2. Photographs of Existing Conditions (Taken in March 2018).pdf
PDF 3 MB Posted
- Solicitation number
- 0004_Amendment
About this file
This document package includes photographs of existing conditions from a site visit in March 2018 along with details of a solicitation amendment for the replacement of the CARES Tower roof and overhangs. The amendment provides interested parties with an RFI tracker, response photographs from the site visit, and revised bid items. Bid responses are now due by June 11, 2020 for the roof replacement project at the CARES Tower, which is owned by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The amendment changes only Bid Item 2 and extends the bid opening date to allow time for responses to bidder questions in the RFI tracker. All other terms and conditions of the original solicitation remain the same.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1a. Response to RFI #12 Record Drawings.pdf | ||
| 1. RFI Tracker with VA Responses (Updated as of 20200527).docx | DOCX document | |
| 36C25020B0020 0004.docx | DOCX document | |
| 3. Revised Bid Items for Project 541-18-103.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
crogers Oval crogers Oval crogers Oval crogers Oval crogers Oval crogers Oval crogers Oval crogers Text Box
CORE 1
crogers Text Box
CORE 2
crogers Text Box
CORE 3
crogers Text Box
CORE 4
crogers Text Box
CORE 5
crogers Text Box
CORE 6
crogers Text Box
CORE 7
crogers Text Box
ROOF 1
crogers Text Box
ROOF 2
crogers Text Box
ROOF 3
crogers Line crogers Line crogers Line crogers Line crogers Line crogers Line crogers Line crogers Typewritten Text Appendix B crogers Text Box Core Cut Locations Roofs 1, 2 & 3
Text Box
ROOF 4
crogers Text Box
SPIKE TEST
crogers Text Box
CORE 8
crogers Oval crogers Oval crogers Line crogers Line crogers Typewritten Text Appendix B crogers Text Box
Roof 4
Oval crogers Text Box
PLAZA
crogers Text Box
PAVER & INSULATION REMOVED
crogers Line crogers Typewritten Text Appendix B crogers Text Box
Plaza
Appendix A
EXISTING CONDITIONS PHOTOS
Roof Area 1: Elevator Penthouse:
Overview of Roof area 1
Core 1: Approx. 6.5” depth. Concrete deck, Insulation wet
Core 2: Approx. 2.5” depth. Concrete deck, Insulation wet
Roof Area 2: Penthouse:
Overview of Roof area 2
Core 3 at flashing: Approx. 5” depth.
Metal deck, Insulation with densdeck cover board, Insulation dry.
Core 4: Approx. 3” depth. Metal deck. Core was cut at bullet hole, Insulation with densdeck cover board, Insulation wet
Roof Area 2: Penthouse:
Roof Area 3: 6 th Floor
Core 5: Approx. 8” depth. Metal deck, Insulation with densdeck cover board, Insulation dry
Core 6: Concrete deck, Insulation wet
A metal leg was present that may have been present to close a deck to wall gap.
Core 7: Approx. 3.5” depth. Concrete deck, Insulation wet
Roof Area 3: 6
Overview of area
Open seam, wet insulation and wind damage
Evidence of past wind damage.
Roof Area 3: 6
Roof Area 4: 2 nd
Elongated cut made to core 7: no vapor retarder.
Spike: Approx. 2.25” depth. Concrete deck, Insulation wet
Core 8: Approx. 6” depth, 7” to top of wood sitting on steel. Concrete deck, Insulation wet
Roof Area 4: 2 nd
Wind damage evident
Overview of roof area
Through wall flashing and weeps visible, low flashing heights.
Roof Area: Plaza Deck
Paver and insulation removed, did not cut through drainage mat.
Overview of Plaza Deck
Overview of roof area 6: West ledge.
| CARES Roof Report, Legend for existing condition photographs, Mar 2018 |
| CARES Roof Report, Existing condition photographs, Mar 2018 |
File details come from the government source that posted it. Updated .