3. Revised Bid Items for Project 541-18-103.docx
DOCX document 14 KB Posted
- Attached to
- Y1DA-- 541-18-103 Replace CARES Tower Roof and Overhangs Federal contract opportunity
- Solicitation number
- 0004_Amendment
About this file
This document contains revised bid items for a federal contract solicitation to replace roofs and overhangs at a Department of Veterans Affairs medical center. The solicitation includes four bid items, with the contract to be awarded to the lowest bidder for Bid Item 1 if funds are available. If bids exceed available funds, the contract will be awarded to subsequent bid items in order of priority. Bid Item 1 covers all work in the specifications, while Bid Items 2 through 4 deduct certain roof replacements and other work. Bidders must submit pricing for all items, and work under any awarded contract must be completed within 290 days of notice to proceed. The first 60 days after notice are reserved for submittals and developing project schedules, with no on-site work permitted unless approved by the Contracting Officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1a. Response to RFI #12 Record Drawings.pdf | ||
| 2. Photographs of Existing Conditions (Taken in March 2018).pdf | ||
| 1. RFI Tracker with VA Responses (Updated as of 20200527).docx | DOCX document | |
| 36C25020B0020 0004.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF BID ITEM(S)
**Note: The Government intends to make award on BID ITEM 1; however, should the bids received exceed the funds available, award will be on BID ITEM 2, BID ITEM 3, or BID ITEM 4 in this order of priority, based on available funding. Bidders are required to submit a price for every bid item.
A. BID ITEM 1 (Base Bid): All work in the drawings and specifications. The contractor shall provide all materials, labor, tools, equipment, insurance, supervision, and any other items required to complete project “Replace CARES Tower Roof and Overhangs”, Project No. 541-18- 103 at the Louis Stokes Department of Veterans Affairs Medical Center, 10701 East Boulevard, Cleveland, OH 44106. Work includes general construction, necessary demolition, alterations, mechanical and electrical work, and certain other items shown and specified. All work shall be completed within 290 calendar days after receipt of Notice to Proceed.
B. BID ITEM 2: (Alternate Deduct 1): All work in BID ITEM 1, except DELETE Roof 2 Replacement and DELETE PROVIDE Roof 2 Sealer/Coating as indicated on the drawings. All work shall be completed within 290 calendar days after receipt of Notice-to-Proceed.
C. BID ITEM 3: (Alternate Deduct 2): All work in BID ITEM 1, except DELETE work as specified in BID ITEM 2. In addition, DELETE Soffit B Replacement as indicated on the drawings. All work shall be completed within 290 calendar days after receipt of Notice-to-Proceed.
D. BID ITEM 4: (Alternate Deduct 3): All work in BID ITEM 1, except DELETE work as specified in BID ITEM 2 and BID ITEM 3. In addition, DELETE Roof 5 Replacement as indicated on the drawings. All work shall be completed within 290 calendar days after receipt of Notice-to- Proceed.
NOTE: The first sixty (60) days after receipt of the Notice to Proceed shall be used for the following:
1. Submission and approval of the Submittal Register, Project Schedule, Safety Plan, Scaffolding Plan, and any other submittals required before actual on-site construction activities can begin.
2. Contractor will not be permitted to mobilize and/or perform/complete any construction es VA Medical Center facility during this sixty (60) day period unless approved by the Contracting Officer.