2-DART IT Network Modernization Pricing Template.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
IT NETWORK MODERNIZATION
Solicitation number
FY25-RFP-005
Issued by
Polk County, Des Moines City, Iowa

About this file

This is a pricing template spreadsheet for the Des Moines Area Regional Transit Authority (DART) IT Network Modernization project in Iowa. DART is seeking proposals for a phased modernization of its network infrastructure that includes updating the core network, implementing software-defined wide area network (SD-WAN) architecture, and enabling connectivity for a future third facility. The project is structured in two phases: Phase 1 covers existing locations and a new facility with hardware including firewalls (4 redundant pairs), core switches (4 units), optional SD-WAN edge devices, wireless access points (5 units for new facility), along with 3-year licensing and professional services for initial setup. Phase 2 focuses on the access layer expansion with 48-port access switches (8 units), wireless access points (12 units), an optional wireless access controller, 3-year licensing for access switch and AP management, and professional services for installation, configuration, and validation.

The pricing template provides a structured format for vendors to submit unit costs and extended costs across all hardware, licensing, and services categories, with specific columns for license renewal costs and notes. The template specifies quantities for major network components but allows flexibility for optional items such as SD-WAN edge devices and wireless access controllers depending on whether functionality is integrated or requires standalone devices. Professional services are included in both phases to ensure proper installation, configuration, SD-WAN integration, and validation of the modernized network infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PhaseCategoryItem DescriptionQuantityUnit Cost ($)Extended Cost (License renewals)($)Notes
Phase 1 - Existing LocationsHardwareFirewalls (HA Pair at each location)4Redundant pairs at each facility
Phase 1 - Existing LocationsHardwareCore Switches (2 at each location)42 per location
Phase 1 - Existing LocationsHardwareSD-WAN Edge Devices (optional)2Integrated into firewall or standalone
Phase 1 - New FacilityHardwareFirewall or Pair1 or 2For basic connectivity at new site
Phase 1 - New FacilityHardwareCore Switch1Initial network core for new facility
Phase 1 - New FacilityHardwareAccess Switches2Initial deployment for limited staff
Phase 1 - New FacilityHardwareWireless Access Points5Initial APs to cover startup space
Phase 1LicensingLicensing (3-year)1Include all required subscriptions
Phase 1ServicesProfessional Services1Initial setup and SD-WAN integration
Phase 2 - Access LayerHardwareAccess Switches 48 port8Estimated total across both sites
Phase 2 - Access LayerHardwareWireless Access Points12Estimated total across both sites
Phase 2 - Access LayerHardwareWireless Access Controller (if needed)1Optional
Phase 2 - Access LayerLicensingLicensing (3-year)1Access switch and AP management
Phase 2 - Access LayerServicesProfessional Services1Install, config, validation

File details come from the government source that posted it. Updated .