Summary: Technical Specifications for Tooele County Landscape Redesign Phase I
This document comprises comprehensive technical specifications prepared by Great Basin Engineering, Inc. for Tooele County's Landscape Redesign Phase I project in Ogden, Utah, dated May 18, 2023. The specifications detail all requirements for a complete landscape renovation project including selective site and structure demolition, electrical systems installation, site clearing and grading, concrete paving, irrigation system installation, and landscape planting. The project encompasses multiple divisions of work: demolition of selected buildings and site elements; installation of electrical infrastructure including conduit, wiring, lighting fixtures, and controls; earthwork and site preparation; concrete pavement for driveways, parking lots, walkways, and curbs; a complete irrigation system with valves, piping, sprinkler heads, and automated controls; and new landscape planting with specified plant materials, topsoil amendments, and establishment period maintenance. The specifications require compliance with the National Electrical Code, International Building Code, American Society for Testing and Materials standards, and local ordinances. All work must be performed by qualified contractors with minimum five years of experience on similar projects, and submittals including shop drawings, product data, and test reports must be provided for approval prior to installation.
Pricing and contract terms are not specified in these technical specifications, as they function as the detailed design and construction requirements document rather than the procurement solicitation itself. The document establishes quality assurance requirements including independent testing agencies for concrete and soil materials, mandatory pre-installation conferences, and comprehensive field quality control testing. The project includes a one-year warranty period for all installed work, with contractors responsible for replacing defective materials and correcting workmanship defects. Contractors are required to provide extra materials including spare sprinkler heads, quick couplers, valve keys, and irrigation tubing. The specifications require detailed record drawings and operation and maintenance manuals to be submitted at substantial completion. Landscape establishment includes a three-month maintenance period with specific watering, mowing, fertilizing, and plant replacement requirements, with all costs for maintenance and replacements included in the contract price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-DF26-09 Landscape and Ramp Construction.pdf | ||
| 3-Attachment D Ramp Design Plans.pdf | ||
| 4-Attachment C Landscape Design Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL
SPECIFICATIONS
FOR
TOOELE COUNTY
LANDSCAPE REDESIGN
PHASE I
TOOELE COUNTY
PREPARED BY
GREAT BASIN ENGINEERING, INC.
OGDEN, UTAH
22N511
MAY 18, 2023
Attachment: B
Table of Contents Tooele Landscape Redesign Phase 1 Tooele County
Table of Contents - PAGE 1
TABLE OF CONTENTS
SECTION ITEM
02 4119 Selective Site and Structure Demolition 26 0500 Electrical General Provisions 26 0502 Electrical Submittals and Spare Parts 26 0507 Electrical Connections for Equipment 26 0519 Conductors and Cables 26 0526 Grounding 26 0529 Supporting Devices 26 0532 Conduit Raceways 26 0533 Electrical Boxes and Fittings 26 0548 Electrical Seismic Control 26 0553 Electrical Identification 26 0726 Wiring Devices 26 2815 Overcurrent Protective Devices 26 4119 Demolition 26 5100 Interior and Exterior Building Lighting 26 5600 Exterior Area Lighting 31 0700 General Site Construction Requirements 31 1000 Site Clearing 31 2000 Earth Moving 32 1313 Concrete Paving 32 8400 Irrigation Systems 32 9000 Landscape Planting 33 0500 Common Work Results for Utilities 33 4100 Storm Utility Drainage Piping
TOOELE COUNTY – LANDSCAPE REDESIGN PHASE 1
SELECTIVE SITE AND STRUCTURE DEMOLITION
\024119 - 1
SECTION 024119 - SELECTIVE SITE AND STRUCTURE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:.
1. Demolition and removal of selected buildings or structures.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
B. Related Sections include the following:
1. Division 01 Section "Summary" for use of premises, and phasing, and Owner-occupancy requirements.
2. Division 01 Section "Photographic Documentation" for preconstruction photographs taken before selective demolition operations.
3. Division 01 Section "Temporary Facilities and Controls" for temporary construction and environmental-protection measures for selective demolition operations.
4. Division 01 Section "Cutting and Patching" for cutting and patching procedures.
5. Division 01 Section "Construction Waste Management and Disposal" for disposal of demolished materials.
6. Division 02 Section "Structure Demolition" for demolition of entire buildings, structures, and site improvements.
7. Division 31 Section "Site Clearing" for site clearing and removal of above- and below-grade improvements.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
\024119 - 2
1.4 MATERIALS OWNERSHIP
A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to Owner that may be encountered during selective demolition remain Owner's property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to Owner.
1. Coordinate with Owner who will establish special procedures for removal and salvage.
1.5 SUBMITTALS
A. Qualification Data: For demolition firm.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's other tenants' on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Locations of proposed dust- and noise-control temporary partitions and means of egress, including for other tenants affected by selective demolition operations.
6. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
7. Means of protection for items to remain and items in path of waste removal from building.
C. Inventory: After selective demolition is complete, submit a list of items that have been removed and salvaged.
D. Pre-demolition Photographs or Videotapes: Show existing conditions of adjoining construction and site improvements, including finish surfaces, that might be misconstrued as damage caused by selective demolition operations. Comply with Division 01 Section "Photographic Documentation." Submit before Work begins.
E. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.
1. Comply with submittal requirements in Division 01 Section "Construction Waste Management and Disposal."
1.6 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.
B. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
\024119 - 3
C. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
D. Standards: Comply with ANSI A10.6 and NFPA 241.
E. Pre-demolition Conference: Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination." Review methods and procedures related to selective demolition including, but not limited to, the following:
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review structural load limitations of existing structure.
3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
5. Review areas where existing construction is to remain and requires protection.
6. Review shoring plans and methods of shoring placement.
1.7 PROJECT CONDITIONS
A. The property is expected to be vacant. Field verify that the property has been vacated and that any owner property has been removed. Neighbors will occupy adjacent properties. Conduct selective demolition so neighborhood operations will not be disrupted.
1. Comply with requirements specified in Division 01 Section "Summary."
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before selective demolition, Owner will remove the items to be salvaged by the owner.
Coordinate other items with the architect.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. Hazardous materials will be removed by Owner before start of the Work or have been removed by Owner under a separate contract.
2. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Architect and Owner. Owner will remove hazardous materials under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
\024119 - 4
1.8 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to Architect.
E. Engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective demolition operations.
F. Survey of Existing Conditions: Record existing conditions by use of measured drawings, preconstruction photographs, preconstruction videotapes, and templates.
1. Comply with requirements specified in Division 01 Section "Photographic Documentation."
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
G. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage during selective demolition operations.
1. Comply with requirements for existing services/systems interruptions specified in Division 01 Section "Summary."
B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
\024119 - 5
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. Arrange to shut off indicated utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
4. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.
a. Where entire wall is to be removed, existing services/systems may be removed with removal of the wall.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Comply with requirements for access and protection specified in Division 01 Section "Temporary Facilities and Controls."
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Division 01 Section "Temporary Facilities and Controls."
C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
\024119 - 6
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.
5. Maintain adequate ventilation when using cutting torches.
6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
7. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
9. Dispose of demolished items and materials promptly. Comply with requirements in
Division 01 Section "Construction Waste Management and Disposal."
B. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area on-site.
5. Protect items from damage during transport and storage.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals, using power-driven saw, then remove concrete between saw cuts.
B. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, then break up and remove.
\024119 - 7
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Division 01 Section "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.8 SELECTIVE DEMOLITION SCHEDULE
A. Coordinate with architect’s plans.
END OF SECTION 024119
ELECTRICAL GENERAL PROVISIONS 26 0500-1
© BNA Consulting
SECTION 26 0500
ELECTRICAL GENERAL PROVISIONS
PART 1 – GENERAL
1.1 RELATED DOCUMENTS:
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section.
B. Architectural, Structural, Mechanical and other applicable documents are considered a part of the electrical documents insofar as they apply as if referred to in full. Contractor must review the entire set of plans and specifications. Reviewing only the electrical set is not acceptable.
1.2 DESCRIPTION OF WORK:
A. The extent of electrical work is indicated on drawings and/or specified in Divisions 26, 27 and 28 sections of the specification. Provide all labor, materials, equipment, supervision and service necessary for a complete electrical system. Work includes, but is not necessarily limited to, the following items.
ITEM SECTION
1. Electrical General Provisions 26 0500
2. Electrical Submittals and Spare Parts 26 0502
3. Electrical Connections for Equipment 26 0507
4. Conductors and Cables 26 0519
5. Grounding 26 0526
6. Supporting Devices 26 0529
7. Conduit Raceway 26 0532
8. Electrical Boxes and Fittings 26 0533
9. Electrical Seismic Control 26 0548
10. Electrical Identification 26 0553
11. Wiring Devices 26 2726
12. Overcurrent Protective Devices 26 2815
13. Demolition 26 4119
14. Interior and Exterior Building Lighting 26 5100
15. Exterior Area Lighting 26 5600
B. Use of standard industry symbols together with the special symbols, notes, and instructions indicated on the drawings describe the work, materials, apparatus and systems required as a portion of this work.
C. Visit the site during the bidding period to determine existing conditions affecting electrical and other work. All costs arising from site conditions and/or preparation shall be included in the base bid. No additional charges will be allowed due to inadequate site inspection.
1.3 DEFINITION OF TERMS
A. The following terms used in Divisions 26, 27 and 28 documents are defined as follows:
1. "Provide": Means furnish, install and connect, unless otherwise indicated.
2. "Furnish": Means purchase and deliver to project site.
3. "Install": Means to physically install the items in-place.
4. "Connect": Means make final electrical connections for a complete operating piece of equipment.
ELECTRICAL GENERAL PROVISIONS 26 0500-2
© BNA Consulting
1.4 RELATED SECTIONS:
A. Consult all other sections, determine the extent and character of related work and properly coordinate work specified herein with that specified elsewhere to produce a complete installation.
B. General and Supplementary Conditions: Drawings and general provisions of contract and Division 1 of the Specifications, apply to all Division 26, 27 and 28 sections.
C. Earthwork:
1. Provide trenching, backfilling, boring and soil compaction as required for the installation of underground conduit, buried cable, in-grade pull boxes, manholes, lighting pole foundations, etc. See Division 31, Sitework, and other portions of Divisions 26, 27 and 28, for material and installation requirements.
D. Miscellaneous Metal Work:
1. Provide fittings, brackets, backing, supports, rods, welding and pipe as required for support and bracing of raceways, lighting fixtures, panelboards, distribution boards, switchboards, motor controls centers, etc. See Division 5, Metals for material and installation requirements.
E. Moisture Protection:
1. Provide membrane clamps, sheet metal flashing, counter flashing, caulking and sealants as required for waterproofing of conduit penetrations and sealing penetrations in or through fire walls, floors and ceiling slabs and foundation walls.
All penetrations through vapor barriers at slabs on grade shall be taped and made vapor tight. See Division 7, Thermal and Moisture Protection for material and installation requirements.
F. Painting:
1. Provide surface preparation, priming and finish coating as required for electrical cabinets, exposed conduit, pull and junction boxes, poles, surface metal raceways, etc. See Division 9, Finishes for material and installation requirements.
1.5 WORK NOT INCLUDED IN THIS DIVISION:
A. Items of work provided under another contract include, but are not necessarily limited to, the following:
1. Telephone cables and electronic equipment.
2. Data system cables, fittings, coverplates and electronic equipment.
3. Control wires for irrigation control valves.
4. Energy management/temperature control system; both line and low voltage including conductors and conduit.
5. Television monitors and projection equipment.
6. Security system equipment, cables, fittings, and coverplates.
7. CCTV cabling and electronic equipment.
8. MATV cabling and electronic equipment
1.6 INTERPRETATION OF DRAWINGS AND SPECIFICATIONS:
A. Before bidding, Contractor shall familiarize himself with the drawings, specifications and project site. Submit requests for clarification to Architect/Engineer in writing prior to issuance of final addendum. After signing the contract, the Contractor shall meet the intent, purpose, and function of the Contract Documents. Any costs of materials, labor and equipment arising therefrom, to make each system complete and operable, is the responsibility of the Contractor.
ELECTRICAL GENERAL PROVISIONS 26 0500-3
© BNA Consulting
1.7 QUALITY ASSURANCE:
A. Reference to codes, standards, specifications and recommendations of technical societies, trade organizations and governmental agencies refers to the latest edition of such publications adopted and published prior to submittal of the bid proposed, unless noted otherwise herein. Such codes or standards are considered a part of this specification as though fully repeated herein.
B. When codes, standards, regulations, etc. allow work of lesser quality or extent than is specified under this Division, nothing in said codes shall be construed or inferred as reducing the quality, requirements or extent of the Drawings and Specifications. Perform work in accordance with applicable requirements of all governing codes, rules and regulations including the following minimum standards, whether statutory or not:
1. National Electric Code (NEC).
2. International Building Code (IBC).
3. International Fire Code (IFC).
4. International Mechanical Code (IMC).
C. Standards: Comply with the following standards where applicable for equipment and materials specified under this Division.
1. UL Underwriters' Laboratories
2. ASTM American Society for Testing Materials
3. CBN Certified Ballast Manufacturers
4. IPCEA Insulated Power Cable Engineers Association
5. NEMA National Electrical Manufacturer's Association
6. ANSI American National Standards Institute
7. ETL Electrical Testing Laboratories
D. All electrical apparatus furnished under this Section shall conform to (NEMA) standards and the NEC and bear the Underwriters' Laboratories (UL) label where such label is applicable.
E. Comply with requirements of State and Local Ordinances. If a conflict occurs between these requirements and the Contract Documents, the most stringent requirements shall govern. The Contractor accepts this responsibility upon submitting his bid, and no extra charge will be allowed after the contract is awarded. This shall not be construed as relieving the Contractor from complying with any requirements of the Contract Documents that may be in excess of the aforementioned requirements, and not contrary to same.
F. Obtain all permits, inspections, etc. required by authority having jurisdiction. Include all fees in bid. Furnish a certificate of approval to the Owner's Representative from the Inspection Authority at completion of the work.
G. Employ only qualified craftsmen with at least three years of experience. Workmanship shall be neat, have a good mechanical appearance and conform to best electrical construction practices. Provide a competent superintendent to direct the work at all times. Any person found incompetent shall be discharged from the project and replaced by satisfactory personnel.
H. Contractor shall have a current state contracting license applicable to type of work to be performed under this contract.
1.8 CONSTRUCTION CHANGE ORDER PROPOSALS
A. In the event that a submission of a change order is issued by the contractor, the following information will be required to be submitted by the contractor, prior to any consideration by the owner/architect.
a. Where project manager or project engineer work is required, the labor cost shall not exceed 2% of the electrical portion of the change order.
ELECTRICAL GENERAL PROVISIONS 26 0500-4
© BNA Consulting
b. All equipment, including conduit and wire, shall be itemized, identifying unit costs and quantities of equipment. Distributor quotes shall accompany all change order requests. The distributor quotes shall include costs for all equipment including conduit and wire. Lot pricing for equipment is not acceptable.
c. The general contractor shall review and confirm that the quantity and costs of materials submitted appear reasonable for the scope proposed.
d. Labor units shall not exceed base NECA #1 standards. No adjustment factors shall be approved.
e. Any research and labeling time, shall be the responsibility of the electrical contractor and shall not be included in the change order request.
f. Any costs associated with the purchase of tools or transportation shall be fully itemized for review by architect/owner.
g. Overtime rates shall only be approved where additional manpower cannot achieve the same result.
h. Change order form shall follow the following format:
i. PCO number
ii. Detailed description of work being performed
iii. Location on project where work is performed
iv. Chosen NECA column
v. Identified material:
1. QTY
2. Unit cost
3. Mark up
4. Material total
vi. Identified labor:
1. QTY
2. Unit cost
3. Composite labor rate
4. Labor total
1.9 RECORD DRAWINGS:
A. Maintain, on a daily basis, a complete set of “Record Drawings”, reflecting an accurate record of work in accordance with the following:
1. Show the complete routing and location of all feeders rated 100 amps and larger.
Locate work buried below grade or under slab, work concealed above ceilings, and work in concealed spaces, dimensionally from fixed structural elements (not partition walls, etc.)
2. Show the complete routing and location of all telecommunications conduits, systems raceways, and empty raceways, 1-1/4" and larger. Locate work buried below grade or under slab, work concealed above ceilings, and work in concealed spaces, dimensionally from fixed structural elements (not partition walls, etc.).
3. Show all changes, deviations, addendum items, change orders, job instructions, etc., that change the work from that shown on the contract documents, including wall relocations, fixtures and device changes, branch circuiting changes, etc.
Where locations of boxes, raceways, equipment, etc. are adjusted in the field to fit conditions, but such new locations may not be obvious by referring to the contract document, show new locations on the record drawings.
B. At the discretion of the Architect/Engineer, the drawings will be reviewed on a periodic basis and used as a pre-requisite for progress payments. This requirement shall not be construed as authorization for the Contractor to make changes in the layout, or work without written authorization for such changes. The “Record Drawings” for daily recording shall consist of a set of blue line prints of the Contract Drawings.
C. Upon completion of the work, purchase a complete set of electronic drawings. Transfer all “Record” information from the blue line prints to the drawings via the current CAD program that it was written. The Architect/Engineer shall review the drawings and the Contractor
ELECTRICAL GENERAL PROVISIONS 26 0500-5
© BNA Consulting shall incorporate the resulting comments into the final record drawings. The Contractor shall make two complete copies of the drawings electronically and forward this to the Engineer.
D. Certify the “Record Drawings” for correctness by placing and signing the following certifications of the first sheet of the drawings:
"CERTIFIED CORRECT (3/8" high letters)
(Name of General Contractor)
By: Date:
(Name of Electrical Contractor)
By: Date:
1.10 GUARANTEE:
A. Ensure that electrical system installed under this contract is in proper working order and in compliance with drawings, specifications, and/or authorized changes. Without additional charge, replace any work or materials that develop defect, except from ordinary wear and tear, within one year from the date of substantial completion. Exception: Incandescent and fluorescent lamps shall be guaranteed for a period of two months from the date of substantial completion.
1.11 OTHER:
A. Right to Hire. “Client” agrees that during the project and for a period of twenty four (24) months following substantial completion that it will not, directly or indirectly, employ or solicit to employ BNA Personnel.
PART 2 – PRODUCTS
2.1 GENERAL:
A. Products are specified by manufacturer name, description, and/or catalog number.
Discrepancies between equipment specified and the intended function of equipment shall be brought to the attention of the Architect/Engineer in writing prior to bidding. Failure to report any conflict, including catalog numbers, discontinued products, etc., does not relieve the Contractor from meeting the intent of the contract documents nor shall it change the contract cost. If the Contractor is unable to interpret any part of the plans and/or specifications, or should he find discrepancies therein, he shall bring this to the attention of the Architect/Engineer who will issue interpretation and/or additional instructions to Bidders before the project is bid.
2.2 MANUFACTURERS:
A. Provide products of manufacturers specified. Manufacturers catalog numbers and descriptions establish the quality of product required. Substitutions will be considered if a duplicate written application (2-copies) is at the office of the Architect/Engineer eight (8) working days prior to the day of the bidding. The application shall include the following: 1) A statement certifying that the equipment proposed is equal to that specified; that it has the same electrical and physical characteristics, compatible dimensions, and meets the functional intent of the contract documents; 2) The specified and submittal catalog numbers of the equipment under consideration; 3) A pictorial and specification brochure.
B. Any conflict arising from the use of substituted equipment shall be the responsibility of the Contractor, who shall bear all costs required to make the equipment comply with the intent of the contract documents.
ELECTRICAL GENERAL PROVISIONS 26 0500-6
© BNA Consulting
C. Samples may be required for non-standard or substituted items before installation during construction. Provide all samples as required.
D. No materials or apparatus may be substituted after the bid opening except where the equipment specified has been discontinued.
E. Provide only equipment specified in the Contract Documents or approved by addendum.
2.3 SPARE PARTS:
A. Provide spare parts (fuses, diffusers, lamps, etc.) as specified. Transmit all spare parts to Owner's Representative prior to substantial completion.
PART 3 – EXECUTION
3.1 INSTALLATION:
A. Layout electrical work in advance of construction to eliminate unnecessary cutting, drilling, channeling, etc. Where such cutting, drilling, or channeling becomes necessary for proper installation; perform with care. Use skilled mechanics of the trades involved. Repair damage to building and equipment at no additional cost to the contract. Cutting work of other Contractors shall be done only with the consent of that Contractor. Cutting structural members shall not be permitted.
B. Provide equipment enclosures appropriate to the environment to which they are installed.
For example, provide NEMA 3R for exterior enclosures and NEMA 1 for interior enclosures unless otherwise noted.
C. Since the drawings of floor, wall, and ceiling installation are made at small scale; outlets, devices, equipment, etc., are indicated only in their approximate location unless dimensioned. Locate outlets and apparatus symmetrically on floors, walls and ceilings where not dimensioned, and coordinate such locations with work of other trades to prevent interferences. Verify all dimensions on the job. Do not scale the electrical drawings, but refer to the architectural and mechanical shop drawings and project drawings for dimensions as applicable.
D. Perform for other trades, the electrical wiring and connection for all devices, equipment or apparatus. Consult Architectural, Mechanical, and other applicable drawings, and all applicable shop drawings to avoid switches, outlets, and other equipment from being hidden behind doors, cabinets, counters, heating equipment, etc., or from being located in chalkboards, tackboards, glass panels, etc. Relocate buried electrical devices and/or connections as directed at no additional cost.
E. Coordinate the location of outlets, devices, connections, and equipment with the supplier of the systems furniture prior to rough-in.
F. Where conduit, outlets or apparatus are to be encased in concrete, it must be located and secured by a journeyman or foreman present at the point of installation. Check locations of the electrical items before and after concrete and/or masonry installation and relocate displaced items.
G. Provide block-outs, sleeves, demolition work, etc., required for installation of work specified in this division.
3.2 CLEAN:
A. Clean up all equipment, conduit, fittings, packing cartons and other debris that is a direct result of the installation of the work of this Division.
B. Clean fixtures, interiors and exteriors of all equipment, and raceways. Replace all filters in electrical equipment upon request for Substantial Completion.
ELECTRICAL GENERAL PROVISIONS 26 0500-7
© BNA Consulting
3.3 POWER OUTAGES:
A. All power outages required for execution of this work shall occur during non-standard working hours and at the convenience of the Owner. Include all costs for overtime work in bid.
B. Submit written request at least 7 days in advance of scheduled outage and proceed with outage only after receiving authorization from the Owner's Representative.
C. Keep all outages to an absolute minimum.
3.4 STORAGE AND PROTECTION OF MATERIALS:
A. Provide storage space for storage of materials and apparatus and assume complete responsibility for all losses due to any cause whatsoever. In no case shall storage interfere with traffic conditions in any public thoroughfare or constitute a hazard to persons in the vicinity. Protect completed work, work underway, and apparatus against loss or damage.
3.5 EXCAVATING FOR ELECTRICAL WORK:
A. General: Locate and protect existing utilities and other underground work in manner that will ensure that no damage or service interruption will result from excavating and backfilling.
Perform excavation in a manner that protects walls, footings, and other structural members from being disturbed or damaged in any way. Burial depths must comply with NEC Section 300-5 (or State of Utah requirement, whichever is more stringent), unless noted otherwise on drawings.
B. Protect persons from injury at excavations, by barricades, warnings and illumination.
C. Coordinate excavations with weather conditions, to minimize possibility of washouts, settlements and other damages and hazards.
D. Provide temporary covering or enclosure and temporary heat as necessary to protect bottoms of excavations from freezing and frost action. Do not install electrical work on frozen excavation bases or sub-bases.
E. Do not excavate for electrical work until the work is ready to proceed without delay, so that total time lapse from excavation to completion of backfilling will be minimum. See other sections of specification for additional requirements for excavating.
F. Store excavated material (temporarily) near excavation, in a manner that will not interfere with or damage excavation or other work. Do not store under trees (within drip line).
G. Retain excavated material that complies with requirements for backfill material. Dispose of excavated material that is either in excess of quantity needed for backfilling or does not comply with requirements for backfill material. Remove unused material from project site, and dispose of in lawful manner.
3.6 BACKFILL MATERIALS:
A. For buried conduit or cable (other than below slab-on-grade, or concrete encased) - 2" thickness of well graded sand on all side of conduit or cable.
B. For trench backfill to within 6" of final grade - soil material suitable for compacting to required densities.
C. For top 6" of excavation - Top soil.
D. Backfill excavations in 8" high courses of backfill material, uniformly compacted to the following densities (percent of maximum density, ASTM D 1557), using power-driven hand-operated compaction equipment.
1. Lawn/Landscaped Areas: 85 percent for cohesive soils, 95 percent for cohesionless soils.
ELECTRICAL GENERAL PROVISIONS 26 0500-8
© BNA Consulting
2. Paved Areas, Other than Roadways (90 percent for cohesive soils, 95 percent for cohesionless soils).
E. Subsidence: Where subsidence is measurable or observable at electrical work excavations during general project warranty period, remove surface (pavement, lawn or other finish), add backfill material, compact, and replace surface treatment. Restore appearance, quality and condition of the surface or finish to match adjacent work, and eliminate evidence of restoration to greatest extent possible.
3.7 CONCRETE BASES:
A. Concrete bases shall be provided under Divisions 26, 27 and 28. Coordinate size and location of all bases and furnish all required anchor bolts, sleeves, reinforcing and templates as required to obtain a proper installation.
3.8 FIRE PENETRATION SEALS:
A. Seal all penetrations for work of this section through fire rated floors, walls and ceilings to prevent the spread of smoke, fire, toxic gas or water through the penetration either before, during or after fire. The fire rating of the penetration seal shall be at least that of the floor, wall or ceiling that it is installed, so that the original fire rating of the floor or wall is maintained as required by Article 300-21 of the National Electrical Code. Where applicable, provide OZ Type CFSF/I and CAFSF/I fire seal fittings for conduit and cable penetrations through concrete and masonry walls, floors, slabs, and similar structures. Where applicable, provide 3M CID cast-in device for floor slabs. Where applicable, provide 3M fire barrier sealing penetration system, and/or IPC Flame Safe Fire Stop System, and/or Chase Foam fire stop system, including wall wrap, partitions, caps, and other accessories as required. All materials to comply with UL 1479 (ASTM E-814). Comply with manufacturer's instructions and recommendations for installation of sealing fittings and barrier sealing systems.
3.9 PROJECT FINALIZATION AND START-UP:
A. Upon completion of equipment and system installation, assemble all equipment Factory Representatives and Subcontractors for system start-up.
B. Each Representative and Subcontractor shall assist in start-up and check out their respective system and remain at the site until the total system operation is accepted by the Owner's representative.
C. The Factory Representative and/or System Subcontractor shall give personal instruction on operating and maintenance of their equipment to the Owner's maintenance and/or operation personnel. To certify acceptance of operation and instruction by the Owner's Representative, the contractor shall prepare a written statement as follows:
1. This is to certify that the Factory Representative and System Subcontractor for each of the systems listed below have performed start-up and final check out of their respective systems.
2. The Owner's Representative has received complete and thorough instruction in the operation and maintenance of each system.
SYSTEM FACTORY REPRESENTATIVE
(List systems included) (List name and address of Factory Representative)
Owner's Representative Contractor
D. Send copy of acceptance to Architect/Engineer.
http://solutions.3m.com/wps/portal/3M/en_US/fire-protection-systems-NA/?WT.mc_id=www.3m.com/firestop http://solutions.3m.com/wps/portal/3M/en_US/fire-protection-systems-NA/?WT.mc_id=www.3m.com/firestop
ELECTRICAL GENERAL PROVISIONS 26 0500-9
© BNA Consulting
3.10 FINAL REVIEW:
A. At the time of final review, the project foreman shall accompany the reviewing party, and remove coverplates, panel covers and other access panels as requested, to allow review of the entire electrical system.
END OF SECTION 26 0500
ELECTRICAL GENERAL PROVISIONS 26 0500-10
© BNA Consulting
BLANK PACE
ELECTRICAL SUBMITTALS AND SPARE PARTS 26 0502-1
SECTION 26 0502
ELECTRICAL SUBMITTALS, O & M MANUALS AND SPARE PARTS
PART 1 – GENERAL
1.1 RELATED DOCUMENTS:
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to all Division 26, 27 and 28 sections.
B. Architectural, Structural, Mechanical and other applicable documents are considered a part of the electrical documents insofar as they apply as if referred to in full. Contractor must review the entire set of plans and specifications. Reviewing only the electrical set is not acceptable.
C. Consult all other sections, determine the extent and character of related work and properly coordinate work specified herein with that specified elsewhere to produce a complete installation.
1.2 SUBMITTAL REQUIREMENTS:
A. GENERAL:
1. After the Contract is awarded but prior to ordering, manufacture, or installation of any equipment, prepare complete Submittals including shop drawings, product data, brochures, etc. for materials and equipment as required by each section of the specification.
2. Review of Submittals shall not relieve the Contractor of responsibility for dimensions and/or errors that may be contained therein, or deviations from the Contract Document's requirements. It shall be clearly understood that the noting of some errors but overlooking others does not grant the Contractor permission to proceed in error. Regardless of any information contained in the Shop Drawings and Brochures, the requirements of the Contract Document's shall govern and are not waived, or superseded in any way by the review of the Shop Drawings and Brochures.
3. Submittals are reviewed, not approved. Comments made within submittals do not alter the contract documents in any way. The contractor is still responsible, regardless of comments (if any) made within submittals, for complying with drawings and specifications.
4. Notify engineer in writing if any of the comments noted in the submittals alter the contract cost. A comment within the submittal process which increases/decreases cost of product is not an authorization to the contractor under any circumstances to proceed.
5. Notify engineer of any modifications between contract documents and submittals.
It is the responsibility of the contractor to ensure compliance.
6. ELECTRONIC SUBMITTAL REQUIREMENTS:
a. Provide submittals in Portable Document Format (PDF).
b. Documents must be electronically bookmarked by Division e.g. 26, 27 and 28, Specification section e.g. 26 0510 and individually for each item submitted for light fixtures, switchgear, transformer, panelboard etc. and keyword searchable using Adobe Acrobat (http://www.adobe.com/acrobat) or Bluebeam Revu (http://www.bluebeam.com) for each relevant section.
http://www.adobe.com/acrobat http://www.bluebeam.com/
ELECTRICAL SUBMITTALS AND SPARE PARTS 26 0502-2
c. Electronically highlight all options for light fixtures, electrical equipment, etc. Manual highlighting and scanning of the documents is NOT acceptable and will NOT be reviewed.
d. Provide only completed cutsheets for all fixture and equipment types.
Blank cutsheets submitted with a schedule are NOT acceptable and will NOT be reviewed.
e. At the time of submission, the electrical contractor shall provide a complete and comprehensive submission of all required specification sections/shop drawings at the same time. Exceptions may be given, with prior approval, for time-sensitive equipment.
f. A maximum of one submittal per specification section is allowed. It is NOT acceptable to provide a product by product submittal. Single product by product submittals will NOT be reviewed.
B. SCHEDULING
1. GENERAL
a. A minimum period of two weeks, exclusive of transmittal time, will be required each time Submittals are submitted or resubmitted for review.
This time period shall be considered by the Contractor when scheduling submittal data.
b. If the shop drawings are rejected twice, the contractor shall reimburse the engineering firm the sum of $1,200.00 for the third review and any additional reviews required prior to the commencement of additional review.
C. QUALITY ASSURANCE
1. PRE-SUBMITTAL PREPARATION
a. Prior to submission of the Shop Drawings and Project Data, review and certify that they are in compliance with the Contract Documents. Verify all dimensional information to ensure proper clearance for installation of equipment.
b. Shop drawings requiring the use of electronic documents (floor plans, Lighting plans, fire alarm plans, etc.) shall be requested via a request for information (RFI) through the general contractor. Electronic documents will be provided to the Architect for distribution. No direct vendor requests will be accepted.
c. Contractor is completely responsible for the content of the submittal
2. SUBMITTAL REQUIREMENTS
a. Provide a stamp or statement on each submittal as follows:
i. I hereby certify that this Shop Drawing and/or Brochure has been checked prior to submittal and that it complies in all respects with the requirements of the Contract Drawings and Specifications for this Project.
(Name of Electrical Subcontractor)
Name .
Position Date .
i. Failure to provide certification will result in submittals being rejected and returned without review.
b. Brochures to be submitted as supplementary information shall be published by the Manufacturers and shall contain complete and detailed
ELECTRICAL SUBMITTALS AND SPARE PARTS 26 0502-3
engineering and dimensional information. Brochures submitted shall contain only information relevant to the particular equipment or materials to be furnished. The Contractor shall not submit catalogs that describe several different items in addition to those items to be used, unless all irrelevant information is marked out, or unless relevant information is clearly marked. Brochures from each manufacturer shall be identified and submitted separately.
c. Shop Drawings shall be done in an easily legible scale and shall contain sufficient plans, elevations, sections, and isometrics to clearly describe the equipment or apparatus, and its location. Drawings shall be prepared by an Engineer/Draftsmen skilled in this type of work. Shop Drawings shall be drawn to at least 1/4" = 1'0" scale.
d. Observe the following rules when submitting the Shop Drawings and Brochures.
i. Each Shop Drawing shall indicate in the lower right hand corner, and each Brochure shall indicate on the front cover the following: Title of the sheet or brochure, name and location of the building; names of the Architect and Electrical Engineer, Contractor, Subcontractors, Manufacturer, Supplier/Vendor, etc., date of submittal, and the date of correction and revision. Unless the above information is included the submittal will be rejected and returned without being reviewed.
1. Submittal Identification shall include the following:
a. A unique number, sequentially assigned, shall be noted on the transmittal form accompanying each item submitted.
b. Original submittal numbers shall have the following format: “XXX-Y;” where “XXX” is the originally assigned submittal number and “Y” is a sequential letter assigned for resubmittals (for example, A, B, or C being the first, second, and third resubmittals, respectively).
Submittal 25B, for example, is the second resubmittal of Submittal 25.
D. POST-SUBMITTAL
1. Check all materials and equipment after arrival on the job site and verify compliance with the Contract Documents.
1.3 PROVIDE SUBMITTALS AS REQUESTED FOR EACH OF THE SECTIONS LISTED BELOW:
A. 26 0519 Conductors and Cables
1. (600V and Below)
a. Submit megohmmeter test data for circuits under 600 volts. Megger all circuits of 100 amp and greater rating.
B. 26 0526 Grounding
1. Submit the name of test agency to be used for testing specified in this section.
Submit results of tests specified in this section. Also include test results in Operation and Maintenance Manuals as specified.
ELECTRICAL SUBMITTALS AND SPARE PARTS 26 0502-4
C. 26 0548 Electrical Seismic Control
1. A single submittal shall be provided for all seismic anchorage and restraints for all Division 26 equipment and systems provided as part of this project.