This document provides pricing details for maintenance, deactivation, and installation services for temporary housing units (THUs) under solicitation number 70FBR624R00000002 issued by the Federal Emergency Management Agency Region 6. Services include preventative maintenance inspections, routine and emergency repairs, transportation, installation, deactivation, cleaning, and project management. Pricing is established for a one year base period from December 2023 to November 2024 covering 350 THUs, and two six month option periods are outlined to continue services through November 2025 at reduced quantities. Fixed unit prices are provided for labor hours and materials with total estimated values of $205,000 for the base period, $128,000 for the first option period, and $70,000 for the second option period. The solicitation seeks to award a contract for emergency housing services for survivors of disaster DR-4559/4570-LA.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overview

NEW - DR-4559/4570-LA IGCE - MDC - Overview
Period of PerformanceTotal
Base PeriodDecember 1, 2023 - November 30, 2024$ 205,000.00
Option Period IDecember 1, 2024 - May 31, 2025$ 128,000.00
Option Period IIJune 1, 2025 - November 30, 2025$ 70,000.00

CONTRACT TOTAL $ 403,000.00

Assumptions:
Maintenance & Deactivation services Base Period from 12/01/2023 - 11/30/2024
MHU mission includes Haul & Install, PMIs, Maintenance, Deactivations, & TPS installs & deactivations.
Assumption for 244 MHUs and 106 TTs for a base period of 1 year. Total of 350 TTHUs.

Base Period Base Period: December 1, 2023 - November 30, 2024 Estimated MHU = 244 Estimated TT = 106

DR-4559-LA M&D

Contract Number TBA CLIN TITLE Description Value of Issue Type Unit of Issue Time Negotiated Qty Rate Total

CLIN 0001Transition of Services
0001AATransition of Services MH/PMCON244$ - 0$ - 0
0001ABTransition of Services TTCON106$ - 0$ - 0
Sub Total -Transition of Services$ - 0
CLIN 0002MH/PM/TT Transportation & Staging
0002AATT Transportation (Additional Miles)Additional miles for installation of TT in a private or commercial site. Note: First 100 miles are included in the appropriate install CLIN.NTEFPMICON150$ - 0$ - 0
0002ABMH/PM Transportation (Additional Miles)Additional miles for installation of a MH/PM in a Private/commercial/group site. Note: First 100 miles are included in the appropriate install CLIN.NTEFPMICON150$ - 0$ - 0
0002ACHeavy TowNTEFPEACON1$ - 0$ - 0
Sub Total - Transportation & Staging$ - 0
CLIN 0003Installation
0003AATemporary Install Pemits (Elevation Certificates)Bonds and Permits for Temporary InstallationNTEFPEA1$ 2,000.00$ 2,000.00DO NOT CHANGE AMOUNT
0003ABPrivate Install MH / PMBasic Manufactured Home / Park Model Installation on a private site. Includes one set of stairs installed at the rear entrance ONLY. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical/water/sewer connection/installation (up to 50 feet), HVAC installation, skirting, and clean and make ready for occupancy. For Park Model units, the Contractor may, at their option, use a single porch bridging between both doors, provided that the Park Models have both entrance/exit doors on the same side of the unit, with a single set of stairs or platform stair servicing the porch.NTEFPEACON1$ - 0$ - 0
0003ACPrivate Install TTBasic Manufactured Travel Trailer Installation on private site. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical / water/sewer connection / installation (up to 50 feet), and Clean and Make Ready for Occupancy. This CLIN DOES NOT include steps.NTEFPEACON2$ - 0$ - 0
0003ADInstallation MiscellanousTra
NTECPNTECON1$5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
0003AEMH/PM Commercial/Group Basic InstallBasic Manufactured Home / Park Model installation at a commercial or group site. Includes one set of stairs installed at the rear entrance. Includes: transportation for install (up to 100 miles).NTEFPEACON1$ - 0$ - 0
0003AFTT Commercial/Group Basic InstallBasic Manufactured Travel Trailer Installation at commercial or group site. Include: Transportation for install (up to 100 miles). This CLIN DOES NOT include stairs, steps or ramp.NTEFPEACON2$ - 0$ - 0
0003AGTank And Pump System Installation (MHU ONLY)EAWO1$ - 0$ - 0
0003AHSteps/Stairs MH / PMStandard Steps for MH/PM (Price per additional entrance, i.e. Front Stairs)NTEFPEACON1$ - 0$ - 0
0003AISteps/Stairs TTStandard Steps for travel trailer.NTEFPEACON1$ - 0$ - 0
0003AJStoops for TTStoop for TT . Pallet - like construction 48" x 48" x 6"NTEFPEACON1$ - 0$ - 0
0003AKMH/PM UFAS Ramp (up to 40 ft of ramp) Ref. 4.3.3Manufactured Home UFAS Ramp (up to 40 feet of ramp- see description in 4.3.3)NTEFPEACON1$ - 0$ - 0
0003ALTT UFAS Ramp ( up to 30 ft of ramp) Ref. 4.3.3Travel Trailer UFAS Ramp (up to 30 feet of ramp- see description in 4.3.3)NTEFPEACON1$ - 0$ - 0
0003AMAdditional Ramp (per feet)Additional per foot rampNTEFPLFCON20$ - 0$ - 0
0003ANPlatform Steps/Stairs for MH/PMPlatform Steps For MH/PMNTEFPEACON1$ - 0$ - 0
0003AOPlatform Steps/Stairs for TTPlatform Steps for TTNTEFPEACON1$ - 0$ - 0
0003APAdditional Sewer Line (Above Ground)4-Inch Lateral Sewer Line, Above ground (over basic install included
sewer line).NTEFPLFCON20$ - 0$ - 0
0003AQAdditional Buried Water Line (Over basic install)4-Inch Lateral Sewer Line, Buried (over basic install included buried
sewer line).NTEFPLFCON20$ - 0$ - 0
0003ARAdditional Water Line for TT (50 ft)Provide additional RV grade polyurethane hose that is RoHS compliant.NTEFPLFCON2$ - 0$ - 0
0003ASTemporary Power PolePower Pole and Meter Loop.NTEFPEACON1$ - 0$ - 0
0003ATAdditional WiringAdditional wiring over basic installNTEFPLACON20$ - 0$ - 0
Sub Total Installation$ 7,000.00
CLIN 0004Maintenance
0004AAPreventive Maintenance Inspection And Repair (PMI) includes minor repair, labor and materialPreventive Maintenance Inspection and Repairs (includes minor repair, labor and materials).NTEFPEACON4200$ - 0$ - 0
0004ABCall CenterMaintenance Call Center.NTEFPMthlyCON12$ - 0$ - 0
0004ACRoutine RepairsRepairs that are serious but do not present an imminent danger to the health, safety or security of the unit occupant or property. Routine repairs are up to a $250.00 material. Labor for routine repairs is included in PMIR.NTEFPEAWO1,500$ - 0$ - 0
0004ADEmergency Repair Visit And DeterminationUse this CLIN to cover the Inspection and Determination of an Emergency Repair MHU. Includes Labor and Travel to the site.NTEFPEAWO200$ - 0$ - 0
0004AELP Refill/Refilling Both Propane Tanks on TTRefill/refilling of liquid propane tanks.NTEEA0$ - 0$ - 0
0004AFEmergency Unit Entry ServicePerform Emergency Unit Entry Service for occupants unable to gain access to a unit.NTEFPEACON150$ - 0$ - 0
0004AGMiscellaneous MaintenanceDuring the “maintenance” of an THU there may be issues that cannot be foreseen but are required to complete the “maintenance”. This CLIN is only to be used if the work required does not fit within the definition of any other “maintenance” CLIN. The contractor shall develop a cost proposal which includes Actual cost related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$3,500.NTECPNTECON1$ 175,000.00$ 175,000.00DO NOT CHANGE AMOUNT
0004AHTank Pump System Monthly Maintenance InspectionEA2928$ - 0$ - 0
0004AIOccupant Substitute Relocation (Housing)Temporary housing for a survivor that requires relocation or an emergency repair that will not resolve or mitigate a threat or imminent dangerNTECPNTE1$ 5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
0004AJThird Party Microbial Growth Inspection ServicesEmploy a third party to perform mold sampling, testing and reporting servicesNTECPNTE1$ 1,500.00$ 1,500.00DO NOT CHANGE AMOUNT
0004AKThird Party Microbial Growth Remdiation ServicesAt the instruction of the COR, the contractor shall hire an
appropriately licensed and/or certified company to remediate microbial growth in an MHU.NTECPNTE1$ 1,500.00$ 1,500.00DO NOT CHANGE AMOUNT
Sub Total - Maintenance$ 183,000.00
CLIN 0005Deactivation
0005AAClean And Make Ready For Reuse (CMR)Clean and Make Ready for ReuseNTEFPEAWO2$ - 0$ - 0
0005ABClean And Make Ready For Reuse MiscellanousA miscellaneous CLIN for Clean and Make Ready for Reuse may be issued to the Contractor if the work needed cannot be completed within the SCOPE of an existing CLIN. Any items or services required to Clean and Make Ready for Reuse not covered in other parts of this PWS will require approval from the CO or COR. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500.NTEFPNTEWO1$ 5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
0005ACMH/PM DeactMH / PM Basic Deactivation Includes transportation for deactivation back to the staging or storage site (up to 100 miles)NTEFPEACON48$ - 0$ - 0
0005ADTT DeactTT Basic Deactivation. Includes transportation for deactivation back to the staging or storage site (up to 100 miles)NTEFPEACON32$ - 0$ - 0
0005AETank Pump System Deactivation (MHU Only)NTEFPEACON25$ - 0$ - 0
0005AFDeactivation MiscellanousThis CLIN is only to be used if the work required does not fit within the definition of any other “deactivation” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. Once the CO/COR has agreed to a price for the work, the final cost will become a fixed unit price. CO approval required if >$3,500.NTECPNTEWO1$ 10,000.00$ 10,000.00DO NOT CHANGE AMOUNT
0005AGMH/PM Emergency DeactMH / PM Emergency Deactivation.NTEFPEACON3$ - 0$ - 0
0005AHTT Emergency DeactTT Emergency Deactivation.NTEFPEACON3$ - 0$ - 0
0005AIRelocation MH/PMDeactivation of the unit at its original location, and installation at a new location.NTEFPEACON1$ - 0$ - 0
0005AJRelocation TTDeactivation of the unit at its original location, and installation at a new location.NTEFPEACON1$ - 0$ - 0
0005AKReposition MH/PMDeactivation of the unit at its original location, and install at a location on the same site.NTEFPEACON1$ - 0$ - 0
0005ALReposition TTDeactivation of the unit at its original location, and install at a location on the same site.NTEFPEACON1$ - 0$ - 0
0005AMMH / PM REINSTALLATIONThe work order includes removal and replacement of the MHU at the same site.NTEFPEAWO1$ - 0$ - 0
0005ANTT Reinstallation(WO remove & replace at same location)The work order includes removal and replacement of the TT at the same site.NTEFPEAWO2$ - 0$ - 0
0005AOCrowning RemovalThe work includes all materials, equipment and labor to remove the
crowning at a Commercial/Private Site.NTEFPEACON15$ - 0$ - 0
Sub Total - Deactivation$ 15,000.00
CLIN 0006Field Task Order Requirements
0006AATask Order ManagerGeneral Contract Management.NTEFPMthlyCON12$ - 0$ - 0
0006ABDeputy Task Order ManagerGeneral Contract Management.NTEFPMthlyCON12$ - 0$ - 0
0006ACAdministrative CoordinatorGeneral Contract SupportNTEFPMthlyCON12$ - 0$ - 0
0006ADProgram ManagerGeneral Contract Management.NTEFPMthlyCON12$ - 0$ - 0
0006AEContract ManagerGeneral Contract Management.NTEFPMthlyCON12$ - 0$ - 0
0006AFSafety ManagerGeneral Contract Management.NTEFPMthlyCON12$ - 0$ - 0
0006AGMaintenance/Deactivation LeadGeneral Contract Management.NTEFPMthlyCON12$ - 0$ - 0
Sub Total - Field Task Order Req.$ - 0
TOTAL$ 205,000.00

Option Period 1 Option Period 1: December 1, 2024 - May 31, 2025 Estimated MHU =195 Estimated TT = 85

DR-4559-LA M&D

Contract Number TBA

CLIN TITLEDescriptionValue of IssueTypeUnit of IssueTime NegotiatedQtyRateTotal
CLIN 1001RESERVED FOR FUTURE USE
Transition of Services0
Transition of Services MH/PM0$ - 0
Transition of Services TT0$ - 0
Sub Total$ - 0
CLIN 1002MH/PM/TT Transportation & Staging
1002AATT Transportation (Additional Miles)Additional miles for installation of TT in a private or commercial site. Note: First 100 miles are included in the appropriate install CLIN.NTEFPMICON150$ - 0$ - 0
1002ABMH/PM Transportation (Additional Miles)Additional miles for installation of a MH/PM in a Private/commercial/group site. Note: First 100 miles are included in the appropriate install CLIN.NTEFPMICON150$ - 0$ - 0
1002ACHeavy TowNTEFPEACON1$ - 0$ - 0
Sub Total - Transportation & Staging$ - 0
CLIN 1003Installation
1003AATemporary Install Pemits (Elevation Certificates)Bonds and Permits for Temporary InstallationNTEFPEA1$ 2,000.00$ 2,000.00DO NOT CHANGE AMOUNT
1003ABPrivate Install MH / PMBasic Manufactured Home / Park Model Installation on a private site. Includes one set of stairs installed at the rear entrance ONLY. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical/water/sewer connection/installation (up to 50 feet), HVAC installation, skirting, and clean and make ready for occupancy. For Park Model units, the Contractor may, at their option, use a single porch bridging between both doors, provided that the Park Models have both entrance/exit doors on the same side of the unit, with a single set of stairs or platform stair servicing the porch.NTEFPEACON1$ - 0$ - 0
1003ACPrivate Install TTBasic Manufactured Travel Trailer Installation on private site. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical / water/sewer connection / installation (up to 50 feet), and Clean and Make Ready for Occupancy. This CLIN DOES NOT include steps.NTEFPEACON1$ - 0$ - 0
1003ADInstallation MiscellanousMisc. Expenses for Private Site Preparation and /or MH / PM installation over & above basic installation charges. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500
NTECPNTECON1$5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
1003AEMH/PM Commercial/Group Basic InstallBasic Manufactured Home / Park Model installation at a commercial or group site. Includes one set of stairs installed at the rear entrance. Includes: transportation for install (up to 100 miles).NTEFPEACON1$ - 0$ - 0
1003AFTT Commercial/Group Basic InstallBasic Manufactured Travel Trailer Installation at commercial or group site. Include: Transportation for install (up to 100 miles). This CLIN DOES NOT include stairs, steps or ramp.NTEFPEACON1$ - 0$ - 0
1003AGTank And Pump System Installation (MHU ONLY)EAWO1$ - 0$ - 0
1003AHSteps/Stairs MH / PMStandard Steps for MH/PM (Price per additional entrance, i.e. Front Stairs)NTEFPEACON1$ - 0$ - 0
1003AISteps/Stairs TTStandard Steps for travel trailer.NTEFPEACON1$ - 0$ - 0
1003AJStoops for TTStoop for TT . Pallet - like construction 48" x 48" x 6"NTEFPEACON1$ - 0$ - 0
1003AKMH/PM UFAS Ramp (up to 40 ft of ramp) Ref. C.4.3.3Manufactured Home UFAS Ramp (up to 40 feet of ramp- see description in C.4.3.3)NTEFPEACON1$ - 0$ - 0
1003ALTT UFAS Ramp ( up to 30 ft of ramp) Ref. C.4.3.3Travel Trailer UFAS Ramp (up to 30 feet of ramp- see description in C.4.3.3)NTEFPEACON1$ - 0$ - 0
1003AMAdditional Ramp (per feet)Additional per foot rampNTEFPLFCON10$ - 0$ - 0
1003ANPlatform Steps/Stairs for MH/PMPlatform Steps For MH/PMNTEFPEACON1$ - 0$ - 0
1003AOPlatform Steps/Stairs for TTPlatform Steps for TTNTEFPEACON1$ - 0$ - 0
1003APAdditional Sewer Line (Above Ground)4-Inch Lateral Sewer Line, Above ground (over basic install included
sewer line).NTEFPLFCON20$ - 0$ - 0
1003AQAdditional Buried Water Line (Over basic install)4-Inch Lateral Sewer Line, Buried (over basic install included buried
sewer line).NTEFPLFCON20$ - 0$ - 0
1003ARAdditional Water Line for TT (50 ft)Provide additional RV grade polyurethane hose that is RoHS compliant.NTEFPLFCON2$ - 0$ - 0
1003ASTemporary Power PolePower Pole and Meter Loop.NTEFPEACON1$ - 0$ - 0
1003ATAdditional WiringAdditional wiring over basic installNTEFPLACON20$ - 0$ - 0
Sub Total Installation$ 5,000.00
CLIN 1004Maintenance
1004AAPreventive Maintenance Inspection And Repair (PMI) includes minor repair, labor and materialPreventive Maintenance Inspection and Repairs (includes minor repair, labor and materials).NTEFPEACON1680$ - 0$ - 0
1004ABCall CenterMaintenance Call Center.NTEFPMthlyCON6$ - 0$ - 0
1004ACRoutine RepairsRepairs that are serious but do not present an imminent danger to the health, safety or security of the unit occupant or property. Routine repairs are up to a $250.00 material. Labor for routine repairs is included in PMIR.NTEFPEAWO250$ - 0$ - 0
1004ADEmergency Repair Visit And DeterminationUse this CLIN to cover the Inspection and Determination of an Emergency Repair MHU. Includes Labor and Travel to the site.NTEFPEAWO110$ - 0$ - 0
1004AELP Refill/Refilling Both Propane Tanks on TTRefill/refilling of liquid propane tanks.NTEEA0$ - 0$ - 0
1004AFEmergency Unit Entry ServicePerform Emergency Unit Entry Service for occupants unable to gain access to a unit.NTEFPEACON60$ - 0$ - 0
1004AGMiscellaneous MaintenanceDuring the “maintenance” of an THU there may be issues that cannot be foreseen but are required to complete the “maintenance”. This CLIN is only to be used if the work required does not fit within the definition of any other “maintenance” CLIN. The contractor shall develop a cost proposal which includes Actual cost related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$3,500.NTECPNTECON1$ 100,000.00$ 100,000.00DO NOT CHANGE AMOUNT
1004AHTank Pump System Monthly Maintenance InspectionEA1170$ - 0$ - 0
1004AIOccupant Substitute Relocation (Housing)Temporary housing for a survivor that requires relocation or an emergency repair that will not resolve or mitigate a threat or imminent dangerNTECPNTE1$ 5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
1004AJThird Party Microbial Growth Inspection ServicesEmploy a third party to perform mold sampling, testing and reporting servicesNTECPNTE1$ 1,500.00$ 1,500.00DO NOT CHANGE AMOUNT
1004AKThird Party Microbial Growth Remdiation ServicesAt the instruction of the COR, the contractor shall hire an
appropriately licensed and/or certified company to remediate microbial growth in an MHU.NTECPNTE1$ 1,500.00$ 1,500.00DO NOT CHANGE AMOUNT
Sub Total - Maintenance$ 108,000.00
CLIN 1005Deactivation
1005AAClean And Make Ready For Reuse (CMR)Clean and Make Ready for ReuseNTEFPEAWO2$ - 0$ - 0
1005ABClean And Make Ready For Reuse MiscellanousA miscellaneous CLIN for Clean and Make Ready for Reuse may be issued to the Contractor if the work needed cannot be completed within the SCOPE of an existing CLIN. Any items or services required to Clean and Make Ready for Reuse not covered in other parts of this PWS will require approval from the CO or COR. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500.NTEFPNTEWO1$ 5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
1005ACMH/PM DeactMH / PM Basic Deactivation Includes transportation for deactivation back to the staging or storage site (up to 100 miles)NTEFPEACON20$ - 0$ - 0
1005ADTT DeactTT Basic Deactivation. Includes transportation for deactivation back to the staging or storage site (up to 100 miles)NTEFPEACON25$ - 0$ - 0
1005AETank Pump System Deactivation (MHU Only)NTEFPEACON15$ - 0$ - 0
1005AFDeactivation MiscellanousThis CLIN is only to be used if the work required does not fit within the definition of any other “deactivation” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. Once the CO/COR has agreed to a price for the work, the final cost will become a fixed unit price. CO approval required if >$3,500.NTECPNTEWO1$ 10,000.00$ 10,000.00DO NOT CHANGE AMOUNT
1005AGMH/PM Emergency DeactMH / PM Emergency Deactivation.NTEFPEACON1$ - 0$ - 0
1005AHTT Emergency DeactTT Emergency Deactivation.NTEFPEACON1$ - 0$ - 0
1005AIRelocation MH/PMDeactivation of the unit at its original location, and installation at a new location.NTEFPEACON1$ - 0$ - 0
1005AJRelocation TTDeactivation of the unit at its original location, and installation at a new location.NTEFPEACON0$ - 0$ - 0
1005AKReposition MH/PMDeactivation of the unit at its original location, and install at a location on the same site.NTEFPEACON0$ - 0$ - 0
1005ALReposition TTDeactivation of the unit at its original location, and install at a location on the same site.NTEFPEACON1$ - 0$ - 0
1005AMMH / PM REINSTALLATIONThe work order includes removal and replacement of the MHU at the same site.NTEFPEAWO0$ - 0$ - 0
1005ANTT Reinstallation(WO remove & replace at same location)The work order includes removal and replacement of the TT at the same site.NTEFPEAWO1$ - 0$ - 0
1005AOCrowning RemovalThe work includes all materials, equipment and labor to remove the
crowning at a Commercial/Private Site.NTEFPEACON8$ - 0$ - 0
Sub Total - Deactivation$ 15,000.00
CLIN 1006Field Task Order Requirements
1006AATask Order ManagerGeneral Contract Management.NTEFPMthlyCON6$ - 0$ - 0
1006ABDeputy Task Order ManagerGeneral Contract Management.NTEFPMthlyCON6$ - 0$ - 0
1006ACAdministrative CoordinatorGeneral Contract SupportNTEFPMthlyCON6$ - 0$ - 0
1006ADProgram ManagerGeneral Contract Management.NTEFPMthlyCON6$ - 0$ - 0
1006AEContract ManagerGeneral Contract Management.NTEFPMthlyCON6$ - 0$ - 0
1006AFSafety ManagerGeneral Contract Management.NTEFPMthlyCON6$ - 0$ - 0
1006AGMaintenance/Deactivation LeadGeneral Contract Management.NTEFPMthlyCON6$ - 0$ - 0
Sub Total - Field Task Order Req.$ - 0
TOTAL$ 128,000.00

Option Period 2 Option Period 2: June 1, 2025 - November 30, 2025 Estimated MHU = 156 Estimated TT = 68

DR-4559-LA M&D

Contract Number TBA

CLIN TITLEDescriptionValue of IssueTypeUnit of IssueQTYRateTotal
CLIN 0001RESERVED FOR FUTURE USE
Transition of Services0
Transition of Services MH/PM0$ - 0
Transition of Services TT0$ - 0
Sub Total$ - 0
CLIN 2002MH/PM/TT Transportation & Staging
2002AATT Transportation (Additional Miles)Additional miles for installation of TT in a private or commercial site. Note: First 100 miles are included in the appropriate install CLIN.NTEFPMI75$ - 0$ - 0
2002ABMH/PM Transportation (Additional Miles)Additional miles for installation of a MH/PM in a Private/commercial/group site. Note: First 100 miles are included in the appropriate install CLIN.NTEFPMI75$ - 0$ - 0
2002ACHeavy TowNTEFPEA1$ - 0$ - 0
Sub Total - Transportation & Staging$ - 0
CLIN 2003Installation
2003AATemporary Install Pemits (Elevation Certificates)Bonds and Permits for Temporary InstallationNTECPNTE1$ 2,000.00$ 2,000.00DO NOT CHANGE AMOUNT
2003ABPrivate Install MH / PMBasic Manufactured Home / Park Model Installation on a private site. Includes one set of stairs installed at the rear entrance ONLY. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical/water/sewer connection/installation (up to 50 feet), HVAC installation, skirting, and clean and make ready for occupancy. For Park Model units, the Contractor may, at their option, use a single porch bridging between both doors, provided that the Park Models have both entrance/exit doors on the same side of the unit, with a single set of stairs or platform stair servicing the porch.NTEFPEA1$ - 0$ - 0
2003ACPrivate Install TTBasic Manufactured Travel Trailer Installation on private site. Includes transportation for install (up to 100 miles), basic site preparation, blocking, strapping and anchoring, electrical / water/sewer connection / installation (up to 50 feet), and Clean and Make Ready for Occupancy. This CLIN DOES NOT include steps.NTEFPEA2$ - 0$ - 0
2003ADInstallation MiscellanousMisc. Expenses for Private Site Preparation and /or MH / PM installation over & above basic installation charges. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500
NTECPNTE1$5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
2003AEMH/PM Commercial/Group Basic InstallBasic Manufactured Home / Park Model installation at a commercial or group site. Includes one set of stairs installed at the rear entrance. Includes: transportation for install (up to 100 miles).NTEFPEA1$ - 0$ - 0
2003AFTT Commercial/Group Basic InstallBasic Manufactured Travel Trailer Installation at commercial or group site. Include: Transportation for install (up to 100 miles). This CLIN DOES NOT include stairs, steps or ramp.NTEFPEA1$ - 0$ - 0
2003AGTank And Pump System Installation (MHU ONLY)EA1$ - 0$ - 0
2003AHSteps/Stairs MH / PMStandard Steps for MH/PM (Price per additional entrance, i.e. Front Stairs)NTEFPEA1$ - 0$ - 0
2003AISteps/Stairs TTStandard Steps for travel trailer.NTEFPEA1$ - 0$ - 0
2003AJStoops for TTStoop for TT . Pallet - like construction 48" x 48" x 6"NTEFPEA1$ - 0$ - 0
2003AKMH/PM UFAS Ramp (up to 40 ft of ramp) Ref. C.4.3.3Manufactured Home UFAS Ramp (up to 40 feet of ramp- see description in C.4.3.3)NTEFPEA1$ - 0$ - 0
2003ALTT UFAS Ramp ( up to 30 ft of ramp) Ref. C.4.3.3Travel Trailer UFAS Ramp (up to 30 feet of ramp- see description in C.4.3.3)NTEFPEA1$ - 0$ - 0
2003AMAdditional Ramp (per feet)Additional per foot rampNTEFPLF20$ - 0$ - 0
2003ANPlatform Steps/Stairs for MH/PMPlatform Steps For MH/PMNTEFPEA1$ - 0$ - 0
2003AOPlatform Steps/Stairs for TTPlatform Steps for TTNTEFPEA1$ - 0$ - 0
2003APAdditional Sewer Line (Above Ground)4-Inch Lateral Sewer Line, Above ground (over basic install included
sewer line).NTEFPLF20$ - 0$ - 0
2003AQAdditional Buried Water Line (Over basic install)4-Inch Lateral Sewer Line, Buried (over basic install included buried
sewer line).NTEFPLF20$ - 0$ - 0
2003ARAdditional Water Line for TT (50 ft)Provide additional RV grade polyurethane hose that is RoHS compliant.NTEFPLF2$ - 0$ - 0
2003ASTemporary Power PolePower Pole and Meter Loop.NTEFPEA1$ - 0$ - 0
2003ATAdditional WiringAdditional wiring over basic installNTEFPLA20$ - 0$ - 0
Sub Total Installation$ 5,000.00
CLIN 2004Maintenance
2004AAPreventive Maintenance Inspection And Repair (PMI) includes minor repair, labor and materialPreventive Maintenance Inspection and Repairs (includes minor repair, labor and materials).NTEFPEA1344$ - 0$ - 0
2004ABCall CenterMaintenance Call Center.NTEFPMthly6$ - 0$ - 0
2004ACRoutine RepairsRepairs that are serious but do not present an imminent danger to the health, safety or security of the unit occupant or property. Routine repairs are up to a $250.00 material. Labor for routine repairs is included in PMIR.NTEFPEA200$ - 0$ - 0
2004ADEmergency Repair Visit And DeterminationUse this CLIN to cover the Inspection and Determination of an Emergency Repair MHU. Includes Labor and Travel to the site.NTEFPEA90$ - 0$ - 0
2004AELP Refill/Refilling Both Propane Tanks on TTRefill/refilling of liquid propane tanks.NTEEA0$ - 0$ - 0
2004AFEmergency Unit Entry ServicePerform Emergency Unit Entry Service for occupants unable to gain access to a unit.NTEFPEA45$ - 0$ - 0
2004AGMiscellaneous MaintenanceDuring the “maintenance” of an THU there may be issues that cannot be foreseen but are required to complete the “maintenance”. This CLIN is only to be used if the work required does not fit within the definition of any other “maintenance” CLIN. The contractor shall develop a cost proposal which includes Actual cost related to the unforeseen work and present the estimate to the CO/COR for review. COR approval required. CO approval required if >$3,500.NTECPNTE1$ 45,000.00$ 45,000.00DO NOT CHANGE AMOUNT
2004AHTank Pump System Monthly Maintenance InspectionEA936$ - 0$ - 0
2004AIOccupant Substitute Relocation (Housing)Temporary housing for a survivor that requires relocation or an emergency repair that will not resolve or mitigate a threat or imminent dangerNTECPNTE1$ 5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
2004AJThird Party Microbial Growth Inspection ServicesEmploy a third party to perform mold sampling, testing and reporting servicesNTECPNTE1$ 1,500.00$ 1,500.00DO NOT CHANGE AMOUNT
2004AKThird Party Microbial Growth Remdiation ServicesAt the instruction of the COR, the contractor shall hire an
appropriately licensed and/or certified company to remediate microbial growth in an MHU.NTECPNTE1$ 1,500.00$ 1,500.00DO NOT CHANGE AMOUNT
Sub Total - Maintenance$ 53,000.00
CLIN 2005Deactivation
2005AAClean And Make Ready For Reuse (CMR)Clean and Make Ready for ReuseNTEFPEA2$ - 0$ - 0
2005ABClean And Make Ready For Reuse MiscellanousA miscellaneous CLIN for Clean and Make Ready for Reuse may be issued to the Contractor if the work needed cannot be completed within the SCOPE of an existing CLIN. Any items or services required to Clean and Make Ready for Reuse not covered in other parts of this PWS will require approval from the CO or COR. The Contractor shall develop a cost proposal for all work to be carried out as part of this assignment. The final negotiated cost will become a fixed price item. CO approval required if >$3,500.NTEFPNTE1$ 5,000.00$ 5,000.00DO NOT CHANGE AMOUNT
2005ACMH/PM DeactMH / PM Basic Deactivation Includes transportation for deactivation back to the staging or storage site (up to 100 miles)NTEFPEA25$ - 0$ - 0
2005ADTT DeactTT Basic Deactivation. Includes transportation for deactivation back to the staging or storage site (up to 100 miles)NTEFPEA35$ - 0$ - 0
2005AETank Pump System Deactivation (MHU Only)NTEFPEA15$ - 0$ - 0
2005AFDeactivation MiscellanousThis CLIN is only to be used if the work required does not fit within the definition of any other “deactivation” CLIN. The contractor shall develop a cost proposal which includes all costs related to the unforeseen work and present the estimate to the CO/COR for review. Once the CO/COR has agreed to a price for the work, the final cost will become a fixed unit price. CO approval required if >$3,500.NTECPNTE1$ 7,000.00$ 7,000.00DO NOT CHANGE AMOUNT
2005AGMH/PM Emergency DeactMH / PM Emergency Deactivation.NTEFPEA2$ - 0$ - 0
2005AHTT Emergency DeactTT Emergency Deactivation.NTEFPEA2$ - 0$ - 0
2005AIRelocation MH/PMDeactivation of the unit at its original location, and installation at a new location.NTEFPEA0$ - 0$ - 0
2005AJRelocation TTDeactivation of the unit at its original location, and installation at a new location.NTEFPEA0$ - 0$ - 0
2005AKReposition MH/PMDeactivation of the unit at its original location, and install at a location on the same site.NTEFPEA0$ - 0$ - 0
2005ALReposition TTDeactivation of the unit at its original location, and install at a location on the same site.NTEFPEA1$ - 0$ - 0
2005AMMH / PM REINSTALLATIONThe work order includes removal and replacement of the MHU at the same site.NTEFPEA1$ - 0$ - 0
2005ANTT Reinstallation(WO remove & replace at same location)The work order includes removal and replacement of the TT at the same site.NTEFPEA1$ - 0$ - 0
2005AOCrowning RemovalThe work includes all materials, equipment and labor to remove the
crowning at a Commercial/Private Site.NTEFPEA5$ - 0$ - 0
Sub Total - Deactivation$ 12,000.00
CLIN 2006Field Task Order Requirements
2006AATask Order ManagerGeneral Contract Management.NTEFPMthly6$ - 0$ - 0
2006ABDeputy Task Order ManagerGeneral Contract Management.NTEFPMthly6$ - 0$ - 0
2006ACAdministrative CoordinatorGeneral Contract SupportNTEFPMthly6$ - 0$ - 0
2006ADProgram ManagerGeneral Contract Management.NTEFPMthly6$ - 0$ - 0
2006AEContract ManagerGeneral Contract Management.NTEFPMthly6$ - 0$ - 0
2006AFSafety ManagerGeneral Contract Management.NTEFPMthly6$ - 0$ - 0
2006AGMaintenance/Deactivation LeadGeneral Contract Management.NTEFPMthly6$ - 0$ - 0
Sub Total - Field Task Order Req.$ - 0
TOTAL$ 70,000.00