2-Contract 26-1 West Maple Water Main Replacement Specs and Bid Docs.pdf

PDF 28 MB Posted

Attached to
Contract 26-1, West Maple Street Water Main Replacement
Solicitation number
US.237238
Issued by
Schuylkill County, Pennsylvania

About this file

Summary: Contract 26-1, West Maple Street Water Main Replacement

This is a specifications and contract document package prepared by Ebert Engineering, Inc. for the Hegins-Hubley Authority in Valley View, Pennsylvania. The project involves the removal and replacement of approximately 1,220 linear feet of existing asbestos cement pipe with 8-inch Ductile Iron Pipe and valve clusters. The scope of work also includes installation of nineteen water service lines and two stubs for future connections with corporation stops, curb stops, and copper service lines; disposal of the removed asbestos concrete water main; installation of three fire hydrants and assemblies; and all necessary site work, restoration, and paving. Sealed bids were due by 2:00 PM on June 10, 2026, via the PennBid online program. Bidders are required to visit the site, with site contact being Demetrius Kasmari, Authority Manager, at 570.682.3228. The contract duration is 90 days from the Notice to Proceed through Substantial Completion. Individual meter pits require field inspection prior to shop drawing submittal, with all new meter pits supplied by the Authority.

Bidders must submit a 10% bid bond, 100% performance bond, 100% payment bond, and 10% maintenance bond for a 24-month period from date of completion. The project is funded by the COVID-19 ARPA PA Small Water and Sewer Grant through the Commonwealth Financing Authority. Progress payments will be made at 95% of work completed with retainage held at 10% until 50% project completion, then reduced to 5% until final completion. Payment requests must be submitted by the 30th of each month for Authority approval by the 20th of the following month, with actual payment timing subject to Commonwealth Financing Authority processing. Liquidated damages are assessed at $100 per day for schedule non-compliance. The project is subject to Pennsylvania Prevailing Wage Act requirements (43 P.S. 165-1 et seq.), and contractors must comply with non-discrimination, sexual harassment, and COVID-19 ARPA grant compliance provisions. Contractor insurance requirements include workers' compensation at statutory limits, commercial general liability of $1,000,000 per occurrence/$2,000,000 aggregate, automotive liability of $1,000,000, and umbrella coverage of $3,000,000, with the Commonwealth Financing Authority, Hegins-Hubley Authority, and Ebert Engineering, Inc. named as additionally insured.

View the file

Other files

File Type Posted
1-West Maple St 1400 Block Water Main 20260522.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .