2-Contract Drawings.pdf
PDF 16 MB Posted
- Attached to
- E. Lincoln Ave Watermain Replacement
- Solicitation number
- US.236987
- Issued by
- Adams County, Gibraltar CDP, Pennsylvania
About this file
This document comprises contract drawings for the E. Lincoln Avenue Watermain Replacement project managed by the Gettysburg Municipal Authority in Adams County, Pennsylvania, scheduled for May 2026. The project involves the installation of approximately 16 linear miles of new 8-inch ductile iron pipe water main with associated infrastructure improvements, including service line connections, gate valves, fire hydrants, and thrust blocks at directional changes. The scope encompasses site plans and profiles across multiple sheets (C-101 through C-103), pavement restoration plans (C-120), miscellaneous construction details (C-501 through C-503), and erosion and sediment control plans (CE-001 through CE-501). The drawings indicate water main connections to existing infrastructure at six locations, replacement of sanitary sewer laterals and manhole structures, and coordination with existing underground utilities including gas lines, electrical conduits, and telecommunications cables. A mandatory prebid conference is scheduled for Friday, May 29, 2026, at 10:30 a.m. at the Gettysburg Municipal Authority Office, with sealed bids due via the PennBid Program on Thursday, June 11, 2026, at 2:00 p.m. local prevailing time. All bids must include 10 percent security and remain irrevocable for 60 days post-opening, or 120 days if award is delayed by government agency approval, bond sales, or grant awards.
The project is subject to Pennsylvania Prevailing Wage Act requirements, with minimum wage rates incorporated into contract documents. Bidders must comply with multiple Pennsylvania statutory obligations including the Steel Products Procurement Act, Underground Utility Line Protection Act, and Public Works Employment Verification Act. Performance and Payment Bonds equal to 100 percent of the contract bid price and comprehensive insurance coverage are mandatory before contract execution. All trenches require saw-cutting and compaction testing, with pavement restoration performed in accordance with PennDOT standards. The contractor bears responsibility for utility locating and field verification, removal and off-site disposal of excavated materials, and restoration of all disturbed surfaces to original condition. Contract documents indicate no specific budget, with final award amounts determined through sealed bidding for a single General Construction division. The substantial completion deadline is within a project timeframe specified in contract documents, with a one-year warranty period required (two years for street, road, and highway work).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Bidding Documents.pdf | ||
| 3-Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .