About this file

This is a bid drawings document prepared by Keystone Engineering Group for New Freedom Borough in York County, Pennsylvania, detailing the construction specifications for Wellhouse No. 1 Upgrades. The project encompasses a 14' x 14' brick masonry addition to the existing wellhouse, duplex ion exchange softening treatment units, outdoor backup power generation with automatic transfer switch, heating and ventilation improvements, flow metering and control valves with analytical equipment, a tempered water eyewash station, a 4' x 4' vault with access hatch at the entry to the 24-inch chlorine contact pipe, and various piping modifications including a new sanitary drain. The construction project has an expected duration of 300 days, with sealed bids due September 2, 2026 at 10:00 am through the PennBid Program. The drawings include detailed specifications for foundation and wall construction, concrete masonry unit (CMU) reinforcement, overhead door installations, isolation joint details, and a comprehensive pipe and equipment legend identifying all components such as strainers, test plugs, water meters, ball valves, control valves, check valves, flow meters, chemical injection tees, static mixers, softener media vessels, brine tanks, and softener control valves with associated power and interlock cable connections.

The bidding documents are available through the PennBid designated website at https://pennbid.bonfirehub.com, where prospective bidders are urged to register as plan holders to receive official notifications, addenda, and periodic updates. All Bidding Documents, including addenda and other relevant information, will be distributed exclusively through the designated website, with neither the Owner nor Engineer assuming responsibility for documents obtained from alternative sources. The drawings provided are dated July 2026 and prepared by Keystone Engineering Group located in Seaford, Delaware, and include multiple sheets covering general site plans, civil details, structural details, demolition plans, and mechanical/electrical specifications necessary for bidders to prepare comprehensive construction cost estimates.

View the file

Other files

File Type Posted
1-Project Manual - Wellhouse No. 1 Upgrades.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WELLHOUSE NO. 1 UPGRADES

NEW FREEDOM BOROUGH

YORK COUNTY, PENNSYLVANIA

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

W W

W W

W W

W W

W W

S S S S S S S S S

S S

S S

S S

S S

S S

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

W W

W W

W W

W W

W W

S S S S S S S S S

S S

S S

S S

S S

S S

FS

24FS

24FS

LODLODLODLODLODLODLODLODLODLODLODLODLODLOD

LOD

LOD

LO

D

LO

D

LO

D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD

LOD LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

3/ 8ʺ

3/4ʺ

JOINT SEALANT DETAIL

NO SCALE

DETAIL - CONNECTION TO EX FOOTING

NO SCALE

FOUNDATION AND FOUNDATION WALL DETAIL

NO SCALE

ISOLATION JOINT DETAIL

NO SCALE

OVERHEAD DOOR - HEAD

OVERHEAD DOOR - JAMB

OVERHEAD DOOR - SILL

NO SCALE

NO SCALE

NO SCALE

DETAIL - CMU CORNER REINFORCING

NO SCALE

DETAIL - WALL

NO SCALE

1'-0ʺ

DETAIL - LADDER REINFORCING SPLICE

NO SCALE

DETAIL - TYPICAL LINTEL

NO SCALE

M

M

PIPE/ EQUIPMENT LEGEND

A 2" STRAINER

B TEST PLUG

C 1" WATER METER

D 1" BALL VALVE

E 1" CONTROL VALVE (MANUAL OPERATION)

F 1" x 2" REDUCER

G 2" CHECK VALVE

H 2" BALL VALVE

J PIPE SUPPORT

K 2" FLOW METER SEE ITEM FIT-200 DWG E-2

L 2" FLOW METER SEE ITEM FIT-100 DWG E-2

M 2" TEE FOR PRESSURE SENSOR, PRESSURE GAUGE, AND VALVE FOR RAW WATER SAMPLE

N TEE (CHEMICAL INJECTION - CAUSTIC). CONTRACTOR TO CONNECT TO EX AS NEEDED.

O TEE (CHEMICAL INJECTION - SODIUM HYPO). CONTRACTOR TO CONNECT TO EX AS

NEEDED.

P 2" TEE WITH VALVE AND HOSE TO FILL DAY TANKS. CONNECT TO EX AS NEEDED.

Q STATIC MIXER (FLANGED)

R 2" x 6" REDUCER

S SOFTENER MEDIA VESSEL

T BRINE TANK

U SOFTENER CONTROL VALVE (POWER AND INTERLOCK CABLE BETWEEN 2 VALVES) SEE

ITEMS FCV-100 AND FCV200 DWG E-2

V 1" BACKWASH DISCHARGE SEE NOTE 1

W 1" BRINE FEED AND BRINE TANK REFILL LINE

X 2" SOFTENER SYSTEM FLOW METER (POWER AND INTERLOCK CABLE TO SOFTENER CONTROL

VALVE

kegi.net

Keystone E N G I N E E R I N G G R O U P

Seaford, Delaware

(302) 291-9093

JULY 2026

N

Keystone E N G I N E E R I N G G R O U P

Seaford, Delaware

E N G I N E E R I N G G R O U P

Seaford, Delaware

E N G I N E E R I N G G R O U P

Seaford, Delaware

01 G-1-G-1
02 03 C-1A -1B-C1A ex
02 03 C-1A -1B-C1B prop
04 C-2-C-2 Details
05 C-3-C-3 E&S Details
06 08 S-1 S-3-S-1
06 08 S-1 S-3-S-2
06 08 S-1 S-3-S-3
09 D-1-D-1 Demo
10 11 M-1 M-2-M-1
10 11 M-1 M-2-M-2
12 15 E-1 E-4
E-1
E-1
E-2
E-2
E-3
E-3
E-4
E-4

File details come from the government source that posted it. Updated .