Clarifier Blowdown Upgrades – Bid Documents Summary

This is a set of bid documents and construction drawings prepared by GHD for the Borough of Chambersburg Water Treatment Plant Clarifier Blowdown Upgrades project located at 7659 Lincoln Way East, Fayetteville, PA 17222. The project scope encompasses installation of approximately 500 linear feet of 8-inch diameter HDPE pipe within existing plant drain piping (24", 30", and 36" diameter), approximately 110 linear feet of buried 8-inch diameter PVC pipe, two new manholes with frames and covers, modifications to an existing drain manhole, and replacement of an existing buried gate valve. Additional work includes demolition and modifications to two clarifier valve pits to accommodate new piping and valves, magnetic flow meters, electric valve actuators, platforms, ladder access, and electrical demolition and upgrades. The project also requires demolition of an existing battery backup tower with associated conduit and conductor removal in the operations room, reconnection to an existing transformer, cleanout of the existing sedimentation lagoon via the plant's licensed hauler, and complete lawn restoration. Sealed bids are due February 10, 2026, at 10:00 AM via the PennBid online system. Bid security of ten percent of the maximum bid price is required, along with performance and payment bonds each in the amount of 100 percent of the contract price and an anti-collusion affidavit.

The contract is subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania Department of Labor. The bid documents include comprehensive civil, structural, process, and electrical drawings with detailed specifications for site layout, piping installation, manhole construction, erosion and sediment control measures, and electrical system modifications. The project is located in Greene Township, Franklin County, Pennsylvania, within the Conococheague Creek watershed (Cold Water Fishes, Migratory Fishes classification). Utility notification is required through the Pennsylvania One Call System at 1-800-242-1776 or 811, with contacts provided for nine utility companies and municipal authorities in the area. The documents specify field verification requirements for existing infrastructure prior to construction and coordinate with approved equipment shop drawings for all piping and connections.

View the file

Other files

File Type Posted
1-CB Clarifier Blowdown Upgrade Bid Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Plot Date: Filename:6 January 2026 - 9:34 AM G:\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\General\11224278-G00001.dwgPlotted By: Mike Wiestling

IssueNo. Drawn Approved Date This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

COVER SHEET

G-00001

M. WIESTLING C. ANGLE

M. WIESTLING T. PARTHEMORE

AS SHOWN

AREA MAP LOCATION MAP

PROJECT

LOCATION

HARRISBURG

YORK

LANCASTER

PHILADELPHIA

PITTSBURGH

ERIE

STATE COLLEGE

WILLIAMSPORT

SCRANTON

CHAMBERSBURG

SITE ADDRESS:

WATER TREATMENT PLANT

7659 LINCOLN WAY EAST

FAYETTEVILLE, PA 17222

PROJECT

LOCATION

BOROUGH OF CHAMBERSBURG

WATER TREATMENT PLANT

CLARIFIER BLOWDOWN UPGRADES

GREENE TOWNSHIP, FRANKLIN COUNTY, PA

BID DOCUMENTS

JANUARY 2026

CALL BEFORE YOU DIG

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE

FOR CONSTRUCTION PHASE AND 10 WORKING

DAYS IN DESIGN STAGE - STOP CALL

PENNSYLVANIA ONE CALL SYSTEM, INC.

1-800-242-1776 OR 811

POCS SERIAL NUMBER: 20252963793

UNDERGROUND UTILITIES ACT:

THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF THE PENNSYLVANIA GENERAL ASSEMBLY UNDERGROUND UTILITY LINE PROTECTION ACT, PA ACT 287 OF 1974, AS AMENDED BY ACT 50 OF 2017, 73 P.S. § 176 ET SEQ., FOR NOTIFICATION OF UTILITIES BEFORE EXCAVATION IN THE CONTRACT AREA. THE ONE UNDERGROUND UTILITIES CALL NUMBER IS 800-242-1776 OR 811.

INDIVIDUAL LOCAL UTILITIES ARE AS FOLLOWS:

COMPANY: CABLE PROTECTION SERVICES INC

ADDRESS: PO BOX 4816

MIDLOTHIAN, VA. 23112

CONTACT: DEBBIE KING

EMAIL: debbie_king@cableps.com

PHONE: 804-562-3409

COMPANY: STAKECENTER

ADDRESS: 7025 ALBERT PICK ROAD

SUITE 600

GREENSBORO, NC. 27409

CONTACT: STAKECENTER DISPATCH

EMAIL: mirasol.garza@brightspeed.com

PHONE: 801-364-1063

COMPANY: COLUMBIA GAS OF PA INC

ADDRESS: 1600 DUBLIN RD

COLUMBUS, OH. 43215

CONTACT: LISA COLLINS

EMAIL: ldugan@nisource.com

PHONE: 614-325-5961

COMPANY: GREENE TOWNSHIP MUNICIPAL AUTHORITY

ADDRESS: 4182 SUNSET PIKE

CHAMBERSBURG, PA. 17202

CONTACT: STEVE BRECHBILL

EMAIL: sbrechbill@greenetownshipma.com

PHONE: 717-263-5324

COMPANY: GREENE TOWNSHIP

ADDRESS: 1145 GARVER LN

CHAMBERSBURG, PA. 17202

CONTACT: TRAVIS BROOKENS

EMAIL: tbrookens@greenetwp.us

PHONE: 717-263-9160

COMPANY: GUILFORD WATER AUTHORITY

ADDRESS: 115 SPRING VALLEY RD

CHAMBERSBURG, PA. 17202

CONTACT: JEN COOLEY

EMAIL: jcooley@guilfordtwp.us

PHONE: 717-263-2813

COMPANY: PENNSYLVANIA ELECTRIC CO

ADDRESS: 341 WHITE POND DR

AKRON, OH. 44320

CONTACT: MELLYSSA ADAMS

EMAIL: madams@firstenergycorp.com

PHONE: 330-436-4013

COMPANY: CHAMBERSBURG BOROUGH

ADDRESS: 100 S 2ND ST

PO BOX 1009

CHAMBERSBURG, PA. 17201

CONTACT: DEVON COSEY

EMAIL: dcosey@chambersburgpa.gov

PHONE: 717-251-2435

COMPANY: ENERGY TRANSFER

ADDRESS: 1300 MAIN ST

HOUSTON, TX. 77002

CONTACT: SAUL SHAW

EMAIL: saul.shaw@energytransfer.com

PHONE: 713-989-7342

COMPANY: TEXAS EASTERN/ENBRIDGE

ADDRESS: SUITE 400

2601 MARKET PLACE

HARRISBURG, PA. 17110

CONTACT: RYAN LUMBATIS

EMAIL: ryan.lumbatis@enbridge.com

PHONE: 717-540-8330

N http://www.ghd.com/

Plot Date: Filename:9 January 2026 - 10:43 AM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\General\11224278-G00002.dwgPlotted By: Mike Wiestling

This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

GENERAL NOTES, LEGENDS AND SHEET INDEX

G-00002

M. WIESTLING C. ANGLE

M. WIESTLING T. PARTHEMORE

AS SHOWN

SINGLE LINE

90° BEND

45° BEND

TEE

LATERAL WYE

REDUCER

PLUG VALVE

GATE VALVE

WELDED JOINT (STEEL / STAINLESS

STEEL PIPE & FITTINGS)

UNION

ITEM DOUBLE LINE

ROTAMETER

UNION

PRESSURE REDUCING VALVE

SOLENOID VALVE

PRESSURE RELIEF VALVE

Y STRAINER

CALIBRATION COLUMN

PULSATION DAMPENER

FLEXIBLE TUBING

QUICK CONNECT (FEMALE)

PLUG VALVE

GATE VALVE

VALVE

ULTRASONIC LEVEL SENSOR

RUPTURE DISK

PRESSURE GAUGE

VACUUM REGULATOR

MOTOR OPERATOR

POLYMER FLOW METER

REDUCER

SOLENOID OPERATOR

PNEUMATIC OPERATOR

TEMPERATURE GAUGE

FLOW CONTROL VALVE

FLOW METER

COALESCING FILTER

PROCESS FLOW DIRECTION

ABBREVIATIONS: PIPING LEGENDSCHEMATIC SYMBOLS LEGEND

GENERAL NOTES (APPLY TO ALL DRAWINGS):

1. EXISTING FACILITIES AND PIPING SHOWN LIGHT. NEW FACILITIES AND PIPING SHOWN DARK.

2. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE ALL EXISTING PIPING ELEVATIONS, LOCATIONS, SIZE AND TYPE OF MATERIAL WITH NEW PIPING PRIOR TO CONSTRUCTION. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE ALL EXISTING EQUIPMENT DIMENSIONS AND ELEVATIONS, AS REQUIRED, PRIOR TO ORDERING NEW EQUIPMENT.

3. CONTRACTOR SHALL COORDINATE ALL PIPING AND OTHER CONNECTIONS WITH THE APPROVED

EQUIPMENT SHOP DRAWINGS.

4. ALL BURIED PIPING TO BE MIN. 5' BELOW GRADE, UNLESS OTHERWISE NOTED.

5. FOR DRAWINGS C-02101 AND C-02102, HORIZONTAL DATUM: NAD 83 (2011)(EPOCH:2010.0000) PA SOUTH

ZONE GRID. REFERENCED FROM "ZDC1", "P817" AND "YORK".

6. FOR DRAWINGS C-02101 AND C-02102, VERTICAL DATUM: NAVD 88. REFERENCED FROM NGS BENCH

MARK DISK "H 156" (JB3356).

7. FOR DRAWINGS C-02101 AND C-02102, SURVEY BASED ON DRAWING NO. 17028-001 To GHD 7 24 17, DATED JULY 7, 2017 AND PROVIDED BY KAYLOR, ALLWEIN & HARTMAN, INC., 1529 EAST CHOCOLATE AVENUE, HERSHEY, PA 17033, TEL: (717) 533-9077.

8. FOR DRAWINGS C-02101 AND C-02102, PRIOR DEED, DEED BOOK 632, PAGE 544, STATES THE PROPERTY IS SUBJECT TO A RIGHT OF INGRESS AND EGRESS TO AND FROM U.S. ROUTE 30 TO A TRACT RETAINED

BY GRANTOR ADJACENT TO THE NORTHWEST CORNER OF THE LANDS.

9. FOR DRAWINGS C-02101 AND C-02102, PRIOR DEED, DEED BOOK 632, PAGE 544, STATES SUBJECT TO RIGHT-OF-WAY FOR INGRESS AND REGRESS TO AND FROM U.S. ROUTE 30 TO AND FROM A TRACT OF

REAL ESTATE PREVIOUSLY CONVEYED TO GEORGE SNURR, ET AL. BY DEED 503, PAGE 736.

10. FOR DRAWINGS C-02101 AND C-02102, PROPERTY LINE INFORMATION SHOWN HEREON IS TAKEN FROM FRANKLIN COUNTY INSTRUMENT #201016563 AND FRANKLIN COUNTY DEED BOOK 674, PAGE 556.

PROPERTY LINES SHOWN ARE REPRESENTATIVE OF THE DEED CONFIGURATIONS BASED ON MINIMAL

FIELD EVIDENCE AND ARE NOT THE RESULT OF AN ACTUAL BOUNDARY RETRACEMENT SURVEY.

ADD'L ADDITIONAL

AFF ABOVE FINISHED FLOOR

ADJ ADJUSTABLE

AGGR AGGREGATE

ALLOW ALLOWANCE

ALT ALTERNATE

ALUM ALUMINUM

ARCH ARCHITECT OR ARCHITECTURAL

ASSY ASSEMBLY

APPROX APPROXIMATE

BLDG BUILDING

BLK BLOCK

BOT or B BOTTOM

CF CUBIC FEET

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CIP CAST IRON PIPE

CMP CORRUGATED METAL PIPE

CO CLEANOUT

CONN CONNECTION

CY CUBIC YARD

CL CLEAR

℄ CENTER LINE

CONC CONCRETE

CONT CONTINUOUS

CPVC CHLORINATED POLYVINYL CHLORIDE

CL JT CONTROL JOINT

DL DEAD LOAD

DIA, Ø DIAMETER

DIP DUCTILE IRON PIPE

DWL DOWEL

EF EACH FACE

EA EACH

EL or ELEV ELEVATION

ELEC ELECTRIC

EQ EQUAL

EX, EXIST EXISTING

EXT EXTERIOR

FF FAR FACE/ FINISHED FLOOR

FM FORCE MAIN

FLR FLOOR

FT FEET

FTG FOOTING

G NATURAL GAS

GPM GALLONS PER MINUTE

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

HDPE HIGH-DENSITY POLYURETHYLENE

HWL HIGH WATER LEVEL

HP HORSEPOWER

ID INSIDE DIAMETER

IF INSIDE FACE

INV INVERT

I/O INPUT / OUTPUT

LF LINEAR FEET

LL LIVE LOAD

LWL LOW WATER LEVEL

M MOTOR

MGD MILLION GALLONS PER DAY

MH MANHOLE

MJ MECHANICAL JOINT

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OPNG OPENING

PRV PRESSURE RELIEF VALVE

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

POLY / PE POLYETHYLENE

⅊ PLATE, PROPERTY LINE

R RADIUS

REINF REINFORCING

REQD REQUIRED

SF SQUARE FOOT

SS STAINLESS STEEL

SCH SCHEDULE

SPEC SPECIFICATION

SQ SQUARE

STL STEEL

STD STANDARD

SYM SYMBOL

TEL TELEPHONE

TEMP TEMPERATURE

TYP TYPICAL

UV ULTRAVIOLET

W WATER

WL WATER LEVEL

W/O WITHOUT

WWF WELDED WIRE FABRIC

SHEET INDEX

SEQUENCE

NUMBER

SHEET

NUMBER SHEET TITLE

GENERAL

G-00001 COVERSHEET

G-00002 GENERAL NOTES, LEGENDS AND SHEET INDEX

CIVIL

C-02101 WATER TREATMENT PLANT EXISTING SITE PLAN

C-02102 WATER TREATMENT PLANT EXISTING YARD PIPING PLAN

C-02501 CIVIL DETAILS

C-02502 CIVIL DETAILS

C-02503 EXISTING DRAIN MANHOLES PLANS AND SECTIONS

CE-02001 EROSION AND SEDIMENT CONTROL PLAN NOTES

CE-02101 EROSION AND SEDIMENT CONTROL PLAN SITE PLAN

CE-02501 EROSION AND SEDIMENT CONTROL PLAN DETAILS

STRUCTURAL

S-02101 INLET FLUME PLAN AND SECTIONS

S-04101 EXISTING CLARIFIER No 1 PLAN AND SECTION

S-05101 EXISTING CLARIFIER No 2 PLAN AND SECTION

PROCESS

DD-04101 EXISTING CLARIFIER No 1 DEMOLITION PLANS AND SECTIONS

DD-05101 EXISTING CLARIFIER No 2 DEMOLITION PLANS AND SECTIONS

D-04101 EXISTING CLARIFIER No 1 PLAN AND SECTION

D-05101 EXISTING CLARIFIER No 2 PLAN AND SECTION

ELECTRICAL

E-00001 ABBREVIATIONS AND SYMBOLS

E-04101 EXISTING CLARIFIER No 1 PLAN AND SECTION

E-05101 EXISTING CLARIFIER No 2 PLAN AND SECTION

E-06101 TREATMENT PLANT BASEMENT AND PARTIAL FIRST FLOOR PLANS

E-07101 DETAILS

DETAIL NUMBER

(NUMERICAL ON EACH SHEET

BEGINNING WITH DETAIL 1)

DETAIL NUMBER

SHEET WHERE DETAIL IS SHOWN

(IF ON DIFFERENT SHEET) DEPICTION BOUNDARY

TYPICAL SECTION MARKS (FOR PLANS)

TYPICAL DETAIL TITLE

TYPICAL DETAIL CALLOUT

OR

D-101

DETAIL NAME

NO SCALE

A-501

A-501

SECTION INDICATORA

X-301

SECTION LETTER

SHEET WHERE SECTION IS SHOWN

(IF SHOWN ON DIFFERENT SHEET)

A D-101

SECTION

SCALE: 1/4" = 1'-0"

SECTION LETTER

(ALPHABETICAL FOR

EACH STRUCTURE)

0 8'4'2'

SHEET WHERE SECTION

IS REFERENCED

SHEET WHERE DETAIL

IS REFERENCED

NEW GRAPHICS; EQUIPMENT, STRUCTURES,

ETC., ARE SHOWN AS BOLD LINEWORK AND

IN THIS TEXT FORMAT.

TRUE NORTH

NORTH INDICATOR

N

XXX

EQUIPMENT TAG

TYPE

NUMBER

GENERAL LEGEND

KEYNOTE INDICATOR

KEYNOTE NUMBER

M

E

E E

E

SETBACK

SETBACK

30'

30'

SETBACK

CP 101

CP 100

Plot Date: Filename:8 January 2026 - 4:41 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-C02101.dwgPlotted By: Shawn Matthews

IssueNo. Drawn Approved Date This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

WATER TREATMENT PLANT

EXISTING SITE PLAN

C-02101

S. MATTHEWS C. ANGLE

M. WIESTLING T. PARTHEMORE

AS SHOWN

LEGENDS

PLAN

SCALE 1" - 40' 0 80'40'20'

N

EXISTING INDEX CONTOURS

EXISTING INTERMEDIATE CONTOURS

EXISTING STRUCTURE

EDGE OF ROAD

EDGE OF GRAVEL ROAD

100 YEAR FLOODPLAIN

TREES

UTILITY POLE

EXISTING FENCE

EXISTING PROPERTY LINE

EXISTING TREE LINE

EXISTING SETBACK LINE

EXISTING UNDERGROUND ELECTRIC

BENCHMARK

EXISTING UNDERGROUND TELEPHONE

CONTROL POINT LOCATIONS

ID NORTHING EASTING ELEVATION DESCRIPTION

CP 100 208906.810 2036509.250 888.58

CP 101 208591.750 2036498.220 909.450 MAG NAIL

M

E

E E

E

NEW 8" SDR35 PVC

NEW 8" Ø HDPE

C-02501

NEW 5'Ø

MANHOLE

(MH 1)

RECONNECT EXISTING PIPE TO

NEW DI STUB OUTS FROM NEW

5'Ø MANHOLE (TYP.) (HYMAX

COUPLINGS TO BE USED)NEW 8" Ø HDPE

C-02501

NEW 5'Ø INSIDE

DROP MANHOLE

(MH 2)

TEST PIT TO FIND 4"

SLUDGE PUMP LINE

S-02101

0+00 1+00

NEW

MH 1

NEW

MH 2

(INSIDE DROP MH)

98.62LF of 8" PVC SDR35 Pipe @ UNKNOWN SLOPE

TEST PIT TO LOCATE EXISTING

4" SLUDGE PUMP LINE

8'

INV OUT

STATION

RIM EL. ±

INV IN

INV OUT

STATION

RIM EL. ±

INV IN UNKNOWN

UNKNOWN

0+00.00 873.5

UNKNOWN

1+03.53

869.1

8" HDPE

Plot Date: Filename:8 January 2026 - 4:41 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-C02102.dwgPlotted By: Shawn Matthews

IssueNo. Drawn Approved Date This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

WATER TREATMENT PLANT

EXISTING YARD PIPING PLAN

C-02102

S. MATTHEWS C. ANGLE

M. WIESTLING T. PARTHEMORE

AS SHOWN

LEGENDS

SHEET GENERAL NOTES

SHEET KEYNOTES

1. CONTRACTOR TO LOCATE AND CONFIRM PIPE TYPE, DIAMETER AND DEPTH. SLOPE

FROM MH 1 TO MH 2 SHALL BE DETERMINED BASED ON DEPTH OF DRAIN LINE.

2. CONTRACTOR TO REPLACE VALVE WITH A NEW GATE VALVE AND NEW VALVE BOX AND

COVER. CONTRACTOR TO CONFIRM PIPE TYPE, DIAMETER AND DEPTH.

3. EXISTING STRUCTURE 'A' IS NOT EXTENDED TO GRADE. CONTRACTOR TO EXTEND

STRUCTURE TO GRADE PER DETAIL 1 ON SHEET C-02502.

4. PROVIDE HDPE BENDS, FLUSHING TEE AND FITTINGS TO COMPLETE BEND.

5. EXISTING STRUCTURE "B" IS TO BE TAKEN APART (CUT) TO FACILITATE THE

INSTALLATION OF THE NEW 8" HDPE BLOW-OFF LINE. ONCE COMPLETED STRUCTURE "B"

SHALL BE PUT BACK TOGETHER AND/OR REPLACED.

PLAN

SCALE 1" - 40' 0 80'40'20'

N

EXISTING INDEX CONTOURS

EXISTING INTERMEDIATE CONTOURS

EXISTING STRUCTURE

EDGE OF ROAD

EDGE OF GRAVEL ROAD

100 YEAR FLOODPLAIN

TREES

UTILITY POLE

EXISTING FENCE

EXISTING PROPERTY LINE

EXISTING TREE LINE

EXISTING SETBACK LINE

EXISTING UNDERGROUND ELECTRIC

BENCHMARK

EXISTING UNDERGROUND TELEPHONE

1. THIS DRAWING HAS BEEN PREPARED TO PROVIDE THE CONTRACTOR WITH A GENERAL

SCOPE OF DEMOLITION WORK TO BE REQUIRED. IT SHALL BE THE CONTRACTOR'S

RESPONSIBILITY TO FIELD VERIFY ALL ITEMS THAT MAY EFFECT DEMOLITION COSTS

INCLUDING BUT NOT LIMITED TO EXACT EQUIPMENT AND PIPING LOCATIONS, ACTUAL

EQUIPMENT AND PIPING SIZES, AND ALL INCIDENTAL EQUIPMENT OR PIPING NOT SHOWN

BUT PART OF THE EQUIPMENT INDICATED TO BE REMOVED OR EFFECTING REMOVAL

PROCESS.

PROFILE

SCALE: H:1" = 40', V: 1" = 10' 0 80'40'20'

0 20'10'

O.

D.

EXCAVATED TRENCH

BACKFILL COMPACTED

TO 95% MIN.

COMPACTION PER

ASTM D-698 (STD.)

DETECTION TAPE

6" TOPSOILFINISH GRADE

TRENCH WALL

SHALL BE

MAINTAINED

AS VERTICAL

OR LAID BACK

UNDISTURBED SUBGRADE PIPE

AASHTO NO. 8

AGGREGATE BEDDING

LIM

IT

O F

PI

PE

B

ED

DI

NG

4'

MI

NI

MU

M

- D

EP

TH

V

AR

IE

S

" M

IN

6" MI

N.

" M

IN

6"

AG

GR

EG

AT

E

MIN.

6"

MIN.

O.D.

TO

DE

TE

CT

IO

N

TA

PE

Plot Date: Filename:8 January 2026 - 4:42 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-C02501.dwgPlotted By: Shawn Matthews

IssueNo. Drawn Approved Date This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

CIVIL

DETAILS

C-02501

S. MATTHEWS C. ANGLE

M. WIESTLING T. PARTHEMORE

AS SHOWN

TRENCH DETAIL - UNPAVED

NO SCALE

NOTE: ALL NON-SHRINK CEMENT GROUT SHALL BE TROWELED SMOOTH.

SECTION

MANHOLE FRAME AND LEVELING RINGS

MANHOLE GASKET SECTION

SECTION

GROOVE

TONGUE

PRECAST CONCRETE

PREFORMED

FLEXIBLE PLASTIC

JOINT SEALANT

WHOLE PRECAST CONCRETE

LEVELING RING (VARIED

THICKNESS) (RUBBER

ADJUSTMENT RISERS ARE

PERMITTED FOR PAVED

AREAS, ONLY)

3/4" DIA. STAINLESS STEEL

STUD W/NUT AND WASHER:

4" MIN. (4 BOLTS REQ'D)DOUBLE APPLICATION

OF PREFORMED

FLEXIBLE PLASTIC

JOINT SEALANT

THREADED INSERT CAST

INTO TOP SECTION

6" MAXIMUM

ALLOWABLE LEVELING

RING ADJUSTMENT

MANHOLE GASKETS, LEVELING

RINGS AND BOLTED FRAME DETAILS

NO SCALE

TYPICAL PLAN OF MANHOLE CHANNELS

NO SCALE

STANDARD MANHOLE FRAME AND COVER

NO SCALE

3/4 O.D.

NOTE: 1. BOLTING OF MANHOLE FRAME AND

COVER NOT REQUIRED FOR MANHOLES

INSTALLED IN PAVED SURFACES.

2. ALL STONE GRADATIONS ARE AASHTO

CLASSIFICATION.

3. PIPES SHALL PROTRUDE 2" INSIDE

MANHOLE WALL.

PLAN

VARIES

6" MIN.

5'-0"

6" MIN.

VARIES

(TYP.)

6"

5" MIN.

SECTION

R=1'-0"

1/2"/FT.

3'- 0" MIN. 2'-0"

18"MAX.

TO TOP

STEP

10"

6" MIN.

VARIES

6"

13-3/4"

VARIES

3'-0" MIN.

5" MIN. (TYP.)

1'-0"

MAX.

SECTION

3 5/8"

2'-0"

1-1/2"

3-3/4"

NOTE: 1. BOLTING OF MANHOLE FRAME AND

2. ALL STONE GRADATIONS ARE AASHTO

3. PIPES SHALL PROTRUDE 2" INSIDE

PLAN

COVER NOT REQUIRED FOR MANHOLES

INSTALLED IN PAVED SURFACES.

MANHOLE WALL.

CLASSIFICATION.

4" MIN. 3/4" DIA. STAINLESS STEEL STUD,

WASHER, AND NUT COATED WITH ONE

COAT OF STANDARD ASPHALT AFTER

INSTALLATION.

MATCH PAVEMENT/GRADE AND

SLOPE AS DIRECTED

FRAME AND LEVELING RINGS

SEALED WATERTIGHT (SEE

MANHOLE FRAME AND

LEVELING RINGS DETAIL)

MANHOLE STEPS

3-1/2" MIN. TO 4" MAX.

EMBEDMENT.

JOINTS SEALED WATERTIGHT

(SEE MANHOLE GASKET

DETAIL)

PRECAST REINFORCED

CONCRETE BASE WITH RISER

SECTION - CHANNEL FORMED

ON JOB WITH CONCRETE -

HOLES FOR PIPE CAST WITH

RUBBER GASKET TO SUIT

JOB CONDITIONS.

PIPE CONNECTION

MADE WITH RUBBER

GASKET. (SEE

MANHOLE PIPE

GASKETS DETAIL) SPACED ON

16" CENTERS

(TYP.)

THREADED INSERT

CAST INTO TOP

SECTION

ANTI-FLOTATION

COLLAR ON MANHOLES

NO.8 OR NO.57 COARSE

AGGREGATE, TAMPED.

6" MIN.

4" MIN. 3/4" DIA. STAINLESS STEEL

STUD, WASHER, AND NUT COATED

WITH ONE COAT OF STANDARD

ASPHALT AFTER INSTALLATION.

MATCH PAVEMENT/GRADE AND

SLOPE AS DIRECTED

FRAME AND LEVELING RINGS

SEALED WATERTIGHT (SEE

MANHOLE FRAME AND

LEVELING RINGS DETAIL)

MANHOLE STEPS

3-1/2" MIN. TO 4" MAX.

EMBEDMENT.

JOINTS SEALED WATERTIGHT

(SEE MANHOLE GASKET

DETAIL)

SPACED ON

16" CENTERS

(TYP.)

PRECAST REINFORCED

CONCRETE BASE WITH RISER

SECTION - CHANNEL FORMED

ON JOB WITH CONCRETE -

HOLES FOR PIPE CAST WITH

RUBBER GASKET TO SUIT

JOB CONDITIONS.

NO.8 OR NO.57 COARSE

AGGREGATE, TAMPED.

ANTI-FLOTATION

COLLAR ON MANHOLES

THREADED INSERT

CAST INTO TOP

SECTION

6 PRECAST CONCRETE MANHOLE WITH PRECAST CONCRETE BASE

NO SCALE

5'-0"

PRECAST CONCRETE INSIDE DROP MANHOLE DETAIL

NO SCALE

SECTION

PIPE CONNECTION MADE

(SEE MANHOLE PIPE

WITH RUBBER GASKET

GASKETS DETAIL)

02601 - MANHOLES)

(REFERENCE SECTION

CHANNEL

FLUSH TO MANHOLE

90° PVC BEND

INSIDE PVC

(S.S.) ANCHORS

STAINLESS STEEL

DROP BOWL W/

PIPE COUPLING

2'-0"

5'-0" (MIN.)

(SEE NOTE 1)

NOTES:

1. PVC DROP BOWL SHALL BE AS MANUFACTURED BY RELINER/DURAN,

INC. OR APPROVED EQUAL. DROP BOWL SHOULD HAVE A HOOD.

2. REFERENCE PRECAST CONCRETE MANHOLE AND MANHOLE COVER

AND CASTING DETAILS.

ADJUSTABLE S.S. PIPE

BRACKET (TYP.) W/

S.S. EXPANSION ANCHORS

BANDS TO BE SPACED AT

4' INTERVALS (MIN. 2)

(PER ENGINEER'S REC.)

8" SDR 35 PVC PIPE

ANTI-FLOTATION

COLLAR ON MANHOLES

(TYP.)

SEE APPROPRIATE TRENCH

DETAIL FOR BACKFILL REQUIREMENTS

PVC TO PVC CONNECTION USE PVC REPAIR SLEEVE

PVC TO CAST IRON CONNECTION USE MECHANICAL JOINT COUPLING

PVC TO ACP CONNECTION USE MECHANICAL JOINT COUPLING

PVC TO TCP/VCP CONNECTION USE S.S. ANTI-SHEAR COLLAR RUBBER ADAPTER

DIP/CIP TO DIP/CIP CONNECTION USE MECHANICAL JOINT COUPLING

FORCEMAIN USE MECHANICAL JOINT COUPLING

UNDISTURBED SUBGRADE

NEW PVC SANITARY SEWER PIPE/FORCEMAIN

50 LB. BAG OF CONCRETE CENTERED

BENEATH JOINT (NOT REQUIRED IN ROCK EXCAVATION)

NO. 8 OR PA NO. 2A. COARSE AGGREGATE

PIPE BEDDING MATERIAL, COMPACTED IN 4" LIFTS.

EXISTING SANITARY

SEWER PIPE/FORCEMAIN

6" MIN.

NOTES:

1. RECONNECTIONS TO BE AIR TESTED IN ACCORDANCE WITH SPECIFICATIONS.

2. MECHANICAL JOINT COUPLINGS TO BE SMITH-BLAIR OR APPROVED EQUAL

PIPE RECONNECTION DETAIL

NO SCALE

EXISTING RCP

4"

CASING SPACER

BLOW DOWN PIPE SPACER

NO SCALE

SECTIONAL ELEVATION

PLAN

34" DIA.

24" DIA.

9"

25-7/8" DIA.

2- 1/2

· 1-800-325-3549

· COVER CAT.# 2070770

· FRAME CAT.# 154510

EAST JORDON IRON WORKS, INC.

FRAME & COVER:

S

T O

R M S E W E

R CONCEALED COVER

PICK HOLE

(4) - 1" ANCHOR

BOLT HOLES

RAISED

LETTERS

TAPER RIBS

NON-SKID SURFACE

AS APPROVED BY ENGR.

27-7/8"

1/2

NOTES:

· CASTINGS TO BE GRAY IRON

· CAST IRON ASTM SPECS. A-48

· H-20 LOADING

· LETTERING AS SPECIFIED BY ENGINEER

· PAINT/COAT BLACK ASPHALTUM

MH ANCHOR BOLT DETAIL

3"

MIN.

MIN. PROJECTION OF 2-1/2" ABOVE

FINAL COURSE OF BRICK OR ADJUSTMENT RING

3/4" GALV. NUT

3/4"x1-1/2" GALV. WASHER

3/4" GALV. ALL THREAD ROD

CONCRETE INSERT

PRE-CAST CONCRETE

TOP SECTION

STANDARD MANHOLE STORM FRAME AND COVER

NO SCALE

SECTIONAL ELEVATION

PLAN

34" DIA.

24" DIA.

9"

25-7/8" DIA.

2- 1/2

· 1-800-325-3549

· COVER CAT.# 2070770

· FRAME CAT.# 154510

EAST JORDON IRON WORKS, INC.

FRAME & COVER:

C H

A M B E R S B

U R

G S

A

N

ITARY SEW

E

R

CONCEALED COVER

PICK HOLE

(4) - 1" ANCHOR

BOLT HOLES

RAISED

LETTERS

TAPER RIBS

NON-SKID SURFACE

AS APPROVED BY ENGR.

27-7/8"

1/2

NOTES:

· CASTINGS TO BE GRAY IRON

· CAST IRON ASTM SPECS. A-48

· H-20 LOADING

· LETTERING AS SPECIFIED BY ENGINEER

· PAINT/COAT BLACK ASPHALTUM

MH ANCHOR BOLT DETAIL

3"

MIN.

MIN. PROJECTION OF 2-1/2" ABOVE

FINAL COURSE OF BRICK OR ADJUSTMENT RING

3/4" GALV. NUT

3/4"x1-1/2" GALV. WASHER

3/4" GALV. ALL THREAD ROD

CONCRETE INSERT

PRE-CAST CONCRETE

TOP SECTION

Plot Date: Filename:8 January 2026 - 4:42 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-C02502.dwgPlotted By: Shawn Matthews

This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

CIVIL

DETAILS

C-02502

S. MATTHEWS C. ANGLE

M. WIESTLING T. PARTHEMORE

AS SHOWN

1 STRUCTURE 'A' - SECTION

SCALE 1/2' = 1'0" 0 4'2'1'

STRUCTURE 'A' - PLAN

SCALE 1/2' = 1'0" 0 4'2'1'

NEW 8" HDPE PIPE

SPACERS (2) - 10' O.C.

DOWNSTREAM SIDE

4" C

LE

AR

TOP SECTION OF

EXISTING MANHOLE

TO BE REMOVED

NEW STORM FRAME

AND COVER

RAISE EXISTING

MANHOLE TO GRADE

SAW CUT EXISTING STRUCTURE

AND ADD NEW PRECAST SECTION

OR POUR IN PLACE WALLS AND TOP

SECTION. REFER TO C-02503 FOR

EXISTING REINFORCING STEEL.

2 STRUCTURE 'B' - SECTION

SCALE 1/2' = 1'0" 0 4'2'1'

STRUCTURE 'B' - PLAN

SCALE 1/2' = 1'0" 0 4'2'1'

NEW 8" HDPE PIPE

4" C

LE

AR

SPACERS (2) - 10' O.C.

DOWNSTREAM SIDE

NEW 8"x4" HDPE TEE

WITH FLANGE TAPPED

FOR 3" QUICK CAM

FLUSHING CONNECTION

NEW 8" HDPE PIPE

NOTE:

1. CONTRACTOR TO CUT TOP OF

INLET, AS NECESSARY, TO

FACILITATE THE INSTALLATION

OF NEW 8" HDPE PIPE.

CIVIL

EXISTING DRAIN MANHOLES PLANS & SECTIONS

C-02503

S. MATTHEWS C. ANGLE

M. WIESTLING T. PARTHEMORE

NOT TO SCALE

SHEET GENERAL NOTES

1. ELEVATIONS OF THESE STRUCTURES ARE FROM THE NGVD 29 DATUM. DESIGN DRAWINGS

ARE BASED ON SURVEYED NAVD 88 DATUM. FOR THE CHAMBERSBURG WATER

TREATMENT PLANT SITE, THE NGVD 29 DATUM IS APPROXIMATELY 0.67 FEET HIGHER THAN

THE NAVD 88 DATUM.

2. EXISTING STRUCTURE 'A' IS NOT EXTENDED TO GRADE. CONTRACTOR SHALL TEST PIT TO

DETERMINE STRUCTURE 'A' DEPTH, AND PROVIDE RISER SECTION WITH NEW ACCESS PER

DETAIL 3 AND 4 ON SHEET C-02501.

3. THIS SHEET PROVIDED FOR REFERENCE ONLY AND IS NOT TO SCALE.

STRUCTURE 'A' STRUCTURE 'B'

Plot Date: Filename:8 January 2026 - 4:43 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-C02503.dwgPlotted By: Shawn Matthews

IssueNo. Drawn Approved Date This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

Plot Date: Filename:8 January 2026 - 4:43 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-CE02001.dwgPlotted By: Shawn Matthews

This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

EROSION AND SEDIMENT CONTROL PLAN

NOTES

CE-02001

S. MATTHEWS C. ANGLE

M. WIESLTING T. PARTHEMORE

AS SHOWN

Soil Description

Approximate boundaries of the soil-mapping units are shown on the attached drawings; this information is obtained from the USDA NRCS online Web Soil Survey (http://websoilsurvey.nrcs.usda.gov/app/). The soils found within the project area are summarized in Table 1.

Table 1 Soils Summary

Soil limitation resolutions:

— Depth to saturated zone, slow percolation, and wetness/depth to water limitations will be addressed by use of a pumped water filter bag if necessary. Pumped water filter bags must be placed at least 50 feet from any stream banks in well-vegetated, flat areas.

— Easily erodible limitations limitations will be addressed by limiting the amount of soil that is exposed. All areas disturbed during construction will be stabilized as described in this plan.

— All buried concrete and steel will be designed to resist the corrosive environment.

— All footers and buried utility pipes will be below the frost line to address frost action limitations.

— To address poor source of topsoil limitatins,topsoil will not be taken from the areas with source limitations.

— Road fill limitation is not applicable to this project.

— Areas to be filled are to be cleared, grubbed, and stripped of topsoil to remove trees, vegetation, roots, and other objectionable material need to have appropriate E&S controls.

— All fills shall be compacted as required to reduce erosion, slippage, settlement, subsidence or other related problems. Fill intended to support buildings, structures and conduits, etc. shall be compacted in accordance with local requirements or codes.

— All earthen fills shall be placed in compacted layers not to exceed nine inches in thickness.

— Fill materials shall be free of frozen particles, brush, roots, sod, or other foreign or objectionable materials that would interfere with or prevent construction of satisfactory fills.

— Frozen materials or soft, mucky, or highly compressible materials shall not be incorporated into fills.

— Fill shall not be placed on saturated or frozen surfaces.

— Seeps or springs encountered during construction shall be handled in accordance with the standard and specification for subsurface drain or other approved method.

Standard Erosion and Sediment Control Plan Notes

1. A copy of the approved erosion and sediment control plan must be available at the project site at all times. The Franklin County Conservation District shall be notified of any changes to the approved plan prior to implementation of those changes. The District may require a written submittal of those changes for review and approval at its discretion.

2. Contractor is responsible for installation and maintenance of all erosion and sediment Best Management Practices (BMPs).

3. At no time shall construction vehicles be allowed to enter areas outside the limit of disturbance boundaries shown on the plan maps. These areas must be clearly marked and fenced off before clearing and grubbing operations begin.

4. Immediately upon discovering unforeseen circumstances posing the potential for accelerated erosion and/or sediment pollution, the operator shall implement appropriate best management practices to minimize the potential for accelerated erosion and sediment pollution and notify the Franklin County Conservation District.

5. All off-site waste and borrow areas must have an E&S Plan approved by the Franklin County Conservation District and E&S measures must be fully implemented prior to being activated.

6. Contractor is responsible for ensuring that any material brought on site is Clean Fill. Form FP-001 must be retained by the property owner for any fill material affected by a spill or release of a regulated substance by qualifying as Clean Fill due to analytical testing (See Clean Fill Requirements).

7. All pumping of sediment laden water shall be through a sediment control BMP, such as a pumped water filter bag or equivalent sediment removal facility, over undisturbed vegetated areas.

8. Sediment tracked onto any public roadway or sidewalk shall be returned to the construction site by the end of each workday and disposed in the manner described in this plan. In no case shall the sediment be washed, shovelled, or swept into any roadside ditch, storm sewer, or surface water.

9. All sediment removed from BMPs shall be disposed of within the limits of disturbance upslope of steep slopes, outside of floodplains or drainage swales, and immediately stabilized or removed from the site.

10. Excess soil must be removed from this site and hauled away immediately to an off-site disposal area having an approved erosion and sediment control plan.

11. Concrete wash water shall be handled in the manner described on the plan drawings. In no case shall it be allowed to enter any surface waters or groundwater systems.

12. All graded areas shall be permanently stabilized immediately upon reaching finished grade. Cut slopes in competent bedrock and rock fills need not be vegetated.

13. Failure to correctly install sediment control facilities or failure to prevent sediment laden runoff from leaving the construction site or failure to take corrective actions to immediately resolve failures of sediment control facilities may result in administrative, civil and/or criminal penalties being instituted by the Pennsylvania Department of Environmental Protection as defined in Section 602 of the Clean Streams Law of Pennsylvania. The Clean Streams Law provides for up to $10,000 per day in civil penalties, up to $10,000 in summary criminal penalties, and up to $25,000 in misdemeanor criminal penalties for each violation.

14. All building materials and wastes shall be removed from the site and recycled or disposed of in accordance with the Department's Solid Waste Management Regulations at 25 Pa. Code 260.1 et seq., 271.1., and 287.1 et seq. No building materials or wastes or unused building materials shall be

15. The contractor will be responsible for the removal of any excess material and make sure the site(s) receiving the excess has an approved and fully implemented erosion and sediment control plan that meets the conditions of Chapter 102 and/or other State or Federal regulations.

16. Contractor is required to have a Preparedness, Prevention, and Contingency (PPC) Plan for the project site. PPC Plan is to be developed and implemented in accordance with PA DEP requirements and is to be in place before construction is started.

Staging of Construction Activities

Erosion and sediment BMPs must be constructed, stabilized, and functional before site disturbance begins within the tributary areas of those BMPs.

All earth disturbance activities shall proceed in accordance with the following sequence. Each stage shall be completed and immediately stabilized before any following stage is initiated. Clearing, grubbing and topsoil stripping shall be limited only to those areas described in each stage. Any deviation from the following sequence must be approved in writing from the Franklin County Conservation District.

The construction sequence will generally be as follows:

1. At least 7 days before starting any earth disturbance activities (including clearing and grubbing), the owner and/or operator shall invite all contractors involved in those activities, the land owner, appropriate municipal officials, the E&S plan preparer, the licensed professional or designee responsible for oversight during construction of the infiltration facility, and a representative of the Franklin County Conservation District for an onsite pre-construction meeting.

2. Excess soil must be removed from this site. At the preconstruction meeting, the Contractor shall provide the Franklin County Conservation District with copies of the Erosion and Sediment Pollution Control Plan for the disposal site(s).

3. At least 3 days before starting any earth disturbance activities, all contractors involved in those activities shall notify the Pennsylvania One Call System Incorporated at 1-800-242-1776 or 811 for buried utilities locations.

4. Clearly field mark the limits of disturbance shown on plan drawings prior to the start of any earth moving activities.

5. Install rock construction entrance and all compost filter socks prior to beginning any earth moving activities. Initial clearing and grubbing should be limited to that which is necessary to install the proposed perimeter BMPs. E&S BMP's shall be implemented and maintained until the permanent stabilization is completed.

6. Prior to any earth moving activities, delineate the proposed underground detention/infiltration facility area and mark off with stakes or orange construction fence to protect this area from compaction.

7. Clear and grub area as necessary.

8. Install concrete washout if required.

9. Install new sludge blowdown piping and connection manhole.

10. Remove concrete washout if required during construction.

11. Complete all other remaining work shown on the drawings and specified in the project manual.

12. Final placement of topsoil, seeding, and mulching of all disturbed areas that are not paved.

13. Upon final completion of an earth disturbance activity or any stage or phase of an activity, all areas disturbed during construction and not paved shall immediately have topsoil restored, replaced, or amended, seeded, fertilized, mulched or otherwise permanently stabilized and protected from accelerated erosion and sedimentation according to the seeding and fertilizing section.

14. No more than 15,000 square feet of disturbed area, which is to be stabilized by vegetation, may reach final grade without being seeded and mulched.

15. Upon completion of all earth disturbance activities and permanent stabilization of all disturbed areas, the owner and/or operators shall contact the Franklin County Conservation District for an inspection prior to removal of the E&S BMPs.

16. After final site stabilization has been achieved, remove all temporary E&S BMPs. Cut open compost filter socks (spread and seed the compost from the filter socks). Areas disturbed during the removal of the E&S BMPs must be permanently stabilized immediately upon completion of the temporary E&S BMP removal activity. In order to ensure rapid vegetation of disturbed areas, such removal should be done only during the germinating season.

17. Upon completion of all earth disturbance activities, removal of all temporary BMPs, installation of all permanent PCSM BMPs, and permanent stabilization of all disturbed areas, the owner and/or operators shall contact the Franklin County Conservation District for a final inspection.

Stabilization Specifications

1. E&S BMPs are to be located and installed as shown on the drawings. E&S BMPs must remain functional as such until all areas tributary to them are permanently stabilized or until they are replaced by another BMP approved by the Franklin County Conservation District.

2. Upon temporary cessation of an earth disturbance activity or any stage or phase of an activity where a cessation of earth disturbance activities will exceed 4 days, the site shall be immediately seeded, mulched, or otherwise protected from accelerated erosion and sedimentation pending future earth disturbance activities.

3. Permanent stabilization is defined as a minimum uniform 70% perennial vegetative cover or other permanent non-vegetative cover with a density sufficient to resist accelerated surface erosion and subsurface characteristics sufficient to resist sliding and other movements.

4. Areas which are to be topsoiled shall be scarified to a minimum depth of 3 to 5 inches - 6 to 12 inches on compacted soils - prior to placement of topsoil. Areas to be vegetated shall have a minimum 4 inches of topsoil in place prior to seeding and mulching. Fill outslopes shall have a minimum of 2 inches of topsoil.

5. Topsoil should not be placed while the topsoil or subsoil is in a frozen or muddy condition, when the subsoil is excessively wet, or in a condition that may otherwise be detrimental to proper grading and seedbed preparation. Compacted soils should be scarified 6 to 12 inches along contour whenever possible prior to seeding.

6. Immediately after earth disturbance activities cease, the operator shall stabilize the disturbed areas. During non-germinating periods, mulch must be applied as described in this plan. Disturbed areas which are not at finished grade and which will be re-disturbed within 1 year must be stabilized in accordance with the temporary vegetative stabilization specifications. Disturbed areas which are at final grade or which will not be re-disturbed within 1 year must be stabilized in accordance with the permanent vegetative stabilization specifications.

7. Erosion control blanketing shall be installed on all slopes 3H:1V or steeper, disturbed areas within 50 feet of a surface water regardless of slope, on all areas of concentrated flows, and on all other disturbed areas specified on the plan maps and/or detail sheets.

Maintenance of the Erosion and Sedimentation Controls

The contractor shall be responsible for the ongoing maintenance of all erosion and sediment control facilities throughout the period of construction and until such time that the site is deemed permanently stabilized.

1. Until the site is stabilized, all erosion and sediment BMP's must be maintained properly. Maintenance must include inspections of all erosion and sediment control BMPs after each runoff event and on a weekly basis. All preventative and remedial maintenance work, including clean out, repair, replacement, regarding, reseeding, remulching, and renetting, must be performed immediately, If erosion and sediment control BMPs fail to perform as expected, replacement BMPs, or modifications of those installed will be required.

2. Any sediment removed from BMPs during construction will be returned to upland areas on site and incorporated into the site grading.

3. A log showing dates that E&S BMPs were inspected as well as any deficiencies found and the date they were corrected shall be maintained on the site and be made available to regulatory agency officials at the time of inspection.

Staging, Laydown, and Equipment Storage

Staging, laydown and equipment storage areas will be located where shown on the drawings. The Contractor is required to provide adequate erosion and sedimentation control for these areas.

Storage and Disposal Areas for Excess Excavated Material

The Owner's Water Treatment Facility shall not be used for storage of excess excavated material. All excess excavated material must be hauled off-site. Areas used for storage and disposal of excess excavated material will be determined by the contractor. The Contractor will be responsible for the removal of any excess material and, prior to the start of the project, must ensure that the site receiving the excess material has an approved erosion and sedimentation control plan that meets the conditions of Chapter 102 and/or other state and federal regulations and, if required by the size of the area, an NPDES permit for Stormwater Discharges Associated with Construction Activities. Prior to the start of the project, the Franklin County Conservation District is to be notified of the location of all soils removed from the project site

Recycling

Wherever possible, recycling of waste materials is preferred rather than disposal. The contractor shall ensure that mechanisms are in place to control waste materials. Construction wastes include, but are not limited to, excess soil materials, building materials, concrete wash water, sanitary wastes, etc. that could adversely impact water quality. The contractor shall remove from site, recycle or dispose of all building materials and wastes in accordance with PA DEP's Solid Waste Management regulations at 25 PA Code 260.1 et seq., 271.1 et. seq., and 287.1 et. seq. The contractor shall not illegally bury, dump, or discharge any building material or waste at the site.

Receiving Stream Name/Chapter 93 Classification

The project's receiving watercourse is Conococheague Creek, and the Chapter 93 classification is Cold Water Fishes, Migratory Fishes (CWF, MF). There is no Existing Use classification.

Seeding and Fertilizing

1. Temporary Seeding

Temporary seed is to be annual ryegrass with 95% purity, 85% germination, and 0.15% max weed seed. Seeding rate is to be 40 lbs/acre. Seeding dates March 15 to October 15.

2. Permanent Seeding

Seed mixture is per the Penn State “Erosion Control and Conservation Plantings on Noncropland.” The seed mixture shall consist of:

· Minimum seed lots are truly minimum, and seed lots to be used for revegatation purposes should equal or exceed these standards.

· PLS is the product of the percentage of pure seed times the percentage germination divided by 100. To determine the actual planting rate, divide the pounds PLS by the PLS percentage shown on the seed tag or calculated as previously discussed.

Seeding dates: March 15 to June 1 and August 1 to October 15. Ryegrass portion: March 15 to October 15.

After seeding, fertilizer and mulch have been applied, all slopes 3H:1V or greater shall have erosion control mat installed as per PennDOT Publication 408, Section 806.2(a)1: Erosion Control Mat-Organic Yarns.

3. Fertilizing and Liming

Commercial fertilizer conforming to the requirements of the Pennsylvania Soil Conditioner and Plant Growth Substance Law. Pulverized agricultural limestone conforming to the requirements of the Agricultural Liming Materials Act.

Temporary seeding fertilizer to be 10-10-10 analysis commercial fertilizer; fertilizer rate to be 500 lb/acre; agricultural limestone rate to be 1 ton/acre.

Permanent seeding fertilizer to be 10-20-20 analysis commercial fertilizer; fertilizer rate to be 1000 lb/acre; agricultural limestone rate to be 6 tons/acre.

4. Mulching

Mulch material, mulch binders, construction and maintenance will be in accordance with PennDOT Publication 408 Section 805 and with the PA DEP Erosion and Sediment Pollution Control Program Manual, dated March 2012. Mulch rate for hay and straw to be 3 tons/acre.

Straw and hay mulch are to be anchored or tackified immediately after application to prevent being windblown; anchoring may be done by “crimping” the straw or hay into the soil, stapling mulch control netting over the mulch or using recycled cellulose fiber binder. If “crimping” is used, slopes must be less than 3H:1V, and the machinery is to be operated on the contour. Straw mulch shall be applied in long strands, not chopped or finely broken. Mulch on slope of 8% or steeper should be held in place with netting. If mulch control netting is used, it is to be stapled according to the manufacturer's recommendations. Binder rate to be 160 lbs/1,000 sq. yd. for recycled cellulose binder.

Mulching without seeding is to be used as an interim stabilization control during non-growing seasons of the year.

5. Topsoil

A minimum of four (4) inches of topsoil shall be placed on all disturbed areas prior to seeding.

Clean Fill Requirements

All fill material is to meet the following DEP Clean Fill requirements:

1. Clean Fill is defined as: Uncontaminated, non-water soluble, non-decomposable, inert, solid material. The term includes soil, rock, stone, dredged material, and used asphalt, as well as brick, block, or concrete from construction and demolition activities that is separate from other waste and is recognizable as such. The term does not include materials placed in or on the waters of the Commonwealth, unless otherwise authorized. (The term “used asphalt” does not include milled asphalt or asphalt that has been processed for re-use.).

2. Any placement of clean fill that has been affected by a spill or release of a regulated substance must use form FP-001 to certify the origin of the fill material and the results of the analytical testing to qualify the material as clean fill. Form FP-001 must be retained by the owner of the property receiving the fill.

3. Environmental due diligence must be performed to determine if the fill materials associated with the project qualify as clean fill. Environmental due diligence is defined as: Investigative techniques, including, but not limited to, visual property inspections, electronic data base searches, review of property ownership, review of property use history, Sanborn maps, environmental questionnaires, transaction screens, analytical testing, environmental assessments, or audits. Analytical testing is not a required part of due diligence unless visual inspection and/or review of the past land use of the property indicates that the fill may have been subjected to a spill or release of a regulated substance. If the fill may have been affected by a spill or release of a regulated substance, it must be tested to determine if it qualifies as clean fill. Testing should be performed in accordance with Appendix A of the Department's policy “Management of Clean Fill.”

SETBACK

SETBACK

M

E

E E

E

RCE

LO

D

LOD

ROCK CONSTRUCTION

ENTRANCE

STAGING, LAYDOWN AND

EQUIPMENT STORAGE AREA

CONCRETE

WASHOUT

SETBACK

SETBACK

SETBACK

CFS

CFS

CFS

CFS

INLET PROTECTION

SETBACK

30'

30'

SETBACK

CFS

CFS

CFS

Plot Date: Filename:8 January 2026 - 4:44 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-CE02101.dwgPlotted By: Shawn Matthews

IssueNo. Drawn Approved Date This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

EROSION AND SEDIMENT CONTROL PLAN

SITE PLAN

CE-02101

S. MATTHEWS C. ANGLE

M. WIESTLING T. PARTHEMORE

AS SHOWN

LEGEND:

EXISTING INDEX CONTOURS

EXISTING INTERMEDIATE

EXISTING STRUCTURE

EDGE OF ROAD

EDGE OF GRAVEL ROAD

100 YEAR FLOODPLAIN

TREES

UTILITY POLE

EXISTING FENCE

EXISTING PROPERTY LINE

EXISTING TREE LINE

EXISTING SETBACK LINE

EXISTING R-O-W

NEW STRUCTURE

LIMIT OF DISTURBANCE

(41085.107 sq ft - 0.94 acres)

LOD

(12") COMPOST FILTER SOCKCFS CFS

SOIL BOUNDARY

SOIL TYPE

NEW CONTOUR

SITE PLAN

SCALE 1" = 40'

PLAN

NORTH

0 80'40'20'

Plot Date: Filename:8 January 2026 - 4:44 PM \\ghdnet\ghd\US\Harrisburg\Projects\564\11224278\Digital_Design\_Clarifier Sludge\ACAD 2020\Sheets\Civil\11224278-CE02501.dwgPlotted By: Shawn Matthews

This document shall not be used for construction unless signed and sealed for construction. Sheet No.

Original Size

Title

Project

Client DesignerDrawn

Scale Arch D

Date Project No.

Reuse of Documents This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization.

© 2026 GHD

Drafting Check

0 1"

Bar is one inch on original size sheet

Design Check

Project Manager

BOROUGH OF CHAMBERSBURG

WTP CLARIFIER BLOWDOWN UPGRADES

11224278 C. ANGLE JANUARY 8, 2026GHD Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011 USA T 1 717 541 0622 W www.ghd.com

0 BID DOCUMENTS MRW CMA JAN-8-2026

EROSION AND SEDIMENT CONTROL PLAN

DETAILS

CE-02501

E. CAMACHO C. ANGLE

M. WIESLTING T. PARTHEMORE

AS SHOWN

50' MIN.

3 FEET

PROFILE

NOTES:

1. REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.

2. RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING ROCK

CONSTRUCTION ENTRANCE.

3. MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL…