2-Ch X - 2026 43 Digester Tank Façade Rehabilitation Construction.pdf
PDF 3 MB Posted
- Solicitation number
- US.262832
- Issued by
- Pennsylvania
About this file
Summary of 2026 43 Digester Tank Façade Rehabilitation Construction
This document comprises the detailed engineering specifications and bid form for a general construction project undertaken by the City of Bethlehem in Pennsylvania for facade rehabilitation of primary and secondary digester tanks at the Bethlehem Wastewater Treatment Plant located at 144 Shimersville Road, Bethlehem, PA 18015. The work includes repair of existing cracks and failing or missing mortar joints, pressure washing and cleaning of surfaces, removal and replacement of existing sealant, repair of existing concrete cracks, and demolition and reconstruction of existing brick as indicated in contract drawings and specifications. The contract is structured as a lump-sum general construction bid (GC-10) for all structural repairs, with five additional unit-price allowance items for supplemental work: additional mortar joint repair measured in linear feet (50 LF estimated); additional sealant replacement in linear feet (25 LF estimated); additional concrete patch repair in square feet (15 SF estimated); additional brick replacement in square feet (50 SF estimated); and general laborer services in hourly increments (40 hours estimated). The contract is coordinated with a separate JDV contract, and work must be performed within the constraints of ongoing wastewater treatment plant operations, with acceptable work hours limited to 7:00 a.m. to 5:00 p.m. unless otherwise approved by the owner. The project is scheduled for the contract period from Notice to Proceed through Final Completion, with all process interruptions and system shutdowns requiring advance written approval from the owner and coordination during low-flow periods defined as 12:00 a.m. to 5:00 a.m.
Pricing is based on a lump-sum bid for the base construction work plus unit prices for additional work, with payment structured according to the schedule of values and progress completion percentages. The engineer for the project is CHA Consulting, Inc., located at One East Broad Street, Suite 310, Bethlehem, PA 18018. Contract administration includes requirements for a detailed work plan submission, coordination drawings, a critical path method construction schedule using Microsoft Project, monthly progress reports, submittal procedures with a 15-day review period for initial submittals, and comprehensive documentation requirements including daily construction reports, material location reports, and special event reporting. All contractors are responsible for maintaining emergency repair crews on call 24 hours per day, and any failure to complete shutdown work within the specified period results in the contractor bearing all associated costs to the owner, including security, overtime, and program management expenses. No local municipal approvals or permits are required for this project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chapter X: Detailed Engineering Specifications – page 1 2026 43 Digester Tank Façade Rehabilitation Construction Project, City of Bethlehem
CHAPTER X – TECHNICAL ENGINEERING SPECIFICATIONS
Project Name: 2026 43 Digester Tank Façade Rehabilitation Construction
Chapter X: Detailed Engineering Specifications – page 1 2026 43 Digester Tank Façade Rehabilitation Construction Project, City of Bethlehem
City of Bethlehem Wastewater Treatment Plant
Facade Rehabilitation, Primary and Secondary Digester Tanks
TABLE OF CONTENTS 000110 - 1
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
000110 Table of Contents 004113 Bid Form
DIVISION 01 – GENERAL REQUIREMENTS
011000 Summary of Work 011400 Work Restrictions 012000 Measurement and Payment 012100 Allowances 012200 Unit Prices 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013116 Multiple Contract Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures 014000 Quality Requirements 014200 References 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution 017329 Cutting and Patching 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training
DIVISION 02 – CONCRETE
024119 Selective Demolition
DIVISION 03 – CONCRETE
030130 Maintenance of Cast-In-Place Concrete
DIVISION 04 – MASONRY
040110 Masonry Cleaning
040120.64 Brick Masonry Repointing
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
079200 Fluid Applied Waterproofing
ATTACHMENTS
TABLE OF CONTENTS 000110 - 2
END OF TABLE OF CONTENTS
BID FORM 004113 - 1
SECTION 004113 – BID FORM
BASE BID LUMP SUM BID ITEMS
ITEM
NO.
DESCRIPTION QTY UNIT PRICE ($)
GC-10
GENERAL CONSTRUCTION OF ALL WORK
ASSOCIATED WITH THE STRUCTURAL
REPAIRS OF THE DIGESTER TANKS.
1 LUMP SUM $
BASE BID UNIT PRICE ALLOWANCE BID ITEMS
ITEM
NO.
DESCRIPTION
EST
QTY
UNIT UNIT PRICE ($) TOTAL PRICE ($)
GC-20
ADDITIONAL MORTAR JOINT
REPAIR IN ACCORDANCE WITH
DETAILS PROVIDED ON THE
CONTRACT DRAWINGS.
50 LF $ $
GC-30
ADDITIONAL REPLACEMENT OF
EXISTING SEALANT IN
ACCORDANCE WITH DETAILS
PROVIDED ON THE CONTRACT
DRAWINGS.
25 LF $ $
GC-40
ADDITIONAL PATCH REPAIR OF
EXISTING CONCRETE. 15 SF $ $
GC-50
ADDITIONAL REPLACEMENT OF
EXISTING BRICK IN ACCORDANCE
WITH DETAILS PROVIDED ON
CONTRACT DRAWINGS.
50 SF $ $
GC-60
PROVIDE THE SERVICES OF A
GENERAL LABORER. 40 HR $ $
TOTAL BASE BID (SUM OF BID ITEMS GC-10 THROUGH GC-60): $
END OF SECTION 004113
SUMMARY OF WORK 011000 - 1
SECTION 011000 – SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: This Project is identified as Facade Rehabilitation, Primary and Secondary
Digester Tanks at the Bethlehem Wastewater Treatment Plant for the City of Bethlehem.
1. Project Location: 144 Shimersville Rd, Bethlehem PA 18015
B. Owner: The City of Bethlehem, 10 East Church Street, Bethlehem, PA 18018.
C. Engineer: CHA Consulting, Inc., One East Broad Street, Suite 310, Bethlehem, PA 18018.
Telephone: 610-865-3000.
D. Engineer Identification: The Contract Documents dated August 2026 were prepared for the
Project by CHA Consulting, Inc., One East Broad Street, Suite 310, Bethlehem, PA 18018 and
City of Bethlehem.
E. The Work includes, but is not limited to, the items listed below. See Bid Form and Measurement and Payment Specification for information regarding Base Bid and Unit Price Bid Items:
1. Repair existing cracks, failing, missing or open mortar joints as indicated in the Contract
Drawings and Specifications.
2. Pressure wash and clean surfaces as indicated in the Contract Drawings and Specifications.
3. Remove and replace existing sealant as indicated in the Contract Drawings and
Specifications.
4. Repair existing cracks in concrete as indicated in the Contract Drawings and Specifications.
5. Demolish and reconstruct existing brick as indicated in the Contract Drawings and
Specifications.
1.3 CONTRACT
A. The work shall be performed under the following prime contract:
1. General Contract
1.4 WORK SEQUENCE
A. The entire Work shall be completed in accordance with the descriptions, constraints and sequence indicated on the Drawings.
B. Construction work shall be performed in a sequence to ensure that all systems are systematically installed in an efficient manner.
SUMMARY OF WORK 011000 - 2
C. See specification 011400 – Work Restrictions for information regarding the sequence of shutdowns and work to be completed.
1.5 USE OF PREMISES
A. General: Contractors shall have limited use of premises for construction operations and limited use of Project Site, during construction period.
1.6 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the 50-division format and CSI/CSC's "MasterFormat" numbering system.
1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete because all available Section numbers are not used. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of Sections in the Contract Documents.
2. Division 01: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract
Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications.
Requirements expressed in the imperative mood are to be performed by Contractor.
Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
1.7 MISCELLANEOUS PROVISIONS
A. Local Municipal Approvals & Permits: None required.
SUMMARY OF WORK 011000 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
SUMMARY OF WORK 011000 - 4
[THIS PAGE INTENTIONALLY LEFT BLANK]
WORK RESTRICTIONS 011400-1
SECTION 011400 - WORK RESTRICTIONS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
B. See Section 01 73 00, Execution and the Contract Drawings for specific requirements on verification is existing conditions at the start of the Project.
1.2 USE OF PREMISES
A. Use of Site: Limit use of premises to work in areas indicated on the Drawings. Do not disturb portions of site beyond areas in which the Work is indicated.
1. Acceptable work hours at 7:00 a.m. to 5:00 p.m., unless otherwise approved by Owner.
2. Limits: Confine construction operations to the legal property boundaries.
3. Owner Occupancy: Owner must retain access to the area of work throughout the construction period. Contractors must coordinate, schedule and perform work to allow
Owner to utilize all existing and temporary facilities without disruption or interruption.
4. Perform the Work so as not to interfere with Owner's operations. At all times, provide measures to ensure safe access by the Owner to and from temporarily and permanently occupied areas of the facility.
5. Comply with the requirements of municipal agencies having authority.
6. Contractor shall provide protection, barriers, signage and traffic controls necessary to maintain the site and to facilitate Owner access to all occupied areas during construction.
1.3 RESPONSIBILITIES
A. This Section includes General requirements and constraints for maintenance of plant operations during construction. Prior to the commencement of the Work, the General Contractor shall submit to the Owner, for written approval, a detailed overall Work plan detailing the Contractor’s plan for performing the Work in conjunction with the operation of the plant. The Contractor’s plan shall include, but not be limited to, all criteria stated in this Specification. Contractor shall note that the shutdowns listed in Part 3 of this Section are not necessarily listed in sequential order. Contractors shall review the information provided and incorporate the requirements into the project schedule.
B. All Contractors shall be responsible for ensuring that the Work is performed in such a manner and order to prevent interruption or degradation of the treatment processes occurring at the plant. All
Work not indicated in the Contractor’s detailed shutdown plan shall remain the responsibility of the Contractor to complete within the stated allowable shutdown period for shutdowns listed herein and as agreed to with the Owner for all other shutdowns during the course of the Work
C. Work under this Contract shall be scheduled and conducted by each Contractor so as not to impede any treatment process, reduce the quality of plant effluent or cause odor or other nuisance. In
WORK RESTRICTIONS 011400-2
performing the Work indicated and specified, the Contractor shall plan and schedule his Work to meet the plant operating requirements, and to comply with the constraints and construction requirements as outlined in this section. No discharge of raw or inadequately treated wastewater shall be allowed. The Contractor shall pay all civil penalties, costs, assessments, etc., associated with any discharge of raw or inadequately treated wastewater resulting from the Contractor’s Work.
D. The General Contractor shall be responsible for coordinating the construction schedules for general construction with the other Prime Contracts to ensure that temporary requirements for maintaining the operation of all facilities that are required to be on-line at any given time are met.
E. Contractors have the option of providing additional temporary facilities that can eliminate a constraint, provided that all requirements of these Specifications are fulfilled. Work not specifically covered in the following paragraphs may, in general, be done at any time during the contract period, subject to the operating requirements and constraints and construction requirements outlined hereinafter. All references to days in this section shall be construed as consecutive calendar days.
F. Contractors shall install all work that is possible to be completed without a shutdown and shall have all materials required for the shutdown onsite prior to the start of the shutdown. All materials that must be submitted for approval shall have been submitted and approved.
G. Prior to completion of shutdown, Contractors shall test all piping and equipment in accordance with the testing criteria specific to the materials installed as specified.
1.4 GENERAL CONSTRAINTS
A. The Contractor shall schedule and execute all Work so that the plant processes and all plant systems are maintained in continuous operation. All system shutdowns, complete or partial, temporary or extended, shall be approved in advance, and in writing, by the Owner. If in the judgment of the
Owner a requested shutdown is not required for the Contractor to perform the Work, the Contractor shall utilize approved alternative methods to accomplish the Work. All shutdowns shall be coordinated with and scheduled at times approved and suitable to the Owner. The scheduling and duration of tie-ins and connections that require process interruptions or removal of tankage from service, or are dependent on process operations, performance requirements, flow of wastewater, or weather as related to flow rate, shall be coordinated with and approved by the Owner based on field conditions and consideration of the above listed factors. Process interruptions shall be scheduled during low flow periods defined as 12:00 am to 5:00 am local time or as otherwise approved by
Owner. All night Work premiums, overtime and other costs including, but not limited to the Owner incurred premium time, security costs and other program management costs related to scheduling of process interruptions shall be borne by the Contractor. Shutdowns shall not begin until all required materials are on hand and ready for installation.
B. Each shutdown period shall commence at a time approved by the Owner, and the Contractor shall proceed with the Work continuously, start to finish, until the Work is completed, and normal plant operation is restored. If the Contractor completes all required Work before the specified shutdown period has ended, the Owner may immediately place the existing system back into service. If the
Contractor does not complete Work within the shutdown period, the Contractor shall pay all costs resulting from the extended delay incurred by the Owner.
C. The Contractor shall submit plans for short-term and extended shutdowns in advance and shall show all shutdowns in the update schedules presented at the monthly and weekly progress meetings.
Shutdown plans shall be submitted, approved and fully coordinated with the Owner, at least seven
WORK RESTRICTIONS 011400-3
(7) days before the scheduled shutdown, unless otherwise indicated. The Owner’s personnel shall operate all plant facilities involved in the short-term and extended shutdowns and diversions.
D. Short-term shutdowns in plant flow or plant systems will be allowed for tie-ins to existing facilities, installation of temporary bulkheads, shoring, etc. All such shutdowns shall be scheduled seven (7) days in advance, unless otherwise indicated, and for low-flow periods or low demand periods as applicable, if critical to the plant operation.
E. Any temporary Work, facilities, roads, walks, protection of existing structures, piping, blind flanges, valves, equipment, etc. that may be required within the Contractor’s Work limits to maintain continuous and dependable plant operation shall be furnished by the Contractor at no cost to the Owner.
F. The Owner shall have the authority to order Work stopped or prohibited that would, in his opinion, unreasonably result in interrupting the necessary functions of the plant operations.
G. If the Contractor impairs the performance or operation of the plant as a result of not complying with specified provisions for maintaining plant operations, then the Contractor shall immediately make all repairs or replacements and do all Work necessary to restore the plant to operation to the satisfaction of the Owner. Such Work shall progress continuously to completion on a 24 hours per day, seven-day per week basis to the satisfaction and at no additional cost to the Owner.
H. The Contractor shall provide the services of emergency repair crews on call 24 hours per day.
I. If the Contractor fails to complete all the Work scheduled in the shutdown period, all costs incurred to the Owner to complete the Work including, but not limited to; security costs, Owner or Owner’s
Representative employee overtime and other Contractor costs shall be the responsibility of the
Contractor.
1.5 MAINTENANCE OF EXISTING BUILDING AND PLANT UTILITIES
A. Building heating and ventilating for the existing plant structures shall be maintained in service for the entire construction period. Temporary heating and ventilation shall be provided to maintain adequate heating and/or ventilation of facilities where Work is being performed. Temperatures to be maintained in any areas occupied by plant operating personnel shall be at least 65°F and no higher than 85°F. The temperature in all other interior plant areas whether new, existing or temporary shall be maintained at a minimum temperature of 45°F.
B. Electric power, lighting service, process control, fire alarm and communications systems shall be maintained in uninterrupted operation in all areas. Individual units may be disconnected as required for replacement, but service shall be available at all times including periods when certain plant utilities are out of service. The Contractor shall coordinate shutdowns required in order to minimize the total number of shutdowns necessary to complete construction. Owner’s phone service to the plant shall be maintained in continuous operation during construction.
C. Potable water service shall be maintained in continuous service at all times during construction except for short-term shutdowns required for tie-ins and connection of temporary bypass piping.
Shutdown of the potable water system shall be fully planned and coordinated through the Owner and shall be limited to not more than 2 hours, except where otherwise indicated. Existing fire hydrants within the plant site shall be operational at all times, unless otherwise approved by the
Owner.
WORK RESTRICTIONS 011400-4
D. The existing non-potable water services shall be maintained in continuous operation during construction except for short-term tie-ins of new or temporary facilities to existing facilities. The
Contractor shall provide temporary support or relocation or demolition of existing non-potable water facilities to complete the Work indicated. The Contractor shall provide all temporary supports, relocation of existing piping, or demolition of existing non-potable water piping including replacement with temporary or permanent non-potable water piping as required at no additional cost to the Owner. Shutdowns of the non-potable water system shall be fully coordinated with the
Owner.
E. All existing sumps and sump pumps shall be maintained in an operable condition with either existing pumps or temporary pumps. Interim piping, power and controls shall be provided as necessary to comply with this requirement.
F. Supply of service and seal water and the necessary connections to existing equipment shall be maintained during construction. Interim piping and seal water supply shall be provided as necessary to comply with this requirement.
1.6 DRAINING, WASH DOWN, CLEANING AND TURNOVER OF FACILITIES
A. Isolation, draining and wash down of tanks, wet wells, channels or other process equipment designated to be performed by the Owner’s workforces shall be done in accordance with the approved CPM schedule and with fourteen (14) days advance written notice from the Contractor.
B. Where required piping demolition or modifications to piping associated with the above listed facilities may limit the ability to dewater the respective facilities using existing connected pumps, the Contractor will be responsible for completing in part or in whole, the draining and wash down operations to the extent necessary to complete the Work.
C. Following draining and hose down of all areas in which the Contractor or its Sub-Contractors are working, the Contractor shall be responsible for cleaning the facilities to the extent necessary to perform the required Work and to protect the health and safety of the Contractor’s personnel. This requirement includes removal and disposal of any residue, solids, debris or other material remaining following the Owners’ draining and hose down operations.
D. The Contractor shall submit for the Owner’s approval the design, furnish, install and maintain stop logs, bulkheads and similar flow isolation devices prior to proceeding with the Work. The
Contractor will submit with its request all Shop Drawings and design calculations. The installation and removal of any flow isolation device shall be done only after receiving the Owner’s written approval of the design and permission to proceed.
1.7 SUBMITTALS
A. Submit shutdown plans for each shutdown in accordance with Paragraph 1.03.
B. The Contractor shall incorporate into the CPM schedule, all constraints and milestones identified in this section. Any proposed deviations or modifications to the constraints shall be submitted for approval prior to implementation. Prior to any scheduled shutdown, the Contractor shall submit a plan of Work including a list of materials, manpower and equipment (including standby equipment) and a contingency plan required to complete the Work. Prior to the process interruption, the
Contractor shall inventory with the Owner and verify that all planned for resources are available and on site.
WORK RESTRICTIONS 011400-5
C. The Contractor is free to propose such modifications to existing or proposed structures to accommodate construction or to facilitate with equipment installation. Where structural modification of an existing or proposed facility is requested, the request shall be accompanied by calculations, Contract Drawings, etc., sealed by a registered Professional Engineer specializing in structural design. The Owner must approve all such proposals in writing.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION
END OF SECTION 011400
WORK RESTRICTIONS 011400-6
MEASUREMENT AND PAYMENT 012000-1
SECTION 012000 - MEASUREMENT AND PAYMENT
PART 1 – GENERAL
1.1 RELATED SECTIONS
A. Section 01 10 00, Summary of Work
B. Section 01 29 00, Payment Procedures
1.2 MEASUREMENT
A. Prices bid in the Bid Form constitute complete payment for Work of the Contract, which Work is as specified in the Contract Documents, Drawings, and Specifications. Item descriptions contained in this Section shall not be considered all encompassing.
B. Work and services of an administrative nature and such other similar work as specified in various
Specification Sections, and not referenced hereinafter in the commentary paragraphs under the
Item Description article, are also considered incidental to the Work of the Contract, for which no separate or additional payment will be paid.
C. Lump Sum Work: Measurement for payment will be made on the basis of completion of the Work in accordance with the Contract Documents and as stated hereinafter.
D. Bid Form Allowances: Items indicated in the Bid Form as Allowances will be used as the funds to pay for each category of work indicated by the allowance titles.
1.3 PAYMENT
A. Schedule of values requirements and procedures for progress payments shall be in accordance with Section 01 29 00, Payment Procedures.
1.4 DEFINITION OF CONTRACT BID ITEMS
A. Bid Item GC-10: General Construction
1. This bid item shall include all labor, equipment, material and incidentals required to complete the General Construction Work, excluding all unit price and allowance work defined in this Section, as specified in the Contract Documents or as directed.
2. Measurement for payment will be the percentage of Work completed as described in the
Contract Documents.
3. Payment will be made based on the contract lump sum price as stated in the Agreement.
B. Bid Item GC-20: Additional Mortar Joint Repair
1. This bid item shall include all labor, equipment, material and incidentals required to repair additional mortar joints.
MEASUREMENT AND PAYMENT 012000-2
Measurement for payment will be the actual linear feet (LF) of additional installation performed.
2. Payment will be made based on the unit bid price provided on the Bid Form multiplied by the measurement described above.
C. Bid Item GC-30: Additional Removal and Replacement of Existing Sealant
1. This bid item shall include all labor, equipment, material and incidentals required to replace additional sealant.
2. Measurement for payment will be the actual additional linear feet (LF) of installation performed.
3. Payment will be made based on the unit bid price provided on the Bid Form multiplied by the measurement described above.
D. Bid Item GC-40: Additional Patch Repair of Existing Concrete
1. This bid item shall include all labor, equipment, material and incidentals required to repair additional concrete cracks.
2. Measurement for payment will be the actual additional square feet (SF) of installation performed.
3. Payment will be made based on the unit bid price provided on the Bid Form multiplied by the measurement described above.
E. Bid Item GC-50: Additional Demolition and Reconstruction of Existing Brick
1. This bid item shall include all labor, equipment, material and incidentals required to reconstruct existing wythe brick.
2. Measurement for payment will be the actual additional square feet (SF) of installation performed.
3. Payment will be made based on the unit bid price provided on the Bid Form multiplied by the measurement described above.
F. Bid Item GC-60: Services of a Laborer
1. This bid item shall include additional hourly Work by a General Laborer (Class 03) as requested.
2. Measurement for payment will be the actual hours of additional Work performed.
3. Payment will be made based on the unit bid price provided on the Bid Form multiplied by the measurement described above.
PART 2 - PRODUCTS - NOT USED
PART 3 - EXECUTION - NOT USED
END OF SECTION 012000
ALLOWANCES 012100 - 1
SECTION 012100 - ALLOWANCES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements governing allowances.
1. Certain items are specified in the Contract Documents by allowances. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order.
B. Types of allowances include the following:
1. Unit price allowances.
2. Lump sum allowances.
3. Contingency allowances.
C. Related Sections include the following:
1. Division 01 Section "Contract Modification Procedures" for procedures for submitting and handling Change Orders for allowances.
2. Division 01 Section "Unit Prices" for procedures for using unit prices.
1.3 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise Engineer of the date when final selection and purchase of each product or system described by an allowance must be completed to avoid delaying the Work.
B. At Engineer's request, obtain proposals for each allowance for use in making final selections.
Include recommendations that are relevant to performing the Work.
C. Purchase products and systems selected by Engineer from the designated supplier.
1.4 SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances, in the form specified for Change Orders.
ALLOWANCES 012100 - 2
B. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.
C. Coordinate and process submittals for allowance items in same manner as for other portions of the Work.
1.5 LUMP-SUM, UNIT-COST, AND CONTINGENCY ALLOWANCES
A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner or selected by Consultant under allowance and shall include applicable taxes, freight, and delivery to Project site.
B. Unless otherwise indicated, Contractor's costs for receiving and handling at Project site, labor, installation, overhead and profit, and similar costs related to products and materials ordered by
Owner or selected by Consultant under allowance shall be included as part of the Contract Sum and not part of the allowance.
C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.
1. If requested by Owner, retain and prepare unused material for storage by Owner. Deliver unused material to Owner's storage space as directed.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCES
A. REFER TO BID FORM(S) FOR ALLOWANCES.
END OF SECTION 012100
UNIT PRICES 012200 - 1
SECTION 012200 - UNIT PRICES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for unit prices if stated on the
Bid Form.
B. Related Sections include the following:
1. Division 01 Section "Allowances" for procedures for using unit prices to adjust quantity allowances.
2. Division 01 Section "Contract Modification Procedures" for procedures for submitting and handling Change Orders.
3. Division 01 Section "Quality Requirements" for general testing and inspecting requirements.
1.3 DEFINITIONS
A. Unit price is stated on the Bid Form, as a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased.
1.4 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.
B. Measurement and Payment: The Engineer will verify units of measurement with the Contractor.
Refer to individual Specification Sections for work that requires establishment of unit prices.
Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A list of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
UNIT PRICES 012200 - 2
3.1 LIST OF UNIT PRICES
A. Refer to the Bid Form for Unit Prices.
END OF SECTION 012200
CONTRACT MODIFICATION PROCEDURES 012600 - 1
SECTION 012600 - CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements for handling and processing
Contract modifications.
B. Related Sections include the following:
1. Division 01 Section "Allowances" for procedural requirements for handling and processing allowances.
2. Division 01 Section "Unit Prices" for administrative requirements for using unit prices.
3. Division 01 Section "Product Requirements" for administrative procedures for handling requests for substitutions.
1.3 MINOR CHANGES IN THE WORK
A. Engineer will issue Field Orders authorizing Minor Changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.
1.4 PROPOSAL REQUESTS
A. Owner-Initiated Proposal Requests: Engineer will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
1. Proposal Requests issued by Engineer are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change.
2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
c. Include costs of labor and supervision directly attributable to the change.
CONTRACT MODIFICATION PROCEDURES 012600 - 2
d. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
B. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the
Contract, Contractor may propose changes by submitting a request for a change to Engineer.
1. Include a statement outlining reasons for the change and the effect of the change on the
Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the
Contract Time.
6. Comply with requirements in Division 01 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified.
C. Proposal Request Form: For Change Order Proposals, use forms provided by the Engineer.
1.5 ALLOWANCES
A. Allowance Adjustment: If an Allowance is included in the work, prior to performing any work included in an allowance, the Contractor shall review the work with the Engineer. No work shall be performed without prior approval of the Engineer. The Engineer will verify and adjust allowance amounts, based on the quantity of work required and by final measurement of work in place. The Contractor shall provide the Engineer with the following information:
1. Include installation costs in purchase amount only where indicated as part of the allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed.
3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit-cost allowances.
4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the Purchase Order amount or Contractor's handling, labor, installation, overhead, and profit. Times for the submission and determination of claims are provided in the General Conditions.
1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents.
CONTRACT MODIFICATION PROCEDURES 012600 - 3
2. No change to Contractor's indirect expense is permitted for selection of higher- or lower-priced materials or systems of the same scope and nature as originally indicated.
1.6 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Proposal Request, the Engineer will issue a Change Order for signatures of Owner and Contractor.
1.7 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: The Engineer may issue a Construction Change Directive.
Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the
Contract Time.
B. Documentation: Maintain detailed records on a time and material basis of work required by the
Construction Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 012600
CONTRACT MODIFICATION PROCEDURES 012600 - 4
PAYMENT PROCEDURES 012900 - 1
SECTION 012900 - PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.
B. Related Sections include the following:
1. Division 01 Section "Unit Prices" for administrative requirements governing use of unit prices.
2. Division 01 Section "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.
1.3 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for
Payment.
1.4 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's
Construction Schedule.
1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following:
a. Application for Payment forms with Continuation Sheets.
b. Submittals Schedule.
2. Submit the Schedule of Values to Engineer at earliest possible date. Schedule of Values must be submitted ahead of initial Application for Payment, in accordance with the General
Conditions.
PAYMENT PROCEDURES 012900 - 2
B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the Schedule of Values:
a. Project name and location.
b. Name of Engineer.
c. Engineer's project number.
d. Contractor's name and address.
e. Date of submittal.
2. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed:
a. Related Specification Section or Division.
b. Description of the Work.
c. Name of subcontractor.
d. Name of manufacturer or fabricator.
e. Name of supplier.
f. Change Orders (numbers) that affect value.
g. Dollar value.
1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.
3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project
Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate.
4. Round amounts to nearest whole dollar; total shall equal the Contract Sum.
5. Provide a separate line item in the Schedule of Values for each part of the Work where
Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.
a. Differentiate between items stored on-site and items stored off-site. If specified, include evidence of insurance or bonded warehousing.
6. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.
7. Allowances: Provide a separate line item in the Schedule of Values for each allowance.
Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured quantity. Use information indicated in the Contract Documents to determine quantities.
8. Each item in the Schedule of Values and Applications for Payment shall be complete.
Include total cost and proportionate share of general overhead and profit for each item.
a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.
PAYMENT PROCEDURES 012900 - 3
9. Schedule Updating: Update and resubmit the Schedule of Values before the next
Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.
1.5 APPLICATIONS FOR PAYMENT
A. Each Application for Payment shall be consistent with previous applications and payments as certified by Engineer and paid for by Owner.
1. Initial Application for Payment, Application for Payment at time of Substantial
Completion, and final Application for Payment involve additional requirements.
B. Payment Application Times: The period covered by each Application for Payment ends on the final day of each month. A draft copy of each month’s Application for Payment should be submitted to the Engineer by the 20th day of each month for review prior to Contractor’s submission of the Certified Progress Payment by the last day of each month.
C. Payment Application Forms: “Application for Payment” form as included in the Project Manual.
D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Engineer will return incomplete applications without action.
1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule.
Use updated schedules if revisions were made.
2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.
3. Include a partial Release of Liens with each month’s progress payment.
E. Transmittal: Submit three (3) signed and notarized original copies of each Application for
Payment to Engineer by a method that allows tracking of delivery.
1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.
F. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:
1. List of subcontractors.
2. Schedule of Values.
3. Contractor's Construction Schedule (preliminary if not final).
4. Products list.
5. Schedule of unit prices.
6. Submittals Schedule (preliminary if not final).
7. List of Contractor's staff assignments.
8. List of Contractor's principal consultants.
9. Copies of building permits.
10. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.
11. Initial progress report.
12. Report of preconstruction conference.
PAYMENT PROCEDURES 012900 - 4
13. Initial settlement survey and damage report if required.
G. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial
Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.
2. This application shall reflect Certificates of Partial Substantial Completion issued previously for designated portions of the Work.
H. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:
1. Evidence of completion of Project closeout requirements.
2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid.
3. Updated final statement, accounting for final changes to the Contract Sum.
4. Executed “Contractor’s Affidavit” as provided in the Contract Documents (form CA, consisting of one page).
5. Executed “Contractor’s Release” as provided in the Contract Documents (form CR, consisting of two pages).
6. Executed “Maintenance Bond” as provided in the Contract Documents (form MB, consisting of two pages).
7. Executed “Statement of Surety Company” as provided in the Contract Documents (form
SS, consisting of one page).
8. Evidence that claims have been settled.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 012900
PROJECT MANAGEMENT AND COORDINATION 013100 - 1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on
Project including, but not limited to, the following:
1. General project coordination procedures.
2. Conservation.
3. Coordination drawings.
4. Administrative and supervisory personnel.
5. Project meetings.
B. The Contractor shall be solely responsible for coordination requirements. Including all
Subcontractors, Sub-sub contractors and beyond.
C. Related Sections: The following Sections contain requirements that relate to this Section:
1. Division 01 Section "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
2. Division 01 Section "Closeout Procedures" for coordinating Contract closeout.
1.3 COORDINATION
A. Coordination: Each contractor shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its operations with operations, included in different Sections, that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
PROJECT MANAGEMENT AND COORDINATION 013100 - 2
B. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for Owner and separate contractors if coordination of their
Work is required.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Pre-installation conferences.
7. Project closeout activities.
D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.
1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work.
1.4 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Indicate relationship of components shown on separate Shop Drawings.
2. Indicate required installation sequences.
B. Staff Names: Within 7 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project.
1.5 ADMINISTRATIVE AND SUPERVISORY PERSONNEL
A. General: In addition to Project superintendent, provide other administrative and supervisory personnel as required for proper performance of the Work.
1. Include special personnel required for coordination of operations with other contractors.
PROJECT MANAGEMENT AND COORDINATION 013100 - 3
1.6 PROJECT MEETINGS
A. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Owner and Engineer, but no later than 15 days after execution of the
Agreement. Hold the conference at Project site or another convenient location. The meeting will review responsibilities and personnel assignments and other pertinent issues to the project.
1. Attendees: Authorized representatives of Owner and Engineer, and their consultants;
Prime Contractor(s) and their superintendent; major subcontractors; and other Owner pre-approved parties shall attend the conference.
This is the start of the file's text. The full file is on GovTribe.