2-Degol RR Expansion Ph3 Plan Set.pdf
PDF 11 MB Posted
- Solicitation number
- Not on record
- Issued by
- Blair County, Pennsylvania
About this file
Summary
This is a plan set and engineering design document for the DeGol Industrial Center Rail Expansion Project - Phase III, prepared by D. Holdings, Inc. and designed by The Eads Group, an engineering, architecture, and design services firm located in Altoona, Pennsylvania. The project is located in Frankstown Township, Blair County, Pennsylvania, and involves the replacement and extension of existing Track 17 at the DeGol Industrial Center. The scope of work includes installation of approximately 2,483 tons of new railroad track (ballast, ties, and rails), removal of 2,483 tons of existing rails, timbers, and ballast, re-aligning and re-grading of 159 tons of track, construction of 744 square feet of cast-in-place concrete at an existing private asphalt pavement road with steel ties and continuous welded rail (CWR), and restoration of 1,000 square feet of adjacent asphalt pavement surface. The project also requires installation of an end-of-track earth mound. Sealed bids were to be submitted online via PennBid until 10:00 A.M. Eastern Standard Time on Friday, April 3rd, 2026. The design was finalized on February 2, 2026, and the plan set includes typical industrial track roadbed sections, poured-in-place concrete railroad track crossing sections, and bituminous asphalt pavement sections.
The project is being financed in part by a grant from the Commonwealth of Pennsylvania through the Commonwealth Financing Authority. All work must include materials, equipment, supplies, and labor for construction as specified in the contract documents. Bidders must be qualified contractors with completed projects similar in character and scope, and each bidder is required to submit an executed non-collusion affidavit, a Statement of Bidders Qualifications, and an Equipment List in forms prescribed in the contract documents. The design documents specify compliance with Pennsylvania One Call System notification requirements, OSHA excavation requirements, AREMA Manual for Railway Engineering standards, and various material specifications for concrete (minimum 4,000 PSI compressive strength at 28 days), steel ties (NARSTCO Type M10 or equivalent), reinforcing steel (ASTM A615, Grade 60), and ballast (AASHTO No. 57 crushed aggregate).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Final Spec. 3-2-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CS-0.00
D. HOLDINGS, INC
www.eadsgroup.com
ENGINEERING ARCHITECTURE AND DESIGN SERVICES
1126 Eighth Avenue, Altoona, PA 16602 814-944-5035 (phone)
814-944-4862 (fax)
FRANKSTOWN TOWNSHIP
BLAIR COUNTY, PA
FEBRUARY 2026
DEGOL INDUSTRIAL CENTER
RAIL EXPANSION PROJECT
PHASE 3
PA ONE CALL SYSTEM, INC.
1-800-242-1776
PENNSYLVANIA! CALL 1-800-242-1776
L
O S
T
N S
Y N
E P
D
O R E
Y U
OFEB
LA
L
P - C
I G
TS
S
LL
Y
E CNO
I A
AV
N A
EM
NI
C
UNDERGROUND UTILITY LINE PROTECTION ACT
BEFORE YOU DIG ANYWHERE IN
1-800-242-1776
PENNSYLVANIA 1 CALL SERIAL NUMBER:
DESIGN LEVEL: 20260332172 FINAL DESIGN: 02/02/2026
NON-MEMBERS SHALL BE
CONTACTED DIRECTLY PA ACT 187
(1996) REQUIRES NOTIFICATION BY
ANY PERSON PREPARING TO
DISTURB THE EARTH'S SURFACE
ANYWHERE IN THE
COMMONWEALTH. PA. ACT 38
(1991) REQUIRES THREE (3)
WORKING DAYS NOTICE TO
UTILITIES BEFORE YOU EXCAVATE,
DRILL OR BLAST. OSHA 1926.651
SPECIAL EXCAVATION
REQUIREMENTS
CONTRACTOR SHALL COMPLY WITH REQUIREMENTS OF PA ONE CALL ACT
287 OF 1974 AS AMENDED BY ACT 187 OF 1986.
PA ACT 287 OF 1974 AS
AMENDED BY ACT 187 OF
1996 73 P.S. & 176 ET. SEQ.
PENNSYLVANIA ONE CALLSHEET INDEX
R:\2236 Degol Bros\25602 Ind Ctr Rail Ph3\06 CADD\80 Site Dev\DEGOL ES-00 CS.dwg, 2/17/2026 10:41:20 AM
Drawing No.
A S
N O
TE
D
Fe br ua ry
B R
B
D
JB
-2 5-w w w .e a d sg ro u p
.c o m
W
IT
H O
FF
IC
E S
IN
p h o n e
.9
.5 fa x:
.9
.4
GENERAL NOTES:
LIST OF UTILITIES
D HOLDINGS, INC. PROPERTY
N
PA
S
PC
S
NA
D
PHASE III PROJECT LOCATION
TRACK 17
0005-1-2 DeGol-HRCS PhIII Trk17 Plots_01.dwg
4OFSEPTEMBER 26, 2025
HOLLIDAYSBURG, PA 16648 BLAIR COUNTY, PA
CONTRACT No. 2025-01 DeGOL INDUSTRIAL CENTER
CONTRACT DRAWINGS
RAIL EXPANSION PROJECT - PHASE III
FOR
D HOLDINGS, INC.
DeGol INDUSTRIAL DRIVE
0005-1-2
126 EIGHTH AVENUE
ALTOONA, PA 16602
CONTACT: DANIEL J. BEYER, PE
(814) 944-5035 office
COVER, NOTES & DETAILS
AS NOTED
SHEET INDEX
COVER, NOTES & DETAILS SHEET 1
PLAN & PROFILE VIEWS SHEET 2
PLAN & PROFILE VIEWS SHEET 3
PLAN & PROFILE VIEWS SHEET 4
TYPICAL INDUSTRIAL TRACK ROADBED SECTION
NOTES:
1. SUB-GRADE MAY BE STABILIZED TO A DEPTH OF 6" WITH LIME,
LIME-FLY ASH, CEMENT OR STONE.
2. TAMPING OF BALLAST MUST NOT DISTURB COMPACTED SUB-BALLAST.
3. TOP OF SUB-GRADE AND TOP OF SUB-BALLAST SHALL BE CROWNED
40:1 AS SHOWN.
NOT TO SCALE
-2:1 6" 6"LC
BALLAST, 6" MIN. UNDER TIE
COMPACTED
SUBGRADE
SURFACE COMPACTED SUB-BALLAST, 6" MIN.
-40:1 CROWN (-2.5%)
CROSSTIE
FINISHED
GRADE
Ex GRADE
MULCH SCHEDULE
ALL DISTURBED AREAS OF THE PROJECT SITE NOT SURFACED WITH
ASPHALT PAVEMENT, CONCRETE OR CRUSHED STONE SHALL BE
SEEDED AND THEN IMMEDIATELY MULCHED WITH WITH STRAW
APPLIED AT A RATE OF 3 TONS PER ACRE. STRAW SHOULD BE
ANCHORED WITH WOOD CELLULOSE FIBER AT A RATE OF 750 LBS PER
ACRE, OR AN EQUAL TACKIFIER OR ANCHORING MATERIAL SHOULD BE
USED.
STANDARD PERMANENT GRASS SEED MIX
TYPICAL SEEDING RATE: 100 LBS PER ACRE OR 2.5 LBS PER 1,000 SF.
PORTION SPECIES PURITYGERMINATION
20% PERENNIAL RYE (Lolium perenne) 98% 90% 50% KENTUCKY BLUE GRASS MIX (Pos pratensis) 98% 85% 30% CREEPING RED or CHEWINGS FESCUE 98% 80%
GENERAL NOTES
1. THE INTENT OF THIS DRAWINGS SET IS TO PLAN AND PROVIDE
INFORMATION FOR THE REPLACEMENT OF A PORTION OF EXISTING
TRACK 17 AND THE CONSTRUCTION OF AN EXTENSION OF
EXISTING TRACK 17 AT THE DeGOL INDUSTRIAL CENTER. THIS
PROJECT IS KNOWN AS "PHASE III" IN A SERIES OF TRACK
IMPROVEMENT PROJECTS AT THE SITE. SEE THE CONSTRUCTION
SPECIFICATIONS FOR ADDITIONAL INFORMATION ON RAILROAD
TRACK CONSTRUCTION, AND THE BID DOCUMENTS FOR
INFORMATION REGARDING THIS CONTRACT'S ANTICIPATED
QUANTITIES.
2. ESTABLISHMENT OF THE PROPERTY BOUNDARY AND ROADWAY
RIGHTS-OF-WAY WERE NOT PARTS OF THE 2023 SURVEY WORK
PERFORMED BY THE EADS GROUP. THE D HOLDINGS, INC.
PROPERTY BOUNDARY LINE IS SHOWN BASED ON PLOTTING
TRACT 1 AS SHOWN ON "'ASBUILT' ALTA/ACSM SURVEY OF
HOLLIDAYSBURG CAR SHOPS PROPERTY SITUATE IN
HOLLIDAYSBURG BOROUGH, FRANKSTOWN TOWNSHIP AND BLAIR
TOWNSHIP, BLAIR COUNTY, PENNSYLVANIA FOR BLAIR COUNTY
DEVELOPMENT CORPORATION, III", DATED FEBRUARY 12, 2007,
AND LAST REVISED FEBRUARY 12, 2007, BY THE EADS GROUP.
3. ADDITIONAL FIELD-RUN SURVEY OF EXISTING PERTINENT
IMPROVEMENTS IN THE IMMEDIATE PROJECT VICINITY WAS
PERFORMED DURING SEPTEMBER 2025 BY THE EADS GROUP. UAV,
GPS AND CONVENTIONAL GROUND SURVEY TECHNIQUES WERE
UTILIZED TO COLLECT DATA FOR ALL TOPOGRAPHIC FEATURES
SHOWN.
4. HORIZONTAL DATUM: PA STATE PLANE COORDINATE SYSTEM,
NORTH AMERICAN DATUM 1983, SOUTH ZONE, U.S. SURVEY FEET.
5. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM (NAVD)
1988.
6. BENCHMARKS HAVE BEEN ESTABLISHED FOR THIS PROJECT AT
THE EXISTING SURVEY CONTROL POINTS SHOWN HEREON.
7. PRELIMINARY DESIGN NOTIFICATION WAS PROVIDED TO THE
PENNSYLVANIA ONE CALL SYSTEM, INC. BY THE EADS GROUP. ALL
UTILITIES SHOWN ARE STRUCTURES THAT WERE PHYSICALLY
LOCATED DURING FIELD-RUN SURVEY ACTIVITIES, BASED ON
GENERAL VISUAL INSPECTION OF THE SITE AND PAINT MARKINGS
PROVIDED BY VARIOUS UTILITY FACILITY OWNERS.
POURED-IN-PLACE CONCRETE RAILROAD TRACK CROSSING SECTION
NOT TO SCALE
8 3/4" O.C.
8 3/4" O.C.
17 1/2" O.C.
10 5/8" 10 5/8" 17 1/2" O.C.
11 3/4" O.C.
11 3/4" O.C.
11 3/4" O.C.
11 3/4" O.C.
3'-11" O.C.
8 3/4" O.C.
8 3/4" O.C.
RAIL RAIL
CAST FLANGEWAY CAST FLANGEWAY
FIELD
SIDE
MAT
FIELD
SIDE
MAT
GAGE SIDE MAT
STEEL
TIES
HORIZONTAL BARS: #4
VERTICAL BARS: #4
* NOTE: ≈2" CLEAR.
** 12" O.C.
*** HORIZONTAL BAR SPACING BETWEEN TIES VARIES PER TIE SPACING.
† 2" CLR.
17 1/2" O.C.
17 1/8" O.C.
17 1/2" O.C.
CAST FLANGEWAY CAST FLANGEWAY
HORIZONTAL BARS: #5
VERTICAL BARS: #5
* NOTE: ≈2" CLEAR.
** 13" O.C.
*** HORIZONTAL BAR SPACING BETWEEN TIES VARIES PER TIE SPACING.
† 2" CLR.
5'-8 1/2" O.C.
9'-0" CAST-IN-PLACE CONCRETE
9'-0" CAST-IN-PLACE CONCRETE
17 1/8" O.C.
17 1/8" O.C.
17 1/8" O.C.
1'-7 3/4" 1'-7 3/4"
LC
LC
-2% -2%0%0%
CAST FLANGEWAY
RAIL
FIELD SIDE TOP BAR MAT
GAGE SIDE TOP BAR MAT
HEAVY BROOM FINISH
CAST-IN-PLACE CONCRETE
2" CLR 2" CLR.
2" CLR.
2" CLR.
2" CLR
2" CLR.
STEEL
TIES
BETWEEN RAILS
NOTES:
1. DIMENSIONS SHOWN ARE BASED ON THE USE OF 115RE RAIL. USE OF A
DIFFERENT SECTION OR WEIGHT OF RAIL MAY RESULT IN SOME
DIMENSIONS BEING DIFFERENT THAN THOSE SHOWN. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO RESOLVE ANY DIMENSION ISSUES
IF RAIL OTHER THAN 115RE IS USED.
2. NO RAIL JOINTS SHALL BE LOCATED WITHIN THE GRADE CROSSING OR
WITHIN 6 FEET OF THE CROSSING'S ENDS.
3. CONTRACTOR SHALL NEATLY SAWCUT THE EXISTING ASPHALT
PAVEMENT SURFACE ON BOTH FIELD SIDES OF THE GRADE CROSSING
AND INSTALL FULL-DEPTH ASPHALT PAVEMENT SECTION ABUTTING THE
CONCRETE GRADE CROSSING AND THE SAWCUT PAVEMENT. THE
FINISHED GRADE OF THE PAVEMENT AND GRADE CROSSING SHALL
PROVIDE FOR SMOOTH VEHICULAR TRAFFIC OVER THE TRACK. ALL
PAVEMENT SEAMS SHALL BE SEALED USING PG 64-22 ASPHALT OIL.
4. STEEL TIES SHALL MEET THE REQUIREMENTS LISTED IN THE MOST
CURRENT VERSION OF CHAPTER 30,PART 6 OF THE AREMA MANUAL
AND SHALL BE NEW NORTH AMERICAN RAILWAY STEEL TIE
CORPORATION (NARSTCO) TYPE M10 OR EQUIVALENT APPROVED BY
THE OWNER. RAIL FASTENING CLIPS AND HOOK-IN-SHOULDERS SHALL
MEET MANUFACTURER’S SPECIFICATIONS FOR THE TIES USED. STEEL
TIES SHALL BE SUPPLIED WITHOUT END SPADES, AND IF NECESSARY,
VIBRATION EQUIPMENT SHOULD BE USED DURING POURING CONCRETE
TO ASSURE FLOW OF CONCRETE WITHIN AND BENEATH STEEL TIES.
5. STEEL TIES SHALL BE PLACED ON THE PREPARED SUB-BALLAST AT
RIGHT ANGLES TO THE CENTERLINE OF THE TRACK. TIES SHALL BE
SPACED 24” CENTER TO CENTER IN TANGENT TRACK AND 22” CENTER
TO CENTER IN CURVED TRACK (4° to 12° CURVES) AND INSTALLED PER
THE MANUFACTURER’S SPECIFICATIONS.
6. TOP AND BOTTOM BAR MATS: #5 BARS. ALL REINFORCING STEEL SHALL
BE DEFORMED BARS CONFORMING TO A.S.T.M. A615,GRADE 60.
7. ALL HORIZONTAL BARS SHALL BE CONTINUOUS. THE NUMBER OF
LONGITUDINAL BAR SEGMENTS SHALL BE MINIMIZED AS MUCH AS
PRACTICALLY POSSIBLE. WHERE LONGITUDINAL BAR JOINTS OCCUR,
THEY SHALL BE LAPPED 18", MINIMUM.
3. THE COMPACTED SUBGRADE SURFACE AND TOP OF SUB-BALLAST
SHALL BE CROWNED AT -40:1 (-2.5%) FROM THE TRACK CENTER LINE.
4. COMPACTED SUBGRADE TO BE COMPACTED TO 98% MODIFIED
PROCTOR DRY DENSITY, AND CAPABLE OF SUPPORTING A MINIMUM
LOAD OF 4,000 LBS PER SQUARE FOOT. SUB-GRADE MAY BE
STABILIZED TO A DEPTH OF 6" WITH LIME, LIME-FLY ASH, CEMENT OR
STONE.
5. CRUSHED AGGREGATE TO BE AASHTO No 57.
6. GEOTEXTILE SHALL MEET AREMA SPECIFICATIONS AND SHALL BE
SIXTEEN (16) OUNCES PER SQUARE YARD. NO LONGITUDINAL SEAMS
ARE ALLOWED WITHIN THE GRADE CROSSING. TRANSVERSE SEAMS
SHALL BE LAPPED 24 INCHES MINIMUM.
7. CONCRETE MIX: MINIMUM 28 DAY COMPRESSIVE STRENGTH 4,000 PSI.
8. NO ROAD VEHICULAR TRAFFIC WILL BE PERMITTED OVER THE GRADE
CROSSING UNTIL CONCRETE HAS REACHED MINIMUM 3,000 PSI
COMPRESSIVE STRENGTH.
9. NO RAILROAD TRAFFIC WILL BE PERMITTED OVER THE GRADE
CROSSING UNTIL CONCRETE HAS REACHED MINIMUM 3,800 PSI
COMPRESSIVE STRENGTH.
10.DESIGN MATERIAL AND WORKMANSHIP FOR THE GRADE CROSSING
SHALL BE IN ACCORDANCE WITH THE AREMA MANUAL FOR RAILWAY
ENGINEERING, AS MOST RECENTLY AMENDED.
-2:1
LC4'-6" 4'-6"
9'-0"
12" 12"
-2:1
ASPHALT
PAVEMENT
SECTION
ASPHALT
PAVEMENT
SECTION
BALLAST
SUB-BALLAST
FILTER FABRIC ON SUBGRADE SURFACE
COMPACTED & STABILIZED SUBGRADE
-2% CROWN
-2% MAX.-2% MAX.
P-I-P
CONCRETE
10 5/8" THICK
MIN.
LC
LC
4'-6" 4'-6" 9'-0"
ASPHALT
PVMT.
ASPHALT
PVMT.
BOTTOM
BAR MAT
POURED-IN-PLACE CONCRETE
FLANGEWAY
TOP
BAR
MATS
FLANGEWAY
10 5/8" MIN. THICKNESS
NOT TO SCALE
USE THIS BITUMINOUS PAVEMENT SECTION FOR RESTORATION AND
CONSTRUCTION OF PRIVATE ROADS AND DRIVEWAYS.
BITUMINOUS ASPHALT PAVEMENT SECTION
4 1/2" 25MM BASE COURSE
PG64-22; <0.3 MILLION ESALS
6" COMPACTED PENNDOT
2A CRUSHED AGGREGATE
COMPACTED SUBGRADE
EARTH MOUND DETAIL
19'
4.7 5' 3'
4.75'
4'13 .5'
NOT TO SCALE
TOP OF RAIL
SOD
SOD
TOP OF SUBGRADE
TOP OF SUBBALLAST
SOD
4H:1V1H :1V
GRADE CROSSING APPROACH TIES
NOT TO SCALE
10'-0" LONG APPROACH TIES
(10 TIES PRECEDING CONCRETE GRADE CROSSING)
CONCRETE GRADE CROSSING
8'-6" LONG
TIES
PHASE IIi PROJECT LOCATION MAP
SCALE: 1"=2000'
1"= FEET
1000 2000
FOR JOINTED INDUSTRIAL TRACK CONSTRUCTION
SPIKING PATTERNS
NOT TO SCALE
NOTE:
THE SPIKING PATTERNS SHOWN HEREON COMPLY WITH AREMA MANUAL OF
RAIL ENGINEERING VOLUME 1, CHAPTER 5, PART 4.1.3 APPENDIX II
"MINIMUM SPECIFICATIONS FOR JOINTED INDUSTRIAL TRACK
CONSTRUCTION".
SPIKE (TYP.)
FOR LIGHT DENSITY JOINTED YARD AND INDUSTRIAL TRACKS
RAIL ANCHORS
NOT TO SCALE
NOTES:
1. THE RAIL ANCHOR PATTERN SHOWN CONFORMS TO THE AREMA
MANUAL OF RAILWAY ENGINEERING CHAPTER 5 SECTION 5.4 FOR
LIGHT DENSITY JOINTED YARD AND INDUSTRIAL TRACKS.
2. INSTALL MINIMUM 16 ANCHORS PER 39 TRACK FEET (8 ANCHORS
PER RAIL) IN BOXED PATTERN.
3. MINIMUM 8 ANCHORS PER SHORTER TRACK LENGTH (4 ANCHORS
PER RAIL).
RAIL JOINT (TYP.)
RAIL ANCHORS (TYP.)
RAIL TRAFFIC
LEGEND
935.63
Ex RAILROAD TRACK; CENTER LINE &
GAGE LINES
Ex WALL (JERSEY BARRIERS) Ex EDGE ASPHALT PAVEMENT Ex EDGE CRUSHED STONE SURFACE Ex EDGE UNPAVED / DIRT SURFACE
Ex GRADE SPOT ELEVATIONS
Ex BUILDING FOOTPRINT
Ex CONCRETE PAD OR SURFACE
Ex EDGE SURFACE WATERCOURSE Ex UTILITY POLE WITH NUMBERS, GUY WIRE & ANCHOR
Ex GRADE CONTOUR LINES
Ex OVERHEAD WIRESE
Ex SURVEY CONTROL POINT
[DO NOT DISTURB]
Ex UNDERGROUND WATER MAIN, WATER VALVE & HYDRANTW
Ex WATER UTILITY STRUCTURE
Ex EDGE WOODED OR BRUSH AREA
Ex SANITARY SEWER MANHOLE &
UNDERGROUND SEWER MAINS
EXISTING TRACK TO BE REPLACED:
CENTER LINE
NEW TRACK: CENTER LINE
NEW CONCRETE GRADE CROSSING
NEW ASPHALT PAVEMENT SURFACE
Track 17 CENTER LINE SEGMENTS
SEGMENT
L1
L2
L3
L4
L5
C1
L6
C2
L7
C3
L8
DEGREE
7°30'00"
7°30'00"
7°30'00"
RADIUS
764.49'
764.49'
764.49'
Δ
5°43'29"
5°43'29"
7°18'57.36"
LENGTH
435.51'
1,380.45'
492.54'
111.00'
127.60'
76.38'
71.93'
76.38'
746.55'
97.62'
210.45'
LINE/CHORD
DIRECTION
N34°25'12.3"E
N34°25'13.7"E
N34°25'12"E
N34°25'12"E
N34°25'12"E
N31°33'27.5"E
N28°41'43"E
N31°33'27.5"E
N34°25'12"E
N30°45'43.3"E
N27°06'14.7"E
START
STATION
-24+19.50
-19+83.99
-6+03.54
-1+11
0+00
1+27.60
2+03.99
2+75.92
3+52.30
10+98.85
11+96.47
START
NORTH
401,597.4401'
401,956.7021'
403,095.4484'
403,501.7561'
403,593.3218'
403,698.5844'
403,763.6454'
403,826.7413'
403,891.8023'
404,507.6445'
404,591.4685'
START
EAST
1,797,804.6229'
1,798,050.7997'
1,798,831.1135'
1,799,109.5266'
1,799,172.2699'
1,799,244.3987'
1,799,284.3582'
1,799,318.8955'
1,799,358.8550'
1,799,780.8469'
1,799,830.7407'
END
STATION
-19+83.99
-6+03.54
-1+11
0+00
1+27.60
2+03.99
2+75.92
3+52.30
10+98.85
11+96.47
14+06.92
END
NORTH
401,956.7021'
403,095.4484'
403,501.7561'
403,593.3218'
403,698.5844'
403,763.6454'
403,826.7413'
403,891.8023'
404,507.6445'
404,591.4685'
404,778.8038'
END
EAST
1,798,050.7997'
1,798,831.1135'
1,799,109.5266'
1,799,172.2699'
1,799,244.3987'
1,799,284.3582'
1,799,318.8955'
1,799,358.8550'
1,799,780.8469'
1,799,830.7407'
1,799,926.6218'
SURVEY CONTROL POINTS
POINT
DESCRIPTION
HVP-01
HVP-02
HVP-03
HVP-04
HVP-05
HVP-06
HVP-07
HVP-08
HVP-09
HVP-10
HVP-11
NORTH
404,816.2601
405,143.8274
403,787.2195
402,456.3959
402,109.3561
401,337.8616
400,839.4050
400,617.9689
400,440.9351
400,160.3926
400,436.4012
EAST
1,800,500.4707
1,800,216.5134
1,799,248.1478
1,798,461.2484
1,798,781.1739
1,798,087.4743
1,797,257.0383
1,797,343.9886
1,795,194.0072
1,795,199.5414
1,796,021.9737
ELEV
923.72
926.61
926.87
926.72
922.93
933.08
933.51
934.95
941.11
940.72
939.05
W W W W W W W W W W W W W W W W W W W W W W W W W W W W
937.35
926.96
938.49
939.75
MA
TC
H
TO
S
HE
ET
Ex TRACK 20
Ex TRACK 19 Ex TRACK 18 Ex TRACK 19
Ex TRACK 18
Ex TRACK 19 Ex TRACK 18
Ex TRACK 20
Ex TRACK 17
PA SPCS SOUTH ZONE
NAD83
MATCH TO SHEET 3
U.S. ROUTE 22
BEGIN NEW
TRACK
AT EXISTING LLT
-24+19.50
Ph III TRACK 17 CENTER LINE
EXISTING No10 LHTOPS Ex No10 LHTO -25+30.50
Ex PF -24+51.75
L1
L2
EVC: -18+70
BVC: -21+70
PI:-19+83.99-24+00 -23+00 -22+00 -21+00 -20+00 -19+00 -18+00 -17+00 -16+00 -15+00 -14+00 -13+00 -12+00 -11+00 -10+00
-26+00 -25+00 -24+00 -23+00 -22+00 -21+00 -20+00 -19+00 -18+00 -17+00 -16+00 -15+00 -14+00 -13+00 -12+00 -11+00 -10+00
SH
EE
T
2 MATCH TO
MA
TC
H
TO SHEET 3
EG:931.0
EG:931.0
EG:930.7
EG:930.5
EG:930.3
EG:930.0
EG:930.0
EG:929.5
EG:929.0
EG:929.0
EG:929.0
EG:928.7
EG:928.3
EG:928.0
EG:928.0
EG:928.0
EG:928.0
EG:927.4
EG:927.3
EG:927.3
EG:927.1
EG:927.0
EG:927.0
EG:927.0
EG:927.0
EG:927.0
EG:927.0
EG:927.0
EG:927.0
EG:926.9
EG:926.8
EG:926.8
EG:926.8
ExTOR:931.4
ExTOR:931.2
ExTOR:930.9
ExTOR:930.7
ExTOR:930.4
ExTOR:930.2
ExTOR:929.8
ExTOR:929.6
ExTOR:929.4
ExTOR:929.1
ExTOR:928.9
ExTOR:928.9
ExTOR:928.6
ExTOR:928.4
ExTOR:928.4
ExTOR:928.3
ExTOR:928.2
ExTOR:928.1
ExTOR:928.1
ExTOR:928.0
ExTOR:927.9
ExTOR:927.8
ExTOR:927.8
ExTOR:927.7
ExTOR:927.6
ExTOR:927.5
ExTOR:927.5
ExTOR:927.4
ExTOR:927.3
ExTOR:927.3
ExTOR:927.2
ExTOR:927.1
ExTOR:927.0
-25+30.50: PS Ex No10 LHTO ExTOR:931.05
-24+51.75: Ex PF ExTOR:930.66
BEGIN PHASE III W
ORK
-24+19.50: Ex LLT ExTOR:930.51
EXISTING No10 LEFT-HAND TURNOUT [111']
REMOVE EXISTING RAILS, TIMBERS & BALLAST; INSTALL NEW BALLAST, TIES & RAILS
PrTOR:930.41
PrTOR:930.16
PrTOR:929.91
PrTOR:929.66
PrTOR:929.41
PrTOR:929.16
PrTOR:928.94
PrTOR:928.76
PrTOR:928.60
PrTOR:928.48
PrTOR:928.39
PrTOR:928.34
PrTOR:928.29
PrTOR:928.24
PrTOR:928.18
PrTOR:928.13
PrTOR:928.08
PrTOR:928.03
PrTOR:927.98
PrTOR:927.93
PrTOR:927.88
PrTOR:927.83
PrTOR:927.78
PrTOR:927.73
PrTOR:927.68
PrTOR:927.63
PrTOR:927.57
PrTOR:927.52
PrTOR:927.47
PVI:-20+20
PVI ELEV:928.51
r:0.1329
300' VCBVC:-21+70
Pr TOR:929.26
EVC:-18+70
Pr TOR:928.36
-0.50% -0.10%
PHASE III TRACK 17 PROFILE
SCALES: 1"=50' HORIZONTAL, 1"=10' VERTICAL
PROPOSED
TOP OF RAIL (PrTOR)
EXISTING
TOP OF RAIL (ExTOR)
EXISTING GRADE (EG)
0005-1-2 DeGol-HRCS PhIII Trk17 Plots_02-04.dwg
4OFSEPTEMBER 26, 2025
HOLLIDAYSBURG, PA 16648 BLAIR COUNTY, PA
CONTRACT No. 2025-01 DeGOL INDUSTRIAL CENTER
CONTRACT DRAWINGS
RAIL EXPANSION PROJECT - PHASE III
FOR
D HOLDINGS, INC.
DeGol INDUSTRIAL DRIVE
0005-1-2
126 EIGHTH AVENUE
ALTOONA, PA 16602
CONTACT: DANIEL J. BEYER, PE
(814) 944-5035 office
PLAN & PROFILE VIEWS
1"=50'
PLAN VIEW
SCALE: 1"=50'
1"= FEET
5 10 10 (V)
1"= FEET
25 50 50 (H)
-11+00 -10+00 -9+00 -8+00 -7+00 -6+00 -5+00 -4+00 -3+00 -2+00 -1+00 0+00 1+00 2+00 3+00 4+00 5+00
SH
EE
T
2 MATCH TO
MA
TC
H
TO SHEET 3
SH
EE
T
3 MATCH TO
MA
TC
H
TO SHEET 4
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.8
EG:926.7
EG:926.7
EG:926.6
EG:926.6
EG:926.6
EG:926.5
EG:926.5
EG:926.5
EG:926.5
EG:926.7
EG:926.8
EG:926.8
ExTOR:927.2
ExTOR:927.1
ExTOR:927.0
ExTOR:927.0
ExTOR:926.9
ExTOR:926.8
ExTOR:926.8
ExTOR:926.7
ExTOR:926.6
ExTOR:926.5
ExTOR:926.5
ExTOR:926.5
ExTOR:926.5
ExTOR:926.5
ExTOR:926.5
ExTOR:926.5
ExTOR:926.6
ExTOR:926.6
ExTOR:926.6
ExTOR:926.6
ExTOR:926.6
ExTOR:926.5
ExTOR:926.5
ExTOR:926.5
ExTOR:926.5
ExTOR:926.4
-1+11: Ex LLT ExTOR:926.57
-0+78.75: Ex PF ExTOR:926.54
0+00: PS Ex No10 LHTO ExTOR:926.46
PrTOR:927.57
PrTOR:927.52
PrTOR:927.47
PrTOR:927.42
PrTOR:927.37
PrTOR:927.32
PrTOR:927.27
PrTOR:927.22
PrTOR:927.17
PrTOR:927.12
PrTOR:927.07
PrTOR:927.02
PrTOR:926.96
PrTOR:926.91
PrTOR:926.86
PrTOR:926.81
PrTOR:926.76
PrTOR:926.71
PrTOR:926.66
PrTOR:926.61
LO PNT:0+45.79
Pr TOR:926.43
PVI:0+75
PVI ELEV:926.38
r:0.3291
120' VCBVC:0+15
Pr TOR:926.44
EVC:1+35
Pr TOR:926.56
EXISTING No10 LEFT-HAND TURNOUT
TO REMAIN [111']
REMOVE EXISTING RAILS, TIMBERS & BALLAST; INSTALL NEW BALLAST, TIES & RAILS
PrTOR:926.43
PrTOR:926.47
PrTOR:926.60
PrTOR:926.75
PrTOR:926.89
PrTOR:927.04
PrTOR:927.19
PrTOR:927.33
PrTOR:927.48
PrTOR:927.63
EG:926.7
EG:926.3
EG:927.0
EG:927.4
EG:927.1
EG:927.0
EG:926.5
-0.10%
1+91.03: BEGIN CONC. XING
PrTOR:926.72
2+73.65: END CONC. XING
PrTOR:926.96
2+79.65: END CW
R
PrTOR:926.98
CWR
82.63'
NEW CONCRETE GRADE CROSSING
FG:926.54
PC:1+27.60
FG:926.97
PC:2+75.92
FG:926.76
PT:2+03.99
FG:927.19
PT:3+52.30
2+42.14: EDGE Ex PVMT PrTOR:926.87
-0.10% 0.29%
1+73.88 END Ex TRACK
RE-ALIGN & RE-GRADE Ex TRACK 17
APPROX. 159' L.F. 1+85.03: BEGIN CW
R PrTOR:926.70
INSTALL NEW SUBBALLAST, BALLAST, TIES & RAILS
PHASE III TRACK 17 PROFILE
SCALES: 1"=50' HORIZONTAL, 1"=10' VERTICAL
PROPOSED
TOP OF RAIL (PrTOR)
EXISTING
TOP OF RAIL (ExTOR)
EXISTING GRADE (EG)
LEGEND
935.63
Ex RAILROAD TRACK; CENTER LINE &
GAGE LINES
Ex WALL (JERSEY BARRIERS) Ex EDGE ASPHALT PAVEMENT Ex EDGE CRUSHED STONE SURFACE Ex EDGE UNPAVED / DIRT SURFACE
Ex GRADE SPOT ELEVATIONS
Ex BUILDING FOOTPRINT
Ex CONCRETE PAD OR SURFACE
Ex EDGE SURFACE WATERCOURSE Ex UTILITY POLE WITH NUMBERS, GUY WIRE & ANCHOR
Ex GRADE CONTOUR LINES
Ex OVERHEAD WIRESE
Ex SURVEY CONTROL POINT
[DO NOT DISTURB]
Ex UNDERGROUND WATER MAIN, WATER VALVE & HYDRANTW
Ex WATER UTILITY STRUCTURE
Ex EDGE WOODED OR BRUSH AREA
Ex SANITARY SEWER MANHOLE &
UNDERGROUND SEWER MAINS
EXISTING TRACK TO BE REPLACED:
CENTER LINE
NEW TRACK: CENTER LINE
NEW CONCRETE GRADE CROSSING
NEW ASPHALT PAVEMENT SURFACE
Track 17 CENTER LINE SEGMENTS
SEGMENT
L1
L2
L3
L4
L5
C1
L6
C2
L7
C3
L8
DEGREE
7°30'00"
7°30'00"
7°30'00"
RADIUS
764.49'
764.49'
764.49'
Δ
5°43'29"
5°43'29"
7°18'57.36"
LENGTH
435.51'
1,380.45'
492.54'
111.00'
127.60'
76.38'
71.93'
76.38'
746.55'
97.62'
210.45'
LINE/CHORD
DIRECTION
N34°25'12.3"E
N34°25'13.7"E
N34°25'12"E
N34°25'12"E
N34°25'12"E
N31°33'27.5"E
N28°41'43"E
N31°33'27.5"E
N34°25'12"E
N30°45'43.3"E
N27°06'14.7"E
START
STATION
-24+19.50
-19+83.99
-6+03.54
-1+11
0+00
1+27.60
2+03.99
2+75.92
3+52.30
10+98.85
11+96.47
START
NORTH
401,597.4401'
401,956.7021'
403,095.4484'
403,501.7561'
403,593.3218'
403,698.5844'
403,763.6454'
403,826.7413'
403,891.8023'
404,507.6445'
404,591.4685'
START
EAST
1,797,804.6229'
1,798,050.7997'
1,798,831.1135'
1,799,109.5266'
1,799,172.2699'
1,799,244.3987'
1,799,284.3582'
1,799,318.8955'
1,799,358.8550'
1,799,780.8469'
1,799,830.7407'
END
STATION
-19+83.99
-6+03.54
-1+11
0+00
1+27.60
2+03.99
2+75.92
3+52.30
10+98.85
11+96.47
14+06.92
END
NORTH
401,956.7021'
403,095.4484'
403,501.7561'
403,593.3218'
403,698.5844'
403,763.6454'
403,826.7413'
403,891.8023'
404,507.6445'
404,591.4685'
404,778.8038'
END
EAST
1,798,050.7997'
1,798,831.1135'
1,799,109.5266'
1,799,172.2699'
1,799,244.3987'
1,799,284.3582'
1,799,318.8955'
1,799,358.8550'
1,799,780.8469'
1,799,830.7407'
1,799,926.6218'
SURVEY CONTROL POINTS
POINT
DESCRIPTION
HVP-01
HVP-02
HVP-03
HVP-04
HVP-05
HVP-06
HVP-07
HVP-08
HVP-09
HVP-10
HVP-11
NORTH
404,816.2601
405,143.8274
403,787.2195
402,456.3959
402,109.3561
401,337.8616
400,839.4050
400,617.9689
400,440.9351
400,160.3926
400,436.4012
EAST
1,800,500.4707
1,800,216.5134
1,799,248.1478
1,798,461.2484
1,798,781.1739
1,798,087.4743
1,797,257.0383
1,797,343.9886
1,795,194.0072
1,795,199.5414
1,796,021.9737
ELEV
923.72
926.61
926.87
926.72
922.93
933.08
933.51
934.95
941.11
940.72
939.05
W W W W W W W W W W W W W W W W W W W W W W W W W
X
X X
E
E
E
E
E
E E E E E E
926.15
923.51
931.0
931.0 932.47
933.04
934.06
926.81 926.76
926.89
935.02 936.60
926.90
926.75
926.54
E
S S SS S S S
S
S
S
S
S
S
Ex TRACK 18 Ex TRACK 19 Ex TRACK 18
PA SPCS SOUTH ZONE
NAD83
MATCH TO SHEET 4
MA
TC
H
TO
S
HE
ET
U.S. ROUTE 22
L7
25.1' O.C.
PS No10 LHTO 0+00 Track 17 11.7'
CLR.
L4
EXISTING No10 LEFT-HAND TURNOUT
INSTALLED DURING PHASE II
Ex LLT -1+11 Ex PF
-0+78.75
Ph III TRACK 17 CENTER LINE L2
L5 C1 16.3' O.C.
C251.1' Ex UTILITY POLE
Ex GUY ANCHOR Ex GUY WIRE
2+79.65
PC:1+27.60
PC:2+75.92
PT:2+03.99
PT:3+52.30
ELECTRIC BOX TO BE
RELOCATED OR REMOVED
7.9'
CLR.
Ph III TRACK 17 CENTER LINE1+85.03
L3 L6
EVC: 1+35
BVC: 0+15
LP: 0+45.79
14.9' CLEAR
94.6' CWR
1+00 2+00 3+00 4+00 5+00
PI:-6+03.54
-10+00 -9+00 -8+00 -7+00 -6+00 -5+00 -4+00 -3+00 -2+00 -1+00
82.6' NEW CONCRETE GRADE XING
17.7' O.C.
1+73.92
6' 6'
2+73.65
END CONC.
1+91.03
END CONC.
PLAN & PROFILE VIEWS
1"=50'
0005-1-2 DeGol-HRCS PhIII Trk17 Plots_02-04.dwg
4OFSEPTEMBER 26, 2025
HOLLIDAYSBURG, PA 16648 BLAIR COUNTY, PA
CONTRACT No. 2025-01 DeGOL INDUSTRIAL CENTER
CONTRACT DRAWINGS
RAIL EXPANSION PROJECT - PHASE III
FOR
D HOLDINGS, INC.
DeGol INDUSTRIAL DRIVE
0005-1-2
126 EIGHTH AVENUE
ALTOONA, PA 16602
CONTACT: DANIEL J. BEYER, PE
(814) 944-5035 office
PLAN VIEW
SCALE: 1"=50'
1"= FEET
5 10 10 (V)
1"= FEET
25 50
4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00
PHASE III TRACK 17 PROFILE
SCALES: 1"=50' HORIZONTAL, 1"=10' VERTICAL
SH
EE
T
3 MATCH TO
MA
TC
H
TO SHEET 4
PVI:6+25
PVI ELEV:928.00
r:0.1957
150' VCBVC:5+50
Pr TOR:927.78
EVC:7+00
Pr TOR:928.00
PrTOR:927.33
PrTOR:927.48
PrTOR:927.63
PrTOR:927.78
PrTOR:927.90
PrTOR:927.97
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
PrTOR:928.00
EG:927.1
EG:927.0
EG:926.5
EG:926.6
EG:926.7
EG:927.0
EG:927.0
EG:926.9
EG:926.6
EG:926.8
EG:927.2
EG:927.0
EG:927.0
EG:927.0
EG:927.2
EG:927.3
EG:927.2
EG:927.0
EG:927.0
EG:927.0
EG:927.2
EG:927.1
EG:927.0
13+48.17: SAFE ZONE
PrTOR:928.00
13+83.17: EARTH MOUND
PrTOR:928.00
14+06.92: PhIII END TRACK 17 PrTOR:928.00
35'
SAFE
ZONE
23.75'
FG:928.00
PC:10+98.85
FG:928.00
PT:11+96.47
0.00%0.29%
INSTALL NEW SUBBALLAST, BALLAST, TIES & RAILS
PROPOSED
TOP OF RAIL (PrTOR)
EXISTING GRADE (EG)
LEGEND
935.63
Ex RAILROAD TRACK; CENTER LINE &
GAGE LINES
Ex WALL (JERSEY BARRIERS) Ex EDGE ASPHALT PAVEMENT Ex EDGE CRUSHED STONE SURFACE Ex EDGE UNPAVED / DIRT SURFACE
Ex GRADE SPOT ELEVATIONS
Ex BUILDING FOOTPRINT
Ex CONCRETE PAD OR SURFACE
Ex EDGE SURFACE WATERCOURSE Ex UTILITY POLE WITH NUMBERS, GUY WIRE & ANCHOR
Ex GRADE CONTOUR LINES
Ex OVERHEAD WIRESE
Ex SURVEY CONTROL POINT
[DO NOT DISTURB]
Ex UNDERGROUND WATER MAIN, WATER VALVE & HYDRANTW
Ex WATER UTILITY STRUCTURE
Ex EDGE WOODED OR BRUSH AREA
Ex SANITARY SEWER MANHOLE &
UNDERGROUND SEWER MAINS
EXISTING TRACK TO BE REPLACED:
CENTER LINE
NEW TRACK: CENTER LINE
NEW CONCRETE GRADE CROSSING
NEW ASPHALT PAVEMENT SURFACE
Track 17 CENTER LINE SEGMENTS
SEGMENT
L1
L2
L3
L4
L5
C1
L6
C2
L7
C3
L8
DEGREE
7°30'00"
7°30'00"
7°30'00"
RADIUS
764.49'
764.49'
764.49'
Δ
5°43'29"
5°43'29"
7°18'57.36"
LENGTH
435.51'
1,380.45'
492.54'
111.00'
127.60'
76.38'
71.93'
76.38'
746.55'
97.62'
210.45'
LINE/CHORD
DIRECTION
N34°25'12.3"E
N34°25'13.7"E
N34°25'12"E
N34°25'12"E
N34°25'12"E
N31°33'27.5"E
N28°41'43"E
N31°33'27.5"E
N34°25'12"E
N30°45'43.3"E
N27°06'14.7"E
START
STATION
-24+19.50
-19+83.99
-6+03.54
-1+11
0+00
1+27.60
2+03.99
2+75.92
3+52.30
10+98.85
11+96.47
START
NORTH
401,597.4401'
401,956.7021'
403,095.4484'
403,501.7561'
403,593.3218'
403,698.5844'
403,763.6454'
403,826.7413'
403,891.8023'
404,507.6445'
404,591.4685'
START
EAST
1,797,804.6229'
1,798,050.7997'
1,798,831.1135'
1,799,109.5266'
1,799,172.2699'
1,799,244.3987'
1,799,284.3582'
1,799,318.8955'
1,799,358.8550'
1,799,780.8469'
1,799,830.7407'
END
STATION
-19+83.99
-6+03.54
-1+11
0+00
1+27.60
2+03.99
2+75.92
3+52.30
10+98.85
11+96.47
14+06.92
END
NORTH
401,956.7021'
403,095.4484'
403,501.7561'
403,593.3218'
403,698.5844'
403,763.6454'
403,826.7413'
403,891.8023'
404,507.6445'
404,591.4685'
404,778.8038'
END
EAST
1,798,050.7997'
1,798,831.1135'
1,799,109.5266'
1,799,172.2699'
1,799,244.3987'
1,799,284.3582'
1,799,318.8955'
1,799,358.8550'
1,799,780.8469'
1,799,830.7407'
1,799,926.6218'
SURVEY CONTROL POINTS
POINT
DESCRIPTION
HVP-01
HVP-02
HVP-03
HVP-04
HVP-05
HVP-06
HVP-07
HVP-08
HVP-09
HVP-10
HVP-11
NORTH
404,816.2601
405,143.8274
403,787.2195
402,456.3959
402,109.3561
401,337.8616
400,839.4050
400,617.9689
400,440.9351
400,160.3926
400,436.4012
EAST
1,800,500.4707
1,800,216.5134
1,799,248.1478
1,798,461.2484
1,798,781.1739
1,798,087.4743
1,797,257.0383
1,797,343.9886
1,795,194.0072
1,795,199.5414
1,796,021.9737
ELEV
923.72
926.61
926.87
926.72
922.93
933.08
933.51
934.95
941.11
940.72
939.05
E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
931.0 931.0
926.54 926.51
927.41
927.01
927.01
S
S
S
S
S
S
S
S S
S S
S S
S S S S S S S S S S
S
S
S
PA SPCS SOUTH ZONE
NAD83
MATCH TO SHEET 4
U.S. ROUTE 22
L7
Ph III TRACK 17 CENTER LINE
C3 L8
Ph III TRACK 17 CENTER LINE PC:10+98.85
PT:11+96.47
25' O.C.
117.4'25' O.C.
END OF TRACK EARTH MOUND
Ph III END TRACK 17
23.75' 35'
SAFE ZONE
28.5' O.C.
34.8' O.C.
EVC: 7+00
BVC: 5+50
5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00
13+00
SAFE ZONE
13+48.17
EARTH MOUND
13+83.17
END TRACK
14+06.92
PLAN & PROFILE VIEWS
1"=50'
1"= FEET
5 10 10 (V)
PLAN VIEW
SCALE: 1"=50'
0005-1-2 DeGol-HRCS PhIII Trk17 Plots_02-04.dwg
4OFSEPTEMBER 26, 2025
HOLLIDAYSBURG, PA 16648 BLAIR COUNTY, PA
CONTRACT No. 2025-01 DeGOL INDUSTRIAL CENTER
CONTRACT DRAWINGS
RAIL EXPANSION PROJECT - PHASE III
FOR
D HOLDINGS, INC.
DeGol INDUSTRIAL DRIVE
0005-1-2
126 EIGHTH AVENUE
ALTOONA, PA 16602
CONTACT: DANIEL J. BEYER, PE
(814) 944-5035 office
1"= FEET
25 50
S S
Ex PF
10060.00 PS Ex No10 LHTO
10070.00
END CWR
10110.00BEGIN CWR
10080.00
PS Ex No10 LHTO
10000.00 Ex PF
10010.00 Ex LLT
10020.00 HORIZ. BREAK
10030.00
HORIZ. BREAK
10040.00 Ex LLT
10050.00 BEGIN CONC. XING
10090.00
END CONC. XING
10100.00
SAFE ZONE
10120.00
EARTH MOUND
10130.00
PhIII END TRACK 17
10140.00LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD
LOD
EDGE Ex PVMT 10150.00
W W W W W W W W W W W W W W W W W W
E E
E E
E
E
E
E
E E E E E E
S S
S S S S
S
S
S
S
S S
S S S SS S
Ex PF
10060.00 PS Ex No10 LHTO
10070.00
END CWR
10110.00BEGIN CWR
10080.00
PS Ex No10 LHTO
10000.00 Ex PF
10010.00 Ex LLT
10020.00 HORIZ. BREAK
10030.00
HORIZ. BREAK
10040.00 Ex LLT
10050.00 BEGIN CONC. XING
10090.00
END CONC. XING
10100.00
SAFE ZONE
10120.00
EARTH MOUND
10130.00
PhIII END TRACK 17
10140.00LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD
LOD
EDGE Ex PVMT 10150.00
ES-0.00
NOTESLEGEND
RECYCLING MEASURES
OVERALL KEY PLAN
R:\2236 Degol Bros\25602 Ind Ctr Rail Ph3\06 CADD\80 Site Dev\DEGOL ES-1.00.dwg, 2/17/2026 10:42:20 AM
Drawing No.
A S
N O
TE
D
Fe br ua ry
B R
B
D
JB
-2 5-
LOD
10010.00 Ex LLT
10020.00
HORIZ. BREAK
10030.00 LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
W W W W W W W W W W W W W W W W W W W W W W W W
Ex PF
10010.00 Ex LLT
10020.00
HORIZ. BREAK
10030.00 LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
ES-1.00
LOD
LEGEND
R:\2236 Degol Bros\25602 Ind Ctr Rail Ph3\06 CADD\80 Site Dev\DEGOL ES-1.00.dwg, 2/17/2026 10:42:54 AM
Drawing No.
A S
N O
TE
D
Fe br ua ry
B R
B
D
JB
-2 5-
10060.00 PS Ex No10 LHTO
10070.00
END CWR
10110.00
BEGIN CWR
10080.00
HORIZ. BREAK
10040.00
Ex LLT
10050.00 BEGIN CONC. XING
10090.00
END CONC. XING
10100.00
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD
LOD LOD LOD LOD LODEDGE Ex PVMT
10150.00
W W W W W W W W W W W W W W W W W W W W W W W W
X
X X
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E
E
S S SS S S S
S
S
S
S
S
S
S
S
S
S
S
S
S S
Ex PF
10060.00 PS Ex No10 LHTO
10070.00
END CWR
10110.00
BEGIN CWR
10080.00
HORIZ. BREAK
10040.00
Ex LLT
10050.00 BEGIN CONC. XING
10090.00
END CONC. XING
10100.00
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD
LOD LOD LOD LOD LODEDGE Ex PVMT
10150.00
ES-1.01
R:\2236 Degol Bros\25602 Ind Ctr Rail Ph3\06 CADD\80 Site Dev\DEGOL ES-1.00.dwg, 2/17/2026 10:43:16 AM
Drawing No.
A S
N O
TE
D
Fe br ua ry
B R
B
D
JB
-2 5-
SAFE ZONE
10120.00
EARTH MOUND
10130.00
PhIII END TRACK 17
10140.00
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
S
S
S
S
S
S
S S
S S
S S
S S S S S S S S S S
SAFE ZONE
10120.00
EARTH MOUND
10130.00
PhIII END TRACK 17
10140.00
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
ES-1.02
R:\2236 Degol Bros\25602 Ind Ctr Rail Ph3\06 CADD\80 Site Dev\DEGOL ES-1.00.dwg, 2/17/2026 10:43:48 AM
Drawing No.
A S
N O
TE
D
Fe br ua ry
B R
B
D
JB
-2 5-
ES-1.03
STANDARD E&S NOTES
STAGING OF EARTHMOVING ACTIVITIES
RECYCLING MEASURES
GENERAL EROSION CONTROL NOTES
EROSION AND SEDIMENTATION POLLUTION
CONTROL MAINTENANCE SCHEDULE
CONSTRUCTION SEQUENCE
SEEDING TABLE
NOTES:
R:\2236 Degol Bros\25602 Ind Ctr Rail Ph3\06 CADD\80 Site Dev\DEGOL ES-1.00.dwg, 2/17/2026 10:44:01 AM
Drawing No.
A S
N O
TE
D
Fe br ua ry
B R
B
D
JB
-2 5-w w w .e a d sg ro u p
.c o m
W
IT
H O
FF
IC
E S
IN
p h o n e
.9
.5 fa x:
.9
.4
ES-1.04
TYPICAL COMPOST SOCK WASHOUT
NOT TO SCALE
COMPOST FILTER SOCK
NOT TO SCALE
R:\2236 Degol Bros\25602 Ind Ctr Rail Ph3\06 CADD\80 Site Dev\DEGOL ES-1.00.dwg, 2/17/2026 10:44:13 AM
Drawing No.
A S
N O
TE
D
Fe br ua ry
B R
B
D
JB
-2 5-w w w .e a d sg ro u p
.c o m
W
IT
H O
FF
IC
E S
IN
p h o n e
.9
.5 fa x:
.9
.4
| 0005-1-2 DeGol-HRCS PhIII Trk17_Complete Set_Issued For Bidding_2025-11-06_rfs.pdf |
| 01 Cover, Notes & Details |
| 02 Plan & Profile Views |
| 03 Plan & Profile Views |
| 04 Plan & Profile Views |
| 0005-1-2 DeGol-HRCS PhIII Trk17_Complete Set_Issued For Bidding_2026-02-17_rfs.pdf |
| 01 Cover, Notes & Details |
| 02 Plan & Profile Views |
| 03 Plan & Profile Views |
| 04 Plan & Profile Views |
File details come from the government source that posted it. Updated .