1-Bid Drawings - 2026 43 Digester Tank Façade Rehabilitation Construction.pdf
PDF 4 MB Posted
- Solicitation number
- US.262832
- Issued by
- Pennsylvania
About this file
This document comprises bid drawings for the 2026 43 Digester Tank Façade Rehabilitation Construction project at the Bethlehem Wastewater Treatment Plant, located at 144 Shimersville Road, Bethlehem, Pennsylvania 18015. The project involves construction repairs to the brick and concrete facades of four digester tanks: South Primary Digester (PD-1), North Primary Digester (PD-2), South Primary Digester (PD-3), and North Secondary Digester (SD), along with repairs to an associated control building. Work includes concrete crack repair via epoxy injection, brick mortar repointing, removal and replacement of loose or broken brick, sealant joint replacement, stainless steel flashing installation, parapet reconstruction, through-wall scupper replacement, roof coating repairs, gutter repairs and verification, capstone patching and resetting, and pressure washing of select areas. Specific quantities identified in the repair legend include repointing areas ranging from 5 to 475 square feet across the four tanks, sealant replacement of 60 to 135 linear feet, concrete crack injection of 36 to 250 linear feet, loose brick replacement of 1 to 8 pieces, and gutter repairs of 190 linear feet. The drawings are dated August 6, 2026, with a revision date of November 16, 2026, and are supplemented by detailed technical specifications.
All contractors must field-verify existing conditions, dimensions, and elevations prior to submitting proposals and beginning work, as the drawings may not depict all existing piping, conduits, equipment, and fixtures requiring relocation. The contractor bears sole responsibility for jobsite safety, development of temporary shoring and bracing sequences, and protection of owner personnel and the public through temporary barricades. All work must comply with the International Building Code 2021. Damaged finishes and materials must be restored to pre-construction condition or better, and all phases of work, including temporary service outages, require coordination with the owner. The contractor must immediately notify the engineer of any existing conditions that prevent installation in accordance with the design details and must submit accurate sketches of conditions with proposed modifications for approval. Additional engineering fees for defective work may be withheld from contractor payments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scale:
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING
VERIFY SCALE
ISSUE FOR
BID
Job No.
Date:
Sheet:
Drawn: Appd:
N o.
D at e By
D es cr ip tio n
Sheet No:
Drawing Copyright © 2026
One East Broad Street Suite 310
Bethlehem, PA. 18018 610.865.3000
S-001
COVER SHEET
AND
GENERAL NOTES
SGY PMG
106246
NOTED
8/6/2026
FA
CA
DE
R
EH
AB
IL
IT
AT
IO
N
PR
IM
AR
Y
AN
D
SE
CO
N
DA
RY
D
IG
ES
TE
R
TA
N
KS
fo r th e
BE
TH
LE
H
EM
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
PL
AN
T
SH
IM
ER
SV
IL
LE
R D
BE
TH
LE
H
EM
PA
BETHLEHEM WASTEWATER TREATMENT PLANT
JUNE 2026
PRIMARY AND SECONDARY DIGESTER TANKS
144 SHIMERSVILLE RD
BETHLEHEM, PA 18015
CHA PROJECT NO. 106246
PROJECT DRAWING LIST
S-001 COVER SHEET & GENERAL NOTES
S-100 SOUTH PRIMARY DIGESTER PD-1 ELEVATIONS
S-101 NORTH PRIMARY DIGESTER PD-2 ELEVATIONS
S-102 SOUTH PRIMARY DIGESTER PD-3 ELEVATIONS
S-103 NORTH SECONDARY DIGESTER SD ELEVATIONS
S-104 CONTROL BUILDING ELEVATIONS
S-500 SECTIONS AND DETAILS
GENERAL NOTES
1. THESE DRAWINGS SHOW THE WORK ASSOCIATED WITH REPAIRS AND RESTORATION OF FOUR (4)
DIGESTER TANKS AT THE WASTE WATER TREATMENT PLANT BETHLEHEM, PA.
2. THE WORK SHOWN ON THESE DRAWINGS HAS BEEN DESIGNED IN ACCORDANCE WITH THE STRUCTURAL
REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE, 2021.
3. ALL EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR TO BEGINNING ANY WORK. IF EXISTING CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE WORK IN ACCORDANCE WITH THE DETAILS AS SHOWN, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD IMMEDIATELY AND PROVIDE AN ACCURATE SKETCH OF THE CONDITION, INCLUDING A PROPOSED MODIFICATION OR CORRECTION, FOR REVIEW AND
APPROVAL.
4. THE CONTRACTOR SHALL REVIEW THE NEED FOR TEMPORARY SHORING AND BRACING PRIOR TO THE CUTTING AND/OR REMOVAL OF ANY EXISTING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT AND COORDINATION OF THE SEQUENCE OF TEMPORARY VERTICAL AND LATERAL BRACING, SHORING, DEMOLITION, AND NEW CONSTRUCTION AS PROJECT CONDITIONS REQUIRE TO MAKE SAFE ALL
STRUCTURAL ELEMENTS AND ADJACENT ELEMENTS IMPACTED BY THE PROJECT SCOPE OF WORK.
5. JOBSITE SAFETY IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. REVIEW OF THE CONSTRUCTION BY THE ENGINEER IS FOR CONFORMANCE WITH DESIGN ASPECTS ONLY, NOT TO REVIEW THE CONTRACTOR'S PROVISIONS FOR JOBSITE SAFETY. LACK OF COMMENT ON THE PART OF THE ENGINEER WITH REGARD TO
JOBSITE SAFETY IS NOT TO BE INTERPRETED AS APPROVAL OF JOBSITE SAFETY ASPECTS.
6. IF FAULTY CONSTRUCTION PROCEDURES, OR MATERIAL, RESULT IN DEFECTIVE WORK THAT REQUIRES ADDITIONAL ENGINEERING TIME TO DEVISE CORRECTIVE MEASURES, PROFESSIONAL FEES MAY BE CHARGED TO THE CONTRACTOR AT THE STANDARD HOURLY RATE OF ADDITIONAL SERVICES. SUCH FEES
MAY BE WITHHELD FROM THE CONTRACTOR'S PAYMENT.
7. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TEMPORARY BARRICADES
AS REQUIRED TO PROTECT THE OWNER'S PERSONNEL AND THE GENERAL PUBLIC FROM INJURY DURING THE CONSTRUCTION PERIOD. DRIVEWAYS AND ENTRANCES SERVING THE PREMISES ARE TO BE KEPT CLEAR AND
AVAILABLE TO THE OWNER AND THE OWNER'S EMPLOYEES AT ALL TIMES.
8. THESE DRAWINGS ARE SUPPLEMENTED BY A DETAILED TECHNICAL SPECIFICATION. THE NOTES SHOWN ON
THESE DRAWINGS UNDER CERTAIN CATEGORIES OF WORK ARE INTENDED TO SUMMARIZE BASIC
REQUIREMENTS AND ARE ON THE DRAWINGS FOR CONVENIENCE.
SPECIAL NOTES TO THE CONTRACTOR:
1. REPAIR QUANTITIES IDENTIFIED ON THESE DRAWINGS WERE BASED UPON FIELD OBSERVATIONS MADE
BY THE ENGINEER.
2. ALL CONTRACTORS MUST REVIEW THE WORK AREA PRIOR TO SUBMITTING CONSTRUCTION PROPOSALS TO DETERMINE THE FULL SCOPE OF THE WORK INVOLVED. THE DRAWINGS MAY NOT SHOW ALL PIPING, CONDUITS, EQUIPMENT, AND FIXTURES THAT MAY HAVE TO BE RE-ROUTED OR TEMPORARILY
DISLOCATED TO PERFORM THE STRUCTURAL WORK SHOWN.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS OF THE EXISTING CONDITIONS
BEFORE PROCEEDING WITH ANY WORK.
4. THE SCHEDULING OF ALL PHASES OF THE WORK, INCLUDING ANY TEMPORARY SERVICE OUTAGES, SHALL
BE COORDINATED WITH THE OWNER.
5. ALL FINISHES OR MATERIALS DAMAGED IN THE PERFORMANCE OF THE WORK SHALL BE RESTORED TO
PRE CONSTRUCTION CONDITION, OR BETTER.
6. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ANY AND ALL CONDITIONS WHICH DIFFER FROM
THOSE SHOWN ON THESE DRAWINGS, OR WHICH PREVENT HIM FROM PERFORMING THE WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
AREA OF WORK
11/16/2026
ELEVATION - 1
SCALE: 3/8"=1'-0"
ELEVATION - 2
SCALE: 3/8"=1'-0"
ELEVATION - 3
SCALE: 3/8"=1'-0"
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
3.0
PATCH CAPSTONE
PER DETAIL 1/S-500
5.0
9.0
ROOF
9.0
ROOF
9.0
ROOF
25'-0" ±25'-0" ±25'-0" ±
APPROX EXTENTS OF FOREGROUND STRUCTURE
11.011.011.0
ELEVATION - 4
SCALE: 3/8"=1'-0"
ELEVATION - 5
SCALE: 3/8"=1'-0"
ELEVATION - 6
SCALE: 3/8"=1'-0"
7.0
5.0
5.0
INSTALL NEW S.S. FLASHING PER
DETAIL 6/S-500.RE-SET CAP STONES
AND REPAIR ROOF COATING AT
REBUILT PARAPET AREA
RE-SET THRU WALL SCUPPER
AND RESTORE ALL FLASHING,
REFER TO DETAIL 8/S-500
NO CAP STONE
WORK
9.0
ROOF
9.0
ROOF
9.0
ROOF
11.0
25'-0" ± 25'-0" ± 25'-0" ±
11.011.0
ELEVATION - 7
SCALE: 3/8"=1'-0"
ELEVATION - 8
SCALE: 3/8"=1'-0"
1.0
CORNER
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
7.0
4.0
1.0
3.0
4.0
3.0
7.0
1.0
9.0
ROOF
9.0
ROOF
25'-0" ± 28'-11" ±
INSTALL NEW S.S. FLASHING PER
DETAIL 6/S-500.RE-SET CAP STONES
AND REPAIR ROOF COATING AT
REBUILT PARAPET AREA
INSTALL NEW S.S. FLASHING PER
DETAIL 6/S-500.RE-SET CAP STONES
AND REPAIR ROOF COATING AT
REBUILT PARAPET AREA
AFTER
RE-SETTING,
TYP
11.0
AFTER
RE-SETTING,
TYP
11.0
KEY PLAN
SCALE: NONE
24 23
29 30
9 10
4 3
N
CONTROL
BLDG
PD-1 PD-2
PD-3 SD
W
N
E
S
DESCRIPTION
1.0
3.0
4.0
MARK
REPAIR LEGEND FOR SOUTH PD-1 ONLY
DENOTATION
CUT BACK EXISTING MORTAR JOINTS AND REPOINT WITH NEW
MORTAR WITHIN DEFINED AREA. REF DETAIL 4/S-500. (30 SQ FT )
SEE ELEVATION VIEW FOR ADDITIONAL REQUIRED WORK NOT NOTED HERE
EXISTING CRACKS, FAILING, MISSING OR OPEN MORTAR JOINTS.
OR
REMOVE LOOSE BRICK, BROKEN BRICK OR MISSING BRICK AND RESET
AS NECESSARY. ANY NEW BRICK TO MATCH EXISTING SIZE, SHAPE, AND
COLOR. (2 BRICK )
ADDITIONAL SPOT REPOINTING TO BE DETERMINED BY
ENGINEER DURING CONSTRUCTION PHASE
(300 SQ FT)
SEE ELEVATION DRAWINGS FOR ADDITIONAL REPAIRS NOT SCHEDULED HERE
5.0 REMOVE EXISTING SEALANT AND REPLACE. (60 LF )
REF 2/S-500
6.0
7.0 DEMO EXISTING 2 WYTHE BRICK AND RECONSTRUCT. COORD w/
SECTION 3/S-500 (130 SF )
8.0
CUT BACK EXISTING MORTAR JOINT AND REPOINT WITH NEW MORTAR.
REF DETAIL 4/S-500. (12 LF )
2.0
9.0 NOT SHOWNINJECTION PORTS AND INJECT ROOF CRACKS (250 LF).
REF DETAIL 5/S-500. ROOF LOCATIONS TO BE FIELD DETERMINED BY ENGINEER
NOT APPLICABLE THIS DIGESTER
NOT APPLICABLE THIS DIGESTER
NOT APPLICABLE THIS DIGESTER
ON ELEVATIONS
REMOVE ALL EXST JT MATERIAL, CLEAN JOINT AND INSTALL
NEW SEALANT PER 2/S-500 (135 LF )
10.0 NOT APPLICABLE THIS DIGESTER
11.0 Scale:
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING
VERIFY SCALE
ISSUE FOR
BID
Job No.
Date:
Sheet:
Drawn: Appd:
N o.
D at e By
D es cr ip tio n
Sheet No:
Drawing Copyright © 2026
One East Broad Street Suite 310
Bethlehem, PA. 18018 610.865.3000
S-100
SOUTH PRIMARY
DIGESTER PD-1
ELEVATIONS
SGY PMG
106246
NOTED
8/6/2026
FA
CA
DE
R
EH
AB
IL
IT
AT
IO
N
PR
IM
AR
Y
AN
D
SE
CO
N
DA
RY
D
IG
ES
TE
R
TA
N
KS
fo r th e
BE
TH
LE
H
EM
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
PL
AN
T
SH
IM
ER
SV
IL
LE
R D
BE
TH
LE
H
EM
PA
ELEVATION - 9
ELEVATION - 10
SCALE: 3/8"=1'-0"
ELEVATION - 11
SCALE: 3/8"=1'-0"
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
1.0
8.0
1.0
8.0
1.0
8.0
3.0
5.0
9.0
ROOF
9.0
ROOF
9.0
ROOF
25'-0" ±25'-0" ±25'-0" ±
ELEVATION - 12
SCALE: 3/8"=1'-0"
ELEVATION - 13
SCALE: 3/8"=1'-0"
ELEVATION - 14
SCALE: 3/8"=1'-0"
2.0
1.0
8.0
1.01.0
8.0
1.0
8.0
5.0
9.0
ROOF
9.0
ROOF
9.0
ROOF
25'-0" ±25'-0" ±25'-0" ±
ELEVATION - 15
SCALE: 3/8"=1'-0"
ELEVATION - 16
SCALE: 3/8"=1'-0"
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
2.0
1.0
8.0
2.0
1.0
8.0
1.0
2.0
4.0
REMOVE AND
RE-SET BRICK
1.0
5.0
9.0
ROOF
9.0
ROOF
29'-5" ±25'-0" ±
KEY PLAN
SCALE: NONE
24 23
29 30
9 10
4 3
N
CONTROL
BLDG
PD-1 PD-2
PD-3 SD
W
N
E
S
DESCRIPTION
1.0
3.0
4.0
MARK DENOTATION
CUT BACK EXISTING MORTAR JOINTS AND REPOINT WITH NEW
MORTAR WITHIN DEFINED AREA. REF DETAIL 4/S-500. (5 SQ FT )
EXISTING CRACKS, FAILING, MISSING OR OPEN MORTAR JOINTS.
OR
ADDITIONAL SPOT REPOINTING TO BE DETERMINED BY
ENGINEER DURING CONSTRUCTION PHASE
(300 SQ FT)
SEE ELEVATION DRAWINGS FOR ADDITIONAL REPAIRS NOT SCHEDULED HERE
5.0 REMOVE EXISTING SEALANT AND REPLACE. (60 LF )
REF 2/S-500
6.0
7.0
8.0
CUT BACK EXISTING MORTAR JOINT AND REPOINT WITH NEW MORTAR.
REF DETAIL 4/S-500. (60 LF )
2.0 PRESSURE WASH AND CLEAN SURFACE (80 SQ FT )
REPAIR LEGEND FOR NORTH PD-2 ONLY
INJECTION PORTS AND INJECT ROOF CRACKS (250 LF).
REF DETAIL 5/S-500. LOCATIONS TO BE FIELD DETERMINED BY ENGINEER9.0
NOT APPLICABLE THIS DIGESTER
NOT APPLICABLE THIS DIGESTER
REMOVE LOOSE BRICK, BROKEN BRICK OR MISSING BRICK AND RESET
AS NECESSARY. ANY NEW BRICK TO MATCH EXISTING SIZE, SHAPE, AND
COLOR. (2 BRICK )
SEE ELEVATION VIEW FOR ADDITIONAL REQUIRED WORK NOT NOTED HERE
INJECTION PORTS, REF DETAIL 5A/S-500 (205 MIN REQ'D)
AND APPLY SEALANTANT TO HORIZ JOINT, REF 2/S-500 (190 LF )
Scale:
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING
VERIFY SCALE
ISSUE FOR
BID
Job No.
Date:
Sheet:
Drawn: Appd:
N o.
D at e By
D es cr ip tio n
Sheet No:
Drawing Copyright © 2026
One East Broad Street Suite 310
Bethlehem, PA. 18018 610.865.3000
S-101
NORTH PRIMARY
DIGESTER PD-2
ELEVATIONS
SGY PMG
106246
NOTED
8/6/2026
FA
CA
DE
R
EH
AB
IL
IT
AT
IO
N
PR
IM
AR
Y
AN
D
SE
CO
N
DA
RY
D
IG
ES
TE
R
TA
N
KS
fo r th e
BE
TH
LE
H
EM
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
PL
AN
T
SH
IM
ER
SV
IL
LE
R D
BE
TH
LE
H
EM
PA
ELEVATION - 25
ELEVATION - 26
SCALE: 3/8"=1'-0"
ELEVATION - 27
SCALE: 3/8"=1'-0"
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
6.0
3.0
2.0
3.0
2.0
1.0
3.0
5.0
10.0 10.0 10.0
25'-0"+- 25'-0"+- 25'-0"+-
ELEVATION - 28
SCALE: 3/8"=1'-0"
ELEVATION - 29
SCALE: 3/8"=1'-0"
ELEVATION - 30
SCALE: 3/8"=1'-0"
REMOVE INSERT AND
PATCH BRICK
6.0 6.06.0
REMOVE (2)
INSERTS AND
PATCH BRICK
1.0
1.0
1.0
3.0
2.0
1.0
1.0
3.0
2.0
3.0
2.0
5.0
10.0 10.0 10.0
25'-0"+- 25'-0"+- 25'-0"+-
ELEVATION - 31
SCALE: 3/8"=1'-0"
ELEVATION - 32
SCALE: 3/8"=1'-0"
4.0
REMOVE INSERT
AND PATCH BRICK
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
6.0 6.01.0
1.0
1.0
1.0
3.0
3.0
2.0
5.0
10.0 10.0
25'-0"+- 29'-4 1/2"+-
KEY PLAN
SCALE: NONE
24 23
29 30
9 10
4 3
N
CONTROL
BLDG
PD-1 PD-2
PD-3 SD
W
N
E
S
DESCRIPTION
1.0
3.0
4.0
MARK DENOTATION
CUT BACK EXISTING MORTAR JOINTS AND REPOINT WITH NEW
MORTAR WITHIN DEFINED AREA. REF DETAIL 4/S-500. (170 SQ FT )
EXISTING CRACKS, FAILING, MISSING OR OPEN MORTAR JOINTS.
OR
ADDITIONAL SPOT REPOINTING TO BE DETERMINED BY
ENGINEER DURING CONSTRUCTION PHASE
(300 SQ FT)
SEE ELEVATION DRAWINGS FOR ADDITIONAL REPAIRS NOT SCHEDULED HERE
5.0 REMOVE EXISTING SEALANT AND REPLACE. (60 LF )
REF 2/S-500
6.0
7.0
8.0
CUT BACK EXISTING MORTAR JOINT AND REPOINT WITH NEW MORTAR.
REF DETAIL 4/S-500. (115 LF )
2.0 PRESSURE WASH AND CLEAN SURFACE (325 SQ FT )
REPAIR LEGEND FOR SOUTH PD-3 ONLY
9.0
REMOVE LOOSE BRICK, BROKEN BRICK OR MISSING BRICK AND RESET
AS NECESSARY. ANY NEW BRICK TO MATCH EXISTING SIZE, SHAPE,
AND COLOR. (2 BRICK )
SEE ELEVATION VIEW FOR ADDITIONAL REQUIRED WORK NOT NOTED HERE
NOT APPLICABLE THIS DIGESTER
10.0 VERIFY INTEGRITY OF TERM BAR AND FASTENERS SECURING GUTTER,
REPAIR OR REPLACE DAMAGED OR MISSING COMPONENTS, RE-SEAL
TERM BAR / GUTTER TO TANK WALL. (190LF)
CONCRETE CRACK REPAIR. REF DETAIL 5/S-500. (36LF)
NOT APPLICABLE THIS DIGESTER
NOT APPLICABLE THIS DIGESTER
Scale:
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING
VERIFY SCALE
ISSUE FOR
BID
Job No.
Date:
Sheet:
Drawn: Appd:
N o.
D at e By
D es cr ip tio n
Sheet No:
Drawing Copyright © 2026
One East Broad Street Suite 310
Bethlehem, PA. 18018 610.865.3000
S-102
SOUTH PRIMARY
DIGESTER PD-3
ELEVATIONS
SGY PMG
106246
NOTED
8/6/2026
FA
CA
DE
R
EH
AB
IL
IT
AT
IO
N
PR
IM
AR
Y
AN
D
SE
CO
N
DA
RY
D
IG
ES
TE
R
TA
N
KS
fo r th e
BE
TH
LE
H
EM
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
PL
AN
T
SH
IM
ER
SV
IL
LE
R D
BE
TH
LE
H
EM
PA
ELEVATION - 17
ELEVATION - 18
SCALE: 3/8"=1'-0"
ELEVATION - 19
SCALE: 3/8"=1'-0"
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
3.0
1.0
3.0
3.0
1.0
3.0
2.0
3.0
3.0
3.0
3.03.0
4.0
VERIFY PROPER DRAINAGE.
REPAIR, STRAIGHTEN, RE-SUPPORT
AND RESTORE SLOPE TO EXISTING
GUTTER THIS AREA
VERIFY PROPER DRAINAGE.
REPAIR, STRAIGHTEN, RE-SUPPORT
AND RESTORE SLOPE TO EXISTING
GUTTER THIS AREA
VERIFY PROPER DRAINAGE.
REPAIR, STRAIGHTEN, RE-SUPPORT
AND RESTORE SLOPE TO EXISTING
GUTTER THIS AREA
10.0 10.0 10.0
25'-0"+-25'-0"+-30'±
ELEVATION - 20
SCALE: 3/8"=1'-0"
ELEVATION - 21
SCALE: 3/8"=1'-0"
ELEVATION - 22
SCALE: 3/8"=1'-0"
3.0
3.03.0
3.0
5.0
3.0
VERIFY PROPER DRAINAGE.
REPAIR, STRAIGHTEN, RE-SUPPORT
AND RESTORE SLOPE TO EXISTING
GUTTER THIS AREA
10.0 10.0 10.0
25'-0"+- 25'-0"+- 25'-0"+-
ELEVATION - 23
SCALE: 3/8"=1'-0"
ELEVATION - 24
SCALE: 3/8"=1'-0"
C O
N
TR
O L
BL
D
G
CLEAN DEBRIS FROM
ALL WEEP JOINTS,
TYPICAL ALL
LOCATIONS AROUND
TANKS
3.0
3.0
1.0
3.0
5.0
3.0
VERIFY PROPER DRAINAGE.
REPAIR, STRAIGHTEN, RE-SUPPORT
AND RESTORE SLOPE TO EXISTING
GUTTER THIS AREA
10.0 10.0
25'-0"+-25'-0"+-
KEY PLAN
SCALE: NONE
24 23
29 30
9 10
4 3
N
CONTROL
BLDG
PD-1 PD-2
PD-3 SD
W
N
E
S
DESCRIPTION
1.0
3.0
4.0
MARK DENOTATION
CUT BACK EXISTING MORTAR JOINTS AND REPOINT WITH NEW
MORTAR WITHIN DEFINED AREA. REF DETAIL 4/S-500. (475 SQ FT )
EXISTING CRACKS, FAILING, MISSING OR OPEN MORTAR JOINTS.
OR
ADDITIONAL SPOT REPOINTING TO BE DETERMINED BY
ENGINEER DURING CONSTRUCTION PHASE
(300 SQ FT)
SEE ELEVATION DRAWINGS FOR ADDITIONAL REPAIRS NOT SCHEDULED HERE
5.0 REMOVE EXISTING SEALANT AND REPLACE. (60 LF )
REF 2/S-500
6.0
7.0
8.0
CUT BACK EXISTING MORTAR JOINT AND REPOINT WITH NEW MORTAR.
REF DETAIL 4/S-500. (8 LF )
2.0 PRESSURE WASH AND CLEAN SURFACE (70 SQ FT )
REPAIR LEGEND FOR NORTH SD-2 ONLY
9.0
REMOVE LOOSE BRICK, BROKEN BRICK OR MISSING BRICK AND RESET
AS NECESSARY. ANY NEW BRICK TO MATCH EXISTING SIZE, SHAPE, AND
COLOR. ( 1 BRICK )
SEE ELEVATION VIEW FOR ADDITIONAL REQUIRED WORK NOT NOTED HERE
NOT APPLICABLE THIS DIGESTER
10.0
NOT APPLICABLE THIS DIGESTER
NOT APPLICABLE THIS DIGESTER
NOT APPLICABLE THIS DIGESTER
VERIFY INTEGRITY OF TERM BAR AND FASTENERS SECURING GUTTER,
REPAIR OR REPLACE DAMAGED OR MISSING COMPONENTS, RE-SEAL
TERM BAR / GUTTER TO TANK WALL. (190LF) Scale:
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING
VERIFY SCALE
ISSUE FOR
BID
Job No.
Date:
Sheet:
Drawn: Appd:
N o.
D at e By
D es cr ip tio n
Sheet No:
Drawing Copyright © 2026
One East Broad Street Suite 310
Bethlehem, PA. 18018 610.865.3000
S-103
NORTH SECONDARY
DIGESTER SD
ELEVATIONS
SGY PMG
106246
NOTED
8/6/2026
FA
CA
DE
R
EH
AB
IL
IT
AT
IO
N
PR
IM
AR
Y
AN
D
SE
CO
N
DA
RY
D
IG
ES
TE
R
TA
N
KS
fo r th e
BE
TH
LE
H
EM
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
PL
AN
T
SH
IM
ER
SV
IL
LE
R D
BE
TH
LE
H
EM
PA
SOUTH ELEVATION
NORTH ELEVATION
SCALE: 3/8"=1'-0"
WEST ELEVATION
SCALE: 3/8"=1'-0"
3.0 1.0
REMOVE
BROKEN
CAPSTONE
PIECE AND
PATCH PER
DETAIL 1/S-500
INSIDE
CORNER
RE-SET
DISPLACED CAP
STONE, RE-SEAL
JOINT PER 2/S-500
REPLACE (3)
BROKEN BRICK.
CLEAN AND COAT
ALL PORTIONS OF
EXPOSED STEEL
LINTEL. REPOINT
ADJACENT BRICK
JOINTS. SIM OPP
SIDE OF WINDOW
REPLACE (5)
BROKEN BRICK,
THIS WINDOW.
CLEAN AND
COAT ALL
PORTIONS OF
EXPOSED STEEL
LINTEL. REPOINT
ADJACENT
BRICK JOINTS
REMOVE BED
JOINT MORTAR AT
LINTEL BEARING,
CLEAN AND COAT
ALL PORTIONS OF
EXPOSED STEEL
LINTEL. REPOINT
JOINT. TYP BOTH
SIDES OF WINDOW
REMOVE BED
JOINT MORTAR AT
LINTEL BEARING,
CLEAN AND COAT
ALL PORTIONS OF
EXPOSED STEEL
LINTEL. REPOINT
JOINT. TYP BOTH
SIDES OF WINDOW
1.0
3.0
3.0
1.0
4.0
EAST ELEVATION
SCALE: 3/8"=1'-0"
3.0 3.0
1.0
RE-SEAL JOINT
PER 2/S-500
KEY PLAN
SCALE: NONE
24 23
29 30
9 10
4 3
N
CONTROL
BLDG
PD-1 PD-2
PD-3 SD
W
N
E
S
DESCRIPTION
1.0
3.0
4.0
MARK DENOTATION
CUT BACK EXISTING MORTAR JOINTS AND REPOINT WITH NEW
MORTAR WITHIN DEFINED AREA. REF DETAIL 4/S-500. (30 SQ FT )
EXISTING CRACKS, FAILING, MISSING OR OPEN MORTAR JOINTS.
OR
ADDITIONAL SPOT REPOINTING TO BE DETERMINED BY
ENGINEER DURING CONSTRUCTION PHASE
(100 SQ FT)
SEE ELEVATION DRAWINGS FOR ADDITIONAL REPAIRS NOT SCHEDULED HERE
5.0
6.0
7.0
8.0
CUT BACK EXISTING MORTAR JOINT AND REPOINT WITH NEW MORTAR.
REF DETAIL 4/S-500. (25 LF )
2.0
REPAIR LEGEND FOR CONTROL BUILDING ONLY
9.0
SEE ELEVATION VIEW FOR ADDITIONAL REQUIRED WORK NOT NOTED HERE
NOT APPLICABLE THIS BUILDING
10.0 NOT APPLICABLE THIS BUILDING
NOT APPLICABLE THIS BUILDING
NOT APPLICABLE THIS BUILDING
NOT APPLICABLE THIS BUILDING
NOT APPLICABLE THIS BUILDING
NOT APPLICABLE THIS BUILDING
REMOVE LOOSE BRICK, BROKEN BRICK OR MISSING BRICK AND RESET
AS NECESSARY. ANY NEW BRICK TO MATCH EXISTING SIZE, SHAPE, AND
COLOR. (8 BRICK )
REMOVE ALL EXST JT MATERIAL, CLEAN JOINT AND INSTALL
NEW SEALANT PER 2/S-500 (6 LF )
11.0 Scale:
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING
VERIFY SCALE
ISSUE FOR
BID
Job No.
Date:
Sheet:
Drawn: Appd:
N o.
D at e By
D es cr ip tio n
Sheet No:
Drawing Copyright © 2026
One East Broad Street Suite 310
Bethlehem, PA. 18018 610.865.3000
S-104
CONTROL BUILDING
ELEVATIONS
SGY PMG
106246
NOTED
8/6/2026
FA
CA
DE
R
EH
AB
IL
IT
AT
IO
N
PR
IM
AR
Y
AN
D
SE
CO
N
DA
RY
D
IG
ES
TE
R
TA
N
KS
fo r th e
BE
TH
LE
H
EM
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
PL
AN
T
SH
IM
ER
SV
IL
LE
R D
BE
TH
LE
H
EM
PA
PLAN
SECTION
TYPICAL PATCH REPAIR DETAIL
SCALE: NONE
S-500
TYPICAL SEALANT DETAIL
SCALE: NONE
S-500
TYPICAL BRICK VENEER RECONSTRUCTION
SCALE: NONE
S-500
EXTENTS OF
CONCRETE SPALL
SAW-CUT BEYOND
PERIMETER OF SPALL
TO A DEPTH OF 1/2"
MIN
PATCH AREA TO
MATCH SURROUNDING
EXISTING CONCRETE
ELEVATION w/ REPAIR
MATERIAL, SEE
OPTIONS
EXIST SLAB BONDING AGENT,
SEE NOTES
D
EP
TH
REPAIR COPING CAP - SIKATOP-123 PLUS REPAIR MORTAR
PREPARATION: REMOVE ALL DETERIORATED CONCRETE, DIRT, OIL, SURFACE
GREASE, AND ALL BOND-INHIBITING MATERIALS FROM SURFACE. BE SURE
REPAIR AREA IS NOT LESS THAN 1/8 INCH (3MM) IN DEPTH. PREPARATION WORK
SHOULD BE DONE BY HIGH PRESSURE WATER BLAST TO OBTAIN AN EXPOSED
AGGREGATE SURFACE PROFILE OF +/- 1/16 INCH. SUBSTRATE SHOULD BE
SATURATED SURFACE DRY (SSD) WITH NO STANDING WATER DURING
APPLICATION.
PRIMING: APPLY A SCRUB COAT OF SIKATOP-123 PLUS PRIOR TO PLACEMENT
OF THE MORTAR. THE REPAIR MORTAR HAS TO BE APPLIED INTO THE WET
SCRUB COAT BEFORE IT DRIES.
MIXING: POUR COMPONENT 'A' INTO MIXING CONTAINER. ADD COMPONENT 'B'
WHILE MIXING CONTINUOUSLY. MIX MECHANICALLY WITH LOW SPEED DRILL
(400-600 RPM) AND MIXING PADDLE OR MORTAR MIXER. MIX TO A UNIFORM
CONSISTANCY. MAXIMUM 3 MIINUTES. REFERENCE MANUFACTURER'S
INSTRUCTIONS FOR ADDITIONAL INFORMATION.
APPLICATION & FINISH: THE MIXED SIKATOP-123 PLUS MUST BE WORKED WELL
INTO THE PRIMED SUBSTRATE, FILLING ALL PORES AND VOIDS. COMPACT WELL.
FORCE MATERIAL AGAINST SAW-CUT OR FORMED EDGES OF REPAIR WORKING
TOWARDS THE CENTER. AFTER FILLING REPAIR, CONSOLIDATE, THEN SCREED.
FINISH WITH STEEL, WOOD, PLASTIC, FLOATES, OR DAMP SPONGES, AS
NECESSSARY TO MATCH THE EXISTING SURFACE TEXTURE. WHERE MULTIPLE
LIFTS ARE REQUIRED, SCORE TOP SURFACE ON EACH LIFT TO PRODUCE A
ROUGHENED SUBSTRATE FOR NEXT LIFT. ALLOW PRECEDING LIFT TO REACH
INITIAL SET BEFORE APPLYING FRESH MATERIAL. SATURATE SURFACE OF THE
LIFT WITH CEAN WATER. IF PREVIOUS LAYERS ARE OVER 48 HOURS OLD,
MECHANICALLY PREPARE THE SUBSTRATE AND DAMPEN.
CURING: MOIST CURE WITH WET BURLAP AND POLYETHYLENE OR A FINE MIST
OF WATER. MOST CURING SHOULD COMMENCE IMMEDIATELY AFTER FINISHING.
PROTECT FRESHLY APPLIED MORTAR FROM DIRECT SUNLIGHT, WIND, RAIN AND
FROST.
VERTICAL CONTROL JOINTS JOINT REPAIR - SIKAFLEX-15LM SEALANT
COPING CAP JOINT REPAIR - SIKAFLEX-1a SEALANT
PD-2 HORIZONTAL JOINT REPAIR-SIKAFLEX PRIMER 429
WITH SIKAFLEX-15LM SEALANT
DESCRIPTION: ONE PART, LOW-MODULUS POLYURETHANE SEALANTS.
PREPARATION: CLEAN ALL SURFACES. JOINT WALLS MUST BE SURFACE SOUND,
CLEAN, DRY, FROST-FREE, AND FREE OF OIL AND GREASE. CURING COMPOUND
RESIDUES AND MANY OTHER FOREIGN MATTERS MUST BE THOROUGHLY REMOVED.
CLEAN BY MECHANICAL METHODS TO EXPOSE A SOUND SURFACE. INSTALL BOD
BREAKER TAPE OR BACKER ROD TO PREVENT BOND AT BASE OF JOINT.
APPLICATION: RECOMMENDED APPLICATION TEMPERATURES, 40 DEG - 100 DEG F.
FOR COLD-WEATHER APPICATIONS, PRE-CONDITIONING UNITS TO APPROXIMATELY 70
DEG F IS RECOMMENDED. ONLY APPLY SEALANT TO CLEAN, SOUND, DRY, AND
FROST-FREE SUBSTRATES. WHEN APPLYING SEALANT, AVOID AIR ENTRAPMENT. DRY
TOOLING IS RECOMMENDED. DO NOT TOOL WITH DETERGENT OR SOAP SOLUTIONS.
DO NOT APPLY TO DAMP OR WET SURFACES. JOINT DIMENSION SHOULD ALLOW FOR
¼ INCH MINIMUM AND ½ INCH MAXIMUM THICKNESS FOR SEALANT. PROPER DESIGN
IS 2:1 WIDTH TO DEPTH RATIO.
ALL APPLICATIONS TO FOLLOW MANUFACTURERS PRODUCT INSTALLATION
INSTRUCTIONS.
NEW CLOSED CELL
W/ SURFACE SKIN
BACKER ROD
NEW SPECIFIED
SEALANT JOINT
COPING OR BRICK
TO
/2
STAINLESS STEEL 345-BT
FLEXIBLE TIE ANCHOR AS MFR
BY HOHMANN & BARNARD.
SPACE AT 16" o.c. HORIZ AND
VERT. SECURE TO CONCRETE
TANK WALL w/ (1) 1/4"Ø x 2 1/2"
S.S. TAPCON ANCHOR
(2) WYHT BRICK RECONSTRUCTION
TO MATCH EXISTING BRICK SIZE,
SHAPE, COLOR AND PATTERN.
MORTAR TO MATCH EXISTING.
TOOTH IN MASONRY AT SIDES OF
DEMO EXTENTS
8" MAX FROM TOP
OF VENEER OR
CONCRETE TANK
WALL, VIF
1/ 2"
M
IN
R
EP
AI
R
1/4
"o
.c
H O
R
IZ
V
ER
T
SEE DETAIL 6/S-500 AND DIGESTER
ELEVATION VIEWS FOR TOP OF
PARAPET RECONSTRUCTION
WHERE APPLICABLE, (NOT SHOWN
HERE).
VERTICAL CONTROL JOINTS AND
COPING CAP HEAD JOINTS
ROUT JOINT AFTER
CRACK INJECTION,
APPLY SPECIFIED
JOINT SEALANT
CONCRETE
PD-2 HORIZONTAL JOINT
INJECTED CONCRETE
COLD JOINT
TYPICAL REPOINTING DETAIL
SCALE: NONE
S-500
SAWCUT BACK EXST
JOINT (3/4" MIN), &
CLEAN OUT ALL
LOOSE MORTAR &
DEBRIS, & REPOINT
w/ NEW MORTAR. DO
NOT CUT OR DAMAGE
BRICK OR ENLARGE
JOINTS
LAP DRIP EDGE
INTACT, DO NOT
TRIM
LA
P
D R
IP
E
D G
E
IN
TA
C
T, D
O N
O T
TR
IM
EDGE OF PIECE
8" M
IN
EDGE OF PIECE 1
CUT / REMOVE HEMMED
DRIP EDGE OF
UNDERLYING S.S.
FLASHING THIS SIDE
1/8" x 1" ELASTIC BUTYL
TAPE CONTINUOUS,
EXTEND FROM DRIP EDGE
TO TRIMMED EDGE AT
HEM
SE
LF
AD
H
ER
ED
M
EM
BR
AN
E
PLAN VIEW A-A
6" 6"
ROOF
SIDE
BELOW LAP
ABOVE LAP
1" 1"
SEE PLAN VIEW FOR SELF
ADHERED MEMBRANE
AND BUTYL MASTIC NOT
SHOWN HERE
FULL MORTAR BED
8" LA
P
A
A
FABRICATED / CURVED
STAINLESS STEEL CAP
FLASHING
PROVIDE CONT SEALANT JOINT
BETWEEN TOP OF MASONRY AND
UNDERSIDE OF S.S. FLASHING ALONG
BOTH INTERIOR AND EXTERIOR
EDGES OF WALL USING SEALANT
CONC TANK
ROOF
INSIDE FACE OF
BRICK PARAPET
SEE DETAIL 7/S-500 FOR
CAP STONE SETTING
PINS, NOT SHOWN HERE
STAINLESS STEEL PARAPET FLASHING DETAILS
SCALE: NONE
S-500
DETAILS SHOWN FOR CONSTRUCTION REFERENCE ONLY, DO NOT
SCALE. FIELD VERIFY ALL CONDITIONS AND REQUIRED DIMENSION
PRIOR TO FABRICATING CURVED FLASHING SECTIONS.
FABRICATE S.S. FLASHING SECTIONS IN 4'-0" MINIMUM SECTIONS.
1.
2.
NO SCALE
FLASHING HEIGHT TO
MATCH EXST, OR A S REQ'D TO
LAP ROOF COATING SYSTEM.
FIELD VERIFY CONDITIONS
PRIOR TO FABRICATION OF
NEW FLASHING
NOTE: NOT SHOWN
CURVED HERE
EXTEND SIKADUR
COMBIFLEX SG
SYSTEM FULL
EXTENT OF
PARAPET
RECONSTRUCTION.
SEAL ALL EDGES w/
MFR. APPROVED
ADHESIVE.
ALSO COORDINATE
WITH 8/S-500
S-500
SETTING PIN COVER DETAIL
SCALE: NONE
CAP STONE STAINLESS STEEL
1/2"Ø x 4"lg S.S. DOWEL w/ 1/8"thk x 2 1/2"o.d. ROUND S.S.
PLATE WASHER WELDED AT
MID-HEIGHT
CMU SUBSTRATE
S.S. THROUGH WALL
FLASHING
M-1 SEALANT
SELF ADHERED
MEMBRANE
RE-USE EXISTING HOLES.
CLEAN OUT EXISTING HOLES
w/ COMPRESSED AIR. RE-DRILL
IF NECESSARY TO REMOVE
REMAINING MORTAR
1/8
EQ TY
P
7"
8"
SELF ADHERED
MEMBRANE
S.S. DOWEL AND
ROUND WASHER
PLAN VIEW
2 1/2"Ø
OUTSIDE
8"x7" SELF-ADHERED MEMBRANE w/ 3/4"Ø
PUNCHED HOLE OVER
DOWEL WASHER
CONTINUOUS
WELD
3/4"Ø HOLE IN
LIMESTONE
M-1 STRUCTURAL
ADHESIVE
INSTALL EXCESS MORTAR
AROUND BASE OF PIN
PRIOR TO SETTING COPING
STONE TO LOCK STONE
INTO PLACE AT BASE
LIMESTONE COPING
TYPICAL CRACK INJECTION DETAIL
SCALE: NONE
5, 5A S-500
REMOVE EXST SEALANT.
SEAL PORTS AND JOINT
WITH SIKADUR 31 HI-MOD
GEL.
EXST CONC
SEPARATION / CRACK
INJECTION
PORTS
INJECT / SEAL PORTS
AND CRACK WITH
MATERIAL NOTED BY
REPAIR TYPE
AFTER INJECTION AND PROPER CURE TIME, REMOVE INJECTION PORTS AND JOINT SEALANT. PREPARE JOINT PER MFR SPECIFICATIONS TO RECIEVE NEW SEALANT.
12"o.c. UNO
5/S-500:
CONCRETE CRACK REPAIR (EPOXY INJECTION):
1. CRACK REPAIR: SIKADUR 35 HI MOD LV (FOR APPLICATION WITH PNEUMATIC
PUMP).
2. SET INJECTION PORTS ALONG THE CRACK AND SEAL PORTS AND CRACK WITH
SIKADUR 31 HI-MOD GEL.
3. WHEN SIKADUR 31 EPOXY SEAL HAS CURED, INJECT SIKADUR 35 HI-MOD LV OR
SIKA CRACK WELD INTO PORTS WITH STEADY PRESSURE. START INJECTION
PROCESS INTO THE FIRST (LOWER) PORT. WHEN RESIN BEGINS TO FLOW FROM
THE ADJACENT PORT, CLOSE OFF THE FIRST PORT AND DISCONNECT THE HOSE.
RECONNECT TO THE SECOND PORT AND INJECT UNTIL RESIN STARTS TO FLOW
FROM THE THIRD PORT. REPEAT THIS PROCESS UNTIL THE WHOLE CRACK HAS
BEEN INJECTED.
4. AFTER THE RESIN HAS BEEN ALLOWED TO CURE, THE INJECTION PORTS AND
CAPSEAL SHOULD BE REMOVED AND ANY HOLES OR VOIDS SHOULD BE FILLED.
5. FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR SURFACE
PREPARATION, PRODUCT MIXING, APPLICATION, CLEAN UP AND CURING.
5A/S-500:
CONCRETE HORIZONTAL COLD JOINT INJECTION (PD-2):
PREPARATION:
MECHANICALLY CLEAN AND REMOVE ALL EXISTING MATERIAL ALONG ENTIRE LENGTH OF
HORIZONTAL CONCRETE COLD JOINT CEE NOTCH.
COLD JOINT INJECTION: SIKAFIX HH HYDROPHILIC, FOR APPLICATION WITH PNEUMATIC
PUMP.
MIXING:
PRIOR TO INSTALLATION THE MATERIAL SHOULD BE AGITATED VIGOROUSLY SHAKING THE 5
GALLON PAIL OR BY MIXING WITH A JIFFY MIXER, BUNG MIXER OR BY HAND.
APPLICATION METHOD / TOOLS:
1. BEGIN BY DRILLING 5/8” DIAMETER HOLES ALONG THE LENGTH OF THE CRACK THROUGH
THE SUBSTRATE. INSTALL INJECTION PACKERS IN THE HOLES AND TIGHTEN. SPACING OF
THE INJECTION PORTS TO BE 12"OC.
2. SEAL CONTINUOUS VEE NOTCH JOINT AND AROUIND INJECTION PORTS WITH SIKADUR 31
HI-MOD GEL. ALLOW TO CURE
3. FLUSH THE DRILLED HOLES WITH WATER TO REMOVE DEBRIS AND DRILL DUST FROM THE
HOLES AND CRACK. THIS WILL ALSO ENSURE THAT THE CRACK IS WET ENOUGH TO
REACT WITH THE GROUT WHEN IT IS INTRODUCED TO THE CRACK. BEGIN THE INJECTION
OF THE GROUT AT THE FIRST PACKER FLUSHED FOR A HORIZONTAL CRACK. DURING THE
INJECTION, THE SIKAFIX® HH HYDROPHILIC WILL DISPLACE WATER FROM THE
CRACK/ADJACENT PORTS. CONTINUE INJECTING UNTIL THE GROUT APPEARS AT THE
ADJACENT PACKER HOLE. STOP PUMPING AND REINSTALL THE PACKER IN THE ADJACENT
HOLE. TIGHTEN THE PACKER AND MOVE THE PUMP HOSE TO THE SECOND PACKER AND
BEGIN INJECTION. CONTINUE THE PROCESS UNTIL 3-4 PACKERS HAVE BEEN GROUTED.
DISCONNECT AND GO BACK TO THE FIRST PACKER AND INJECT ALL THE PORTS FOR THE
SECOND TIME IF NECESSARY. SOME PORTS MAY TAKE ADDITIONAL GROUT, WHICH WILL
FILL UP AND FURTHER DENSIFY THE MATERIAL IN THE CRACK. CONTINUE PROCESS UNTIL
THE LENGTH OF THE PREPARED CRACK IS INJECTED. NOTE: INJECTION PRESSURE WILL
VARY FROM 200 PSI TO 2500 PSI DEPENDING ON THE WIDTH OF THE CRACK, THICKNESS
OF CONCRETE AND CONDITION OF CONCRETE.
4. AFTER THE RESIN HAS BEEN ALLOWED TO CURE, THE INJECTION PORTS AND CAPSEAL
SHOULD BE REMOVED AND ANY HOLES OR VOIDS SHOULD BE FILLED.
5. FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR SURFACE PREPARATION,
PRODUCT MIXING, APPLICATION, CLEAN UP AND CURING.
6. AFTER INJECTION AND PROPER CURE TIME, REMOVE INJECTION PORTS AND JOINT
EPOXY. PREPARE JOINT PER MFR SPECIFICATIONS TO RECEIVE NEW SPECIFIED
SEALANT.
CONSULT AND FOLLOW MANUFACTURER FOR FULL INSTRUCTIONS AND PROCEDURES FOR ALL MATERIALS
THROUGH WALL SCUPPER DETAILS
SCALE: NONE
S-500
THRU WALL SCUPPER BOX DETAIL
3 SIDED FLANGE, INSIDE FACE OF
PARAPET. SET BOTTOM FLUSH TO
TOP OF CONCRETE TANK
TOP OF CONCRETE TANK
INSIDE VERT PARAPET WALL FACE
SLIP FIT OF INTERIOR SCUPPER
SECTION INTO EXTERIOR SECTION.
PROVIDE ADEQUATE URETHANE
CAULK ALL SIDES PRIOR TO SLIP FIT
ASSEMBLY TO ENSURE PERMANENT
WATERTIGHT SEAL
PROVIDE S.S. TAPCON ANCHORS
THRU SCUPPER FLANGES TO
PARAPET
6" (MIN.)
(M
IN
SCUPPER SECTIONS TO BE
CONSTRUCTED FROM 18ga. (MIN)
T304 STAINLESS STEEL.
ALL NON BRAKE BENT CORNERS,
FOLDS OR FLANGES TO BE
CONTINUOUS WELD.
CAULK ALL AROUND
S.S. THRU WALL SCUPPER
BOX. SEE DETAIL BELOW FOR
CONSTRUCTION
MASONRY PARAPET TO BE
RECONSTRUCTED, SEE
ELEVATIONS. FIELD VERIFY
AND MATCH EXISTING BRICK
RECONSTRUCT WALL
OPENING AS REQ'D FOR NEW
THRU WALL SCUPPER BOX AT
EXISTING LOCATION.
SET SCUPPER BOX FLANGE IN
CONTINUOUS BED OF
URETHANE CAULK PRIOR
TO FINAL INSTALLATION
SIKADUR COMBIFLEX SG SYSTEM. SEAL ALL EDGES w/ MFR.
APPROVED ADHESIVE. EXTEND SIKADUR COMBIFLEX SG
SYSTEM FULL EXTENT OF PARAPET RECONSTRUCTION.
CUT SIKADUR
COMBIFLEX 3 SIDES AT
SCUPPER, FOLD / LAP
BOTTOM PORTION INTO
FLOOR OF SCUPPER
BOX.
NEW CURVED S.S. THRU WALL
FLASHING, SEE DETAIL 6/S-500
EXIST COPING CAPS
TO BE RE-SET
NEW SCUPPER
GUTTER BOX AND
DOWNSPOUT
TUCK SCUPPER
GUTTER UNDER
SCUPPER BOX
FLANGE
3" (MIN)
ALL SIDES, TYP
4 SIDED FLANGE, OUTSIDE
FACE OF PARAPET.
SEAL PERIIMETER
VIEWS PROVIDED FOR CONSTRUCTION REFERENCE ONLY, DO NOT SCALE
CONC TANK WALL AND ROOF
TANK ROOF SEALED w/
SIKADUR BROADCAST EPOXY
OVERLAY SYSTEM, FIELD
VERIFY
4"
PERIMETER SEALANT
FL
AS
H
IN
G H
EI
G
H T
TO
M
AT
C
H E
XS
T, O R
A S
R
EQ
'D
TO
L
AP
R O
O F
C O
AT
IN
G
SY
ST
EM
. F
IE
LD
V
ER
IF
Y C
O N
D
IT
IO
N
S
PR
IO
R
T O
FA
BR
IC
AT
IO
N
O F
N
EW
FL
AS
H
IN
G
4"
EXTEND SIKADUR
COMBIFLEX 8" MIN PAST
BRICK RECONSTRUCTION
Scale:
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING
VERIFY SCALE
ISSUE FOR
BID
Job No.
Date:
Sheet:
Drawn: Appd:
N o.
D at e By
D es cr ip tio n
Sheet No:
Drawing Copyright © 2026
One East Broad Street Suite 310
Bethlehem, PA. 18018 610.865.3000
S-500
SECTIONS AND DETAILS
SGY PMG
106246
NOTED
6/26/2026
FA
CA
DE
R
EH
AB
IL
IT
AT
IO
N
PR
IM
AR
Y
AN
D
SE
CO
N
DA
RY
D
IG
ES
TE
R
TA
N
KS
fo r th e
BE
TH
LE
H
EM
W
AS
TE
W
AT
ER
T
RE
AT
M
EN
T
PL
AN
T
SH
IM
ER
SV
IL
LE
R D
BE
TH
LE
H
EM
PA
| Sheets and Views |
| S-001 |
| Sheets and Views |
| S-100 |
| Sheets and Views |
| S-101 |
| Sheets and Views |
| S-102 |
| Sheets and Views |
| S-103 |
| Sheets and Views |
| S-104 |
| Sheets and Views |
| S-500 |
File details come from the government source that posted it. Updated .