaii in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.

The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the KO, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The

CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Reserved

1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.

3.2 Materials: None

3.3 Equipment: None

3.4 Services: None

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.3 Contractor Security Clearance: Reserved

5.0 Requirements: The Contractor shall:

5.1 Door #6 - Conversion from Automatic to Manual Operation:

De-energize and Remove: Safely de-energize, lock-out/tag-out, and remove all electrical power connections to the Door #6 motor operator.

Remove Automatic Components: Completely remove the existing motor operator, control panel, push-button stations, safety sensors (reversing edges), and all associated electrical conduit and wiring.

Install Manual Chain Hoist: Furnish and install a new, heavy-duty manual chain hoist mechanism appropriately sized for the door's weight and dimensions.

Adjust Door Balance: Inspect and adjust the door's torsion springs as necessary to ensure it is properly balanced for safe and efficient manual operation via the new chain hoist.

5.2 Door #10 - Motor Operator Replacement:

De-energize and Remove: Safely de-energize, lock-out/tag-out, and remove the existing, non-functional motor operator, control panel, and any associated faulty components.

Install New Motor Operator: Furnish and install one (1) new, heavy-duty commercial-grade motor operator (e.g., jackshaft or hoist type). The new operator must be correctly sized for the door's specifications and cycle-duty requirements.

Install Controls and Safety Devices: Connect the new operator to the existing power source. Connect the button (Open/Close/Stop) control station, and a reversing safety edge on the bottom of the door.

Programming and Limit Setting: Program and calibrate the new operator by setting the precise open and close travel limits. Adjust clutch and torque settings in accordance with the manufacturer's installation manual.

5.3 Building 3379 - Mauka Side Overhead Door Replacement:

Demolition and Disposal: Safely dismantle, remove, and dispose of the existing inoperable, rusted 12' x 14' overhead door, shroud, guides, and all associated damaged components on the Mauka side of Building 3379.

Install New Coiling Door Assembly: Furnish and install one (1) new 12' x 14' heavy-duty commercial-grade overhead coiling door system featuring 22-gauge, hot-dipped galvanized steel contour slats primed in gray.

Guides and Headplates: Provide and install structural steel guides and headplates primed in black.

Springs and Deflection Limits: Equip the door with a compression spring system designed for ease of maintenance, and a heavy-duty one-piece barrel designed to limit deflection to 0.03" per foot of door width.

Safety and Weatherproofing: Install galvanized endlocks to prevent slat wear, a bottom weatherstrip, and a 24-gauge roll-formed hood.

Manual Operation & Security: Equip the system with a manual chain hoist assembly and two (2) secure inside slide locks.

5.4 Post-Repair Operational Testing: Upon completion of the physical installation, the Contractor shall perform comprehensive operational tests on all three (3) doors in the presence of a Government representative.

Door #6: Must travel smoothly up and down its full range of motion using the manual chain hoist and remain in the open position without drifting.

Door #10: The new motor operator must run smoothly and quietly. The door must open and close correctly using the control station, and stop accurately at the set limits. All safety features (reversing edge) must be tested and proven to be fully functional.

Building 3379 (Mauka Side Door): The new door must travel smoothly and quietly through its full range of motion via the manual chain hoist, balance properly without drifting, and successfully lock/secure using both inside slide locks.

The Contractor shall perform any necessary adjustments to ensure the proper, safe, and reliable operation of both roll-up doors.

5.5 Reporting and Documentation:

The Contractor shall develop and submit the following documentation during the appropriate phases of the project:

Pre-Work Submittals: Prior to mobilization or the start of any physical work, the Contractor shall submit the following for approval by the COR:

1. Installation Plan & Schedule: A comprehensive plan detailing the methodology and a project schedule with all key milestones.

2. Material Submittals: Product data sheets, specifications, and certifications for all materials and equipment to be installed (e.g., door operator, coiling door assembly, guides, etc.) to verify compliance with PWS requirements.

Post-Work / Closeout Submittals:

1. Preventive Maintenance (PM) Schedule: A recommended schedule of PM tasks for all newly installed systems.

2. Operations & Maintenance (O&M) Manuals: Comprehensive O&M Manuals for all new equipment installed.

3. Drawings: Any as-built drawings generated during the project.

4. Discrepancy Cost Estimate: A cost estimate per door to repair any new discrepancies found during the inspections.

5. Warranty Documentation Submittal: As a final deliverable, the Contractor shall compile and submit all warranty information, including their own workmanship warranty and all secured manufacturer warranties, to the COR.

5.6 Warranty:

1-Year Workmanship Warranty: The Contractor warrants that all work performed under this contract, including all equipment, materials, and workmanship, shall be free from defects and conform to all contract requirements. This warranty shall remain in effect for a period of one (1) year from the date of final acceptance.

Contractor's Responsibility to Remedy: During this warranty period, the Contractor shall, at their own expense, remedy any defect or failure to conform.

This includes repairing any damage to Government property that results from the Contractor's defective work or negligence.

Manufacturer and Supplier Warranties: The Contractor shall secure all standard commercial warranties from manufacturers and suppliers for any materials or equipment furnished. These warranties shall be executed for the benefit of the Government. The Contractor is responsible for enforcing these third-party warranties if directed by the Contracting Officer.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandatory or Advisory

Website

Federal Acquisition Regulation Mandatory https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement Mandatory http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Hawaii Administrative Rules Mandatory Code of Federal Regulations Mandatory Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1:

07/01/2025)

Mandatory http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors

(paragraph 9)

August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201 -2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

04/03/2017 (Change 1:

10/29/2020)

Mandatory https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common

Access Card (CAC)

09/09/14 (Change 1:

05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive (HSPD)-12

Policy for a Common Identification Standard for Federal Employees and

Contractors

08/27/2004 Mandatory https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and

Civil Liberties Programs

01/05/2021 (Change 1:

04/24/2025)

Mandatory https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy

Program

05/14/2007 Mandatory https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01 Cyberspace Workforce Management

02/15/2023 Mandatory https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M Information Assurance Workforce

Improvement Program

12/19/2005 (Change 4:

11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/

DoD 5220.22-M National Industrial Security Program Operating Manual (Now part 117 of

Title 32 CFR) https://www.esd.whs.mil/Directives/issuances/dodm/

AFI 10-245

Antiterrorism

03/28/2013 (Certified current

03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and

Procedures

08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and

Procedures

03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFPD 17-1

Information Dominance Governance and Management

04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID=1&series =-1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019 (Change 1:

06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security

Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm

DD 250

Material Inspection and Receiving

Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective Performance Standard Acceptable Quality

Levels (AQL) Surveillance Method / By

Whom

5.1 Door #6

Conversion to

Manual Operation

Successfully remove all automatic operator components. Install a new, appropriately sized manual chain hoist. The door must be properly spring-balanced, operate smoothly, and hold its position without drifting.

100% of automatic components removed.

The door operates smoothly through its full range of motion using the manual chain hoist.

No defects found during the final inspection.

Assessment / COR

5.2 Door #10

Motor Operator Replacement:

Successfully remove the old motor and install a new, appropriately sized motor operator. Install and test all required controls (3-button station) and safety devices

(reversing edge) in accordance with manufacturer specifications and safety standards.

100% of new components installed correctly. The door operates smoothly, stops at set limits, and all safety features are fully functional. No defects found during the final inspection.

Assessment / COR

5.3 Building

3379 Overhead

Door Replacement

Successfully demolish existing door and install a new 12' x 14' heavy-duty coiling door system

(slats, guides, barrel, chain hoist, weatherstripping, and slide locks) in accordance with the specified parameters and manufacturer guidelines.

100% of the old assembly removed.

The new door operates smoothly, is properly balanced, and fully secures via the inside slide locks. No defects found during the final inspection.

Assessment / COR

5.4 Post-Repair

Operational

Testing:

Perform comprehensive operational tests on all three

(3) doors to confirm the functionality and safety of the completed work. The Contractor shall make all necessary adjustments.

All three (3) doors are fully operational and meet all acceptance criteria outlined in the PWS, with zero safety-related defects.

Assessment / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.2 For

Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.

Provide a DBIDS package for each personnel who needs access to a DoD Installation at least 30 calendar days before the start of the project

1 Electronic Submission

COR

1.4.5.3 AT Level 1

Awareness Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.5.11 OPSEC

Training Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.10 Identification

Media

Return within 14 days of employee’s departure from contract performance.

Original(s) Hard Copy KO

5.5 - Installation Plan & Schedule

Provide within 15 calendar days after contract award.

1 Electronic Submission

COR

5.5 - Material Submittals

Provide within 30 calendar days after contract award.

1 Electronic Submission

COR

5.5 - Preventive Maintenance (PM)

Schedule

Provide no later than 30 days after the inspection

1 Electronic Submission

COR

5.5 - Operations & Maintenance (O&M)

Manuals

Provide no later than 30 days after the inspection

1 Electronic Submission

COR

5.5 - Drawings (if any)

Provide no later than 30 days after the inspection

1 Electronic Submission

COR

5.5 - Discrepancy Cost Estimate

Provide no later than 30 days after the inspection

1 Electronic Submission

COR