This solicitation requests offers for a utility float in accordance with attached specifications. The Navy seeks a rigid float structure to separate hulls of nested ships and prevent contact while berthing or mooring. Requirements include a 61-foot steel hull with 4-foot-6-inch height, rubber fendering, and lifting eyes. Offers are due by 8:00 AM on June 25, 2021. Award of a firm-fixed-price supply contract is anticipated, with terms FOB destination to Naval Base Kitsap in Bremerton, Washington. Shipping costs must be included in item prices. This small business set-aside solicitation was distributed via SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to UTILITY FLOAT, newest first.
File Type Posted
2.1.1 21R0026 RFP Amend 0003.pdf PDF
2.1.1 21R0026 RFP Amend 0002.pdf PDF
2.1.1 21R0026 RFP Amend 0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N0040621R0026 25-May-2021

b. TELEPHONE NUMBER

360-476-5373

8. OFFER DUE DATE/LOCAL TIME

08:00 AM 25 Jun 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N004069. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MELANIE R. JOHNSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N0005221RC0012C

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

NAVSUP FLC PUGET SOUND

467 W STREET, 2ND FLOOR

ATTN: M.JOHNSON

BREMERTON WA 98314

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 360-476-5373 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

336611

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF75

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

N0040621R0026

Section Supplies or Services and Price

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each

UTILITY FLOAT

FFP

BUILT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

MILSTRIP: N0005221RC0012C

PURCHASE REQUEST NUMBER: N0005221RC0012C

PSC CD: 1945

NET AMT

000101

WELD MAPS

FFP

Provided in CAD-type software and PDF files in accordance with the attached Statement of Work.

MILSTRIP: N0005221RC0012C

Section B - Supplies or Services and Prices

000102

MATERIALS CERTIFICATION

FFP

Provide certification that material used shall be FDA-approved or otherwise harmless to marine life. in accordance with the attached Statement of Work.

000103

MATERIAL RECEIPTS

FFP

Provide material receipts for structural materials, hardware, and for Ultra High Molecular Weight (UHMW) materials. Those receipts shall be maintained and consist of original reports, complete heat-treating records, original manufacturer mechanical test reports, traceability to identify and validate integrity of each production lot to final packing and shipment in accordance with the attached

000104

MECHANICAL INSPECTIONS REPORTS

FFP

All faults encountered and rectifications made shall be documented in the Mechanical Inspections Reports. Provide one hard copy and electronically with Word, Excel, Power Point, or PDF files in accordance with the attached Statement of Work.

000105

TEST PLAN

FFP

Prepare and submit in accordance with the attached Statement of Work.

000106

WATERTIGHT COMPONENTS PRELIM TEST REPORT

FFP

Deliver a comprehensive, detailed test report in a Microsoft Word or Adobe file in accordance with the attached Statement of Work.

000107

WATERTIGHT COMPONENTS FINAL TEST REPORT

FFP

Deliver the final test report and the summary certification report of satisfactory tests in a Microsoft Word or Adobe file in accordance with the attached Statement

000108

STATIC FLOAT TEST REPORT

FFP

Deliver the test report as Microsoft Word or Adobe files in accordance with the attached Statement of Work.

000109

DYNAMIC FLOAT TEST REPORT

FFP

Deliver the test report as Microsoft Word or Adobe files in accordance with the

000110 NON DESTRUCTIVE TEST CERT and REPORT

FFP

Deliver the certification and test summary report as Microsoft Word or Adobe files in accordance with the attached Statement of Work.

000111 PULL TEST CERT and REPORT

FFP

Deliver the certification and test summary report in accordance with the attached

000112

LIFT TEST REPORT

FFP

Deliver the test report as Microsoft Word or Adobe files in accordance with the

000113

PARTS LIST

FFP

Provide as a hard copy document and as a usable combination of Microsoft Word and Excel files or PDF files on one CD ROM set.in accordance with the attached

000114

TECHNICAL DATA

FFP

Deliver one hard copy and electronic, digital software files on one set of CD ROMs with the unit in accordance with the attached Statement of Work.

000115

MSDS

FFP

Provide a list of all MSDS for paint and primer used in accordance with the

000116

VOID FINAL AIR TEST CERT

FFP

Provide certification of satisfactory test in accordance with the attached Statement

NOTICE TO OFFERORS

NOTICE TO INTERESTED PARTIES

1. This solicitation is for the procurement of a Utility Float in support of Commander Navy Region Northwest, Port Operations, Bremerton, WA. It is anticipated that this solicitation will result in an award of a Firm, Fixed-Price Supply type contract.

2. The entire solicitation shall be filled out, signed, and returned as part of your quote. See block 8 on page 1 of the solicitation for the closing date and time.

3. The deadline for submission of questions regarding the solicitation’s terms, conditions, specifications, and/or the statement of work (SOW) / performance work statement (PWS) is 15 days prior to the solicitation’s closing date.

4. Quotes will be evaluated in accordance with FAR 52.212-2 Evaluation Commercial Items.

5. All questions in regards to this solicitation shall be submitted, via email, to the Contract Specialist (listed below):

Name: Melanie Johnson

Email: melanie.r.johnson1@navy.mil

Section C - Descriptions and Specifications

STATEMENT OF WORK

New Construction

NAVY REGION NORTH WEST, BREMERTON, WA.

PROJECT DESCRIPTION AND INFORMATION:

DESCRIPTION: The Utility Float is a rigid structure designed to separate hulls of nested ships or submarines, working platforms, or moorings that prevent contact of their appendages while berthing or mooring in the demanding marine environment of piers and wharves. Separators operate with a float attached or they may have a built-in buoyancy chamber for flotation. They will be outfitted with fendering materials to absorb berthing and environmental loads and conditions. Separators provide separation to ensure that overhanging and other protruding structures are clear.

Definitions. Descriptions given herein shall not be interpreted as being exhaustive of the subject and any failure of the text to mention or elaborate on specific requirements shall not relieve the Contractor of the obligation of delivering a work effort this is acceptable to the customer.

Unless otherwise stated, “as shown”, “as detailed”, or other words of similar import refer to the contractual documents including reference documents and publications.

The words “as directed”, “as approved”, or words of similar import refer to the direction, requirements, permission, approval or acceptance by the Contracting Officer.

The term “Government” means the United States Government, represented by the Contracting Officer.

Where “in accordance with Regulatory Body requirements” is stated, the industrial efforts shall be in accordance with commercial regulatory body requirements unless otherwise authorized by Contracting Officer.

The term “Customer” means Port Operations Service Craft Coordinators.

The term “marine” or “marine quality” means an item constructed of materials unaffected by moisture, sea spray extremes in temperature or other hazards of the marine environment, and is designed and constructed to perform its intended functions under marine operating conditions.

The terms “herein” means the applicable section(s) of the Specification.

For further reference Port Operations Service Craft Coordinators shall be designated as customer.

The Contractor shall notify the Contracting Officer with any questions pertaining to the Statement of Work (SOW) or technical specifications and drawings. Any conflicts or discrepancies with this SOW, the Utility Float technical specifications, and drawings shall be resolved in writing by the Contracting Officer in accordance with the terms and conditions, including 52.212-4(s). The customer will serve as the technical point of contact prior to proceeding with the work.

The Contracting Officer is the only authorizing person who can perform any modifications to the resulting contract, which would be in writing. Verbal instruction in conflict with this contract shall not be used unless it amounts to a clarification and both parties agree it is mutually beneficial and does not affect the contract price.

1. GENERAL REQUIREMENTS.

This document invokes requirements applicable to manufacture of the Utility Float listed below, both for work performed in and out of the dock, to Commercial Marine Standards. The requirements herein are part of the contract and as such, compliance is a contractual requirement. The Contractor is responsible for understanding and complying with all requirements established herein. These Specifications work with the technical drawings and other references to describe the essential features, functions and requirements of the work.

2. PHYSICAL CHARACTERISTICS.

Length Overall: 61 FT Beam: 16 FT Height: 4 FT-6 IN Est. Weight: 18 T Draft: 1 FT Hull Material: Steel

The Utility Float shall be constructed in accordance with (IAW) NAVSEA Drawing 803-921865, and as such, will be a 61 feet long by 16 feet wide non-corrosive body assembly supported by a flotation device. The Floats are designed for extreme conditions such as the impact from berthing at high velocity and craft mooring forces from high velocity currents and winds for these conditions.

The Float must be placed to be in contact with various craft and ship’s hull. Utility Float shall conform to the below listed performance requirements. The Utility Float shall float in a horizontal orientation, in the actual position in which it is intended to be used. The Utility Float and the appendages shall be constructed in a manner and of a material which will not cause damage to the ship structures during use. Materials and construction shall be capable of withstanding typical mooring/berthing operations over at least a 35 year period, under normal use, without significant deterioration. The Utility Float shall be outfitted with lifting eyes to allow them to be lifted out of the water by a crane. Construction shall be such that overall weight of the Utility Float does not change subsequent to use; the materials will not absorb water, and standing water will drain freely from the Utility Float, thus avoiding any change in weight.

The Utility Float assembly shall be a one-piece construction. Minimum two feet free-board requirements and thereby any proposed design changes to the NAVSEA design must be demonstrated by the offeror to meet those freeboard requirements. Each Float shall contain a rubber backing where the craft comes in contact with the float.

3. PRESERVATION AND PAINTING.

NOTE: Do not apply paint to zinc anodes and threads of fasteners or other components not normally painted. Paint inadvertently applied or spilled on these surfaces shall be immediately removed or the item replaced at Contractor’s expense.

NOTE: Surface preparation and equipment used for paint application shall be in strict compliance with the coating manufacturer requirements and inspected in accordance with ASTM F940. A minimum of two coats shall be applied to satisfy the Dry Film Thickness (DFT) unless specifically permitted otherwise by the manufacturer’s instructions.

3.1 Hull Preservation.

Mask and install plugs, blanks, or other covers to prevent system contamination or equipment damage from sandblasting. Remove protective materials upon completion of sandblasting.

Commercial blast clean surface of hull, to the upper edge of the deck surface prior to application of new coating system. Accomplish the requirements of SSPC SP-10. Power tool clean areas to SSPC SP-10 surface preparation where sandblast equipment cannot access. Apply a 12-year marine epoxy coating system in accordance with manufacturer’s instructions. Primer, top coat and anti fouling coats shall all be from the same manufacturer and compatible with each other. Between spray coats a “stripe” coat of un-thinned paint of the next paint coat shall be applied to all edges, welds, and cutouts. Apply anti fouling coating from bottom of hull to the upper edge of the deck. Anti-fouling paint top coat color shall be black. Paint draft markings, distinguishing figures and topside fittings a final topcoat of white. Relocate the Utility Float on the blocks, after application of hull paint and is properly cured, to permit 100 percent preservation and painting of areas previously covered by the blocks.

3.2 Main Deck and Topside Preservation.

Prepare and blast deck to SSPC SP-10 surface preparation. Power tool clean areas to SSPC SP-10 surface preparation where sandblast equipment cannot access.

3.3 Primer and Non-Skid.

Apply primer and MIL-PRF-24667 Type II non-skid in accordance with the manufacturer’s instructions. New primer, non-skid, and color coat shall be from the same manufacturer and compatible with each other.

a. Apply the primer and non-skid: forward and aft and from side to side, deck gray in final color, with the non-skid peaks and valleys coarsely and reasonably uniform and in the same direction;

uniform in color, and presenting a roughly uniform course appearance over the entire surface receiving non-skid.

3.4 Cross-Roll.

Cross-roll all welded seams running parallel to the direction of the peaks and valleys. Cross-rolling shall extend approximately 3 to 6 inches on either side of the weld seam. Welds 8-inches or less shall be treated as one weld.

3.5 Color Topping.

Apply the manufacturer’s color topping equivalent to MIL-PRF-24635 to peripheral deck edging (4-inches) and areas not receiving non-skid. Maintain a 2-inch border around all deck fittings and vertical surfaces. Manhole covers shall not be non-skidded.

3.6 Void Identification.

Provide void cover numbers white color, 6-inch high block numerals to designate void number per table 3. Label only with tank number (1, 2 etc.)

3.7 Gas Free Statement.

Provide 1.5 inch white block letters the gas free statement below, on each void cover to read inboard in conjunction with cover numbers:

GAS FREE

PRIOR TO ENTRY

3.8 Paint/Protective Coating System.

The protective paint/coating system shall be used for all corrosion-affected materials, e.g., steel, in accordance with the following system, as a minimum. Surface preparation and coating application to be accomplished by an Society for Protective Coatings Quality Process 1 (SSPC QP1) certified coating contractor or a Quality Process 3 (QP3) certified paint shop.

NOTE 1: EXTERIOR DECKS PAINT IS THE AREA OF THE UTILITY FLOAT UNDER THE

DECKING MATERIAL THAT WILL NEED TO BE PAINTED.

NOTE 2: RECOAT WINDOW FOR ANTIFOULING COATING OVER EPOXY SHALL BE IN

ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS FOR COATING OVER EPOXY.

THIS GENERALLY REQUIRES THAT THE RECOAT WINDOW BE ADJUSTED SO THAT

ANTIFOULING IS APPLIED AS SOON AS THE EPOXY COAT HAS DRIED TO TOUCH.

NOTE 3: THE ANTIFOULING PAINT SHALL BE APPLIED FROM THE BOTTOM OF THE

UTILITY FLOAT TO APPROXIMATELY ONE FOOT ABOVE THE WATER LINE.

NOTE 4: DO NOT APPLY PAINT TO ZINC ANODES, NAMEPLATES/TAGS/SIGNS, TO

THREADS OF FASTENERS, RUBBER, PLASTIC, GLASS OR OTHER COMPONENTS NOT

NORMALLY PAINTED. PAINT INADVERTENTLY APPLIED OR SPILLED ON THESE

SURFACES SHALL BE IMMEDIATELY REMOVED OR THE ITEM REPLACED AT

CONTRACTOR’S EXPENSE.

NOTE 5: SURFACE PREPARATION AND EQUIPMENT USED FOR PAINT APPLICATION

SHALL BE IN STRICT COMPLIANCE WITH THE COATING MANUFACTURER

REQUIREMENTS AND INSPECTED IN ACCORDANCE WITH ASTM F941. A MINIMUM OF

THREE COATS SHALL BE APPLIED UNLESS SPECIFICALLY PERMITTED OTHERWISE

BY THE MANUFACTURER’S INSTRUCTIONS. BETWEEN SPRAY COATS, IN AREAS OF

HIGH CORROSION POTENTIAL, A “STRIPE” COAT OF UN-THINNED PAINT OF THE

NEXT PAINT COAT SHALL BE APPLIED TO ALL EDGES, WELDS, AND CUTOUTS.

NOTE 6: IF WELDING OR ADDITIONAL FABRICATIONS WITH FIXTURES OR

HARDWARE IS ACCOMPLISHED BY THE MANUFACTURER ON SURFACES BELOW THE

WATERLINE AFTER THE PAINT SYSTEM ALREADY HAS BEEN APPLIED, THE PAINT

SYSTEM SHALL BE RE-APPLIED AS TOUCH-UPS AT THOSE SPECIFIC LOCATIONS

AFFECTED.

4. PRESERVATION, PACKAGING, & PACKING.

Mooring equipment shall be preserved, packaged and packed in accordance with the contractor’s standard practice in a manner to prevent corrosion, deterioration, and damage, and to ensure arrival at destination in a satisfactory condition.

5. MARKING.

After the protective paint/coating has been completed, each Utility Float shall have markings stenciled on the main deck centerline, on FWD end and AFT end. Stenciled characters will be, UF-

139. Letters shall be, 6 inches in height in block letters 1 inch wide, top-coated in white paint, to enable reading that information at a distance of ten feet.

The following identification information shall be on a 4x6 inch plate permanently attached to UF to indicate the following:

US NAVY- EQUIPMENT TITLE

MANUFACTURER’S LOGO/NAME

DATE PROVIDED

SERIAL NUMBER

WEIGHT

The equipment title shall be Utility Float. One plate will be attached to each float in an area of low traffic (on main deck near forward end centerline).

The manufacturer shall provide proof of equipment markings by providing digital pictures of each item demonstrating Utility Float markings and serial numbers as well as gross weight of the Unit stenciled onto the Unit as identification markings. The gross weight shall be included on the lifting sketches/rigging diagram. Digital pictures shall be .jpeg-type files.

5.1 Designating and Marking.

Record all hull and other markings, upon Utility Float haul out, for installation after preservation is completed. Upon completion of hull painting, reinstall hull and other markings using information recorded.

6. LIFTING ATTACHMENTS.

Each Utility Float (the “Unit”) shall be outfitted with lifting padeyes to allow it to be lifted out of the water by a crane. Mooring fittings and lifting pad-eyes permanent installation shall be provided. Only welders qualified per AWS D1.1/D1.1M shall be allowed to install welded pad-eyes and mooring fittings. Pad-eyes shall be located over stiffeners or supporting structure of sufficient strength to support the load. Pad-eyes and support stiffeners shall not be installed within 3 inches of butt seam welds. Additionally, lifting attachments shall be manufactured and permanently installed per the following:

a. Each lifting attachment shall be capable of supporting one half the gross weight of the equipment at the anticipated lift angle with a design factor of six to one based on ultimate strength. For single point lifts, the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of six to one based on ultimate strength.

b. Each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA), which is capable of supporting one half the gross weight of the equipment at the anticipated lift angle. For single point lifts, the lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.

c. Load shackles shall be applied in the plane of the pad-eye. The manufacturer shall ensure that load shackles are not side-loaded more than 10 degrees out of the plane of the attachment and shackles are not put in a bind against the attachment. The lifting attachments shall be located above the center of gravity such that the lifting slings do not contact the equipment, or alternatively a spreader beam engineered by the manufacturer shall be provided.

d. Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1-inch.

e. The equipment shall be marked in a prominent location with the gross weight. Marking shall be upper case letters of a contrasting color, with a minimum height of 1-inch. Marking shall include the units (i.e., “pounds”).

f. The mooring equipment Unit shall be provided with a placard permanently on the equipment, etched or welded. The lifting sketch shall detail any specific requirements and/or configurations that must be met prior to lifting (e.g., “utilize 10’ minimum length slings”, “spreader beam required” etc.). The lifting sketch shall include the location of the center of gravity of the equipment, equipment manufacturer and model (if applicable), and gross weight.

g. Each mooring equipment Unit shall be designed for use in a heavy industrial marine environment to withstand impact during repeated lifting and handling. The Unit design shall incorporate withstanding stresses using any two points of a four-point pick for lifting/rigging.

h. Equipment-applicable mooring cleats shall be horned conforming to ASTM A148/A148M.

Provide one pair of cleats straddling each corner applicable to the mooring equipment Unit but only in vicinity of lifting pad-eyes at the corners. Cleats only at those corner locations will permit free working surfaces along the longitudinal and lateral deck walls upper surface of the Unit. Cleats shall be a minimum from edge of the Unit structure to provide normal services. If cleats are to be used as towing attachments, they shall be designed and tested to withstand the forces of towing the Unit in local waters with minimum list or trim under tow. Separate towing attachments on an applicable lateral deck wall upper surface of the Unit are acceptable

7. MATERIALS REQUIREMENTS.

Steel used in fabrication of the Utility Float and its equipment assemblies must be free of kinks, sharp bends, and other conditions, which would degrade the finished product. Manufacturing processes shall not reduce the strength of the steel to a value less than intended by the design.

Manufacturing processes shall be done neatly and accurately. All bends shall be made by controlled means to ensure uniformity of size and shape. Structural steel shall be compliant to ASTM A36/A36M, A575, A992/A992M, Steel Pipe ASTM 252, ASTM A53, Type E, or S, Grade B.

For any portions of the Unit made of steel, all welding procedures shall be in accordance with AWS D1.1/D1.1M, and weld maps shall be furnished by the Unit manufacturer. The surface of parts to be welded shall be free from rust, scale, paint, grease, or other foreign matter. Welds shall be of sufficient size and shape to enable the full strength of the parts connected by the welds. Welds shall transmit stress without permanent deformation or failure when the parts connected by the weld are subjected to proof and service loadings. All exposed welds must be continuous. Non-stitch welding is acceptable. All welding procedures and verified welder qualifications shall be in accordance with the requirements of MIL-STD-278 and AWS D1.1/D1.1M. Weld allowable unit stresses shall be in accordance with AWS D1.1/D1.1M. Welded hollow structural members and voids shall be seal-welded. Hand holes shall be seal-welded or closed with gasketed, bolted covers. The Unit manufacturer shall provide weld maps (diagrams). Weld maps shall be provided in CAD-type software and PDF files.

Fenders materials used on Unit applicable main deck outboard edges and on outboard edges of applicable protruding railings and outer tips of retractable apparatus shall be rubber, non-marring, ethylene propylene dimonometer (EPDM), as specified in ASTM D2000 Rubber Products in Automotive Applications. Size and shape of fenders shall be identified in drawing SK10653 not to exceed the hull pressures/reaction forces as specified and nominally fit the curvature of adjacent submarines and surface ship hulls. Fender rub strips shall be of Ultra-High Molecular Weight Polyethylene materials including additives and shall be traceable by original lot number. Contractor to provide certification that material used shall be FDA-approved or otherwise harmless to marine life.

7.1 Materials.

Use only new materials as indicated on the drawings, publications or as specified in this specification, unless noted otherwise. The use of asbestos, polychlorinated biphenyl (PCB), magnesium, cadmium, or mercury in any materials is prohibited.

7.2 Hardware.

Bolts or bolting if used, all hardware consisting of bolts, nuts, and washers shall be galvanized according to ASTM A123 or ASTM A153 as applicable and shall have a Rockwell Hardness of C-32 maximum, and shall be permanently marked (by embossing or indentation) with the ASTM designation, grade, and manufacturer identification. All structural bolt connections shall be made with ASTM A325 high strength plain galvanized bolts; ASTM A563 plain galvanized nuts; and ASTM F436 galvanized washers; or stainless steel nuts and bolts according to ASTM F593 or ASTM F594 as applicable. Hardened washers shall be used at the bolt head and the nut end of each bolted connection. All structural bolted connections shall be installed in accordance with Specification for Structural Joints using ASTM A325 or A490 bolts.

7.3 Threaded Fasteners.

Provide threaded fasteners in accordance with ASTM standards except as otherwise specified herein or on the drawings. Use coarse thread series unless the component’s design indicates a necessity to use fine thread series. Do not exceed the hole diameters produced using standard size drill bits for mounting bolts. Brass and cadmium plated fasteners are prohibited

7.4 Materials Certifications.

The Unit manufacturer shall provide material receipts, for structural materials and hardware, and for Ultra High Molecular Weight (UHMW) materials. Those receipts shall be maintained and consist of original reports, complete heat-treating records, original manufacturer mechanical test reports, traceability to identify and validate integrity of each production lot to final packing and shipment.

8. INSPECTIONS.

The manufacturer shall provide digital pictures as .jpeg type files of the following:

• Tanks raw before paint then after paint

• Exterior raw before paint then after paint, rubber fenders installed

• Topside raw before paint, then after non-skid with the contrasting stripe coat on the fittings, cleats, bits, lifting eyes, and stencils on tank voids.

Each tank and void.

Inspection of utility floats by a Government Representative shall occur prior to the utility floats being placed in the water. If the utility floats will be delivered via water, this inspection will take place at the contractor’s facility. If the utility floats will be delivered via a method other than water, this inspection will take place at the customer’s location upon arrival of the utility floats. Contractor will be responsible for putting the utility floats in the water after inspection is complete.

8.1 Final Acceptance.

Final inspection shall be at the delivery destination, via the NRNW Service Craft Coordinator N31.

Final Acceptance / approval shall be made by the NRNW Service Craft Coordinator N31 point of contact.

8.2 Mechanical Inspections.

For installations and fabrications inspections and grooming, the Contractor shall demonstrate the equipment has been inspected for mechanical integrity as follows:

a. All welds shall be inspected for integrity and appearance.

b. Surfaces shall be examined for sharp edges and burrs.

c. Fasteners shall be checked for tightness.

d. Paint shall be checked for flaking, blistering, and correct coloring.

All faults encountered and rectifications made shall be documented in the Mechanical Inspections Reports in Microsoft Word or Adobe files, all occurring prior to delivery at recipient location.

Provide reports to NRNW Service Craft Coordinator N31. Provide one hard copy and electronically to NRNW Service Craft Coordinator N31 with Word, Excel, Power Point, or PDF files as attachments within 15 days following completion of all mechanical inspections.

8.3 Provisions For Repair And Retest.

In the event of a test failure, the contractor may elect, without external direction, to correct the failed condition and request a retest of the system.

9. TESTING.

9.1 General Test Requirements.

All Contractor affected equipment, systems and subsystems shall be tested for compliance with these Specifications and Commercial Marine standards and practices. Testing shall demonstrate workmanship, alignment, strength, rigidity, water tightness, functionality, and suitability for the purpose intended. A Test Plan shall be prepared and submitted to the Government Representative for review. Materials, supplies, utilities, equipment, instrumentation, services and personnel shall be provided by the Contractor to accomplish each test. Safety precautions shall be incorporated into each test procedure. Prepare all test documentation during the development and implementation of the acceptance test. As a minimum, the following shall be accomplished:

a. Prepare and maintain an acceptance test schedule with dates of each scheduled test and performance requirements. Any Government required support, with date requested by Contractor shall be shown on the test schedule. The test schedule shall be fully integrated with the Contractor’s production schedule and a copy provided to the Government Representative.

b. Provide a detailed description of the preoperational checks to be conducted, operations to be performed, and the parameters to be satisfied. Provide data sheets that contain spaces for recording the quantitative values determined during the test. Include the minimum and maximum allowable tolerance limits for each measured value. Provide signatures and printed name of the person conducting the test, the Government Representative, and the date of the test on test sheets. Use block diagrams or simplified schematics to clarify the procedure or test method. Include a comment sheet to record significant events and observations by either the Government witness or Contractor.

c. Document the overall test results and findings in relation to the technical specification requirements for all accepted test reports. Provide a complete copy of the test procedure, with filled in data sheets, and detailed analysis of the raw data to the Government Representative, including corrective action and retesting, as required.

d. Perform tests using the applicable test procedure for systems and subsystems. Demonstrate compliance with the Specification requirements. Complete all work prior to initial testing of that particular system or subsystem. Accomplish any grooming or dry run testing prior to the scheduled acceptance test.

e. A Government Representative will witness each test unless Contractor receives authorization, by a Government Representative, to proceed without a Government Representative present. Provide a minimum of 24 hours notification to the Government Representative prior to conducting required tests, 72 hours notification for tests performed during weekends or Federal holidays. Adjustments of equipment shall not be made during acceptance testing. A Government Representative may countersign the acceptance test report, however the Government Representative signature does not constitute approval or concurrence in any aspect of the testing, other than the presence of a Government representative at the test.

f. Stop tests if the equipment, system or subsystem being tested fails to satisfy the acceptance criteria of the established test procedure. Determine the cause and correct prior to retest.

9.2 Watertight Components Preliminary Test.

The contractor shall: perform a structural and water-tightness air test of all watertight components of the assembled mooring equipment Unit for a period of 10 minutes; inspect all accessible areas to determine leakage sites; document discrepancies; and rectify any leakage sites. Afterwards, the contractor shall repeat watertightness test and rectify any leakage sites until successful. The contractor shall deliver a comprehensive, detailed test report in a Microsoft Word or Adobe file.

9.3 Watertight Components Final Test.

The contractor shall perform the final water-tightness air test of all watertight components of the assembled mooring equipment Unit for a period of 10 minutes with zero pressure drop permitted.

Allow pressure to stabilize for 15 minutes prior to conducting test. The contractor shall provide copy of the certification report of satisfactory air test for each watertight compartment file and the final summary certification report of satisfactory tests. The contractor shall deliver the final test report and the summary certification report of satisfactory tests in a Microsoft Word or Adobe.

NOTE: The manufacturer shall successfully float the Utility Float at their facility. If the float is transported by a method other than sea travel, the contractor shall conduct a second successful float test at the Government’s facility.

9.4 Static Float Tests.

After final assembly and integration installation of all applicable equipment is completed by the Utility Float contractor, the manufacturer shall conduct static, motionless float tests of the Float at their facility to demonstrate level Unit inclination, load stability, and free-board and draft within design limits per the manufacturer design calculations. The tests must demonstrate the Unit floats without taking on water and floats within the following inclination tolerances: Pitch (Trim) angle (Forward and Aft): 0.25 Degree; Roll (List) angle (STBD and Port): 1.0 Degree. Ballast offset shall be added as required to achieve results within inclination tolerances. The report shall be delivered as Microsoft Word or Adobe files.

9.5 Dynamic Float Tests.

After conducting Static Float Tests, the manufacturer shall conduct dynamic, navigational float tests of the Utility Float towed at speeds not to exceed 4 knots. The manufacturer must demonstrate level Float inclination, load stability, and freeboard and draft within design limits per the manufacturer design calculations. The tests must demonstrate the Utility Float; floats without taking on water. The report shall be delivered as Microsoft Word or Adobe files.

10. OTHER MECHANICAL TESTS.

The manufacturer shall perform the following specialized mechanical tests:

10.1 Non-Destructive Tests.

Non-destructive testing of equipment-applicable pad-eyes shall be per MIL-STD 271 and MIL-STD 2035 and consist of a Magnetic Particle Test, a Penetrant Dye Test, and a Visual Test. Personnel qualified per AWS D1.1/D1.1M, Structural Welding Code, are required to perform the non-destructive tests. Acceptance and certification of non-destructive testing of pad-eyes shall be per AWS D1.1/D1.1M. Certification shall include the date tests were performed, type of equipment used, method, results, and signatures of personnel authorized to make such certifications for the manufacturer. Tests and certifications in a detailed summary report shall be delivered in Microsoft Word or Adobe files.

CAUTION: The manufacturer shall perform visual tests and non-destructive testing prior to pull-tests, and shall perform visual tests after pull-tests as well.

10.2 Pull Tests.

Equipment-applicable lifting pad-eyes shall be pull-tested (load-tested) by the manufacturer to 200% (+5%/-0%) of mooring equipment Unit gross weight, and the manufacturer shall provide a certification report of the successful testing. Test load shall be in the plane of the pad-eye and held for ten minutes without damage or permanent distortion to the pad-eye, welds, or supporting structure. Equipment Unit applicable mooring fixtures and towing fixtures shall be load-tested by the manufacturer to 125% (+5/-0%) of the calculated design forces, and a certification report shall be provided. The manufacturer shall provide a summary report of those tests to: NRNW Service Craft Coordinator N31.

10.3 Lift Tests.

The contractor shall provide a detailed report on the results of a Lift Test in which the mooring equipment Unit shall be successfully lifted out of the water with a crane per lifting attachments lift/rigging diagram requirements without damage to the equipment Unit or its lifting pad-eyes. The report shall be delivered as Microsoft Word or Adobe files.

11. IDENTIFICATION SYSTEM:

Each mooring equipment Unit shall have an identification system reflected by Word document files as records that can identify the Unit by its serial number. Therefore, in the event markings disappear, information can still be retrieved from the serial number. The identification system shall be designed to last through the life of the unit.

11.1 Parts List, that provides a summary Parts List document with detailed lists of manufacturer parts, part numbers, quantities, and equipment model numbers which correspond to design and fabrication drawings for all equipment installed and mounted onto/within the mooring equipment Unit, and the summary Parts List shall include all hardware and materials descriptions. The Parts List shall be provided as a hard copy document and as a usable combination of Microsoft Word and Excel files or PDF files on one CD ROM set.

11.2 The manufacturer shall provide List of Current Welder Certificates, per AWS D1.1/D1.1M.

The manufacturer shall also provide written and approved welding procedures, in accordance with MIL-STD-278 and AWS D1.1. The manufacturer’s welding procedures shall be verified by an accredited 3rd party inspection company such as ABS, Lloyd’s or DNV. Additionally, the manufacturer shall provide written and approved nondestructive test procedures, in accordance with MIL-STD-271 and MIL-STD-2035.

The Welding Certificates, Welding Procedures and NDT Procedures, specified above, shall be provided thirty (30) days after contract award.

11.3 Specific format and quantities for TECHNICAL DATA documents. Technical Data for each Utility Float per the applicable mooring equipment inventory delivered shall be provided by the manufacturer with each Unit to applicable recipient delivery addresses. One hard copy and electronic, digital software files on one set of CD ROMs of the Technical Data for each Utility Float per the applicable equipment delivered shall also be delivered to, via the local NAVSUP FLC Puget Sound.

12. SHIPPING AND DELIVERY.

Utility Float to be delivered to the recipient at the applicable location(s). Technical Data, 1 Lot with each delivery, shall be delivered to the address(es) of the applicable recipient(s).

Delivery location:

Puget Sound Naval Shipyard, Bremerton, WA Charlie Pier

Seven calendar days notice must be provided to customer before contractor makes delivery.

48 hours prior to delivery the contractor must contact Port Operations with the following information:

Tug name:

Tug crew name:

*Delivery time:

Channel they will be monitoring:

*Delivery time will be no earlier than 0730 and no later than 1330.

Port Operations Service Craft Coordinator Representative: Mr. Jerry Burleson (360) 476-9663 or Mr.

Billy Dewhurst (360) 476-0968 or Mr. Gregg Clark (360) 476-3266.

13. Care of Utility Float.

Insure security of Utility Float, equipment, materials and components related to the work being performed at the Contractor’s facility and during the tow to and from the Contractor’s facility. Keep Utility Float free of chips, shavings, refuse, dirt, scrap materials, welding slag, sandblast grit and the other extraneous matters. Clean tanks and voids prior to closing. Provide pictures in .jpeg type file of each tank and void. Take appropriate measures to avoid wear or damage and to prevent corrosion and deterioration. Prevent water accumulation in the hull or structure during work performance. Utility Float shall be clean upon its final delivery to the government.

14. Workmanship.

Provide workmanship consistent with highest standards of commercial marine practice and regulatory bodies. The Government reserves the right to accept or reject material or workmanship nonconformance. Nonconformance with Contractor’s quality control processes will influence past performance rating provided on contract evaluation.

15. Reliability and Quality Program.

At the time of delivery, work performed shall meet the performance requirements specified herein and Utility Float shall be clean in all respects. In the event that deficiencies are discovered during the warranty period, an opportunity will be afforded the Contractor to witness, inspect and comment to such deficiencies. Provide materials and articles, used for work performed on Utility Float, of commercial marine quality conforming to the requirements of the Regulatory Bodies listed herein unless specified to be otherwise. Where terms such as machinery, fittings, structures and equipment are herein specified to be accordance with Government specifications, it is intended that commercial marine equivalents, when approved by the Contracting Officer, may be substituted.

16. Required Information.

The Contractor shall provide a list of all MSDS for paint and primer used. List shall be provided to customer within 7 working days of completion work. A list of key Contractor personnel with telephone numbers and emergency contact information shall be provided to the Contracting Officer prior to production work commencing. Both reports shall be submitted electronically.

17. Corrective Action Requests (CAR).

The customer will monitor production work performed at any time or at any facility where work is ongoing. If, during the performance of work, the customer observes work that fails to meet the specifications or would lead to an unsatisfactory end product, the customer will alert the Contracting Officer who will advise the Contractor of the deficiency. If the deficient work is not corrected within a reasonable amount of time (determined by the customer) the Contractor will be issued a CAR and be required to respond to the Contracting Officer in writing.

18. Environmental and Hazardous Waste Management.

Comply with all federal, state, and local laws, codes, regulations, acts, ordinances, and rules for Environmental Protection and Hazardous Waste Management/ Disposal, including obtaining required licenses and permits. Take actions to mitigate creation of hazardous waste by recycling and other available methods. Any hazardous waste generated by work under this contract is the responsibility of the Contractor

19. Availability Requirements.

Submit all written and electronic correspondence with the government, however addressed, via the Contract Administration Office. Submit separate letters for subjects related to payments to the Contracting Officer and for each subject concerning changes or delivery. Insure only Company “authorized representatives” sign Contractor correspondence. Furnish the Contracting Officer with the listing of names, titles, and telephone numbers of these authorized representatives, including emergency contract numbers.

20. Contractor Provided Services.

Provide all utility and other services required by the Contractor for the completion of work. These services include, but are not limited to, electrical power, compressed air, stream, crane service, tugs, garbage/refuse, telephone, and toilet facilities.

21. Drawings.

Develop drawings, lofting and templates necessary to perform work associated with this specification and provide a hard and electronic copy to the customer.

22. Hot Work/Welding..

It is the contractor’s responsibility to ensure compliance with the applicable requirements of ANSI/AWS D 1.1, Structural Welding Code, Steel rules for all welding equipment and materials.

Sequence welding to keep the thermal expansion of structures to minimum. Perform visual, radiographic, ultrasonic, magnetic particle or dye penetrant inspection of welds to determine conformance in accordance ASTM requirements. Visually inspect 100 percent of all welds. Cut plating and structural members neatly and accurately, with edges cleaned and prepared for welding.

Grind sharp edges smooth to avoid injury to personnel.

23. Transportation of Utility Floats.

Transport Utility Float from the Government facility to the Contractor’s repair facility and upon completion of all work transport the Utility Float from the Contractor’s repair facility to the Government facility. Provide all materials, labor, and insurance bond necessary for safe transport of the Utility Float to and from the Contractor’s facility and within the Contractor’s repair facility. The Utility Float’s must be picked up or delivered between the hours of 0730 to 1430 Monday through Friday. No pickup or deliveries will be accepted on federal holidays.

24. General.

Provide qualified and experienced employees, facilities, and necessary equipment to safely dock and undock Utility Float, including:

a. A qualified dock master currently certified by the Contractor and accepted by the Government Docking Officer (GDO).

b. Support employees to satisfactorily accomplish the docking and undocking evolutions.

c. Tugs, pilots and employees for the complete transfer, docking, and undocking of the Utility Float.

The GDO will review and approve the number and size of the tugs to be utilized at the docking conference

25. Stability.

Calculate stability as required by NAVSEA Technical Manual S9086-7G-010/Chapter 997. This shall include draft, list trim, strength, and stability calculations.

26. Bump of Utility Float.

Relocate the Utility Float on the dry dock blocks, after application of hull paint and proper cure time has elapsed, to permit 100 percent preservation and painting of areas previously covered by the dry dock blocks.

27. Manhole Covers.

27.1 Paint covers IAW Para 3.2 through 3.8 and install gaskets. Install all nuts and washers with cres. Repair any internal preservation damage resulting from welding operation.

27.2 Void Final Air Test. Perform a compartment tightness air test of all voids to 2 pounds per square inch for a period of 10 minutes with zero pressure drop permitted after all production work is completed. Allow pressure to stabilize for 15 minutes prior to conducting test. Provide copy of the certification of satisfactory air test, for each void.

27.3 Void preliminary and final air test will be witnessed by the customer. Provide a minimum of 24 hours notification prior to conducting required tests, 72 hours notification for tests performed during weekends or Federal holidays.

28. Condition Found (CFR).

Utilize “Figure A” or contractor standard form if agreed upon, for communication with the Contracting Officer concerning issues related to the Specifications herein. The form shall be duplicated and completed, as necessary, to inform the Contracting Officer and customer of problems, as well as suggested recommendations which may correct them. All communications shall be electronic.

FIGURE A

Condition Found Report (CFR)

Date: ______________

From: ________________________________ (Contractor Authorized Representative)

To: FISC, Puget Sound Contracting Officer

Via: CNRNW Port Operations, Contracting Officer’s Representative (COR)

Vessel:

Section of Contract Affected: _____________________________________________

Description –

Impact –

Recommended Action –

CNRNW Port Operations, Representative -

Signature of CNRNW Port Operations, Representative Date

Page ___ of ____

29. REFERENCES

29.1 Reference Drawings and Publications.

All references shall be of the current issue and/or revision indicated in Table One. It is incumbent on the Contractor to maintain current commercial specifications and be thoroughly familiar with Federal, State and Local laws, regulations and ordinances. Contractor is prohibited from using Government provided technical information for any purpose other than that contemplated by the specifications.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .