2.04_RFP_N6883626RS003_PPQ.pdf
PDF 141 KB Posted
- Attached to
- Instructor Support - NCTC Gulfport, MS Federal contract opportunity
- Solicitation number
- N6883626RS0030002
About this file
This is a Past Performance Questionnaire template (Appendix B) for solicitation N6883626RS003, designated as source selection sensitive information under FAR 3.104. The questionnaire is completed by Government evaluators to assess contractor performance on relevant past contracts and must be returned by close of solicitation to Yaynel Yambo and Robert Edwards at the provided Navy email addresses.
The questionnaire collects contract identification information (contractor name, CAGE code, contract number, type, competitive status, period of performance, initial and final costs, and service description) and customer/agency details (name, description, and geographic scope). Evaluators provide their identification and years of experience on the subject contract. The evaluation section requires raters to assess 26 performance criteria using a six-point scale: E (Exceptional), VG (Very Good), S (Satisfactory), M (Marginal), US (Unsatisfactory), and NA (Not Applicable). Performance factors evaluated include management quality, personnel capability, quality control, problem identification and resolution, responsiveness to contract changes, timeliness of deliverables, billing accuracy, small business participation, and overall contractor performance. The questionnaire requires detailed narrative explanations for any Exceptional, Marginal, or Unsatisfactory ratings, plus disclosure of any cure notices, terminations for default or convenience, and pending terminations. A final section requests narrative comments on overall contractor performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2.04_RFP_N6883626RS003.pdf | ||
| 2.10_ N6883626RS0030002.pdf | ||
| 2.10 002 RFPAmend SF-30.pdf | ||
| 2.10 001 RFPAmend SF-30.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE SELECTION SENSITIVE INFORMATION DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY
APPENDIX B
PAST PERFORMANCE QUESTIONNAIRE
N6883626RS003
WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 3.104 RESPONSES TO THIS PAST PERFORMANCE QUESTIONAIRE ARE DUE BY NO LATER THAN CLOSE OF
SOLICITATION
SECTION 1: CONTRACT IDENTIFICATION
A. Contractor:
B. Cage Code:
C. Contract number:
D. Contract type:
E. Was this a competitive contract? Yes No
F. Period of performance:
G. Initial contract cost:
H. Current/final contract cost:
I. Reasons for differences between initial contract cost and final contract costs:
J. Description of service provided:
SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION
A. Customer or agency name:
B. Customer or agency description (if applicable):
C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:
SECTION 3: EVALUATOR IDENTIFICATION
A. Evaluator's name:
B. Evaluator's title:
C. Evaluator's phone number:
D. Evaluator's e-mail:
E. Number of years evaluator worked on subject contract:
SECTION 4: EVALUATION
Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:
CODE PERFORMANCE LEVEL
E EXCEPTIONAL - The contractor’s performance meets contractual requirements and exceeds many (requirements) to the Government’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VG VERY GOOD- The contractor’s performance meets contractual requirements and exceeds some
(requirements) to the Government’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
S SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
M MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
US UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
NA NOT APPLICABLE - Unable to provide a score.
Place an ''X" in the appropriate column using the definitions above.
The Contractor: E VG S M US NA
1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
2. Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
3. Delegated authority to project managers and supervisors commensurate with contract requirements.
4. Home office participated in solving significant local problems.
5. Followed approved quality control plan.
6. Provided effective quality control and/or inspection procedures to meet contract requirements.
7. Corrected deficiencies in a timely manner and pursuant to their quality control procedures.
8. Provided timely resolution of contract discrepancies.
9. Identified problems as they occurred.
10. Suggested alternative approaches to problems.
11. Displayed initiative to solve problems.
14. Paid subcontractors/suppliers in a timely manner.
15. Provided accurate and complete line item cost proposals including all aspects of work required for each task.
16. Provided services or completed task orders in accordance with the delivery schedule?
17. Cooperated with Government personnel after award.
18. Submitted accurate and timely reports.
19. Submitted all deliverables in accordance with the contract delivery schedule.
20. Handled both scheduled and unscheduled surges (increased workload) while controlling costs?
21. Submitted current, accurate, and complete billings?
22. How would you rate the contractor's overall performance?
23. Ability to meet or exceed small business and small disadvantaged business goals set forth in the approved subcontracting plan.
24. Ability to effectively manage small business participation to meet technical performance.
25. Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in "Comments."
26. Would you award another contract to this company?
1. Please discuss each and every response for which you indicated E (Exceptional), M (Marginal) or US (Unsatisfactory) in response to the questions above (use additional sheets, if necessary).
2. Government Contracts Only: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?
Yes Default Convenience Pending Terminations No
If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc).
12. Was responsive to contract changes.
13. Provided adequate project supervision.
SECTION 5: NARRATIVE SUMMARY
Please provide any additional comments concerning this contractor’s performance, as desired.
Evaluator’s Signature Date
Thank you for your prompt response and assistance!
Please return this completed questionnaire to the recipients below by no later than close of solicitation
E-mail to: Yaynel Yambo and Robert Edwards @ Yaynel.c.yambo.civ@us.navy.mil and robert.s.edwards42.civ@us.navy.mil
File details come from the government source that posted it. Updated .