2.1.1 26QS173 SOW 38E9A4414R_00_A01_Attachment 1_redacted.pdf
PDF 169 KB Posted
- Attached to
- HIGH PRESSURE AIR COMPRESSOR
- Solicitation number
- N0040626QS173
About this file
This is a Statement of Work (SOW) for a U.S. Navy contract. The document outlines on-site work to be performed from August 19, 2026 through October 2, 2026. Job specification 38F9A55114R-A01 is referenced as Enclosure 1, containing detailed requirements for the contracted services. The SOW indicates that substantial portions of the document are redacted, limiting visibility into the specific nature of the work, deliverables, and performance standards required.
The contractor is required to report all labor hours, including subcontractor labor hours, for services performed under the contract via the Secure Access Management (SAM) portal at https://sam.gov. Reporting must include all required data fields and be submitted no later than October 31 of each calendar year, beginning with 2013. Labor hours should be reported by Government fiscal year (October 1 through September 30), though inputs may be submitted at any time during the fiscal year. Contractors with questions regarding reporting requirements may contact the SAM help desk.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .