2. Bird Netting SOW.pdf
PDF 195 KB Posted
- Attached to
- Bird Control Netting Installation
- Solicitation number
- FA466126Q6001
About this file
This is a Statement of Work (SOW) for installing bird netting at Building 5110 on Dyess Air Force Base in Texas.
The contractor must install heavy-duty bird netting with a 10-year life expectancy on the south-facing overhang of the building to prevent bird roosting, nesting, and perching. The netting specifications call for approximately 100' x 100' with ¾-inch mesh opening, installed as a single continuous piece over steel support cabling using crimps, turnbuckles, cable clamps, and plastic ties. Acceptable products include Bird B Gone Bird Net 2000™, Bird-X Premium HDPE Bird Netting, or Bird-X Heavy Duty Knotted Polyethylene. The contractor must perform all work in accordance with federal, state, and local regulations, applicable building codes (NEC, NFPA, BOCA, CABO), and OSHA standards. Work must be completed within 60 calendar days, excluding holidays, during weekday hours from 0730-1630 Monday through Friday. The contractor is responsible for all personnel, equipment, tools, materials, supervision, daily site cleanup, debris removal and off-base disposal, and restoration of any damaged areas. A one-year warranty covering all materials and workmanship is required. The contractor must coordinate work schedules with Project Manager TSgt John Somerville (325-696-5066) and Project Supervisor TSgt Christopher Balcerzak (325-696-2329). All contractor employees must obtain USAF identification cards prior to base entry, maintain current driver's licenses and vehicle registration/insurance, and comply with base security procedures including the Dyess Form 173 process. The work site must remain clean and clutter-free as an active employment area, with dumpsters placed in locations designated by the building manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4. Questions and Answers - Bird control netting.pdf | ||
| RFQ FA466126Q6001 Amendment 0002.docx | DOCX document | |
| Redacted Attendance Roster.pdf | ||
| RFQ FA466126Q6001 Amendment 0001.docx | DOCX document | |
| RFQ FA466126Q6001.docx | DOCX document | |
| 1. Provisions and Clauses.pdf | ||
| 3. Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
INSTALL BIRD NETTING
BUILDING 5110
DYESS AFB, TEXAS
1. Description of Work. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to install bird netting at the south facing overhang of Building 5110, on Dyess AFB.
1.1 Installation. The contractor shall perform the following at a minimum:
• Install bird netting described in Attachment 1 to prevent sagging. The contractor shall use steel support cabling, crimps, turnbuckles, cable clamps, plastic ties, and other hardware necessary to provide a sturdy barrier to prevent birds from nesting in this building. Adjust cabling, as necessary, to prevent sagging.
1.1.1 Contractor shall ensure that all netting shall be continuous, in order to prevent roosting, nesting, and perching of all birds. Any adjacent areas dissembled, damaged, or removed by the contractor during installation shall be properly repaired by the contractor at no expense to the Government. All debris / trash generated by this project shall be removed and properly disposed of off base by the contractor. The contractor or his representative shall be on site during duty hours, or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.
NOTE: Where more than one standard is applicable, the higher standard shall be adhered to.
1.1.2 A site visit for the facility will be scheduled, and Contractor attendance is highly recommended. It is the responsibility of the Contractor to validate all measurements and requirements of the SOW at the site visit.
1.2 SPECIAL REQUIREMENTS. The work site shall remain clean and clutter free since this area is an active employment site. All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and / or relocation at the building manager’s request. These requirements shall not impact the performance period.
1.3 POINTS OF CONTACT:
Project Manager: TSgt John Somerville at 325-696-5066 located in Building 5130.
Project Supervisor: TSgt Christopher Balcerzak at 325-696-2329 located in Building 5110.
1.4 PERFORMANCE PERIOD: All work shall be completed within a 60 calendar day period, excluding holidays.
1.5 Warranty. The Contractor shall warranty all material and workmanship for a period of one year from the date of acceptance by the government.
2.0. Hours of Service. The contractor’s personnel will perform scheduled work on weekdays, Monday through Friday from 0730 – 1630 except US Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Exceptions shall be coordinated in advance and approved in writing by the Contracting Officer (CO) or GR.
2.1. U.S. Recognized Holidays.
1 January New Year’s Days 3rd Monday in January Martin Luther King Jr.’s Birthday 3rd Monday in February President’s Day Last Monday in May Memorial Day 4th of July* Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day 11 November* Veterans Day 4th Thursday in November Thanksgiving Day 25 December* Christmas Day
*American holidays falling on a Saturday will be observed on the preceding Friday, and holidays falling on a Sunday will be observed on the following Monday.
2.3. Temporary Work Stoppage. In the event the U.S. Government requests a temporary shutdown of the facility, the contractor will be notified in writing by the CO. Any Government caused delays as a result of a temporary shutdown that may require an adjustment to the contract will be coordinated through the CO.
3. Disposal of Materials. All debris materials generated under this contract such as scrap, salvage material, industrial waste, non-recyclable materials, and equipment/material not listed on hand-receipts shall be disposed of off-base by the contractor in accordance with all applicable federal, state, and local regulations. During the progress of the work, discarded paint materials, rubbish, cans and rags shall be removed from the project site at the end of each workday.
4. Inspection/Acceptance. Upon completion of above work, acceptance inspections shall be conducted by the contractor and the Government points of contact. If any deficiencies are found during the inspection, the contractor shall make correction(s) as required, at no additional charge to the Government. Contractor will be held liable for all damages during installation of furniture.
5. Responsibility for Damages. Any damages caused to U.S. Government property during the course of performing this contract shall be restored, replaced and/or repaired to its original condition at no additional cost to the U.S. Government. The Contractor shall notify the CO within one (1) business day of damage to Government property or equipment during the execution of the contract.
6. Government Furnished Properties and Services. The Government will provide reasonable utilities and work space for the contractor to perform the requested duties. The Contractor will provide all equipment and storage space necessary to perform tasks. No covered or secure storage areas will be made available to the contractor. Storage of materials or equipment inside of a government facility shall be coordinated and approved by CE in writing.
6.1. Toilet Facilities. Use of existing toilet facilities in the immediate work area only will be permitted. Contractor personnel will ensure facility cleanliness is maintained at all times.
6.2 Telephones. The Government will not provide telephone services. If available, the Contractor may use government phones in a case of emergencies or during field and site work.
No long-distance telephone calls will be authorized.
7. Restricted Area/Access Coordination. The GR is responsible for coordinating with the facility manager/user/occupant/requester to provide access, escorts, or temporary visitor access badges for contractor personnel while performing SOW duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.
7.1 Restricted/Controlled Areas. Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area. Dyess AFB security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Dyess AFB in question.
The project area of security exists in “GENERAL ACCESS” areas. These areas are all of Dyess AFB outside of the "USAF Controlled" and "USAF Restricted" areas.
8. Installation Access. Dyess AFB is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. The GR will provide information necessary to obtain identification cards. The contractor shall be responsible to ensure that all of its employees obtain, and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the contractor shall be responsible for turn in of identification cards to the Contracting Officer or to the Pass and Registration Office of the Security Forces.
NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.
8.1. Dyess Form 173. The Dyess AFB Form 173 is subject to the privacy act of 1974, Authority: 10 U.S.C. 8012 and 5 U.S.C. 552a (b) (7). Disclosure is Mandatory: Failure to provide the information and Social Security Number (SSN) could result in denied access to the Dyess AFB installation.
8.1.1. Effective 1 Nov 04, a completed signed original Dyess Form 173 (Mar 04) must be delivered to Pass & ID by 0900 on the duty day prior to the desired day of entry onto Dyess AFB. The Visitor Control Center no longer issues temporary passes to contractor personnel unless they have already been previously identified on an executed Dyess Form 173. All information on the Dyess Form 173 must be typed and the authorizing signature must be in blue or black ink. Personal information provided on the Dyess Form 173 will be cross-referenced against state and federal criminal databases to identify those individuals possessing outstanding warrants. Those individuals with outstanding warrants will be detained at the Visitor Control Center on the desired day of entry, and turned over to Abilene Police Department.
8.1.2. The approving authority (individual on the 577) can make “ink changes” in red ink to correct any errors noted on the form. All changes have to be initialed by the approval authority.
8.1.3 .All individuals with Dyess Form 173’s will still continue to be processed via the Texas Law Enforcement Terminal System (TLETS—police wants/warrants check). Once it is determined the individual is cleared from any wants or warrants, a copy of the Dyess Form 173 will be placed at the Tye Gate entry point. The Tye Gate Guard will use this form as an Entry Authority List (EAL) allowing contractors onto the installation. The contractor will then be able to go to the Gate directly (not the Visitor Control Center (VCC) or Arnold Gate) and verify if their Dyess Form 173 is there. Should their Dyess Form 173 not be there, they will be directed to the VCC for issuance of an AF Form 75. At this time, someone will physically have to meet them to sponsor them onto the installation. (Reasons why the form would not be at the guard shack would be erroneous driver’s license number, erroneous information, warrant, or identified as illegal alien).
8.1.4 Should their Dyess Form 173 be at the Tye Gate entry point, the contractor will be told to proceed directly to the Pass and Registration Section for the 7 SFS Contractor Badge issue. The Pass Section will have the original Dyess Form 173. Once a badge is obtained, they need only show the badge at the installation gate for entry onto the installation. Please note that neither the Security Forces Control Center nor the Tye Gate Guards will check the Dyess Form 173 for errors. This is the responsibility of the Pass and Registration Section.
8.1.5. The Dyess Form 173 will be maintained at the Tye Gate entry point for 48 hours (two business days). After the specified time has expired, it will be destroyed. Should the contractor not process through Tye Gate in that 48-hour period, the contractor will require someone to physically vouch them on base to get a one day pass at the VCC so they may proceed to the Pass and Registration office for their badge. The hold period for these forms at the gate can and will be extended should rain days occur or through prior coordination with any affected agency.
8.2. Identification of Contractor Vehicles. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage.
8.3. Other Vehicle and Licensing Requirements:
8.3.1. All Contractor employees who will be driving a vehicle on Dyess AFB shall have a current driver’s license with them at all times while on Dyess AFB.
8.3.2. All Contractor vehicles to be operated on Dyess AFB will have a valid state registration, vehicle inspection, and insurance. Proof of registration and vehicle insurance must be physically available at all times while the vehicle is on Dyess AFB.
8.3.3. Any Contractor employee who will be operating heavy equipment or specialized equipment that requires a license or certification shall be so licensed and/or certified with proof presented to the contracting officer prior to work start.
9. Security Danger Warning, Accident Prevention, Fire Prevention and Fire Protection Requirements. All Contractor operations shall be conducted and performed in accordance with the Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and the US Army Corps of Engineers’ Safety and Health Requirements Manual 385- 1-1, dated 03 Sep 96 at https://www.publications.usace.army.mil/USACE-Publications/Engineer- Manuals/. The Contractor shall keep the work site clean and clear of any work debris, materials, supplies, tools, or equipment when work is not taking place.
9.1. Security Police and Fire Protection. The Government will provide general on-base security police and fire protection service. Security police phone extension is (325)696-2131 for emergencies, and (325)696-4100 for routine calls. Fire protection emergency phone is 117 (from on-base phone only), or (325)696-2117 from a cell phone.
10. Contract Manager. The contractor shall provide a contract manager who shall be responsible for all requirements in this SOW. The name of this person and an alternate(s) who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer (CO). The contract manager or alternate shall have full authority to act for the contractor on all matters relating to this contract. The contractor shall provide the contract manager’s names, addresses, and telephone numbers. The contractor shall maintain a current listing of employees, providing updates as changes occur. The contract manager or alternate shall be available during Mon-Fri at 0800-1500. The contract manager or alternate shall have a good understanding of the requirements pertaining to this contract for interpretation and implementation of directives (written and oral) issued in English by the CO or GR.
10.1. Removal of Contractor Employees. The contractor shall utilize only experienced, responsible, and capable employees in the performance of this contract. The CO may require that the contractor remove any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of the U.S.
Government.
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/
Attachment 1
PROJECT REQUIREMENTS. The following products meet the requirements: Bird B Gone
— Bird Net 2000™ (or equal products will be accepted)
• Material: UV-stabilized knotted polyethylene
• Mesh: ¾″
• Twine: 6-monofilament strands, each 12 mil
• Fire Resistance: Melting point > 270 °F; maintains integrity in sub-zero temperatures
• Breaking Strength: > 40 lb per strand (ISO 1806/9001 tested)
• Warranty: 10 years (black), 3 years (white/stone)
Bird-X Premium HDPE Bird Netting
• Material: HDPE with UV inhibitors
• Mesh: ¾″ (also available in 2″)
• Tensile Strength: Up to 535 lb overall
• Warranty: 10-year material/workmanship guarantee
Bird-X Heavy Duty Knotted Polyethylene (as listed at Lowe’s)
• Mesh: ¾″
• Material: Commercial-grade knotted polyethylene
• Warranty: 10-year limited
• Designed for permanent bird control
• Remove and install new bird netting in the Atrium. o The netting must be heavy duty with a life expectancy of 10 years.
o The netting must be approximately 100’x100’ with ¾ Mesh size opening.
o The new netting must be one piece.
o The netting must be installed over the cable strands.
File details come from the government source that posted it. Updated .