2-BID SET KSB-2026-RCCWM.pdf
PDF 8 MB Posted
- Attached to
- Race Street Water Main Replacement
- Solicitation number
- Not on record
- Issued by
- Chester County, Pennsylvania
About this file
This is a bid set of construction plans prepared by Pennoni Associates Inc. for the Borough of Kennett Square, Pennsylvania, detailing the replacement and lowering of an existing 12-inch diameter cast iron water main at the East Branch of Red Clay Creek crossing in Anson B. Nixon Park. The project involves installing approximately 70 linear feet of new 12-inch diameter ductile iron Class 52 pipe at a deeper depth beneath the streambed, maintaining a minimum of 42 inches of cover from the bottom of the streambed to the top of the pipe. The scope of work includes site improvements, erosion and sedimentation control measures, temporary construction features such as sandbag cofferdams and bypass pumps, removal and replacement of the existing water main, concrete thrust blocks at connection points, restoration of paved surfaces including curbs, sidewalks, and paved trails, and complete restoration of disturbed areas. The project is subject to specific environmental and regulatory constraints: tree clearing must be completed by March 31, 2026, and stream construction activities cannot commence until June 16, 2026, due to migratory fish designation restrictions and Indiana bat summer occupancy periods.
The construction documents establish comprehensive specifications for materials, workmanship, and contractor responsibilities. All materials must be new and stored to preserve quality; concrete thrust blocks require 3,000 PSI minimum compressive strength concrete; and the new water main must utilize ductile iron pipe meeting specified standards. The contractor is required to maintain one complete set of contract drawings on site with red-marked alignments and inverts of all utilities, conduct routine inspections during construction, comply with all applicable laws and Pennsylvania Department of Transportation standards within state rights-of-way, and maintain public roads and trails in a broom-swept condition. The contractor must obtain written permission before conducting activities on private property, call Pennsylvania One-Call System at least three working days before excavation, provide sediment control and temporary seeding measures, document any pre-existing damage to existing structures, and repair or replace all construction-related damage at no cost to the owner. Staging areas must be fully restored upon project completion, with all restoration costs borne by the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
SITE
U:
\A cc ou nt s\K
ES
QB
\K
ES
QB
- R ed
C lay
C re ek W at er
M ain
L ow er ing
\D
ES
IG
N\
_S
HE
ET
S\
CS
.d wg
PL
OT
TE
D:
/1
6/
:1
PM,
B
Y:
Pr inc e
Am inu
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
: 11
CS0001
B Y
N O
D
A
TE
R E
V
IS
IO
N
S
E A
S T
B R
A N
C H
O F
R E
D C
LA
Y
C R
E E
K W
A
TE
R M
A
IN
L O
W E
R
IN
G
N
O R
TH
W
A
LN
U T
R O
A D
K E
N N
E
TT
S Q
U A
R E
, P A
S O
U
TH
B R
O A
D S
TR
E
E T
K E
N N
E
TT
S Q
U A
R E
, P A
B O
R O
U G
H O
F K
E N
N E
TT
S
Q U
A R
E
C O
V E
R S
H E
E T
KESQB25007
AS NOTED
WJK/PMA
2025-10-17
MJE
SHEET
APPROVED BY
OF1 8
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATE; AND OWNER SHALL
INDEMNIFY AND HOLD HARMLESS PENNONI ASSOCIATES
FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES
ARISING OUT OF OR RESULTING THEREFROM.
A
LL
D
IM
E N
S
IO
N S
M U
S T
B E
V E
R
IF
IE
D
B Y
C O
N
TR
A C
TO
R
A N
D O
W N
E R
M U
S T
B E
N O
TI
FI
E D
O F
A N
Y D
IS
C
R E
P A
N C
IE
S
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
PREPARED FOR:
OWNER
BOROUGH OF KENNETT SQUARE
600 SOUTH BROAD STREET
KENNETT SQUARE, PA 19348
(610) 444-6020
EAST BRANCH OF RED CLAY CREEK
WATER MAIN LOWERING
BOROUGH OF KENNETT SQUARE, CHESTER COUNTY, PENNSYLVANIA
DECEMBER 2025
LOCATION MAP
Scale: 1" = 700'
USGS MAP
Scale: 1" = 1000'
N O
R
TH
N O
R
TH
-1 1-
FE
M
A D
E
LI
N E
A
TE
D F
LO
O
D W
A Y
A N
D F
LO
O
D P
LA
IN
P M
A
-1 2-
B
ID
P
LA
N S
P M
A
CALL 1-800-242-1776
CALL BEFORE YOU DIG
BEFORE YOU DIG ANYWHERE IN PENNSYLVANIA
PA. ACT 287 OF 1974 REQUIRES THREE WORKING DAYS
NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR
BLAST PENNSYLVANIA ONE-CALL SYSTEM, INC.
SERIAL NUMBER(S): 20251681681 (PRELIMINARY DESIGN)
PREPARED BY:
PENNONI ASSOCIATES INC.
Christiana Executive Campus 121 Continental Drive, Suite 207 Newark, DE 19713-4310 T 302.655.4451 F 302.654.2895
EXISTING PROPOSED
CURB
EDGE OF PAVEMENT
DESCRIPTION
LEGEND
SIDEWALK
MINOR CONTOUR
MAJOR CONTOUR300
WATER METER
WATER UNDERGROUND
WATER VALVE
COMPOST FILTER SOCK
SHEET INDEX
SHEET DWG SHEET TITLE
1 CS0001 COVER SHEET
2 CS1001 SITE IMPROVEMENTS
3 CS6041 WATER AND SITE DETAILS
4 CS8001 EROSION & SEDIMENTATION POLLUTION CONTROL PLAN-NORTH ACCESS
5 CS8002 EROSION & SEDIMENTATION POLLUTION CONTROL PLAN-SOUTH ACCESS
6 CS8501 EROSION & SEDIMENTATION POLLUTION CONTROL NOTES
7 CS8502 EROSION & SEDIMENTATION POLLUTION CONTROL DETAILS
8 CS8503 EROSION & SEDIMENTATION POLLUTION CONTROL DETAILS
PAVED TRAIL
LIMIT OF DISTURBANCE
ROCK CONSTRUCTION ENTRANCE
SANDBAG COFFERDAM
BYPASS PUMP
TEMPORARY STOCKPILE
CONCRETE CLEANOUT
FLOODWAY
FLOODPLAIN
P E
D E
S
TR
IA
N
B R
ID
G
E
TEMPORARY SANDBAG COFFERDAM
TEMPORARY SANDBAG
COFFERDAM
DISCHARGE BYPASS INTO STABLE
AREA OF STREAMBED
BYPASS PUMP
EXISTING 12" CAST IRON WATER MAIN
NEW 12" DUCTILE IRON CLASS 52 WATER MAIN PIPE USING
VERTICAL OFFSETS AT STREAM CROSSING AND HORIZONTAL
OFFSET OF ±5FT FROM EXISTING WATER MAIN. MAINTAIN
MINIMUM 42 INCHES OF COVER FROM BOTTOM OF STREAMBED
TO TOP OF PIPE FOR CROSSING. SEE SHEET CS6041 FOR DETAIL.
REMOVE/TRIM TREES TO
THE MINIMUM REQUIRED.
FLOWEAST BRANCH OF RED CLAY CREEK
CAREFULLY REMOVE ANY IN-STREAM AND
STREAMBANK ROCK AND FEATURES.
REPLACE/RESTORE STRUCTURES TO
PRE-EXISTING CONDITION UPON COMPLETION
OF WATER MAIN REPLACEMENT.
TOP OF BANK
TOP OF BANK
TRENCH PLUG
REMOVE/TRIM TREES TO
THE MINIMUM REQUIRED.
EXISTING WATER METER
12" GATE VALVE
12" WET TAP
AFTER NEW 12" MAIN IS CONSTRUCTED AND
OPERATIONAL, PERMANENTLY CLOSE THE 12" INSERTION
VALVE, REMOVE ITS VALVE BOX, AND CUT AND CAP THE
EXISTING 12" MAIN. INSTALL CONCRETE THRUST BLOCK
ON THE NORTH AND SOUTH END.
12" GATE VALVE
12" WET TAP
TRENCH PLUG
AFTER NEW 12" MAIN IS CONSTRUCTED AND
OPERATIONAL, PERMANENTLY CLOSE THE 12" INSERTION
VALVE, REMOVE ITS VALVE BOX, AND CUT AND CAP THE
EXISTING 12" MAIN. INSTALL CONCRETE THRUST BLOCK
ON THE NORTH AND SOUTH END.
12" INSERTION
VALVE
12" INSERTION
VALVE
ONCE THE NEW WATER MAIN
IS OPERATIONAL, EXCAVATE,
DEMOLISH, AND DISPOSE
EXISTING ABANDONED
WATER MAIN.
APPROXIMATE
BOUNDARY OF
EXCAVATION
0+00
0+55
A- A
A- A
FLOODWAY
NO
RTH BRO
AD STREET
PAVED TRAIL
REPLACE SECTION OF CURB AS
NECESSARY. EXTENT OF
REPLACEMENT
TO BE DETERMINED BY THE
ENGINEER.
SEE SHEET CS6041 FOR DETAIL.
REPLACE SECTION OF
CONCRETE SIDEWALK AS
NECESSARY. EXTENT OF
REPLACEMENT TO BE
DETERMINED BY THE
ENGINEER.
SEE SHEET CS6041 FOR
DETAIL.
REPLACE SECTION OF PAVED
TRAIL AS NECESSARY.
EXTENT OF REPLACEMENT TO
BE DETERMINED BY THE
ENGINEER.
SEE SHEET CS6041 FOR
DETAIL.
0+55 0+00
VERT: 1:2
HORIZ: 1:10
PROPOSED IMPROVEMENTS
E
LE
V A
TI
O
N
3 1/2' MIN.
EXISTING 12" CAST
IRON WATER MAIN
NEW 12" DUCTILE
IRON WATER MAIN
STREAMBANK
ONCE THE NEW WATER MAIN
IS OPERATIONAL, EXCAVATE,
DEMOLISH, AND DISPOSE
EXISTING ABANDONED
WATER MAIN.
U:
\A cc ou nt s\K
ES
QB
\K
ES
QB
- R ed
C lay
C re ek W at er
M ain
L ow er ing
\D
ES
IG
N\
_S
HE
ET
S\
CS
TE
D:
/1
6/
:1
PM,
B
Y:
Pr inc e
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
: 11
CS1001
B Y
N O
D
A
TE
R E
V
IS
IO
N
S
KESQB25007
AS NOTED
WJK/PMA
2025-10-17
MJE
SHEET
APPROVED BY
OF2 8
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
A
LL
D
IM
E N
S
IO
N S
M U
S T
B E
V E
R
IF
IE
D
B Y
C O
N
TR
A C
TO
R
A N
D O
W N
E R
M U
S T
B E
N O
TI
FI
E D
O F
A N
Y D
IS
C
R E
P A
N C
IE
S
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
00 10' 20'
PE
N
N O
N I A
SS
O
C
IA
TE
S
IN
C
C hr is tia na
E xe cu tiv e C am pu s
C on tin en ta l D riv e, S ui te
N ew ar k, D E
3-
T
2.
5.
F
.6
.2
N O
R
TH
E A
S T
B R
A N
C H
O F
R E
D C
LA
Y
C R
E E
K W
A
TE
R M
A
IN
L O
W E
R
IN
G
N
O R
TH
W
A
LN
U T
R O
A D
K E
N N
E
TT
S Q
U A
R E
, P A
S O
U
TH
B R
O A
D S
TR
E
E T
K E
N N
E
TT
S Q
U A
R E
, P A
B O
R O
U G
H O
F K
E N
N E
TT
S
Q U
A R
E
S
IT
E
IM
P R
O V
E M
E N
TS
-1 1-
FE
M
A D
E
LI
N E
A
TE
D F
LO
O
D W
A Y
A N
D F
LO
O
D P
LA
IN
C O
N S
TR
U
C
TI
O N
N O
TE
S
P M
A
GENERAL NOTES
1. PARCEL BOUNDARIES AND BUILDING FOOTPRINTS ARE BASED UPON CHESCOVIEWS GIS DATA
AVAILABLE FROM CHESTER COUNTY.
2. UNLESS SPECIFICALLY STATED OR SHOWN HEREON TO THE CONTRARY, THIS SURVEY IS MADE
SUBJECT TO AND DOES NOT LOCATE OR DELINEATE:
2.1. RIGHTS OR INTERESTS OF THE UNITED STATES OF AMERICA OR THE COMMONWEALTH OF
PENNSYLVANIA OVER LANDS CONTAINING ANY ANIMAL, MARINE, OR BOTANICAL SPECIES
REGULATED BY OR UNDER THE JURISDICTION OF ANY FEDERAL, STATE, OR LOCAL
AGENCY.
2.2. THE JURISDICTION OF ANY FEDERAL, STATE, OR LOCAL AGENCY. BUILDING SETBACK
LINES, ZONING REGULATIONS OR LINES ESTABLISHED BY ANY FEDERAL, STATE OR
LOCAL AGENCY WHICH MAY AFFECT THE BUILDING OR DEVELOPMENT POTENTIAL OF
THE SUBJECT PROPERTIES.
2.3. ANY SUBSURFACE OR SUBTERRANEAN CONDITION, EASEMENTS OR RIGHTS INCLUDING
BUT NOT LIMITED TO MINERAL OR MINING RIGHTS, OR THE LOCATION OF OR RIGHTS TO
ANY SUBSURFACE STRUCTURES, CONTAINERS OR FACILITIES OR ANY OTHER NATURAL
OR MAN-MADE SUBSURFACE CONDITION WHICH MAY OR MAY NOT AFFECT THE USE OR
DEVELOPMENT POTENTIAL OF THE SUBJECT PROPERTIES.
3. LOCATIONS OF UTILITIES AS SHOWN ARE APPROXIMATE AND MAY OR MAY NOT BE COMPLETE.
THE NATURE AND EXACT LOCATION OF EXISTING UTILITIES MUST BE VERIFIED PRIOR TO
INITIATING ANY ACTIVITY THAT MAY AFFECT THEIR USE OR LOCATION.
3.1. THE LOCATION OF THE EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE
BASED ON EXISTING UTILITY RECORDS AVAILABLE AT THE TIME THESE PLANS WERE
PREPARED AND VISIBLY APPARENT SURFACE UTILITY FEATURES.
3.2. COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF UNDERGROUND UTILITIES
AND STRUCTURES IS NOT GUARANTEED.
3.3. THE CONTRACTOR SHALL VERIFY LOCATIONS AND DEPTHS OF ALL UNDERGROUND
UTILITIES AND STRUCTURES BEFORE THE START OF WORK.
4. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES WITHIN THE WORK AREA VIA THE
PENNSYLVANIA ONE CALL SYSTEM, INC. (800-242-1776) A MINIMUM OF 3 WORKING DAYS
BEFORE THE START OF EXCAVATION.
CONSTRUCTION NOTES
1. THESE CONSTRUCTION DRAWINGS ARE FOR THE REPLACEMENT AND LOWERING OF THE
EXISTING WATER MAIN AT THE EAST BRANCH OF RED CLAY CREEK CROSSING IN ANSON B.
NIXON PARK LOCATED IN THE BOROUGH OF KENNETT SQUARE.
2. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO LOCATE PROPERTY LINES AND
RIGHT-OF-WAY LINES PRIOR TO CONSTRUCTION AND AVOID CONSTRUCTION ACTIVITIES ON
PRIVATE PROPERTY AND/OR RIGHTS-OF-WAYS WHERE SAID CONSTRUCTION IS PROHIBITED.
THE CONTRACTOR MAY CONDUCT CONSTRUCTION ACTIVITIES ON PRIVATE PROPERTY
PROVIDED IF HE HAS OBTAINED PRIOR WRITTEN PERMISSION FROM THE PROPERTY OWNER
AND HAS SUBMITTED A COPY OF SAID WRITTEN PERMISSION TO THE OWNER.
3. A FINAL SET OF APPROVED CONSTRUCTION PLANS AND SPECIFICATIONS SHALL BE
MAINTAINED ON THE JOB SITE AT ALL TIMES. FAILURE TO COMPLY WITH THIS PROVISION SHALL
BE CONSIDERED CAUSE TO STOP THE WORK.
4. THE CONTRACTOR SHALL MAINTAIN ONE COMPLETE SET OF CONTRACT DRAWINGS ON WHICH
HE SHALL NOTE, IN RED, THE ALIGNMENTS AND INVERTS OF ALL UNDERGROUND UTILITIES
INSTALLED OR ENCOUNTERED DURING THE PROSECUTION OF THE WORK. ALL DISCREPANCIES
BETWEEN THE PLAN LOCATIONS AND ELEVATIONS OF BOTH THE EXISTING AND PROPOSED
UTILITIES SHALL BE SHOWN ON THE AS-BUILT DRAWINGS TO BE MAINTAINED BY THE
CONTRACTOR IN THE FIELD.
5. THE CONTRACTOR SHALL OPEN ONLY THAT SECTION OF TRENCH OR ACCESS PITS WHICH CAN
BE BACKFILLED AND STABILIZED AT THE END OF EACH WORKING DAY. THIS REQUIREMENT
DOES NOT APPLY TO AREAS COMPLETELY CLOSED AND SECURE FROM VEHICULAR OR
PEDESTRIAN TRAFFIC.
6. THE CONTRACTOR SHALL USE ONLY NEW MATERIALS, PARTS, AND PRODUCTS. ALL MATERIALS SHALL BE STORED SO AS TO ASSURE THE PRESERVATION OF THEIR QUALITY AND FITNESS FOR
THE INTENDED WORK.
7. ROUTINE INSPECTIONS DURING CONSTRUCTION WILL BE PERFORMED BY THE
OWNER/ENGINEER. THESE INSPECTIONS DO NOT RELIEVE THE CONTRACTOR FROM HIS
OBLIGATION AND RESPONSIBILITY FOR CONSTRUCTING ALL WORK IN STRICT ACCORDANCE
WITH ALL STANDARDS AND SPECIFICATIONS AND CONSTRUCTION DOCUMENTS.
8. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, RULES,
REGULATIONS AND ORDERS OF ANY PUBLIC BODY HAVING JURISDICTION. THE CONTRACTOR
SHALL ERECT AND MAINTAIN, AS REQUIRED BY THE CONDITIONS AND PROGRESS OF THE
WORK, ALL NECESSARY SAFEGUARDS FOR SAFETY AND PROTECTION.
9. TREE CUTTING OR TREE TRIMMING IS PROHIBITED DURING THE INDIANA BATS SUMMER
OCCUPANCY PERIOD FROM APRIL 1 TO SEPTEMBER 30 AND TRICOLOR PUP SEASON FROM MAY
15 TO JULY 31.
10. THE CONTRACTOR SHALL COMPLY WITH THE TROUT STOCKING AND MIGRATORY FISH
DESIGNATION, WHICH PROHIBIT CONSTRUCTION ACTIVITIES WITHIN THE STREAM BETWEEN
MARCH 1 AND JUNE 15
11. THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL MEASURES TO PROTECT STOCKPILE
AREAS AND STORAGE AREAS. ALL AREAS USED BY THE CONTRACTOR FOR STAGING
OPERATIONS SHALL BE FULLY RESTORED BY THE CONTRACTOR UPON COMPLETION OF THE
PROJECT. IF THE STAGING AREA IS PAVED, IT SHALL BE RESTORED TO ITS ORIGINAL
CONDITION. IF THE STAGING AREA IS UNPAVED, IT SHALL BE RE-GRADED, TOPSOILED, SEEDED, AND MULCHED TO THE SATISFACTION OF THE ENGINEER. ALL COSTS ASSOCIATED WITH
RESTORATION OF THE STAGING AREA SHALL BE AT THE CONTRACTOR'S EXPENSE. IF THE
ENGINEER DETERMINES THAT A SATISFACTORY STAND OF GRASS DOES NOT EXIST AT THE
TIME OF FINAL INSPECTION, ALL COSTS ASSOCIATED WITH RE-ESTABLISHING A SATISFACTORY
STAND OF GRASS SHALL BE AT THE CONTRACTOR'S EXPENSE.
12. EQUIPMENT AND/OR STOCKPILE MATERIAL SHALL NOT BE STORED IN THE DRIPLINE AREA OF
ANY TREE.
13. THE CONTRACTOR SHALL PROVIDE TEMPORARY SEED AND MULCH FOR ALL AREAS WHERE
SOIL IS EXPOSED AND SILT FENCE IS NOT SPECIFIED, BY THE CLOSE OF EACH BUSINESS DAY.
14. THE CONTRACTOR SHALL MAINTAIN PUBLIC ROADS, STREETS AND PAVED TRAILS IN A BROOM
SWEPT CONDITION AT ALL TIMES.
15. PRIOR TO CONSTRUCTION, CONTRACTOR TO FIELD LOCATE AND RECORD ANY DAMAGE TO
EXISTING PAVING, SIDEWALK, CURB, OR STRUCTURES NOT TO BE REMOVED OR REPLACED,
ENGINEER TO VERIFY LOCATION AND EXTENT OF DAMAGE.
16. DAMAGE TO EXISTING PAVING, SIDEWALK, CURB, OR STRUCTURES NOT TO BE REPLACED OR
REMOVED DURING CONSTRUCTION SHALL BE IMMEDIATELY REPORTED TO ENGINEER.
CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGE WORK WITHOUT CHARGE TO THE
OWNER.
17. THE CONTRACTOR SHALL REMOVE AND IMMEDIATELY REPLACE, RELOCATE, RESET OR
RECONSTRUCT ALL OBSTRUCTIONS IN THE WORK AREA, INCLUDING, BUT NOT LIMITED TO,
MAILBOXES, SIGNS, LANDSCAPING, LIGHTING, PLANTERS, CULVERTS, DRIVEWAYS, PARKING
AREAS, CURBS, GUTTERS, FENCES, OR OTHER NATURAL OR MAN-MADE OBSTRUCTIONS.
18. MATERIALS AND CONSTRUCTION STANDARDS FOR STREETS, CURBS, GUTTERS AND
SIDEWALKS SHALL CONFORM TO BOROUGH STANDARDS. CONSTRUCTION AND INSTALLATION
OF ALL FACILITIES SHALL CONFORM TO BOROUGH SPECIFICATIONS AND BE SUBJECT TO
INSPECTION BY APPROPRIATE BOROUGH OFFICIALS.
19. ALL MATERIALS AND WORKMANSHIP WITHIN THE STATE OF PENNSYLVANIA RIGHT-OF-WAY
SHALL BE IN ACCORDANCE WITH CURRENT COMMONWEALTH OF PENNSYLVANIA DEPARTMENT
OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION.
20. ALL DISTURBED AREAS NOT IN THE PAVEMENT SHALL BE TOP-SOILED (6” MINIMUM), FERTILIZED, SEEDED AND MULCHED. IF SOD IS USED NEXT TO A PAVED TRAIL, CONTRACTOR SHALL GRADE
TOPSOIL ADJACENT TO THE TRAIL PRIOR TO PLACEMENT OF SOD TO ENSURE THAT SOD IS
PLACED FLUSH OR JUST BELOW EDGE OF TRAIL TO AVOID WATER PONDING ON THE TRAIL.
SITE PLAN
00 10' 20'
N. BROAD STREET ACCESS RESTORATION
N O
R
TH
CROSS SECTION A-A
00 10' 20'
-1 2-
B
ID
P
LA
N S
P M
A
FIN. GRADE
1(MIN)
A
A'
A
A'
1 1 (MIN)
3" CL.
VIRGIN SOIL(TYP)
16.4
22.0
6" AND 8"
BEARING SURFACE REQUIRED - SQ. FT.
THRUST BLOCKING FOR HORIZONTAL AND VERTICAL DOWNWARD THRUSTS
* 200 PSI WORKING PRESSURE
3.3
4.2
2.0
MUST BE ADJUSTED FOR TEST PRESSURES ABOVE 200 P.S.I.
SOIL TESTING AGENCY TO ESTABLISH ALLOWABLE BEARING PRESSURE BASED ON FIELD CONDITIONS.
D.E. DENOTES DEAD END AND APPLIES AT TEES AND PLUGS.
AND BEARING AREAS ARE TO BE ADJUSTED ACCORDINGLY.
(ALLOWANCES MUST BE MADE FOR SATURATED SOILS.)
8.2
ALLOWABLETYPE OF
BEARING
MATERIAL
SAND
SOFT CLAY
CLAY
SOFT ROCK
ROCK
NOTES:
SAND & GRAVEL
1(MIN)
LOAD **
TON/SQ FT
0.75
2.0
2.0
2.0
2.4
2.0
2.0
22.5
5.2
6.8
2.6
1 9.2
4.6
12.0
PIPE SIZES
DEGREE OF BEND OR DEFLECTION ***
69.1
51.8
13.0
10.4
3.5
25.9
FIN. GRADE
25.6
19.2
2.8
2.2
0.8
2.6
2.0
2.0
4.8
3.8
2.0
11.1
5.5
14.7
D.E.
10.0
5.0 9.6
22.5
13.4
6.1
5.0
1.6
8.8
7.0
2.4
6.6
5.3
2.0
D.E.
32.5
24.4
12.2
35.0
17.6
46.8
26.4
13.2
22.5
35.2
1 (MIN)
22.5
52.2
39.2
23.9
19.1
6.4
16.9
13.5
4.5
9.8
7.8
2.6
95.7
47.9
127.6
68.0
33.9 19.6
D.E.
90.3
34.5
27.6
9.2
18.7
14.9
5.0
24.4
19.5
6.5
183.9
137.9
69.0
74.7
37.3
99.5
97.5
48.8
D.E.
130.1
16", 18" AND 20"10" AND 12" 24"
4" CL.
MIN.
BEND
200 P.S.I. TEST PRESSURE
FOR VERTICAL UPWARD THRUST
LENGTH (FT.)
11.25
MINIMUM THRUST BLOCKING DIMENSIONS *
ALLOWANCES MUST BE MADE FOR SATURATED SOILS AND
SIZES ADJUSTED ACCORDINGLY.
4" CL.
TYP.
MIN.
HOOK (TYP.)
90 DEG.
STD. A.C.I.
18-20
6.5
6.0
SIZES
PIPE
6-8
10-12
14-16
(IN.)
4.0
4.5
5.5
DEPTH (FT.)
11.25
WIDTH (FT.)
14.0
13.0
10.0
7.5
6.5
6.0
8.0
6.5
11.5
4.5
5.0
8.0
22.5
3.0
4.0
5.0
7.5
9.58.0
7.0
6.5
5.0
4.5
5.5
6.5
4.0
5.0
6.0
22.5
3.0
4.0
5.0
11.25
7.5
8.07.0
7.0
5.0
6.0
6.5
4.0
6.0
5.5
22.5
DEGREE OF BEND OR DEFLECTION
WIDTH
2.5' MIN.
6"
3"
LENGTH
3"
6"
DEPTH
VERTICAL THRUST DOWNWARD
ELEVATION
HORIZONTAL THRUST
PLAN
SECTION A-A
SECTION A'-A'
NOTES:
1. CONCRETE SHALL HAVE 3,000 P.S.I. MINIMUM 28 DAY
COMPRESSIVE STRENGTH.
2. REINFORCING STEEL SHALL BE ASTM A-615, GRADE 60
3. COVER ALL FITTINGS AND JOINTS WITH POLYETHYLENE
FILM BEFORE PLACING CONCRETE
4. COAT ALL EXPOSED FERROUS SURFACES WITH TWO
COATS EPOXY, APPLIED PER MFG'S RECOMMENDATIONS.
5. CONCRETE MUST BEAR AGAINST VIRGIN SOIL.
6. KEEP CONCRETE CLEAR OF JOINTS AND LUGS.
7. FORM UNSUPPORTED AREAS OF CONCRETE.
BEARING AREA
VIRGIN SOIL (TYP.)
BEARING SURFACE AREA
VIRGIN SOIL
SECTION
ELEVATION
NOTES:
1. FOR 4" AND 6" PIPE, USE THREE # 4 BARS OVER FITTING ONLY.
2. FOR 8" THROUGH 20" PIPE, USE SIX # 6 BARS WITH TWO OVER FITTINGS AND FOUR OVER PIPES.
3. FOR 24" PIPE, USE SEVEN # 7 BARS AS SHOWN.
4. CONCRETE TO HAVE 3,000 P.S.I. MINIMUM 28 DAY COMPRESSIVE STRENGTH.
5. REINFORCING STEEL TO BE ASTM A-615, GRADE 60
6. COVER ALL FITTINGS AND JOINTS WITH POLYETHYLENE FILM BEFORE PLACING CONCRETE
7. COAT ALL EXPOSED FERROUS SURFACES WITH TWO COATS BITUMASTIC, APPLIED PER MFG'S RECOMMENDATIONS.
8. BEND REINFORCING BARS TO U SHAPE CONFORMING TO OUTSIDE PIPE DIAMETER.
9. KEEP CONCRETE CLEAR OF JOINTS AND LUGS.
10. FORM UNSUPPORTED AREAS OF CONCRETE.
CONCRETE THRUST BLOCKS FOR HORIZONTAL AND VERTICAL DOWNWARD THRUST
NOT TO SCALEW3
CONCRETE THRUST BLOCKS FOR VERTICAL UPWARD THRUST
NOT TO SCALEW4
BEND
FITTING
#6 DIA. BARS @ 9" O.C.
IN EACH DIRECTION
BEND
FITTING
B E
A R
IN
G
S U
R
FA
C E
A R
E A
B E
A R
IN
G
S U
R
FA
C E
A R
E A
4' M
IN
. C
O V
E R
4' M
IN
. C
O V
E R
WATER MAIN - BACKFILL & RESTORATION
NOT TO SCALEW2
PIPE O.D. + 24" (MIN.)
PIPE O.D.
EXISTING GRADE
BLUE WARNING TAPE TO
BE PLACED 18" ABOVE PIPE
WATER MAIN DEPTH,
SIZE, AND MATERIAL AS
SPECIFIED
AASHTO #57 STONE BEDDING
AND INITIAL BACKFILL
6" TOPSOIL (MIN.) AND SEED
OUTSIDE OF STREAMBANK
NOTES:
1. AASHTO #57 STONE SHALL BE USED TO REPLACE ALL UNSUITABLE SUBGRADES.
2. BACKFILL WITH EXCAVATED STREAMBED MATERIAL ACROSS BOTTOM OF
STREAMBED TO EXISTING STREAMBED ELEVATION. DO NOT INSTALL TOPSOIL WITHIN
STREAMBANKS
12"
MIN.
12"
MIN.
" M
IN
6" M
IN
SUITABLE BACKFILL
(SEE NOTE #2)
CURB SECTION
(SEE DETAIL)
COMPACTED 2A STONE
CLASS AA CONCRETE
COMPACTED SOIL OR UNDISTURBED EARTH
BROOM FINISH
NOTES:
· EXPANSION JOINTS SHALL BE LOCATED EVERY 20' O.C. MINIMUM.
· TOOLED CONTRACTION JOINTS SHALL BE LOCATED EVERY 5' O.C. MINIMUM.
· LIGHT BROOM FINSH SHALL BE APPLIED TO SIDEWALK IN THE DIRECTION OF THE WIDTH.
· SIDEWALK SHALL HAVE A 2% SLOPE TOWARD CURB UNLESS OTHERWISE APPROVED.
4" MIN.
4" MIN.
TOOLED/CUT CONTRACTION JOINT
PRE-MOLDED EXPANSION JOINT MATERIAL
RECESSED 1/4" FROM SURFACE
SIDEWALK SECTION
SIDEWALK JOINTS
CONCRETE CURB
CONTRACTION JOINT - SPACED
20'-0" MAX. TO 4'-0" MIN.
CONTRACTION JOINT TYPICAL CROSS SECTION
2" DEEP
3/16" WIDE
SAW CUT (2" DEEP
3/16" WIDE)
FINISHED GRADE 1/4" RADIUS 3/4" RADIUS
CLASS AA
CONCRETE
8"
7"
6"
CURB END TREATMENT
8"
10"
3'
2"
CONSTRUCTION JOINT
TOP OF STRAIGHT CURB
PAVEMENT SURFACE
20'
PAVEMENT
SURFACE
(SEE NOTE #1)
1/2" PREMOLDED EXPANSION JOINT
SEAL WITH EMULSIFIED ASPAHLT
END TRANSITION
NOTES:
1. ALL NEW CURB SHALL MATCH THE EXISTING TOP ELEVATION AND DIMENSIONS OF ANY
ABUTTING CURBING.
1/4" / 1' (TYP)
6X6 W2.1XW2.1 WELDED WIRE FABRIC
3" MIN. 3" MIN.
SUPERPAVE ASPHALT MIXTURE DESIGN,
HMA/WMA WEARING COURSE, PG 64-22, 3 TO <30
MILLION ESALS, 9.5 MM MIX,
2" DEPTH, SRL-H
2A COMPACTED STONE OR SUITABLE
SUBGRADE AS APPROVED BY THE ENGINEER,
8" DEPTH
TRAIL PAVING DETAIL
NOT TO SCALET1
CONCRETE SIDEWALK DETAIL
NOT TO SCALECS1
TYPICAL VERTICAL CURB DETAIL
NOT TO SCALEC1
6"
2-#4 BARS1-1/2" TYP
WATER BEND VERTICAL FITTING
CONCRETE THRUST
BLOCK (TYP.)
12" GATE VALVE
AND VALVE BOX
(TYP.)
12" WET TAP
(TYP.)
ONCE THE NEW WATER MAIN IS OPERATIONAL AND
EXISTING MAINS CAN BE ABANDONED. AT BOTH END OF
THE EXISTING MAIN, CLOSE THE 12" INSERTION VALVES,
REMOVE THE INSERTION VALVE BOXES, CUT AND CAP,
AND INSTALL CONCRETE THRUST BLOCKS.
WATER BEND
HORIZONTAL
FITTING
12" INSERTION
VALVE AND
VALVE BOX (TYP.)
WATER BEND
HORIZONTAL
FITTING
12" CAP (TYP.)
EXCAVATE, DEMOLISH, AND
DISPOSE EXISTING
ABANDONED WATER MAIN.
EX. 12" MAIN
WATER MAIN VERTICAL OFFSET AT STREAM CROSSING
NOT TO SCALEW1
STREAMBED
" M
IN
MECHANICAL RESTRAINED JOINTS
EXISTING GRADE
E X
IS
TI
N G
C O
V E
R
3/4" GALVANIZED
THREADED ROD
RESTRAINT
NOTES:
1. EBAA FITTINGS AND LENGTHS OF RESTRAINT SHALL BE VERIFIED USING
THE EBAA RESTRAINT LENGTH CALCULATOR AVAILABLE AT
http://rcp.ebaa.com/.
EXISTING GRADE
WATER BEND
VERTICAL FITTING
(TYP.)
CONCRETE
THRUST BLOCK
(TYP.)
WATER MAIN PLAN AT STREAM CROSSING
U:
\A cc ou nt s\K
ES
QB
\K
ES
QB
- R ed
C lay
C re ek W at er
M ain
L ow er ing
\D
ES
IG
N\
_S
HE
ET
S\
CS
TE
D:
/1
6/
:2
PM,
B
Y:
Pr inc e
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
: 11
CS6041
B Y
N O
D
A
TE
R E
V
IS
IO
N
S
KESQB25007
AS NOTED
WJK/PMA
2025-10-17
MJE
SHEET
APPROVED BY
OF3 8
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
A
LL
D
IM
E N
S
IO
N S
M U
S T
B E
V E
R
IF
IE
D
B Y
C O
N
TR
A C
TO
R
A N
D O
W N
E R
M U
S T
B E
N O
TI
FI
E D
O F
A N
Y D
IS
C
R E
P A
N C
IE
S
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
PE
N
N O
N I A
SS
O
C
IA
TE
S
IN
C
C hr is tia na
E xe cu tiv e C am pu s
C on tin en ta l D riv e, S ui te
N ew ar k, D E
3-
T
2.
5.
F
.6
.2
E A
S T
B R
A N
C H
O F
R E
D C
LA
Y
C R
E E
K W
A
TE
R M
A
IN
L O
W E
R
IN
G
N
O R
TH
W
A
LN
U T
R O
A D
K E
N N
E
TT
S Q
U A
R E
, P A
S O
U
TH
B R
O A
D S
TR
E
E T
K E
N N
E
TT
S Q
U A
R E
, P A
B O
R O
U G
H O
F K
E N
N E
TT
S
Q U
A R
E
W A
TE
R
A N
D S
IT
E
D E
TA
IL
S
-1 2-
B
ID
P
LA
N S
P
W
AT
ER
W
ORKS
D
RIV
E
TEMPORARY ROCK
CONSTRUCTION ENTRANCE
SEE SHEET CS8502 FOR DETAIL
GRAVEL PARKING LOT
CONCRETE WASHOUT FACILITIES
SEE SHEET CS8502 FOR DETAIL
PEDESTRIAN BRIDGETEMPORARY SANDBAG COFFERDAM
(OR EQUIVALENT)
SEE SHEET CS8502 FOR DETAIL
TEMPORARY SANDBAG COFFERDAM
(OR EQUIVALENT)
SEE SHEET CS8502 FOR DETAIL
DISCHARGE BYPASS INTO STABLE
AREA OF STREAMBED
TEMPORARY STOCKPILE
FLOW
PROTECTIVE MATS (AS NEEDED)
FOR WET AREAS
SEE SHEET CS8502 FOR DETAIL
LIMIT OF DISTURBANCE
13.090 SF (0.30 AC)
RED CLAY CREEK
EAST BRANCH OF
BYPASS PUMP
NO
RTH W
ALNUT STREET
HAZEL AVENUE
RICHARDS ROAD
EXISTING 12"
CAST IRON
WATER MAIN
PARKING
TEMPORARY STOCKPILE
(FOR SOUTH ACCESS)
TEMPORARY ROCK
CONSTRUCTION ENTRANCE
(FOR SOUTH ACCESS)
SEE SHEET CS8502 FOR DETAIL
NEW 12" DUCTILE
IRON CLASS 52
WATER MAIN PIPE
FLOODPLAIN
FLO
O
D W
AY
FLOODPLAIN
U:
\A cc ou nt s\K
ES
QB
\K
ES
QB
- R ed
C lay
C re ek W at er
M ain
L ow er ing
\D
ES
IG
N\
_S
HE
ET
S\
CS
TE
D:
/1
6/
:2
PM,
B
Y:
Pr inc e
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
: 11
CS8001
B Y
N O
D
A
TE
R E
V
IS
IO
N
S
KESQB25007
AS NOTED
WJK/PMA
2025-10-17
MJE
SHEET
APPROVED BY
OF4 8
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
A
LL
D
IM
E N
S
IO
N S
M U
S T
B E
V E
R
IF
IE
D
B Y
C O
N
TR
A C
TO
R
A N
D O
W N
E R
M U
S T
B E
N O
TI
FI
E D
O F
A N
Y D
IS
C
R E
P A
N C
IE
S
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
00 50' 100'
PE
N
N O
N I A
SS
O
C
IA
TE
S
IN
C
C hr is tia na
E xe cu tiv e C am pu s
C on tin en ta l D riv e, S ui te
N ew ar k, D E
3-
T
2.
5.
F
.6
.2
N O
R
TH
E A
S T
B R
A N
C H
O F
R E
D C
LA
Y
C R
E E
K W
A
TE
R M
A
IN
L O
W E
R
IN
G
N
O R
TH
W
A
LN
U T
R O
A D
K E
N N
E
TT
S Q
U A
R E
, P A
S O
U
TH
B R
O A
D S
TR
E
E T
K E
N N
E
TT
S Q
U A
R E
, P A
B O
R O
U G
H O
F K
E N
N E
TT
S
Q U
A R
E
E R
O S
IO
N
S
E D
IM
E
N
TA
TI
O
N P
O
LL
U
TI
O N
C O
N
TR
O L
P
LA
N -N
O R
TH
A
C C
E
-1 1-
FE
M
A D
E
LI
N E
A
TE
D F
LO
O
D W
A Y
A N
D F
LO
O
D P
LA
IN
C O
N S
TR
U
C
TI
O N
N O
TE
S
P M
A
ACCESS TO NORTH SIDE OF CREEK
ENTER PARK FROM N. WALNUT STREET
-1 2-
B
ID
P
LA
N S
P
PEDESTRIAN BRIDGE
TEMPORARY SANDBAG COFFERDAM
(OR EQUIVALENT)
SEE SHEET CS8502 FOR DETAIL
TEMPORARY SANDBAG COFFERDAM
(OR EQUIVALENT)
SEE SHEET CS8502 FOR DETAIL
DISCHARGE BYPASS INTO STABLE
AREA OF STREAMBED
TEMPORARY STOCKPILE
TEMPORARY STOCKPILE
(FOR NORTH ACCESS)
FLOW
PROTECTIVE MATS (AS NEEDED)
FOR WET AREAS
SEE SHEET CS8502 FOR DETAIL
BYPASS PUMP
NO
RTH BRO
AD STREET
EAST LINDEN STREET
ELM
STR
EET
N O
R
TH
W
ILLO
W
STR
EET
EXISTING 12" CAST IRON
WATER MAIN
TEMPORARY ROCK
CONSTRUCTION ENTRANCE
SEE SHEET CS8502 FOR DETAIL
LIMIT OF DISTURBANCE
13,090 SF (0.30 AC)
RED CLAY CREEK
EAST BRANCH OF
PROTECTIVE MATS (AS NEEDED)
FOR SIDEWALK
SEE SHEET CS8502 FOR DETAIL
NEW 12" DUCTILE IRON
CLASS 52 WATER MAIN PIPE
330340
FLOODPLAIN
FLO
O
D W
AY
FLOODPLAIN
FLOODPLAIN
FLOODWAY
U:
\A cc ou nt s\K
ES
QB
\K
ES
QB
- R ed
C lay
C re ek W at er
M ain
L ow er ing
\D
ES
IG
N\
_S
HE
ET
S\
CS
TE
D:
/1
6/
:2
PM,
B
Y:
Pr inc e
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
: 11
CS8002
B Y
N O
D
A
TE
R E
V
IS
IO
N
S
KESQB25007
AS NOTED
WJK/PMA
2025-10-17
MJE
SHEET
APPROVED BY
OF5 8
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
A
LL
D
IM
E N
S
IO
N S
M U
S T
B E
V E
R
IF
IE
D
B Y
C O
N
TR
A C
TO
R
A N
D O
W N
E R
M U
S T
B E
N O
TI
FI
E D
O F
A N
Y D
IS
C
R E
P A
N C
IE
S
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
00 50' 100'
PE
N
N O
N I A
SS
O
C
IA
TE
S
IN
C
C hr is tia na
E xe cu tiv e C am pu s
C on tin en ta l D riv e, S ui te
N ew ar k, D E
3-
T
2.
5.
F
.6
.2
N O
R
TH
E A
S T
B R
A N
C H
O F
R E
D C
LA
Y
C R
E E
K W
A
TE
R M
A
IN
L O
W E
R
IN
G
N
O R
TH
W
A
LN
U T
R O
A D
K E
N N
E
TT
S Q
U A
R E
, P A
S O
U
TH
B R
O A
D S
TR
E
E T
K E
N N
E
TT
S Q
U A
R E
, P A
B O
R O
U G
H O
F K
E N
N E
TT
S
Q U
A R
E
E R
O S
IO
N
S
E D
IM
E
N
TA
TI
O
N P
O
LL
U
TI
O N
C O
N
TR
O L
P
LA
N -S
O U
TH
A
C C
E
-1 1-
FE
M
A D
E
LI
N E
A
TE
D F
LO
O
D W
A Y
A N
D F
LO
O
D P
LA
IN
C O
N S
TR
U
C
TI
O N
N O
TE
S
P M
A
ACCESS TO SOUTH SIDE
OF CREEK
FROM N. BROAD STREET
-1 2-
B
ID
P
LA
N S
P
EROSION AND SEDIMENT CONTROL NOTES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS
WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE
APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED,
SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT
THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE
NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO
IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY
REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND
APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE
ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR
OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER,
APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE
PCSM PLAN PREPARER (IF APPLICABLE), THE LICENSED PROFESSIONAL
RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION
OF THE PCSM PLAN (IF APPLICABLE), AND A REPRESENTATIVE FROM THE
CHESTER CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION
MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE
ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE
PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT
1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND
UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE
WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION
FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE
LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO
IMPLEMENTATION.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF
TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER
OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO
THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION
SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL
STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE
PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR
THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS
DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER
AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON
THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED
OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE
STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE
AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL
EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH
STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN
DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE
SLOPES SHALL BE 2H:1V OR FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES
POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT
POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST
MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION
AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION
DISTRICT AND/OR THE REGIONAL OFFICE OF THE DEPARTMENT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE
SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE
DEPARTMENT’S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA.
CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS
OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED,
BURIED, DUMPED, OR DISCHARGED AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN
APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE
DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL
BROUGHT ON SITE IS CLEAN FILL.FORM FP-001 MUST BE RETAINED BY THE
PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR
RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL
DUE TO ANALYTICAL TESTING.
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE
ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN, OVER
UNDISTURBED VEGETATED AREAS.
14. VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT
DIRECTLY FROM LOT. VEHICLES AND EQUIPMENT MAY ONLY ENTER AND
EXIT THE CONSTRUCTION SITE VIA A STABILIZED ROCK CONSTRUCTION
ENTRANCE FROM THE LOCAL DRIVE.
15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL
BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS
OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND
ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE
WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING,
RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED
IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED,
REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE
REQUIRED.
16. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS
ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL
BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY
AGENCY OFFICIALS AT THE TIME OF INSPECTION.
17. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL
BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK
DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO
CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY
ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
18. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE
MANNER DESCRIBED ON THE PLAN DRAWINGS.
19. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM
DEPTH OF 3 TO 5 INCHES — 6 TO 12 INCHES ON COMPACTED SOILS —
PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL
HAVE A MINIMUM 6 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND
MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF
TOPSOIL.
20. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION,
SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS.
FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS,
ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL
REQUIREMENTS OR CODES.
21. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO
EXCEED 8 INCHES IN THICKNESS.
22. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS,
SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD
INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
23. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE
MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
24. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
25. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE
HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR
SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
26. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY
UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK
AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50
FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN
DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF
THIS PLAN.
27. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY
AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE
ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR
PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN.
AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1
YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY
STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE
REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE
WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
28. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM,
PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT
NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST
ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF
RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
29. EROSION AND SEDIMENT BMPS MUST BE CONSTRUCTED, STABILIZED,
AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE
TRIBUTARY AREAS OF THOSE BMPS. E&S BMPS SHALL REMAIN
FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE
PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER
BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE
DEPARTMENT.
30. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS
TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE
REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION
DISTRICT OR THE DEPARTMENT.
31. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND
PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER
AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION
DISTRICT FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE
E&S BMPS.
32. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY
EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO
PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS.
AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS
SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID
REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS
ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
33. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND
PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER
AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION
DISTRICT TO SCHEDULE A FINAL INSPECTION.
34. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT
SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR
FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE
OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL
PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN
SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN
STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES,
UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN
MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
35. CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED
ON THE PLAN DRAWINGS. IN NO CASE SHALL IT BE ALLOWED TO ENTER
ANY SURFACE WATERS OR GROUNDWATER SYSTEMS.
36. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT
NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED
SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION
MATERIAL/WASTES.
37. UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL
SHALL BE IMMEDIATELY BACKFILLED AND THE CHANNEL RESTORED TO
ITS ORIGINAL CROSS-SECTION AND PROTECTIVE LINING. ANY BASE FLOW
WITHIN THE CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE
MANNER DESCRIBED IN THIS PLAN UNTIL SUCH RESTORATION IS
COMPLETE.
38. CHANNELS HAVING RIPRAP, RENO MATTRESS, OR GABION LININGS MUST
BE SUFFICIENTLY OVER-EXCAVATED SO THAT THE DESIGN DIMENSIONS
WILL BE PROVIDED AFTER PLACEMENT OF THE PROTECTIVE LINING.
39. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES
3H:1V OR STEEPER WITHIN 50 FEET OF A SURFACE WATER AND ON ALL
OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL
SHEETS.
40. FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER
WOODY VEGETATION, ORGANIC MATERIAL, LARGE STONES, AND OTHER
OBJECTIONABLE MATERIALS.
41. ALL AREAS REQUIRING TEMPORARY STABILIZATION MUST BE ADDRESSED
WITHIN 14 DAYS OF COMPLETION OF DISTURBANCE. SEEDING SHALL BE
ACCOMPLISHED THROUGH THE USE OF HYDRO-SEEDING TECHNIQUES OR
CONVENTIONAL SEEDING AND MULCHING AT THE RATE OF 3.0 TONS/ACRE.
42. POLLUTANTS SUCH AS FUELS, LUBRICANTS, BITUMENS, RAW SEWAGE
AND OTHER HARMFUL MATERIALS SHALL NOT BE DISCHARGED INTO OR
NEAR RIVERS, STREAMS AND IMPOUNDMENTS, OR INTO NATURAL OR
MANMADE CHANNELS LEADING THERETO.
43. ALL APPLICABLE REGULATIONS OF FISH AND WILDLIFE AGENCIES AND
STATUTES RELATING TO THE PREVENTION AND ABATEMENT OF
POLLUTION SHALL BE COMPLIED WITHIN THE PERFORMANCE OF THE
CONTRACT.
44. PROVIDE FACILITIES FOR CLEANING TIRES. THE TIRES OF ALL VEHICLES
SHALL BE CLEANED PRIOR TO LEAVING THE SITE. AT THE END OF EACH
CONSTRUCTION DAY, THE CONTRACTOR SHALL CLEAN AND REMOVE ANT
MUD OR SEDIMENT THAT HAS BEEN TRACKED ONTO PUBLIC ROADS AND
OUTSIDE THE LIMITS OF CONSTRUCTION.
45. THE CONTRACTOR SHALL NOT STOCKPILE EQUIPMENT, TOPSOIL,
MATERIALS, ETC. IN OTHERWISE UNDISTURBED LAWN AREAS, AND AREAS
INDICATED FOR THE PRESERVATION OF EXISTING VEGETATION.
46. THE CONTRACTOR SHALL FLAG THE LIMIT OF DISTURBANCE PRIOR TO
CONSTRUCTION.
47. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THERE IS
SUFFICIENT TEMPORARY COVER ON ALL PIPING DURING CONSTRUCTION
TO PREVENT DAMAGE TO PIPES.
48. THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH
THE PROVISIONS OF THE APPENDIX 64, EROSION CONTROL RULES AND
REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL
PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES,
ARTICLE III, WATER RESOURCES, CHAPTER 102, EROSION CONTROL. ALL
CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF
CHAPTER 102, EROSION CONTROL OF THE ADMINISTRATIVE CODE TITLE
25 OF THE STATE OF PENNSYLVANIA.
49. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION
CONTROLS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST
INCLUDE INSPECTIONS AND DOCUMENTATION OF ALL EROSION AND
SEDIMENTATION CONTROLS AFTER EACH STORM EVENT AND ON A
WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK,
INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING,
RE-SEEDING, RE-MULCHING, AND RE-NETTING, MUST BE PERFORMED
IMMEDIATELY.
50. ANY DISTURBED AREA ON WHICH ACTIVITY HAS CEASED AND WHICH WILL
REMAIN EXPOSED FOR MORE THAN 14 DAYS MUST BE SEEDED AND
MULCHED IMMEDIATELY. DURING NON-GERMINATING PERIODS, MULCH
MUST BE APPLIED AT THE RECOMMENDED RATES. DISTURBED AREAS
WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED
WITHIN 1 YEAR MAY BE SEEDED AND MULCHED WITH A QUICK GROWING
TEMPORARY SEED MIXTURE AND MULCH. DISTURBED AREAS WHICH ARE
EITHER AT FINISHED GRADE OR WILL NOT BE RE-DISTURBED WITHIN 1
YEAR MUST BE SEEDED AND MULCHED WITH A PERMANENT SEED
MIXTURE AND MULCH. AREA MULCHED DURING THE NON-GERMINATING
PERIOD OF OCTOBER 15 TO APRIL 1 MUST BE LIMED, FERTILIZED, SEEDED
AND MULCHED BY APRIL 20.
51. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE
OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE
DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA.
CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR
SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING
MATERIAL OR WASTES AT THE SITE.
52. ALL PUMPING OF SEDIMENT LADEN WATER OR POTENTIALLY SEDIMENT
LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS
A PUMPED WATER FILTER BAG DISCHARGING OVER NON-DISTURBED
AREAS. IF GROUNDWATER IS ENCOUNTERED DURING EXCAVATION, A
PUMPED WATER FILTER BAG (SEE DETAIL) IS TO BE INSTALLED BEFORE
EXCAVATION CAN PROCEED.
53. UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH
DISTURBANCE ACTIVITY, OR ANY STAGE THEREOF, THE PROJECT SITE
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROPRIATE TEMPORARY
OR PERMANENT STABILIZATION.
54. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY
EROSION AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS
DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED.
55. BEFORE INITIATING ANY REVISION TO THE APPROVED EROSION AND
SEDIMENT CONTROL PLAN OR REVISIONS TO OTHER PLANS WHICH MAY
AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN,
THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE
ENGINEER. THE OPERATOR SHALL ASSURE THAT THE APPROVED
EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY
IMPLEMENTED. IMMEDIATELY UPON DISCOVERING UNFORESEEN
CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION
AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT
APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE POTENTIAL
FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
56. PEM WETLAND SEED MIX SHALL BE USED FOR SEEDING IN ALL EXISTING
WETLAND AREAS. PERMANENT LAWN RESTORATION MIX SHALL BE USED
IN ALL EXISTING UPLANDS AREAS.
57. TIMBER OR COMPOSITE MATS OR APPROVED WETLANDS ACCESS
MATERIALS SHALL BE UTILIZED IN WETLANDS AND OTHER SOFT AREAS.
MAINTENANCE NOTES:
1. THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND
SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY
IMPLEMENTED. UNTIL THE SITE IS STABILIZED, ALL EROSION AND
SEDIMENTATION BMP'S MUST BE MAINTAINED PROPERLY.
MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND
SEDIMENTATION BMP'S AFTER EACH RUNOFF EVENT AND ON A
WEEKLY BASIS. ALL SITE INSPECTIONS SHALL BE DOCUMENTED IN AN
INSPECTION REPORT LOG KEPT FOR THIS PURPOSE. THE
COMPLIANCE ACTIONS AND THE DATE, TIME AND NAME WILL BE KEPT
ON THE SITE AT ALL TIMES AND MADE AVAILABLE TO THE DISTRICT
UPON REQUEST.
ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING
CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING,
REMULCHING AND RENETTING, MUST BE PERFORMED IMMEDIATELY.
IF EROSION AND SEDIMENTATION BMP'S FAIL TO PERFORM AS
EXPECTED, REPLACEMENT BMP'S OR MODIFICATIONS OF THOSE
INSTALLED WILL BE NEEDED.
WHERE BMP'S ARE FOUND TO FAIL TO ALLEVIATE EROSION OR
SEDIMENT POLLUTION THE PERMITTEE OR CO-PERMITTEE SHALL
INCLUDE THE FOLLOWING INFORMATION:
a. THE LOCATION AND SEVERITY OF THE BMP'S FAILURE AND ANY
POLLUTION EVENTS.
b. ALL STEPS TAKEN TO, REDUCE, ELIMINATE AND PREVENT THE
RECURRENCE OF THE NON-COMPLIANCE.
c. THE TIME FRAME TO CORRECT THE NON-COMPLIANCE, INCLUDING
THE EXACT DATES WHEN THE ACTIVITY WILL RETURN TO
COMPLIANCE.
2. SEEDED AREAS THAT HAVE WASHED AWAY SHALL BE FILLED AND
GRADED, AS NECESSARY, AND THEN RESSEDED. A STRAW COVER
SHALL BE APPLIED TO RETAIN THE SEED ALONG WITH AN ANCHORING
METHOD UNTIL IT HAS A CHANCE TO ROOT PROPERLY.
3. SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN
LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS,
FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED,
OR PLACED IN TOPSOIL STOCKPILES.
U:
\A cc ou nt s\K
ES
QB
\K
ES
QB
- R ed
C lay
C re ek W at er
M ain
L ow er ing
\D
ES
IG
N\
_S
HE
ET
S\
CS
TE
D:
/1
6/
:3
PM,
B
Y:
Pr inc e
ST
YL
E:
Pe nn on i N
CS
.st b
PR
OJ
EC
T
ST
AT
US
: 11
CS8501
B Y
N O
D
A
TE
R E
V
IS
IO
N
S
KESQB25007
AS NOTED
WJK/PMA
2025-10-17
MJE
SHEET
APPROVED BY
OF6 8
DRAWN BY
DRAWING SCALE
DATE
PROJECT
ALL DOCUMENTS PREPARED BY PENNONI ASSOCIATES
ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED
TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON
THE EXTENSIONS OF THE PROJECT OR ON ANY OTHER
PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION
OR ADAPTATION BY PENNONI ASSOCIATES FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS
SOLE RISK AND WITHOUT LIABILITY OR LEGAL
EXPOSURE TO PENNONI ASSOCIATES; AND OWNER
SHALL INDEMNIFY AND HOLD HARMLESS PENNONI
ASSOCIATES FROM ALL CLAIMS, DAMAGES, LOSSES AND
EXPENSES ARISING OUT OF OR RESULTING THEREFROM.
A
LL
D
IM
E N
S
IO
N S
M U
S T
B E
V E
R
IF
IE
D
B Y
C O
N
TR
A C
TO
R
A N
D O
W N
E R
M U
S T
B E
N O
TI
FI
E D
O F
A N
Y D
IS
C
R E
P A
N C
IE
S
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
PE
N
N O
N I A
SS
O
C
IA
TE
S
IN
C
C hr is tia na
E xe cu tiv e C am pu s
C on tin en ta l D riv e, S ui te
N ew ar k, D E
3-
T
2.
5.
F
.6
.2
E A
S T
B R
A N
C H
O F
R E
D C
LA
Y
C R
E E
K W
A
TE
R M
A
IN
L O
W E
R
IN
G
N
O R
TH
W
A
LN
U T
R O
A D
K E
N N
E
TT
S Q
U A
R E
, P A
S O
U
TH
B R
O A
D S
TR
E
E T
K E
N N
E
TT
S Q
U A
R E
, P A
B O
R O
U G
H O
F K
E N
N E
TT
S
Q U
A R
E
E R
O S
IO
N
S
E D
IM
E
N
TA
TI
O
N P
O
LL
U
TI
O N
C O
N
TR
O L
N O
TE
-1 2-
B
ID
P
LA
N S
P
EXISTING ROADWAY
PROFILE
PLAN VIEW
NOTES:
REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND ROCK OVER
FULL WIDTH OF ENTRANCE.
RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO
ENTERING ROCK CONSTRUCTION ENTRANCE.
MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED AND PROPER PIPE COVER AS SPECIFIED BY MANUFACTURER IS NOT OTHERWISE PROVIDED. PIPE SHALL BE SIZED
APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED.
MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON
ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 50 FOOT INCREMENTS UNTIL
CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.
EXISTING ROADWAY
MOUNTABLE
BERM (6 IN. MIN.)*
EARTH FILL
PIPE AS NECESSARY
GEOTEXTILE
EXISTING
GROUND
MIN 8" AASHTO #1
* MOUNTABLE BERM USED TO
PROVIDE PROPER COVER FOR PIPE
50' (MIN)
M
IN
M
IN
M
IN
3'
50' (MIN)
MATERIAL TYPE 3 mil HDPE 5 mil HDPE 5 mil HDPE
MULTI-FILAMENT
POLYPROPYLENE
(MFPP)
HEAVY DUTY
MULTI-FILAMENT
POLYPROPYLENE
(HDMFPP)
MATERIAL
CHARACTERISTICS PHOTODEGRADABLE PHOTODEGRADABLE BIODEGRADABLE PHOTODEGRADABLE PHOTODEGRADABLE
SOCK DIAMETERS 12"
18"
12" 18" 24" 32"
12" 18" 24" 32"
12" 18" 24" 32"
12" 18" 24" 32"
MESH OPENING 3/8" 3/8" 3/8" 3/8" 1/8"
TENSILE STRENGTH 26 PSI 26 PSI 44 PSI 202 PSI
ULTRAVIOLET
STABILITY %
ORIGINAL
STRENGTH
(ASTM G-155)
23% AT 1000 HR. 23% AT 1000 HR. 100% AT 1000 HR. 100% AT 1000 HR.
MINIMUM
FUNCTIONAL
LONGEVITY
6 MONTHS 9 MONTHS 6 MONTHS 1 YEAR 2 YEARS
TWO-PLY SYSTEMS
INNER CONTAINMENT NETTING
HDPE BIAXIAL NET
CONTINUOUSLY WOUND
FUSION-WELDED JUNCTURES
3/4" X 3/4" MAX APERTURE SIZE
OUTER FILTRATION MESH
COMPOSITE POLYPROPYLENE FABRIC (WOVEN LAYER AND
NON-WOVEN FLEECE MECHANICALLY FUSED VIA NEEDLE PUNCH)
3/16" MAX APERTURE SIZE
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS
ORGANIC MATTER CONTENT 25 % - 100% (DRY WEIGHT BASIS)
ORGANIC PORTION FIBROUS AND ELONGATED
pH 5.5 - 8.5
MOISTURE CONTENT 30% - 60%
PARTICLE SIZE 30% - 50% PASS THROUGH 3/8" SLEVE
SOLUBLE SALT CONCENTRATION 5.0 dS/m (MMHOS/CM) MAX
TABLE 4.1 - COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
TABLE 4.2 - COMPOST STANDARDS
FL
O
W FLO
W
DISTURBED AREA
UNDISTURBED AREA
SECTION
PLAN VIEW
EXISTING
CONTOURS
COMPOST
FILTER SOCK
2 IN. x 2 IN.
WOODEN STAKES
PLACED 10 FT ON
CENTER
2 IN. x 2 IN. WOODEN STAKES
PLACED 10 FT ON CENTER
COMPOST FILTER SOCK
BLOWN/PLACED
FILTER MEDIA
DISTURBED AREA
UNDISTURBED AREA
NOTES:
SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST
SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.
COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE
OF ITS TRIBUTARY AREA.
TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.
ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE
SOCK AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF
INSPECTION.
BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER’S
RECOMMENDATIONS.
UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND
THE MULCH SPREAD AS A SOIL SUPPLEMENT.
IN
M
IN
CONCRETE WASHOUT FACILITIES DETAIL
NOT TO SCALE
STANDARD CONSTRUCTION DETAIL #3-1
ROCK CONSTRUCTION ENTRANCE
NOT TO SCALE
FILTER BAG
WELL VEGETATED, GRASSY AREA
FILTER BAG
PLAN VIEW
ELEVATION VIEW
NOTES:
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL
SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE
OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL
BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL
PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2
FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE
THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE
REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO
STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE
UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER
STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES
GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND
NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST
BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV
WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA
IS NOT AVAILABLE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED
BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED
FOR THIS PURPOSE.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY
THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND
SCREENED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL
CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
PROPERTY TEST METHOD MINIMUM STANDARD
AVG. WIDE WIDTH
STRENGTH ASTM D-4884 60 LB/IN
GRAB TENSILE ASTM D-4632 205 LB
PUNCTURE ASTM D-4833 110 LB
MULLEN BURST ASTM D-3786 350 PSI
UV RESISTANCE ASTM D-4355 70%
AOS % RETAINED ASTM D-4751 80 SIEVE
INTAKE HOSE
PUMP
CLAMPS
DISCHARGE HOSE
HEAVY DUTY LIFTING STRAPS
(RECOMMENDED)
INTAKE
HOSE
PUMP
CLAMPS
DISCHARGE HOSEWELL VEGETATED,
GRASSY AREA
STANDARD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .