This is a Quality Assurance Surveillance Plan (QASP) for a Small Craft Maintenance Support Technician contract with the Navy. The QASP establishes the Government's systematic method for monitoring contractor performance in delivering maintenance and small boat repair services as outlined in the associated Performance Work Statement (PWS).
The contractor must perform preventative and corrective maintenance on small craft in accordance with Navy Preventive Maintenance System (PMS) and SKED 3.2 documentation, with an acceptable quality level of 98% of maintenance completed on schedule with no more than 2% rework required. Additional critical services include inventory control and parts ordering with 100% monthly physical inventory completion and 95% accuracy for records and parts tracking; coxswain and small craft maintenance training for approximately 80 personnel with 100% of scheduled monthly training evolutions completed; support for small boat operational testing with zero safety mishaps attributed to contractor negligence and 100% compliance with underway checklists; and provision of unscheduled and mission-critical maintenance coverage with a 98% response rate to COR-validated notifications. Administrative deliverables include a Quality Control Plan submitted within five working days of contract start, monthly status reports due by the 15th calendar day of each month, meeting minutes submitted within five days of meetings, and a final report submitted within 15 days of contract conclusion. Surveillance methods include 3MC review of SKED 3.2 logs, random spot checks by the Contracting Officer Representative (COR), review of OMMS-NG records, direct observation, underway logs review, and official inspection reports. Contract discrepancy reports may be issued for non-compliance, requiring the contractor to respond in writing within five days with corrective action plans. Failure to achieve satisfactory performance may result in contract termination, loss of future Government contracts, or non-exercise of available options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.04a Att. 2 PWS SM Craft SME.pdf | ||
| 2.04a Att. 3 DD254.pdf | ||
| 2.04a Att. 1 SAP Comb SS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of the Small Craft Maintenance
Support Technician, the Contractor shall provide maintenance and small boat repair, troubleshooting, equipment maintenance scheduling and tracking, repair parts ordering and tracking, data entry, budget analysis and tracking specific to maintenance, and provide coxswain training as a Subject Matter Expert for the Command. The
Contractor shall be accurate and thorough with all contract/task order requirements.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints.
4. Performance Measurement: Performance will be measured in accordance with the following table:
TASK PERFORMANCE
OBJECTIVE
PERFORMANCE
STANDARDS
FREQUENCY ACCEPTABLE
QUALITY
LEVEL (AQL)
SURVEILLANCE
METHOD
3.1.2 Conduct preventative and
corrective maintenance for all small crafts
All maintenance performed IAW Navy
PMS, SKED 3.2, and applicable technical manuals.
Continual 98% of maintenance completed on schedule with no more than 2% rework required.
3MC review of
SKED 3.2 logs;
random spot checks by the COR.
3.1.1
3.1.3.3
Maintain inventory control, execute parts ordering, and conduct monthly physical inventories
Accurate data entry and tracking utilized within OMMS-NG and SKED 3.2.
Monthly inventories are completed as required.
Monthly 100% completion of monthly physical inventories; 95% accuracy for records and parts tracking.
COR and Supply
Officer review of
OMMS-NG records and monthly inventory reports.
3.1.3.2 Provide coxswain and
small craft maintenance training
Training delivered safely, accurately, and
IAW command SOPs and technical guidelines for approx.
80 personnel.
Monthly 100% of scheduled monthly training evolutions completed.
COR review of training muster sheets/rosters and periodic direct observation.
3.1.2 Prepare
equipment/records for
Craft, trailers, and administrative records
Continual Zero (0) critical failures during
Official inspection reports (ISIC, readiness certifying events (e.g., ISIC, TYCOM 3M, and
INSURV)
are maintained in an
"inspection-ready" status at all times.
official inspections;
achieve a
Satisfactory or higher overall rating.
TYCOM, INSURV);
pre-inspection spot checks by the COR.
3.1.2 Support small boat
operational testing
IAW proper use of diagnostic equipment and adherence to safety protocols during all waterborne testing and troubleshooting.
Continual Zero (0) safety mishaps attributed to contractor negligence;
100% compliance with underway checklists.
Underway logs review; direct observation by the
Command/COR.
3.3 Provide Unscheduled and
Mission-Critical
Maintenance Coverage
Provide flexible operational coverage to satisfy unscheduled, time-sensitive maintenance requirements.
As Required Contractor responds to 98% of COR-validated mission-critical notifications.
COR review of maintenance logs and after-action reports.
3.5.1 Management/Quality
Control Plan (QCP)
Contractor Developed
IAW PWS.
Within five working days of contract start date
100% on-time submission;
Approved by
COR.
COR review and approval.
3.5.2 Monthly Status Reports Reports submitted
IAW PWS.
15th calendar day of the month
100% on-time submission.
Submitted monthly to COR.
3.5.3 Meeting Minutes /
Conference Notes
Minutes/notes taken for all contract-related meetings.
Within 5 days of the meeting
100% on-time submission.
Submitted to COR.
3.5.4 Final Report The report
summarizes all monthly reports and contract activity.
Within 15 days from contract conclusion
100% on-time submission.
Submitted to COR.
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/task order may result in the non-exercise of available options
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.